HomeMy WebLinkAboutItem 4.16 G&O and CIP Status Report CITY CLERK File # D[]~~-[~]O] AGENDA STATEMENT CITY COUNCIL MEETING DATE: September 19,2006 SUBJECT: Fiscal Year 2006-2007 Goals & Objectives Status Report & CIP Schedule Prepared by: Richard C. Ambrose, City Manager ATTACHMENTS: 1. 2. Goals & Objectives Status Report Capital Improvement Program Schedule RECOMMENDATION: /J}J.0 ! 'I Receive the Report FINANCIAL STATEMENT: None DESCRIPTION: On June 13,2006, the City Council adopted the Goals & Objectives Program for Fiscal Year 2006-2007. In order to keep the City Council abreast of Staff progress towards the objectives assigned by the City Council, Staff has prepared a bi-monthly status report for the period ending August 31, 2006. As of that date, a total of 8 of 96 objectives (7%) have been completed. With respect to high priority objectives, a total of8 out of84 (10%) have been completed. In June 2006, the City Council approved a Five Year Capital Improvement Program (CIP) Update for Fiscal Years 2004-2009 and appropriated funds for Fiscal Year 2006-2007. The attached CIP schedule lists 48 projects that received funding in Fiscal Year 2006-2007. The schedule shows the status for each project and also identifies an estimated start and completion date. The schedule only includes a time frame for those projects that are funded in Fiscal Year 2006-2007. Subsequent phases and future projects included in the Five Year CIP, but not funded in Fiscal Year 2006-2007, are not listed on the schedule. An additional schedule has been included in this update, which provides more detailed information for the Eastern Dublin Arterial Street Improvements project. RECOMMENDATION: Staff recommends that the City Council receive the report. COPIES TO: HI cc- fo rm sl agdastmt.doc ITEM NO. ~& \ b ADOPTED 2006-2007 GOALS & OBJECTIVES BIMONTHLY REPORT AS OF 08-31-06 MASTER :i ~ i =+ -3.:... (S"' # COUNCIL PERSON YEAR PROPOSED OBJECTIVE FOR ACCOMPLISHING ESTIMATED ESTIMATED STATUS PRIORITY RESPONSIBLE GOAL START COMPLETION I. GENERAL GOVERNMENT A. ADM1NISTRA liON 1. High Pattillo 2005 Conduct programming study for Civic Center. Sept 2005 Nov 2006 UNDERWAY; Staff reviewing documents associated with programming study. 2. High Pattillo/Silver 2006 Prepare and implement mandatory ethics training for legislative Oct 2006 Feb 2007 UNDERWAY; First of two trainings will occur bodies. Oct 2006 and second in Feb 2007. 3. High Ambrose/Silver 2006 Conduct comprehensive update to City's Municipal Code August 2006 June 2008 UNDERWAY 4. High Rankin 2006 Develop Technology Master Plan for City of Dublin Sept 2006 Mar 2007 UNDERWAY; Scheduled to release RFP in Organization. September and award contract by November; Report to be completed by February 2007. 5. High Pattillo 2006 Develop comprehensive community-wide diversity plan. Jul 2006 Apr 2007 UNDERWAY ADDITIONAL OBJECTIVES (ADMINISTRATION) B. F1NANCE 1. High Rankin 2001 Evaluate the need to replace the City's accounting system. Sept 2006 June 2007 UNDERWAY; Scheduled to release RFP in September; A ward contract December; Report to be completed by March 2007. ADDITIONAL OBJECTIVES (FINANCE) 1. Ambrose 2005 Undertake Voter Opinion Research to determine community Dec 2005 TBD NO PROGRESS; Project deferred due to support for tax increase for Recreation! Aquatic Complex and evaluation of other financing alternatives; See Dublin Historic Park. Objective III A. 2. C. INTERGOVERNMENl AL RELATIONS High Ram 2003 Work with cities in the Tri Valley Area to develop and maintain July 2005 June 2007 UNDERWAY; Clearing House opened in affordable housing