HomeMy WebLinkAboutItem 4.10 Schaefer Ranch GHAD
CITY CLERK
File # 360-60
AGENDA STATEMENT
CITY COUNCIL MEETING DATE: November 7,2006
SUBJECT:
Resolution Setting a Public Hearing on the Formation of the
Schaefer Ranch Geologic Hazard Abatement District
Report Prepared by Frank Navarro, Senior Civil Engineer
ATTACHMENTS:
Resolution Setting a Public Hearing on the Formation of the
Schaefer Ranch Geologic Hazard Abatement District, together with:
Exhibit "A" to the Resolution, Petition For Formation (including
Exhibit "A" to the Petition, Boundary Map, Exhibit "B" to the
Petition, Legal Description, and Exhibit "c" to the Petition, Plan of
Control), and Exhibit "B" to the Resolution, Notice of Public
Hearing
~'AdoPt the Resolution Setting a Public Hearing on the Formation of
the Schaefer Ranch Geologic Hazard Abatement District.
RECOMMENDATION:
FINANCIAL STATEMENT:
There is no immediate fiscal impact. Once the Schaefer Ranch
Geologic Hazard Abatement District ("Schaefer Ranch GHAD") has
been formed and a funding mechanism has been approved by the
Board of Directors and affected property owners, the costs
associated with the operation of the Schaefer Ranch GHAD will be
offset by assessments paid by property owners within the District.
DESCRIPTION:
Division 17 of the California Public Resources Code establishes legal standards for geologic hazard
abatement district ("GHAD") formation, GHAD financing and the scope of GHAD authority (Section
26500 et seq.).
California Public Resources Code S 26550.5 provides that proceedings for the formation of a new GHAD
may be initiated by a petition signed by owners of at least ten percent (10%) of the real property to be
included within the proposed district.
-------------------------------------------------------------------------------------------------------------
COpy TO:
ITEM NO.
'tIO
,'\
V
Page 10f2
G:\DEVELOP\Schaefer Ranch\GHAD Formation\agst Schaefer Ranch GHAD Formation 11 0706.DOC
The Schaefer Ranch GHAD annexation petition has been executed and submitted to the City Council of
the City of Dublin. The adoption of the resolution setting a public hearing on the formation of the
Schaefer Ranch GHAD is the first step in the formation process.
ANALYSIS:
Under the Public Resources Code, the City Council must adopt a resolution setting a public hearing and
noticing by mail the owners of real property to be included within the Schaefer Ranch GHAD at least
twenty (20) days before the date set for the hearing. Property owners may thereafter object in writing to
the proposed formation of the Schaefer Ranch GHAD.
The City Council of the City of Dublin will hold a public hearing on the proposed formation of the
Schaefer Ranch GHAD on December 5, 2006.. If it appears at the hearing that the owners of more than
50 percent of the assessed valuation of property within the territory to be annexed object to the formation,
the proceedings must be abandoned. At the close of the hearing, the City Council will decide whether or
not to form the Schaefer Ranch GHAD.
After the Schaefer Ranch GHAD is formed, the City Council must take additional steps to make the
Schaefer Ranch GHAD operational. Specifically, the City Council must then appoint members to act as
the initial Board of Directors for the Schaefer Ranch GHAD. The Board of Directors must then pass a
budget and levy an assessment. Levying the assessment requires two steps: (a) approval of the engineer's
report and the initiation of the assessment ballot proceeding, and (b) following the 45-day notice period
required by Proposition 218, a public hearing to tabulate the assessment ballots and approve or deny the
assessment.
RECOMMENDATION:
Staff recommends that the City Council adopt the Resolution Setting a Public Hearing on the Formation
of the Schaefer Ranch Geologic Hazard Abatement District.
Page 2 of2
16 ~;;L,
RESOLUTION NO. . - 06
A RESOLUTION OF THE CITY COUNCIL
OF THE CITY OF DUBLIN
*************************************
SETTING A PUBLIC HEARING ON THE FORMATION OF THE
SCHAEFER RANCH GEOLOGIC HAZARD ABATEMENT DISTRICT
WHEREAS, this Resolution is adopted pursuant to the provisions of Division 17 (Section
26500 et seq.) of the Public Resources Code, entitled "Geologic Hazard Abatement Districts"; and
WHEREAS, on November 1,2006, the City Council of the City of Dublin was presented
with a petition for the formation ofthe Schaefer Ranch Geologic Hazard Abatement District
("GHAD Petition"), including a plan of control ("Plan of Control"); and
WHEREAS, the GHAD Petition, attached hereto as Exhibit A, is substantially in the form
described in Section 26551 and 26552 of the Public Resources Code; and
WHEREAS, the City Council reviewed the Plan of Control presented with the GHAD
Petition and has determined that the health, safety and welfare require the formation of the Schaefer
Ranch Geologic Hazard Abatement District ("District"); and
WHEREAS, the City Council intends to schedule a public hearing ("Hearing") on the
proposed formation of the District pursuant to the requirements of Section 26557 of the Public
Resources Code.
NOW, THEREFORE, BE IT RESOLVED THAT:
Section 1.
Findin2:s and Determinations
The City Council hereby finds and determines that the above recitals are true and correct and
have served as the basis, in part, for the findings and actions set forth below.
Section 2.
