HomeMy WebLinkAboutItem 4.03 Accept Work #06-01 2005-06 SidewlkRepair&CurbRamp
CITY CLERK
File # D~[llJ[l2]-~15J
AGENDA STATEMENT
CITY COUNCIL MEETING DATE: August 1, 2006
SUBJECT.
Acceptance of Work Contract No 06~01, 2005-2006 Annual
Sidewalk Safety Repair Program and Curb Ramp Installation
Report Prepared bv' Melissa A. Morlun, Public Works Di~
None
ATTACHMENTS:
RECOMMENDATlON:~ I)
'l
Accept improvements under Contract No. 06-01,2005-2006
Annual SIdewalk Safety Repair Program and Curb Ramp
Installation, and authorize the release of retentIon after 35
days if there are no subcontractor clallns,
FINANCIAL STATEMENT:
Sidewalk Safety Repair Program:
FY 2005-2006
Budge(
Estimated Actual
Design, Inspeeholl & Miscellaneous:
$ 16,20000
$ 7,308.87
Constmetion:
S,dewalk Improvements (Remove & replace):
Pedestrian curb ranlps:
$ 59,277 71
$ 9,765.00
$ 56,499.60
$ 10.500.00
Total.
$ 85,242.71
$ 74,30S.47
The Sidewalk Safety Repair Program is budgeted in the General Fund (Fund 001). The pedestrian
curb ramps are funded through a Community Development Block Grant (CDBG) in the amount of
$9,765
---------------------------------------------------------~-~--------------~~~--------------------------------
COpy TO: Sposeto Engineering
Alma Balanza, Alameda County HCD
Page I of2
lTEMNO.!I.3
U:\MAINT PR(l,IECTSI.S1DEWAIX\2005-2()()(I\AS acccpt.ancc.I}(){.'
DESCRIPTION: On May 16, 2006 tbe City Council awarded Contract No. 06-01,2005-2006
Annual Sidewalk Safety Repair Program and Curb Ramp Installation to Sposeto Engineering.
The Annual Sidewalk Safety Repair Program (Remove and Replace) repairs sidewalk offsets of 314-ineh
or more that may pose a tripping hazard. The Remove and Replace process is used in locations where the
offset is more significant or where tree roots are causing the offset. ThIs procedure requires removal of
the existing sidewalk, and in the case of root problems, removal of the tree roots, and then replacement of
the concrete sidewalk.
While maintenance of sidewalks and other frontage improvements is legally the responsibility of the
private property owner, the City Council has adopted a City-pmd sidewalk rcpair program on a year-by-
year basis smee 1983 At the budget hearing for Fiscal Year 2005-2006, the City Council extended the
funding of the repair program for an addItional year.
This year, the sidewalk safety repair program included eonstmetion of approximately five (5) pedestrian
curb ramps that arc funded through a Commumty Development Block Grant.
Staff has reviewed the work performed under this contract alld has determined that the work is complete.
Staffrecommends that the City Council accept the improvements under Contract No. 06-01,2005-2006
Ammal Sidewalk Safety Repair Program and Curb Ramp Installation, and authorize the release of'
retentIOn after 35 days if there are no subcontractor claims.
Page 2 of2