opportunities, and publicize and coordinate September 2005; Permanent executive director the regions housing needs. selected. High Ram 2004 Participate in Tri Valley Vision Project. July 2003 Ongoing UNDERWAY; Staff continues to work with the Tri-Valley Business Council on the Preserving Prosperity Project as well as other issues of regional significance. \) ~) p ~~~, ,~I ~/ Page 1 l)'\ ADOPTED 2006-2007 GOALS & OBJECTIVES BIMONTHL Y REPORT AS OF 08-31-06 # COUNCIL PERSON YEAR PROPOSED OBJECTIVE FOR ACCOMPLISHING ESTIMATED ESTIMATED STATUS PRIORITY RESPONSIBLE GOAL START COMPLETION ADDITIONAL OBJECTIVES (INTERGOVERNMENTAL RELATIONS) D. PUBLIC RELATIONS 1. High Carter 2006 Produce a City wide Newsletter. Aug 2006 Nov 2006 UNDERWAY 2. High Carter 2005 Plan and implement 25tn Year Cityhood Celebration. Feb 2006 Feb 2007 UNDERWAY; Status report to Council September 2006. 3. High Holman 2006 Evaluate the need to improve the Citizen and Organization of July 2006 Oct 2006 UNDERWAY; Council Ad Hoc Committee met; the Year Programs Report scheduled to go to Council in October 2006. 4. High Carter 2006 Include City calendar in 25th Year Celebration July 2006 Nov 2006 NEARLY COMPLETE ADDITIONAL OBJECTIVES (PUBLIC RELATIONS) E. CONTRACT ADMIN1STRA TION 1. High Thuman 2006 Crossing Guards Contract Evaluation. Feb 2007 May 2007 NO PROGRESS 2. High Ram 2006 Building & Safety Contract Evaluation. Feb 2007 May 2007 NO PROGRESS 3. High Pattillo 2006 Fire Service Contract Evaluation. Feb 2007 May 2007 NO PROGRESS ADDITIONAL OBJECTIVES (CONTRACT ADMINISTRATION) II. COMMUNITY DEVELOPMENT A. PLANNING 1. High Ram/Lowart 2002 Develop Historic District Master Plan for Dublin Blvd/Donlon June 2003 Aug 2006 COMPLETE property and implement Specific Plan, if required. 2. High Ram 2004 Implement residential planned development and investigate Dec 2002 TBD UNDERWAY; Building permits issues for EAR, opportunities to create a new village in Eastern Dublin Transit DR Horton and Avalon Bay; Metropolitan in plan Center. check; Village Green in plan check. 3. High Ram/Lowart 2003 Complete General Plan Amendment on Dimanto Property. TBD TBD UNDERWAY; No application submitted. 4. High Ram 2003 Complete GP A Study on the Transportation Corridor Right-of- Jan 2006 Mar 2007 UNDERWAY Way. 5. High Ram 2003 Complete Review of Moller annexation and General Plan July 2004 Feb 2007 UNDERWAY; EIR and DSRSD water analysis Specific Plan Amendments. underway. 6. High Ram 2001 Complete Parks Reserve Forces Training Area (Camp Parks) TBD TBD UNDERWAY; Waiting for Army to select Master General Plan and Specific Plan Amendments. Developer. Page 2 .~ ~ ~ --- (f\ ADOPTED 2006-2007 GOALS & OBJECTIVES BIMONTHLY REPORT AS OF 08-31-06 # COUNCIL PERSON YEAR PROPOSED OBJECTIVE FOR ACCOMPLISHING ESTIMATED ESTIMATED PRIORITY RESPONSIBLE GOAL START COMPLETION 7. High Ram 2006 Prepare Community Design Element of General Plan Aug 2006 July 2007 8. High Ram 2006 Update Downtown, West Dublin BART and San Ramon Dec 2006 Mar 2008 Specific Plans into one comprehensive Plan that addresses the entire Downtown Area. 9. High Ram 2002 Complete Scarlett Court Specific Plan. Sept 2006 Feb 2007 10. High Ram 2006 11. High Ram 2006 12. Medium Ram 1996 13. Medium Ram 1996 ADDITIONAL OBJECTIVES (PLANNING 1. Ram 2006 STATUS UNDERWAY; Request for Proposals sent to consulting firms, estimate contract award in October 2006. NO PROGRESS; Waiting to start after Community Design Element is underway. Complete review of Redgewick Annexation of General Plan and TBD Specific Plan Amendments. Hold study session with Planning Commission to discuss how Feb 2007 Dublin