Public Hearin2: Scheduled
The City Council will conduct a Hearing on the proposed formation of the District on
December 5t\ 2006 at 7:00 p.m. or as soon thereafter as the matter can be heard, in the City Council
Chambers, 100 Civic Plaza, Dublin, California, 94568. At the Hearing, any objections to the
proposed district shall be presented.
Section 3.
Notice of Hearin2:
A notice ofthe hearing ("Notice"), attached hereto as Exhibit B, shall be mailed to each
owner of real property to be included in the proposed district as shown on the assessment roll last
equalized by Alameda County. The Notice shall be mailed first-class, postage prepaid, in the
United States mail and postmarked not less than 20 days preceding the date of the Hearing. The
Notice shall include a copy of the GHAD Petition and shall indicate where the Plan of Control may
/7-7-D& Lj, /0
Af-IztLh fYleh+
1
/) FtJ~;)
be reviewed or duplicated. The Notice shall also set forth the address where objections to the
proposed formation may be mailed or otherwise delivered up to and including the time of the
Hearing.
Section 4.
Obiections to Formation
At any time not later than the time set for hearing objections to the proposed formation, any
owner of real property within the proposed district may make a written obj ection to the formation.
Such objection shall be in writing, shall contain a description ofthe land by lot, tract, and map
number, and shall be signed by such owner. Objections shall be mailed or delivered as specified in
the Notice. Ifthe person whose signature appears on such an objection is not shown on the
assessment roll last equalized by Alameda County, the written objection shall be accompanied by
evidence sufficient to indicate that such person is the owner of said property.
PASSED AND ADOPTED on the 7th day of November, 2006, by the following vote:
AYES:
NOES:
ABSENT:
ABSTAINING:
Mayor
ATTEST:
City Clerk
2
3fb'D d
EXHIBIT A
GHAD PETITION
EXHIBIT A
To the Resolution
~Ob~d
PETITION FOR FORMATION OF THE
SCHAEFER RANCH GEOLOGIC HAZARD ABATEMENT DISTRICT
PURSUANT TO DIVISION 17 OF THE PUBLIC RESOURCES CODE
OF THE STATE OF CALIFORNIA
TO: The City Clerk for the City of Dublin:
The undersigned owners of land within the boundaries of the territory
proposed to be included in the Schaefer Ranch Geologic Hazard Abatement
District ("District") hereby request that the City Council of the City of Dublin
initiate proceedings for formation of the District to include the territory described
in Exhibit A ("Boundary Map") and Exhibit B ("Legal Description"), attached
hereto, pursuant to the provisions of Division 17 of the Public Resources Code
sections 26500 et seq. Said owners are the owners of all the territory proposed
for inclusion in the District.
(a) This petition is made pursuant to Division 17 of the Public
Resources Code with particular reference to Article 3 (commencing
with Section 26550) and Article 4 (commencing with Section
26561 ).
(b) Opposite the signature of each petitioner is an indication of the lot,
tract and map number or other legal description sufficient to identify
the signature of the petitioner as that of an owner of land within the
territory proposed to be included in the District.
(c) Opposite the signature of each petitioner is an indication of the date
on which said petitioner's signature was affixed to this petition.
5iJb~;)
(d) The following documents are attached to this petition and are
incorporated herein by reference as if set forth in full in the petition:
i. A map of the boundaries of the territory proposed to be
included in the District (Exhibit A);
ii. A legal description of the boundaries of the territory
proposed to be included in the District (Exhibit B); and
iii. A Plan of Control prepared by an engineering geologist
certified pursuant to Section 7822 of the California
Business and Professions Code, which describes in
detail geologic hazards, their location and the areas
affected thereby, and a plan for the prevention,
mitigation, abatement and control thereof (Exhibit C).
0-/--0(0
Per Exhibits A & B
Date
Albert D. Seeno, III
Signature of Petitioner
Description of Property
Date
Signature of Petitioner
Description of Property
Date
Signature of Petitioner
Description of Property
Date
Signature of Petitioner
Description of Property
<6;:r
EXHIBIT A
BOUNDARY MAP
EXHIBIT A .
70 i::he ?eti t/Ofl'
MANUEL MACHADO
EAST SA Y REGIONAL
PARK OtSTRtCT
,~PN f}!3A..140(J.(j()1.o3
APN 85.IJ,.P400.()OU)5
ACCEPTED 1/4 CORNER
ACCEPTED 1/4 CORNER
COUNTY OF ALAMEDA
us.
32 33
5 4
US
S89'29.04"E 2594.61"
S89'33.S2..E 1715. IS.
CITY OF DUBLIN
'"
~
:s
'"
~
)..
....
~
o
<.:>
\"
;;~
6~
~'"
g;:?
<:: ~
!1l
Cl
~
)..
....
(:;
;....,
:.0""
~U
;::d l.:;,
~~~
'"
ffit:
(;)<(
444.83 t ACRES TOTAL
EX/STING
SCHAEFER
RESIDENCE
BEl-t!ES /'lO
99-13/918
600
EAST RA Y REG/ONAL
PARK D/STR/CT
'"
~ 11;
:5 ~
'" Cl
~ ~
).. i:::
~ (:;
o US.
