HomeMy WebLinkAboutItem 4.05 Building & Safety Consultants
CITY CLERK
File # D[BIa[Q]-ln]~
AGENDA STATEMENT
CITY COUNCIL MEETING DATE: April 4, 2006
SUBJECT:
Annual Review of Existing Building and Safety Consultants
Report Prepared by Gregory Shreeve Sr., Building Official
ATTACHMENTS:
I)
2)
Projected 2006-2007 Building & Safety Workload
Workload & Performance Measures - Historical Data
RECOMMENDATION: ~ Approve continuation of contracts with Linhart, Petersen, Powers
,.... U and Associates (LP2A), 4LeafInc., Precision Inc., CSG Consultants
~ Inc., and Berryman & Hennigar for Building and Safety Services for
the City of Dublin in Fiscal Year 2006-2007
FINANCIAL STATEMENT:
In Fiscal Year 2006-2007 it is projected that 26,800 hours of
inspection, plan check and specialized services will be required.
Only those hours required will be billed. Based on these projected
hours of service the annual cost of these contracts will be
$ 2,178,320 Funding will be included in the Fiscal Year 2006-2007
Preliminary Budget.
DESCRIPTION:
Since July 1995, the City of Dublin has contracted with the firm LP2A for primary Building and Safety
Services. Due to an increase in construction activity and a tight labor market, LP2A was unable to fill
critical positions in building inspections. As a result, in Fiscal Year 2001-2002, the City of Dublin
contracted with the firm 4Leaflnc. for Building and Safety Services. The City added the firms of
Precision Inc. and CSG Consultants Inc. in June 2003, and the firm Berryman & Hennigar in September
2004 for overflow work. Due to cyclical construction activity, the City has found that this type of contract
arrangement best suits the City's needs.
Current Contract Staff Levels provided to the City by each company includes the following:
. LP2A - One (1) In-House Plans Examiner (Engineer) and off site plan review services;
. 4LeafInc - Two (2) Supervising Building Inspectors, Two (2) Commercial Inspectors and Eight
(8) Residential Building Inspectors; and
----~--------------------------------------------------------------------------------------------------------
COpy TO: In-House Distribution
Page I of2
ITEM NO.~
G:\Agendas\2006\cc annual review of building contracts.doc
. CSG, Precision and Berryman & Hennigar currently do not have staff assigned at the City of
Dublin.
The Consultants' work has been responsive to the City's needs. Customer requests on the phone and over
the counter have been handled quickly and efficiently
In Fiscal Year 2006-2007, Staff projects that contract services will be as follows:
. One (I) full time In-House Plans Examiner;
. Two (2) full time Supervising Inspectors;
. Two and one-half (2.5) full time Commercial Inspectors;
. Six and nine-tenths (6.9) full time Residential Inspectors; and
. In addition, additional off-site plans examiner services will be required.
The assumptions used in estimating service needs are outlined in Attachment 1 A summary of historical
workload data is provided in Attachment 2.
The City Council authorized a rate increase of approximately 6 percent for each of the various hourly
services starting July I, 2005 at the May 17, 2005 City Council meeting and authorized a new rate
schedule for LP2A that started on January I, 2006 at the December 20,2005 City Council meeting. These
rate schedules shall remain in effect for the 2006-2007 Fiscal Year. Staff will review the cost of the
various services during the Fiscal Year 2007 -2008 budget cycle.
RECOMMENDATION:
Staff recommends that the City Council approve the continuation of contracts with Linhart, Petersen,
Powers and Associates (LP2A), 4LeafInc., Precision Inc., CSG Consultants Inc., and Berryman &
Hennigar for Building and Safety Services for the City of Dublin in Fiscal Year 2006-2007
Page 2 of2
/01 :l
PROJECTED 2006-2007
BUILDING AND SAFETY WORKLOAD
Estimated Valuation
$ 300,843,998
Estimated number of permits
1,971
Estimated number of Inspections
35,226
Total Estimated new dwelling units issued
877
Total Estimated dwelling units finaled
1,291
Number of hours for inspection, plan review,
26,800
Sil!nificant Proiects
Transit Center
Avalon Bay
Elan by D R Horton
Metropolitan by D R Horton
Camilla Place by EAH
Fairway Ranch
Multi- Family Apartments
Senior Apartments
Tralee by Pinn Brothers
Silveria Ranch by Pinn Brothers
Manors
Estates
Villas
Schaefer Ranch
Sonata by Standard Pacific Homes
Sorrento - Area F by Toll Brothers
Milano - Village I
Trivia - Village 2
Frenze - Village 3
Sienna - Village 4
Amalfi - Village 5
Village 9 and 10
Terraces - Area G by Toll Brothers
Willows on San Ramon Rd by Braddock and
Logan
Lifestyle Retail by Blake Hunt
Dublin Honda
GM Auto Mall
Gateway Medical Center
Quarry Lane School
Ulferts
'-+, '5 If /'-f lOb
ATTACHMENT 1
?of';)-
WORKLOAD & PERFORMANCE MEASURES
BUILDING AND SAFETY DIVISION
HISTORICAL DATA
INDICATOR ACTUAL BUDGET ESTIMATED 2005- ESTIMATED
2004-2005 2005-2006 2006 2006-2007
Building Valuation $342,961,746 $275,446,419 $353.349,418 $300,843,998
Building Permit Fees $3,267,227 $2,146,363 $2,823,497 $2,400,655
Permits Issued 1,837 1,722 1,842 1,971
Inspections 33,534 38,771 34,244 35,226
Dwelling Units Issued 1,163 961 1,342 877
Dwelling Units Finaled 704 951 819 1,291
Fiscal Year 2006-2007
Contract Labor Projections
POSITION HOURLY ESTIMATED ESTIMATED
RATE HOURS TOTAL COST
Off-site / On-site Plan Review $95 2,040 $193,800
Specialized or Structural review $100 1,040 $104,000
Building Inspector (2) Supervising $87 4,160 $361,920
Building Inspector (2.5) Commercial $85 5,160 $438,600
Building Inspector (6.9) $75 14,400 $1,080,000
Total 26,800 $2,178,320
ATTACHMENT 2