Blvd will look and feel from Schaefer Road to Fallon Road. Update City's General Plan. Develo City Com rehensive Telecommunications Policy. TBD UNDERWAY; Proposals received from consultants for design work, estimate contract award in September 2006; Land Use analysis postponed until Camp Parks planning completes. NO PROGRESS; Developer is not ready to submit proposal. NO PROGRESS June 2007 NO PROGRESS NO PROGRESS Update Historic Village Area Specific Plan by adding properties to the Specific Plan area. NO PROGRESS 3. High Ram 2006 4. High Ram 2006 5. Medium 2003 Ram 1m lement First Time Homeowner Program Complete evaluation of the potential renovation!redevelopment ofthe Arroyo Vista Housing site. UNDERWAY; Pro am to begin in October 2006. UNDERWAY; Developer team selected for redevelopment of site; Staff working with HOD for disposal of HUD property as well as securing Section 8 vouchers. UNDERWAY; Attending meetings on development ofRHNA methodology. Work with ABAG to ensure that the Regional Housing Needs Jun 2006 Allocation process addresses City of Dublin housing needs in an equitable manner Process five (5) First Time Homebuyer Loans and make Oct 2006 progress report to City Council. Revise Density Bonus Ordinance Jul 2003 Jun 2008 Jun 2007 NO PROGRESS Sept 2006 UNDERWAY; Study sessions are being held with Planning Commission. Page 3 \>-1 C) ~ -.. \J\ I. Prepare Universal Design Ordinances for adoption as an amendment to Building Code Requirements. 2. High Shreeve 2006 Conduct study to determine amount of construction taking place Sep 2006 without building permits to determine if an enhanced building permit compliance program is needed. 3. Hi h Shreeve 2006 1m lement real-time electronic field ins ection system. Jun 2007 ADDITIONAL OBJECTIVES (BUILDING & SAFETY) # COUNCIL PERSON PRIORITY RESPONSIBLE ADDITIONAL OBJECTIVES (HOUSING) ADOPTED 2006-2007 GOALS & OBJECTIVES BIMONTHLY REPORT AS OF 08-31-06 PROPOSED OBJECTIVE FOR ACCOMPLISHING GOAL ESTIMATED START ESTIMATED COMPLETION STATUS Jun 2007 UNDERWAY Jun 2008 NO PROGRESS Develop Geologic Hazard Abatement District (GHAD) standards for the formation of the Schaefer Ranch and Fallon Villa e GHADs. ADDITIONAL OBJECTIVES ENGINEERING) 2. High 2006 Foss 3. High Foss 2003 Work with property owner of Ralph's Grocery store to identify replacement alternatives. Sept 2006 COMPLETE; New tenant to be 99 Ranch Market; Lease executed; 99 Ranch is preparing to take possession of the premises; Expected to open by May 2007. UNDERWAY; City Council to hear request to amend Downtown Specific Plan to allow additional development on site. UNDERWAY; Staff is processing building permits and is working with potential tenants for a new 17,500 s.f. retail building. Work with Dublin Honda on development options for Amador July 2006 Plaza site. June 2007 Work with Dublin Place Shopping Center to facilitate new July 2003 improvements to the Center. June 2007 Page 4 ~.. C'> "",:.. {'" ..i t, \ ADOPTED 2006-2007 GOALS & OBJECTIVES BIMONTHLY REPORT AS OF 08-31-06 # COUNCIL PRIORITY High PERSON RESPONSIBLE Foss YEAR PROPOSED OBJECTIVE FOR ACCOMPLISHING GOAL Work with Dublin Chamber of Commerce to create a program to recognize Dublin businesses through events in local papers, City Newsletters, websites, etc. ECONOMIC DEVELOPMENT 2006 ESTIMATED START Sept 2006 ESTIMATED COMPLETION June 2007 STATUS 4. NO PROGRESS 1. Lowart 2005 Undertake development of design and construction documents Apr 2005 UNDERWAY; Design development complete; for new Community Center at Shannon Park. Construction documents in ro ess. 2. High Ambrose/Lowart 2005 Undertake development of design and construction documents TBD NO PROGRESS; Pending evaluation of for new Recreation Center/Aquatic Center Complex at Emerald public/private partnership. Glen Park. 3. High Lowart 2006 Conduct in-depth community needs assessment and opinion Sept 2006 Dec 2007 UNDERWAY; Draft RFP to be presented to survey of Department programs and services, and develop a Council Oct 2006. Strategic Plan for Department programs and services. 