(.) R.f.W
33 34
4 3"'- ACCEPTED 1/4 CORNER
T.3S
R.I.W
TRACT 6765
SCHAEFER RANCH
A PORTION OF SECTIONS 3 & 4, TOWNSHIP 3
SOUTH, RANGE 1 W!:ST,
MT. DIABLO BASE AND MERIDIAN.
CITY OF DUBLIN
ALAMEDA COUNTY, CALIFORNIA
ftJa DlUll!gn R8lICJWCeS, Ale.
'7""" ~ . ........ . ....,.,..,
APh! 85A-.,N!J()..U04..0i
.700 y..- VaIIt,. RH4 _ 100
w_~____
SCALE: t" = toOO'
7EI.__OO
NOVEMBER, 2006
EAST BA Y REGtONAL
PARK D/STRlCT
~
:it
~
APN 94;.(;(j:8..008
L8
I
o
I
500
I
2000
I
1000
,
\
\
\ /.'EAST RAY REGIONAL PARK D/Sm/CT
,...,.\./.... APsV 941-00U3.Q09
..~ \
\
\
COUNTY OF
ALAMEDA
EXHIBIT 'A'
GHAD BOUNDARY EXHIBIT
SHEET 1 OF 2
....
--1
"I
C)''"
~
Ii)
LINE TABLE
LINE LENGTH BEARING
L1 145.11 $48 034 '1j "E
L2 35.93 509'59'09"E
13 108.23 516'19"16"W
L4 25.00 S13"40'44"E
L5 438,12 541"19'00"E
L6 249.89 532'04"20"<
Ll 49144 SI8'05'49"E
L8 502"81 502'20"33"E
L9 176.93 518'35"08"E
L10 178.88 500'34"01"W
111 338.98 519'09"21""W
L12 221.56 584 '55"54"W
L13 174.32 505'04"06"E
L14 205.13 515'29"10"W
L15 816.14 N89'42"48"E
L16 51368 512'21"42""E
L11 299 82 516'44 "06"E
L18 565,51 N86"OI'31"E
L19 118.45 590'OO"00"E
L20 23881 N52'15"21"E
L21 145.72 580'23"31"E
L22 338.94 557'59"05"E
L23 324"50 586'40"56""E
L24 479.65 564 '23 "41"E
L25 53"'8 531'11"05'E
L26 54.55 552'46"22'W
L21 64.98 562'26"35"E
L28 5182 Nl7'29"03"W
L29 41.26 524'46"42'W
L30 36.60 ST9"18'2rw
L31 45.12 N34"14'51"W
L32 38653 584'49"OrW
L33 122.22 521'31"J9"W
L34 152.60 564'56"28"W
L35 225.92 N54'OS'20"W
L36 91.81 587'40"43"W
L31 164.40 523'31"03"W
LINE TABLE
LINE LENGTH BEARING
L38 195.64 514'01'35"W
L39 204.10 N82'39"32'W
L40 255.59 N53'44'04'W
L41 105.06 S82"'8'S4"W
L42 110.84 S19'51'38"W
L43 T15.61 N89"27'Ol"W
L44 154.13 N24'59"58"W
L4S 216.11 S8S"SS"6"W
L46 178.82 519'52"26"W
L47 320.99 58S"17'16"W
L48 UO.61 N2474'2S"W
149 294.12 S86'20"13"W
L50 102.97 548'49"53"W
L51 232"99 N66'31'21"W
L52 241.96 N43'02"38"W
L53 484.10 N14"41'36"W
L54 318.64 581'08"09"W
L55 426.98 N4f"39'34"W
L56 260.44 N60"33'3rW
L51 380"38 518'03"55"W
L58 18.85 516'29"42"W
L59 300.19 N14'30"24"W
L60 458.31 N61'22"45"W
L61 458.62 N75",,'25"W
L62 401.40 N81'58"44'W
L63 301.13 N16'12"50'W
L64 222,75 N81"06'38"W
L65 274.44 NSS"2f20"W
L66 123"83 510'39"5S"W
L6l 558.44 N03'08"04"E
L68 890.26 588'22"02"<
L69 583.44 N01'31"58"E
LlO 539.69 N62"27"25"E
Lll 341.12 562'21"25"W
Ll2 319"35 NOO"30'45"W
Ll3 2.43 553'16"1O"W
Ll4 14.74 527'13 "56'W
CIJRYE DA TA
CIJRYE DELTA RADIUS LENGTH
CI 59"21'40" 112.50' 119.02'
C2 38'35"04" 231"50" 159"94"
C3 26'18"25" 231.50" 109.05"
C4 16'17"59'" 559.94' 159.29"
C5 11'06"30'" 450.00' 81.24'
C6 16"41'54" 1175.00' 342.44'
Cl Ir24'SO" 1525.00" 330.42
C8 1'50"23"" 1115"00" 31.13"
C9 6'25"39" 1225.00" 131.42"
Cl0 26'02"14" 389"00" 176.18"
CI1 0'20"22"" 8030"00' 41.56'
C12 6'24'00' 1510"00" 175.31"
C'3 4"29'19" 650.00" 50.92"
TRACT 6765
SCHAEFER RANCH
A PORTION OF SECTIONS 3 & 4, TOWNSHIP 3
SOUTH, RANGE t WEST,
MT. DIABLO BASE AND MERIOIAN.
CITY OF DUBLIN
ft~LA:~';~ __
'i,..... ,...... · .......... · .........