4. High Lowart 2006 Prepare an update to the Parks and Recreation Master Plan. COMPLETE 5. High Lowart 2006 Develop and implement four (4) family-oriented July 2006 June 2007 UNDERWAY; Dates have been set for all events; programs/events. First will be Outdoor Movie night in September at Emerald Glen Park; Remaining events will be durin spnn and early summer 2007. 6. Medium Lowart 2004 Work with EBRPD to complete negotiations for land acquisition Dec 2002 TBD NO PROGRESS; Property owner not interested in in the western hills for an en S ace Area. selling land at this time. 7. Medium Lowart 2004 Identify and secure sources of funding for land acquisition in the July 2004 TBD UNDERWAY; Although property owner not western hills for an Open Space Area. interested in selling land at this time; Altamont Open Space funding available. 8. Medium Lowart 2004 Upon completion of land acquisition in the western hills, TBD NO PROGRESS complete an Open Space Master Plan and appropriate CEQA documents. 9. Medium Lowart 2004 Closely monitor development projects Citywide to identify July 2004 TBD UNDERWAY otential sites for a unique aSSlVe ark/recreation facility. 10. Medium Lowart/Thuman 2006 Explore the feasibility of establishing a Police Activities League TBD NO PROGRESS (PAL) program in partnership with Dublin Police Services. If feasible, establish PAL non-profit organization and Board of Directors. Page 5 U\ ~ , ) . (j'1 \ ADOPTED 2006-2007 GOALS & OBJECTIVES BIMONTHLY REPORT AS OF 08-31-06 # COUNCIL PERSON YEAR PRIORITY RESPONSIBLE Medium Lowart 2004 ESTIMATED START TBD ESTIMATED COMPLETION STATUS NO PROGRESS; Dependent on School District. 11. Undertake a site master plan, programming and financial feasibility study for the Dublin Historic Park including DHP A land/cemetery feasibility study. 2. High Lowart 2005 Coordinate grand re-opening of Murray Schoolhouse to COMPLETE commemorate the 150th anniversary of the Schoolhouse upon com 1etion of the exhibit restoration ro" ect. 3. High Lowart 2004 Work with Ulferts on the installation of public art as a condition COMPLETE of ro"ect a roval. 4. High Lowart 2002 Work with Dublin Fine Arts Foundation to complete Art in the Sept 2002 Sept 2007 UNDERWAY; Recommended for approval by the Parks projects for Bray Commons Neighborhood Park. Heritage & Cultural Arts Commission and Parks & Community Services Commission; Presentation to City Council September 2006. 5. High Lowart 2004 Work with the developer to locate significant works of art in July 2004 TBD NO PROGRESS; Proposed artwork for Village two key places of the Dublin Transit Center, the Village Green Green deferred by Council until 25% occupancy Center and the "Iron Horse" Plaza. of Site B; No occupancy to date; Iron Horse Plaza timeline TBD. 6. High Lowart 2006 Facilitate the selection of public art as a condition of approval July 2006 Jun 2007 UNDERWAY for five (5) private development projects which currently have land use entitlements. 7. High Lowart 2006 Research and submit new application for Murray Schoolhouse Aug 2006 Dec 2006 UNDERWAY; New application to be submitted to be laced on the National Register of Historic Places. by December 2006. 8. High Lowart 2006 Pursue accreditation for the Heritage Center through the Sept 2006 Mar 2008 UNDERWAY; Phase I Museum Assessment American Association of Museums. Program completed April 2006; Phase II application for Public Dimension assessment due by February 2007; (Process takes approximately one year to complete from application submittal date). 9. High Lowart 2006 Develop a Teen Apprentice Camp for the youth at the Heritage Mar 2007 Aug 2007 NO PROGRESS Center. Page 6 is',, (J. l> 0"\ # COUNCIL PERSON YEAR PRIORITY RESPONSIBLE High Lowart 2006 10. 11. High Lowart 2006 12. High Lowart 2006 13. 14. High Medium Lowart Lowart 2006 2004 ADOPTED 2006-2007 GOALS & OBJECTIVES BIMONTHLY REPORT AS OF 08-31-06 PROPOSED OBJECTIVE FOR ACCOMPLISHING GOAL Develop a year-round Children's Theatre program. Submit application for California Cultural Historic Endowment grant for Dublin Historic Park Project. Coordinate one (1) new visual arts exhibit at the Civic Center, Senior Center, or Library. Expand program activities and hours of Heritage Center. Work with BART to incorporate high quality artwork as part of the West Dublin BART Station Project. 15. Medium Lowart 2004 Implement Phase II of the Downtown Public Art/Bus Shelter Project. ADDITIONAL OBJECTIVES HERITAGE & CULTURAL ARTS ESTIMATED START June 2006 ESTIMATED COMPLETION June 2007 STATUS Jan 2006 TBD UNDERWAY; Two summer theatre camps completed in July/August 2006; Children's Musical Theatre program offered in Fall 2006 at Nielsen School. NO PROGRESS; Application details have not been released by the State. NO PROGRESS Jan 2006 June 2007 July 2004 TBD COMPLETE UNDERWAY; Design will include area for Public Art; Developer has no funding available to include Public Art in project. NO PROGRESS; Not funded in Fiscal Year 2006/2007. Jul 2006 Jun 2007 UNDERWAY; Continued contact with Ford Motor and "Driving Skills for Life" Program. UNDERWAY; Awaiting space/facilities expansion evaluation prior to proceeding. UNDERWAY; Relationship developed with Construction Industry Crime Prevention Program (CCIP); Preliminary discussions with Livermore and Pleasanton Police. UNDERWAY; Curriculum review in progress. 1. High Thuman 2004 Develop a teen driver safety/education program. Aug 2004 Jan 2007 2. High Thuman 2006 Formalize volunteer program to enhance community/police Aug 2005 Jun 2007 interaction and to support police operations. 3. High Thuman 2006 Explore the feasibility of a multi-jurisdictional enforcement Aug 2006 June 2007 team to help reduce commercial burglaries in the Tri- Valley with a focus on construction related theft. 4. High Thuman 2006 Partner with the Dublin Unified School District to provide a safe Sept 2006 May 2007 school environment by conducting classroom safety training for teachers. 5. High Thuman 2006 Increase DUI awareness and education through the performance Aug 2006 June 2007 of three (3) DUI Checkpoints, pending the award ofOTS grant funding. Page 7 UNDERWAY; OTS Grant was not awarded; DUI Checkpoints will be completed with assistance of other agencies; No dates set. ~ +-, ,.. ~ ADOPTED 2006-2007 GOALS & OBJECTIVES BIMONTHLY REPORT AS OF 08-31-06 # COUNCIL PROPOSED OBJECTIVE FOR ACCOMPLISHING GOAL ESTIMATED START ESTIMATED COMPLETION STATUS 2006 Conduct open houses at each fire station with emphasis on self Sept 2006 Mar 2007 UNDERWAY; Scheduled for October for all Fire preparedness for disasters. Stations; Open house scheduled for St. Patrick's Day pancake breakfast. 2. High Pattillo 2006 Conduct fire safety outreach for businesses relative to Sep 2006 Jun 2007 UNDERWAY; Curriculum being reviewed. emergency preparedness. 