R100 Ypooo\> v-,. Rood, __ 1tItI
w_ QowM, 00JN0n0I0 _
7I!l IU6I _tJO
NOVEMBER, 2006
EXHIBIT 'A'
GHAD BOUNDARY EXHIBIT
SHEET 2 OF 2
C<J
~
C>\\
~)
q at 6d-
EXHIBIT B
LEGAL DESCRIPTION
EXHIBIT B.
-I:: 0 -tlte '""kt:/tiol'l
1 t'b<6d-
EXHIBIT "B"
GHAD
LEGAL DESCRIPTION
ALL THAT REAL PROPERTY SITUATE IN THE COUNTY OF ALAMEDA, STATE
OF CALIFORNIA, DESCRIBED AS FOLLOWS:
A PORTION OF SECTIONS 3 AND 4, TOWNSHIP 3 SOUTH, RANGE 1 WEST,
MOUNT DIABLO BASE AND MERIDAN, MORE PARTICULARLY DESCRIBED
AS FOLLOWS:
BEGINNING AT THE NORTHWEST CORNER OF SAID SECTION 4; THENCE
ALONG THE NORTH SECTION LINE OF SAID SECTION 4, SOUTH 89029'04"
EAST 2594,67 FEET TO THE NORTH ~ CORNER OF SAID SECTION 4; THENCE
CONTINUING ALONG SAID NORTH SECTION LINE SOUTH 89033'52" EAST
1715,15 FEET; THENCE ALONG THE ARC OF A NON-TANGENT CURVE, THE
RADIUS POINT OF WHICH BEARS SOUTH 79006'33" EAST, CONCAVE TO THE
EAST, HAVING A RADIUS OF 172.50 FEET, THROUGH A CENTRAL ANGLE OF
59027'40", AN ARC LENGTH OF 179.02 FEET; THENCE SOUTH 48034'13" EAST
145.11 FEET; THENCE ALONG THE ARC OF A CURVE, CONCAVE TO THE
SOUTHWEST, HAVING A RADIUS OF 237,50 FEET, THROUGH A CENTRAL
ANGLE OF 38035'04", AN ARC LENGTH OF 159.94 FEET; THENCE SOUTH
09059'09" EAST 35.93 FEET; THENCE ALONG THE ARC OF A CURVE
CONCAVE TO THE WEST, HAVING A RADIUS OF 237,50 FEET, THROUGH A
CENTRAL ANGLE OF 26018'25", AN ARC LENGTH OF 109,05 FEET; THENCE
SOUTH 16019'16" WEST 108.23 FEET; THENCE SOUTH 73040'44" EAST 25,00
FEET; THENCE SOUTH 41019'00" EAST 438,12 FEET; THENCE SOUTH 32004'20"
EAST 249.89 FEET; THENCE SOUTH 18005'49" EAST 497.44 FEET; THENCE
SOUTH 02020'33" EAST 502,81 FEET; THENCE SOUTH 18035'08" EAST 176.93
FEET; THENCE SOUTH 00034'07" WEST 178,88 FEET; THENCE SOUTH 19009'21"
WEST 338.98 FEET; THENCE SOUTH 84055'54" WEST 227,56 FEET; THENCE
SOUTH 05004'06" EAST 174.32 FEET; THENCE SOUTH 15029'10" WEST 205.73
FEET; THENCE NORTH 89042'48" EAST 816,74 FEET; THENCE SOUTH 72027'42"
EAST 573,68 FEET; THENCE SOUTH 76044'06" EAST 299,82 FEET; THENCE
NORTH 86001 '31" EAST 565,57 FEET; THENCE SOUTH 90000'00" EAST 118.45
FEET; THENCE NORTH 52015'21" EAST 238.87 FEET; THENCE SOUTH 80023'31"
EAST 145,72 FEET; THENCE SOUTH 57059'05" EAST 338,94 FEET; THENCE
SOUTH 86040'56" EAST 324.50 FEET; THENCE SOUTH 64023'41" EAST 479.65
FEET; THENCE ALONG THE ARC OF A NON-TANGENT CURVE, THE RADIUS
POINT OF WHICH BEARS NORTH 69000'53" EAST, CONCAVE TO THE
NORTHEAST, HAVING A RADIUS OF 559.94 FEET, THROUGH A CENTRAL
ANGLE OF 16017'59", AN ARC LENGTH OF 159.29 FEET; THENCE SOUTH
37017'05" EAST 53,18 FEET; THENCE SOUTH 52046'22" WEST 54.55 FEET;
THENCE SOUTH 62026'35" EAST 64,98 FEET; THENCE ALONG THE ARC OF A
NON-TANGENT CURVE, THE RADIUS POINT OF WHICH BEARS NORTH
<?;)...