3. High Pattillo 2005 Implement the Auto-Pulse Resuscitation System and present July 2005 Jun 2007 UNDERWAY; Awaiting results from County data and recommendations on the effectiveness of the system. Medical Directors special study. 2. 3. High High Carter Carter Identify and secure location for more adequate Emergency Operations Center. 2006 Conduct City Council Disaster Training. 2006 Conduct citywide disaster exercise. Nov 2005 Jun 2007 UNDERWAY; Consultant selected to conduct programming study for Maintenance/EOC facility. Training to be scheduled in January 2007. Exercise is scheduled in April 2007 in conjunction with other County disaster exercise. COMPLETE Sep 2006 Sep 2006 Jan 2007 Apr 2007 4. High Pattillo 2004 Provide "Train the Trainer" course and materials to Dublin Unified School District for school disaster training. DISASTER PREPAREDNESS Jul 2005 July 2006 Page 8 \;)() <;,; ~ '-. \1" \ ADOPTED 2006-2007 GOALS & OBJECTIVES BIMONTHLY REPORT AS OF 08-31-06 # COUNCIL PERSON YEAR PROPOSED OBJECTIVE FOR ACCOMPLISHING ESTIMATED ESTIMATED STATUS PRIORITY RESPONSIBLE GOAL START COMPLETION E. WASTE MANAGEMENT 1. High Carter 2006 Conduct audit of exclusive and non-exclusive solid waste Nov 2006 May 2007 NO PROGRESS franchisees to ensure accurate diversion reporting and remittance of franchise fees. 2. High Morton/Lowart 2006 Install recycled water at Civic Center. Apr 2006 Jun 2007 UNDERWAY; Working with DSRSD to discuss feasibility. ADDITIONAL OBJECTIVES (WASTE MANAGEMENT) V. TRANSPORTATION A. MAINTENANCE 1. High Morton 2004 Examine potential funding sources for design and construction Nov 2005 Jun 2007 UNDERWAY; Consultant selected to conduct of a maintenance yard and secure a site if funding becomes programming study. available 2. High Morton/Rankin 2006 Complete Building Management Study Jul 2006 Jun 2007 UNDERWAY; Consultant selection Oct 2006. 3. High Morton 2006 Implement five (5) new community volunteer projects. Jul 2006 Jun 2007 UNDERWAY ADDITIONAL OBJECTIVES (MAINTENANCE) B. TRANSPORTATION 1. High Morton 2004 Participate in Tri-Valley Triangle Analysis to prioritize 1-580,1- July 2005 Oct 2006 UNDERWAY 680 and Route 84 transportation improvements. 2. High Morton 2004 Update Tri-Valley Transportation Development Fee Nexus July 2005 Dec 2006 UNDERWAY Study together with the other (6) six agencies in the TVTC. 3. High Morton 2004 Work with EBRPD and the City of Pleasant on to conduct a July 2005 Oct 2006 UNDERWAY; Council presentation scheduled preliminary engineering study and identify funding sources to for October 2006. facilitate the connection of Alamo Canal Trail under 1-580 to Pleasanton trails. 4. High Morton 2001 Work with ACTIA for the implementation of the Measure B July 2005 Dec 2006 UNDERWAY transportation project along the Scarlett Drive corridor between Dublin Blvd. and Dougherty Road. Page 9 ~ ~ '....') ~ ADOPTED 2006-2007 GOALS & OBJECTIVES BIMONTHLY REPORT AS OF 08-31-06 # COUNCIL PERSON YEAR PROPOSED OBJECTIVE FOR ACCOMPLISHING ESTIMATED ESTIMATED STATUS PRIORITY RESPONSIBLE GOAL START COMPLETION 5. High Morton 2004 Utilize new CCT A traffic model to work with Livermore, Oct 2005 Feb 2007 UNDERWAY Pleasanton, Alameda County and the Tri-Valley Transportation Council to examine configurations of streets parallel to 1-580 (i.e., Dublin Blvd. /North Canyons Parkway, Stoneridge Drive/Jack London Blvd.) and make recommendations/advocacy. 6. High Morton 2002 Work with Pleasanton and Livermore to develop a cost sharing Sept 2005 June 2007 UNDERWAY; City Attorney drafting agreement. agreement for the ultimate improvement of the 1-580/Fallon Road Interchange. 7. High Morton 2006 Work with LA VTA and BART to improve connectivity between July 2006 Sept 2006 NEARLY COMPLETE; Bus service started Aug the City Park-and-Ride lot and the BART Station. 2006; Sign installation underway. 8. High Morton 2004 As part of the GP A for Parks RFT A, evaluate alternatives for a Feb 2006 TBD NO PROGRESS Central Parkway extension to Dougherty Road and interface options to the planned Scarlett Drive Extension. 9. High Morton 2004 Develop a City-wide Bicycle Master Plan including bicycle July 2005 Nov 2006 NEARLY COMPLETE access to parks and open space areas. 10 High Morton 2005 Prepare global transportation plan for City (multi-modal). April 2007 June 2007 NO PROGRESS ADDITIONAL OBJECTIVES (TRANSPORTATION) -......... \:J ~ Page 10 ., '-.. ~ CITY OF DUBLIN FY 2006-2007 CIP STATUS AS OF 8/31/2006 GENERAL 10 Number Project Name 1 93135 CTV Studio Remodel Status UNDERWAY; CTV is negotiating space needs with the Pleasanton Unified School District. (Behind schedule) 2 93150 Network System Upgrade UNDERWAY; Goal is to release RFP in Sep and award by Nov; Report complete by Feb and to Council in Mar. 3 93191 Accounting System UNDERWAY; Phase 1-Consultant Assessment; Goal release RFP in Sep and award by Dec; Phase 1 report by Mar. 4 93192 Geographic Information System NO PROGRESS; Scope of work for consultant will be (Phase III) developed. Work will occur after Jan 1, 2007. 5 93200 Building Permit System UNDERWAY; Proposals under review. 6 93402 Maintenance Facility Study UNDERWAY 7 93451 Library Repairs NO PROGRESS; Goes out to bid beginning of Sep 2006; Bid opening at the end of Sep 2006. 8 93462 Inspector Trailers NO PROGRESS; Utility hook-ups Apr 2007 with trailer move Jun 2007. 9 93900 Building Management Study UNDERWAY; RFP out. 10 93910 Civic Center Mod. Design Svcs UNDERWAY; Report to City Council Nov 2006. & Construction ~ 11 93917 ADA Transition Plan UNDERWAY ~ ~ ~ 12 93923 Civic Center Window Sealing UNDERWAY; Authorized to go to bid Sep 2006. ~ = 13 93970 Automated Document Storage & NO PROGRESS =: Retrieval System ~ 14 94500 Public Facility Fee Study Update UNDERWAY; Appraisal complete. ~ ~ \') Page 1 10 Number Project Name 1 94250 Sidewalk Safety Repair 2 94601 San Ramon Road Concrete Sound Wall Maintenance 3 94942 Seasonal Street Banners NO PROGRESS NO PROGRESS CITY OF DUBLIN FY 2006-2007 CIP STATUS AS OF 8/31/2006 COMMUNITY IMPROVEMENTS Status Jul UNDERWAY; Designs to City Council Oct 2006. Page 2 \; '\:) "'-. ~ CITY OF DUBLIN FY 2006-2007 CIP STATUS AS OF 8/31/2006 PARKS ID 1 Number 95010 Project Name Community Needs Assessment Status UNDERWAY 2 95210 Stagecoach Park Assessment District Water Meter UNDERWAY; Meter purchased. 3 95465 Shannon Community Center UNDERWAY; Design development approved, Reconstruction construction documents in progress. 4 95555 Dublin Historic Park COMPLETE; Master Plan Complete. 5 95566 Murray Schoolhouse Exhibit COMPLETE Restoration 6 95602 Emerald Glen Park Recreation & NO PROGRESS; Pending evaluation of publiclprivate Aquatic Complex partnership. 7 95625 Dougherty Hill Park - Dog Park UNDERWAY; Bid awarded with construction to begin Sep 2006. 8 95631 Park Furniture Replacement UNDERWAY; Bid awarded with installation to be complete by Oct 2006. 9 95635 Park Play Area Renovations NO PROGRESS; Project to begin Nov 2006. 10 95640 Dublin Ranch Neighborhood UNDERWAY; Area F Neighborhood Square. Parks 11 95640 Dublin Ranch Neighborhood UNDERWAY; Area G Neighborhood Square. Parks 12 95640 Dublin Ranch Neighborhood NO PROGRESS; Area F Neighborhood Park. Parks 13 95830 Dublin Sports Ground Renovation NO PROGRESS; To begin after the fields close in December. 