01024'28" EAST, CONCAVE TO THE NORTH, HAVING A RADIUS OF 450.00
FEET, THROUGH A CENTRAL ANGLE OF 11006'30", AN ARC LENGTH OF 87,24
FEET; THENCE NORTH 77029'03" WEST 57,82 FEET; THENCE ALONG THE ARC
OF A CURVE , CONCAVE TO THE SOUTH, HAVING A RADIUS OF 1175,00
FEET, THROUGH A CENTRAL ANGLE OF 16041'54", AN ARC LENGTH OF
342.44 FEET, TO A POINT OF NON-TANGENCY, THE RADIUS POINT OF WHICH
BEARS SOUTH 04010'57" EAST; THENCE SOUTH 24046'42" WEST 41.26 FEET;
THENCE SOUTH 79018'27" WEST 36,60 FEET; THENCE NORTH 34014'51" WEST
45.12 FEET; THENCE SOUTH 84049'07" WEST 386,53 FEET; THENCE ALONG
THE ARC OF A CURVE, CONCAVE TO THE NORTH, HAVING A RADIUS OF
1525.00 FEET, THROUGH A CENTRAL ANGLE OF 12024'50", AN ARC LENGTH
OF 330.42 FEET TO A POINT OF COMPOUND CURVATURE; THENCE ALONG
SAID COMPOUND CURVE, CONCAVE TO THE NORTH, HAVING A RADIUS
OF1175.00 FEET, THROUGH A CENTRAL ANGLE OF 01050'23, AN ARC
LENGTH OF 37,73 FEET, TO A POINT OF NON-TANGENCY, THE RADIUS
POINT OF WHICH BEARS SOUTH 05023'34" WEST; THENCE SOUTH 27037'39"
WEST 122.22 FEET; THENCE SOUTH 64056'28" WEST 152,60 FEET; THENCE
NORTH 54005'20" WEST 225.92 FEET; THENCE SOUTH 87040'43" WEST 91.81
FEET; THENCE ALONG THE ARC OF A NON- TANGENT CURVE, THE RADIUS
POINT OF WHICH BEARS NORTH 09053'56" WEST, CONCAVE TO THE NORTH,
HAVING A RADIUS OF 1225.00 FEET, THROUGH A CENTRAL ANGLE OF
06025'39", AN ARC LENGTH OF 137.42 FEET, TO A POINT OF NON-TANGENCY,
THE RADIUS POINT OF WHICH BEARS NORTH 03028'17" WEST; THENCE
SOUTH 23037'03" WEST 164.40 FEET; THENCE SOUTH 74001 '35" WEST 195.64
FEET; THENCE NORTH 82039'32" WEST 204.10 FEET; THENCE NORTH
53044'04" WEST 255.59 FEET; THENCE SOUTH 82018'54" WEST 105.06 FEET;
THENCE SOUTH 19051 '38" WEST 170,84 FEET; THENCE NORTH 89027'07"
WEST 115.61 FEET; THENCE NORTH 24059'58" WEST 154.13 FEET; THENCE
SOUTH 88055'16" WEST 216.17 FEET; THENCE SOUTH 19052'26" WEST 178.82
FEET; THENCE SOUTH 85017'16" WEST 320.99 FEET; THENCE NORTH
24024'25" WEST 140,61 FEET; THENCE SOUTH 86020'13" WEST 294,72 FEET;
THENCE SOUTH 48049'53" WEST 102,97 FEET; THENCE NORTH 66031'21"
WEST 232.99 FEET; THENCE NORTH 43002'38" WEST 241.96 FEET; THENCE
NORTH 74041 '36" WEST 484,10 FEET; THENCE SOUTH 81008'09" WEST 378,64
FEET; THENCE NORTH 41039'34" WEST 426,98 FEET; THENCE NORTH
60033'37" WEST 260.44 FEET; THENCE SOUTH 78003'55" WEST 380,38 FEET;
THENCE SOUTH 53016'10" WEST 2.43 FEET; THENCE ALONG THE ARC OF A
CURVE, CONCAVE TO THE SOUTHEAST, HAVING A RADIUS OF 389,00,
THROUGH A CENTRAL ANGLE OF 26002'14", AN ARC LENGTH OF 176,78
FEET; THENCE SOUTH 27013'56" WEST 74,74 FEET; THENCE, ALONG THE ARC
OF A NON-TANGENT CURVE, THE RADIUS POINT OF WHICH BEARS SOUTH
69001 '00" EAST, CONCAVE TO THE EAST, HAVING A RADIUS OF 650,00 FEET,
THROUGH A CENTRAL ANGLE OF 04029'19", AN ARCH LENGTH OF 50.92
FEET; THENCE SOUTH 16029'42" WEST 18,85 FEET; THENCE NORTH 74030'24"
WEST 300.19 FEET; THENCE NORTH 67022'45" WEST 458,31 FEET; THENCE
NORTH 76011 '25" WEST 458,62 FEET; THENCE NORTH 87058'44" WEST 407.40
<t:~
,J
FEET; THENCE NORTH 76012'50"WEST 301.13 FEET; THENCE NORTH 81006'38"
WEST 222,75 FEET; THENCE NORTH 55021 '20" WEST 274.44 FEET; THENCE
SOUTH 70039'55"WEST 123,83 FEET; THENCE NORTH 03008'04" EAST 558.44
FEET; THENCE SOUTH 88022'02" EAST 890.26 FEET; THENCE NORTH 01037'58"
EAST 583.44 FEET; THENCE NORTH 62027'25" EAST 539.69 FEET; THENCE
ALONG THE ARC OF A NON-TANGENT CURVE, THE RADIUS POINT OF
WHICH BEARS NORTH 24024'16" EAST, CONCAVE TO THE NORTHEAST,
HAVING A RADIUS OF 8030.00 FEET, THROUGH A CENTRAL ANGLE OF
00020'22", AN ARC LENGTH OF 47,56 FEET TO A POINT ON A REVERSE
CURVE; THENCE ALONG THE ARC OF A REVERSE CURVE, CONCAVE TO
THE SOUTHWEST, HAVING A RADIUS OF 1570.00 FEET, THROUGH A
CENTRAL ANGLE OF 06024'00", AN ARC LENGTH OF 175,37 FEET, TO A POINT
OF NON-TANGENCY, THE RADIUS POINT OF WHICH BEARS SOUTH 18020'38"
WEST; THENCE SOUTH 62027'25" WEST 341.72 FEET; THENCE NORTH
75052'39" WEST 963.67 FEET; THENCE NORTH 00030'45" WEST 319.35 FEET;
THENCE NORTH 00050'31" EAST 1362.44 FEET TO THE POINT OF
BEGINNING.