14 95851 Fallon Sports Park (Water Meter) COMPLETE; Water meter purchased. '""' \N I;:) \:-" Page 3 ......... ~ CITY OF DUBLIN FY 2006-2007 CIP STATUS AS OF 8/31/2006 STREETS 12007 ID Number Project Name Status Jul I Aug I Sep I Oct I Nov I Dec 1 Jan I Feb 1 Mar I Apr I May 1 Jun 1 94520 Tri-Valley Triangle Study UNDERWAY ..:;.:,' ~ 2 96001 Tri-Valley Transportation UNDERWAY I': ' ~" ~ Development Fee Regional Transportation Projects : 3 96011 West Dublin BART Station NO PROGRESS I.:. .,,:'" .:'..' "'" .: "'" '~," ~ Corridor Enhancement - Dublin Boulevard - Hansen Drive to Clark Avenue 4 96012 East Dublin BART Station NO PROGRESS I . Corridor Enhancement - Dublin Boulevard - Tassajara Road to Clark Avenue 5 96022 Dublin Boulevard Bridge NO PROGRESS .". Resurfacing at Alamo Canal 6 96082 Underground Utilities - Dublin UNDERWAY .... "",.,,';::. .- Blvd./Dougherty Rd. intersection and Vicinity 7 96400 Eastern Dublin Arterial Street UNDERWAY ;..:,:.;:: .::'" . : . . . Improvements 8 96430 1-580/Fallon Interchange UNDERWAY; Awaiting Caltrans approval. .' ''':'i'':'''''~'' .: . Improvements 9 96452 Downtown Traffic Signal UNDERWAY . ;':"';' . Equipment Replacement 10 96580 Annual Street Overlay Program NO PROGRESS I ~ ' '" 11 96585 Annual Slurry Seal Program NO PROGRESS !' . ,..":;:;~; "':''''''':>k::'':''~ 12 96773 Alamo Canal Trail Under 1-580 UNDERWAY; Public meeting held Aug 2006. I :,;:,,";;1<;;:Jl;~'1'J:~~l"';J~,'I~ .. .....:~ ". .. . ,..'''~, '"'' . , 13 96775 Citywide Bicycle I Pedestrian UNDERWAY; Plan is nearing completion. .; .,- Plan 14 96840 Scarlett Dr I Iron I-jorse trail UNDERWAY; Preliminary engineering to be : .,..",,:..::;,):' .:,'c',".: ".: .. Extension completed Dec 2006. 15 96852 Dougherty Rd Improvements- UNDERWAY '::;:.." '. <E,:,;i:fi .... ...... ,.,:.,:,. ,i\,: . Houston to 1-580 16 96870 St. Patrick Way - Regional UNDERWAY I. "':: . .';:::;::',/:;,'.:..:' .::' . . Street to Golden Gate Drive : 17 96920 Dublin Boulevard Improvements UNDERWAY u '."""i:,i,',. ..,. ".:: . - Village Parkway to Sierra Court : Page 4 .......... -t: ~ ., "- ~~ ID 1 Number 96400 2 96400 3 96400 4 96400 5 96400 6 96400 7 96400 CITY OF DUBLIN FY 2006-2007 CIP STATUS AS OF 8/31/2006 EASTERN DUBLIN ARTERIAL STREET IMPROVEMENTS - 96400 Project Name Tassajara Road from Dublin Ranch Phase I north to Fallon Road. Four lanes total. Two to be constructed by Pinn, two by Un. Status UNDERWAY; Pinn section under construction; Un portion pending approval and development of Wallis Ranch. Median on Dublin Blvd. between NO PROGRESS; Construction extended to 2006. Scarlett Dr. and DeMarcus Blvd. Fallon Rd. from Tassajara Rd southeasterly to the end of Dublin Ranch improvements. Installation of a westbound right-turn from Dublin Boulevard to northbound Hacienda Drive Pavement overlay on Central Parkway just east of Tassajara Road Dedications and improvements along Tassajara Road south of the proposed intersection with Fallon Road Improvements to Fallon Road between Dublin Boulevard and 1-580. NO PROGRESS; Design complete; Construction on hold until 2007 pending resource agency permit being issued. NO PROGRESS; Project is not currrently schedlued for construction. NO PROGRESS; Project is not currrently schedlued for construction; Pending development of DiManto property. NO PROGRESS; Project is not currently scheduled; Dependant on timing of DiManto, Wallis Ranch, and Quarry Lane School. UNDERWAY; Under Construction. Page 5 Jun ~ .............. :~\>>f' ._'. {'ddM ~ I;:) .' z'" CJ'\