CONTAINING 444.83 ACRES ( 19,376,631 SQ, FT,) MORE OR LESS.
// ~Ol" (}h
\~... "".' 1: if
-:)1' ,.rJ
V
EXHIBIT C
PLAN OF CONTROL
.
"PLAN OF CONTROL
FOR
SCHAEFER RANCH
GEOLOGIC HAZARD ABATEMENT DISTRICT
(GHAD)
'.
.
nm1T~
to t:J..e Jli;;ir:iO pt
PLAN OF CONTROL
FOR
SCHAEFER RANCH
GEOLOGIC HAZARD ABATEMENT DISTRICT
(GRAD)
DUBLIN, CALIFORNIA
SUBMITTED
TO
SCHAEFER RANCH, LLC
PREPARED
BY
ENGEOINCORPORATED
PROJECT NO. 4748.1.500.01
NOVEMBER 1, 2006
COPYRIGHT @ 2006 BY ENGEO INCORPORATED. THIS
DOCUMEJ\'T MAY NOT BE REPRODUCED IN WHOLE OR IN PART
BY ANY MEANS WHATSOEVER, NOR MAY IT BE QUOTED OR
EXCERPTED WITHOUT THE EXPRESS WRITTEN CONSENT OF
ENGEO INCORPORATED.
.
.
.
li.tJt~) ~~
ENC3EO
INCORPORATED
T ABLE OF CONTENTS
Page
I. Authority and Scope ,....""......,........."....".. ....."......... ..., ..... ...........,.. '..,..',..,.... ,..,. ...,'.., '.. 1
Property Identification".,.." ..,.......,....,.."....,....""..."..",.. .,.....".."",.....,..,....,.......".", ..,1
II. Background.... ......',.. .......".....,..'...." ...., ...........,..........,..,..,....."..........,......,.. ......... '......,.., 2
Pregrading Site Conditions........,' ....".."..,.."..".... ......",......,.."..,.....,..,.,..,..,............",..2
Proposed Development....."...".....,..",.."..,........"..,.,..,......,...., ,..,...........................,..... ,2
Open Space,........... ....... .....,.., .......,..,.... .........,..".." .....,'........................... ........"......,.., ,4
GHAD Responsibilities ....",.... .........,.."..."",.....,.......",....".....,......,....".........,......,.."..4
III. Site Geology.... ....,..,....,...." .....,., ....'..., ,..".. ......' , '....",..., ....,.. ...".."..,.,.. .............,....",.. ,....' 6
Geologic Setting""""""""."""""""",.."".""""",.""""".,."..""."",..""."""",.,.""""" 6
Site Geology.............,...........................,..."..".......".....,...",..........."..",...........,........,.... 6
IV. Geologic Hazards,..".." ....",.."..., ,.. ..." ......,......",,'...... ................"..,..,'....",....,....,'..." .....' 7
Slope Instability....,....,....,..,..",..,..,.." .......",..",.....".., .....".........,....,'..,..... ,.......,...." ...., 7
Erosion and Sedimentation ....,..,......,.... ...........' .....,.. ..... ..............", ...... ....".....,........., ..,9
Seismically-Induced Ground Shaking......"""...",...,.......,.....",...,..,.,...""".....,.,..".... ,..9
V. Criteria for GHAD Responsibility .............................,....,......,....................................., 11
Prevention, Mitigation, Abatement and/or Control of Geologic Hazards ....,..............11
Exceptions..,.."........"....,.,.." .........', ..'......,..........".....,..,..,..,..,..,.......",..,...,'..'",,'...., ...11
Isolated or Remote Slope Instability.. .............. ............. ........ ........... ......... ......,.. ,.. ..,.. ..11
Single Property..,.. .....,........ ..... ........."...."..,........,..", .......,...", ........., ...."".., .........,.... ..11
Geologic Hazards Resulting From Negligence of Property Owner,.......................,.... 12
Vertical Movement or Creep Due to Shrink Swell or Settlement ......................,....,...12
Protected Wildlife Habitat...,..",..".... ,....'......,.......,..',....."..,..,........,...."....,......, ...,..., ,13
Property Not Accepted,..,..,...., ...,...,.... .......'",.....' ....",..,..,......" ...............""..,... ......., ..13
Damage to GHAD Accepted Property from Landslide Originating on Property not
Accepted by GHAD .. ....,..,.." ......"..,.......'..,......"..,......,........,.'....".........".....,...,..,..... ,13
GHAD Funding or Reimbursement for Damaged or Destroyed Structures or Site
Improvements ,..",......"""..,....,..,..",..,.."..,....,..",..,..",.....,..".."..........",..."..,......".., ..13
VI. Acceptance"....,.."....,.........,..,..., ..........,...,.."..,......"................,...",.." ..... .... ..............'..'.. 15
Activation of Assessment..,.."" ....""'.....""""".."..,..""",......,,,.. .......'""..' ,..'"""".... ,15
Responsibility for GHAD Activities,................,.......,.."., ,....".,....,....."..,.... ........,...., ..15
VII. Schaefer Ranch GHAD Management Plan....,........,..,..............................,....,..,.............. 16
Landslide Mitigation for Existing Landslides and Erosion Features .......,...................17
Geotechnical Techniques for Mitigation of Landslide and Erosion Hazards ..............21
VIII. Priority of GHAD Expenditures................ ..,..............,.. ,...... ,.. ,.......... .........,....,.. ..,....... 23
IX. Biotechnical Recommendations for Prevention and Mitigation of Existing or Potential
Erosion Hazards"....,...,..".. .....,..."..",....",.."..,..""........,....,..""..""".",.."....,....,.....""", 24
4748,1.500,01
November 1,2006
DRAFT
C1 UO~~
EN<3EO
INCORPORATED
TABLE OF CONTENTS (Continued)
X. Maintenance and Monitoring Schedule ..,..,..,........,.......,...............,...........,.................. 25
SELECTED REFERENCES
EXHIBIT A - GHAD Legal Description
EXHIBIT B - GHAD Boundary Exhibit
GHAD Open Space Exhibit
PLATE 1- Parcel Designation Plan
PLATE 2 - Geologic Map
APPENDIX A - Water Quality - Detention Basin Monitoring and Maintenance
APPENDIX B- Site Geology
4748,1.500,01
November 1, 2006
DRAFT
(1) db <D~
ENGEO
INCORPORATED
I. Authority and Scope
The Schaefer Ranch Geologic Hazard Abatement District ("GHAD" or "District") is proposed to
be formed under authority of the California Public Resources Code (Division 17, commencing
with Section 26500), Formation of the GHAD has been proposed to provide a framework for the
prevention, mitigation, abatement, and control of identified or potential geologic hazards,
Development of a Plan of Control prepared by a State Certified Engineering Geologist is a
requirement for formation of a GHAD, Pursuant to Section 26509, this Plan of Control was
prepared by an engineering geologist certified pursuant to Section 7822 of the Business and
Professions Code and describes the geologic hazards, their location, and the area affected by
them, It also provides a plan for the prevention, mitigation, abatement, or control thereof, As
used in this Plan of Control, and as provided in Section 26507, "geologic hazard" means an
actual or threatened landslide, land subsidence, soil erosion, earthquake, fault movement, or any
other natural or unnatural movement of land or earth,
Property Identification
The boundary of Schaefer Ranch (Tract 6765), the legal description of the property, its parcel
designations, and the proposed boundary of the GHAD are shown in Exhibits A and B and Plate
I.
4748,1.500.01
November 1,2006
DRAFT
1
1C1 ~ ~d-
ENGEO
INCORPORATED
II. Background
The Schaefer Ranch project is located on the north side of Highway 580 in west Dublin,
California. The east side of the property borders open space for an adjacent subdivision and East
Bay Regional Park District land, The northern side of the property borders East Bay Regional
Park District land and the Machado Property. The west side of the property borders the
DaVilla/Eden Canyon Family Partnership Property, Access to the site is currently provided via
Schaefer Ranch Road through an existing freeway underpass, The site is approximately
445 acres in area and is bordered on the west and north by undeveloped land (the "GHAD
Property"), The GHAD Property includes the area shown in Exhibit B,
Pregrading Site Conditions
The GHAD Property is located in an area dominated by a high ridgeline that reaches elevations
of over 1,100 feet (Plate 2), In plan view, the crest of the ridge forms a "V" shape, open to the
west. The high point on the property, Donlan Point at elevation 1,138 feet, occurs at the apex of
the "V", at the east end of the high ridgeline, East of Donlan Point, a single ridgeline continues
to the east at elevations of 750 to 900 feet. South of the ridge, the property slopes to Highway
580 at elevations of 600 to 700 feet. The center of the high ridge is drained by Marshall Canyon
and Kelley Canyon, Wagon Wheel Canyon flows from a saddle south of the main ridge, All
three canyons drain northwest, into undeveloped lands. The vegetation on site currently consists
of open grassland in upland areas and south-facing slopes, local brush and tree cover in the
canyon bottoms and some lower portions of north-facing slopes,
Proposed Development
The Preliminary Grading Plan for the subject property, developed by PIA Design Associates
currently shows single family residential units, interior subdivision streets, a leisure park, a
4748,1,500,01
November 1, 2006
DRAFT
2
t';~
dO (J'D '6 cJ-
ENGEO
INCORPORA TED
sports park, three detention basins, three water quality basins, a water tank, an East Bay Regional
Park District trailhead, staging area and associated trails and an approximately 5.7 acre parcel at
the site, A Geotechnical Investigation dated October 1997 was completed for the Schaefer
Ranch site by Alan Kropp and Associates (AKA), ENGEO Incorporated performed a
supplemental exploration at the Schaefer Ranch site and provided supplemental geotechnical
recommendations in a report dated January 29, 2004, as well as subsequent documents listed in
the references section,
Grading plans for the subject site indicate that the majority of planned residential units will
occupy cut areas along the west-northwest and northwest trending ridgelines at the site,
Proposed residential units will also occupy building pads in fill areas in the southwest portion of
the site west of proposed Schaefer Ranch Road and within the west and northwest portions of the
site, In addition to the proposed residential development, a westward extension of Dublin
Boulevard is planned at the site,
Along the uphill side of the Dublin Boulevard Extension, 2: 1 (horizontal: vertical) slopes up to
180 feet in vertical height are planned, East of Station 30+50 the 2:1 slopes are planned to be
rebuilt as engineered fill slopes, West of Station 30+50, portions of the 2:1 slopes outside of
mapped landslide areas are not planned to be rebuilt. Landslides within the grading limits along
Dublin Boulevard are planned to be completely removed and replaced with drained engineered
fill, Benches with concrete-lined ditches and stormdrain systems are planned on graded slopes
steeper than 3: 1,
According to grading plans by P / A Design Resources, deep fill areas are planned at the
southwest and northwest portions of the Schaefer Ranch Project site. Engineered fill within the
above mentioned portions of the site are shown to extend up to approximately 150 feet above
original grades in some places. ENGEO provided recommendations for the monitoring of deep
fills in letters dated June 26, 2005, and August 17, 2005, Settlement instrumentation will be
4748,1.500.01
November 1, 2006
DRAFT
3
d lfiQ 1)OL-
ENGEO
INCORPORATED
provided in the deep fill areas at the southwestern portion of the site west of Schaefer Ranch
Road and in the deep fill area in the northwest portion of the site, The developer will provide for
monitoring of the settlement instruments during grading as well as during the residential
construction period,
Open Space
Project Open Space includes Parcels AI, Bl, C1, E, F, G, R, L, P, R, S, U and V as shown in
Open Space Exhibit. Title to these parcels will be conveyed to the GRAD approximately three
years after the recording of the first final map affecting the GHAD Property, Since long-term
maintenance and stability of the GRAD Property will protect the open space, which is an amenity
that will benefit all of the current and future property owners, the funding for the GRAD's
activities will be shared by all current and future property owners within the GRAD's
boundaries, All such activities shall be consistent with this Plan of Control.
According to the GHAD Boundary Exhibit prepared by P A Design Resources (August 16, 2006)
approximately 66 acres of open space designated as Parcel A has been deeded to the East Bay
Regional Park District and will therefore be outside of the GRAD's boundaries, although the
GRAD reserves the right to enter this property at its discretion in conjunction with maintenance
and repairs on the GHAD property (see attached Exhibit B),
GRAD Responsibilities
The GHAD will mitigate, prevent, abate or repair landslide or erosion hazards that could directly
affect property within the GRAD boundary, as necessary to implement this Plan of Control. The
GRAD will also assume open-space management responsibilities that are required for the
Schaefer Ranch Project. These responsibilities will include: vegetation management, erosion
control, vegetation removal (fire suppression), and selected other maintenance associated with
4748,1.500,01
November 1, 2006
DRAFT
4
;J ;J., ffb 1; ~
ENGEO
INCORPORATED
open space. In addition, the responsibility of the GRAD includes: maintenance, repair and
replacement of detention basins (within the GRAD Property), vegetation control, armoring of
channels and desilting of detention basins.
The GRAD's responsibilities will include but may not be limited to monitoring and maintenance
for the following as appropriate,
. Detention Basins and Water Quality Basins on Parcels "R", "G" and "V", including
structures, vegetation and sediment removal.
· Maintenance and repair of EVA and access Roads,
. Erosion repairs,
· Revegetation and vegetation control, including fire break mowing, weeding and additional
hydroseeding as deemed necessary,
. Sediment removal from concrete structures (applies only to open-space catch basins, field
inlets, V-ditches and stormdrain pipes),
. Slope stabilization (includes minor landsliding and debris bench clearing),
. Subdrain outfall maintenance.
. Open-space stormdrain pipe and V-ditch replacement.
In addition, the GRAD will have maintenance, monitoring and repair responsibilities for slopes,
which will include natural, reconstructed or partially-reconstructed landslides as indicated within
the referenced ENGEO reports and discussed below (Section V),
4748,1.500,01
November 1, 2006
DRAFT
5
d 3 d1 <6;).
D
ENGEO
INCORPORATED
III. Site Geology
Geologic Setting
The site is located within the Coast Ranges geologic provmce of California, a senes of
northwest-trending ridges and valleys, Bedrock in the province has been folded and faulted
during regional uplift beginning in the Pliocene period, roughly 4 million years before present.
More specifically Schaefer Ranch is located in the central East Bay Hills, an area that is
characterized by folded and faulted Cretaceous to Pliocene-age sedimentary rocks (Plate 2), The
eastern and western geologic boundaries of the East Bay Hills are formed by the active Calaveras
and Hayward Faults,
Site Geology
Regional geologic maps of the area have been prepared by Dibblee (1980), Crane (1988) and
Graymer (1996). The most recent regional map prepared by Graymer indicates that the site is
underlain by late and middle Miocene rocks of the Briones Formation and undivided middle
Miocene marine rocks of the Monterey Group including the Rodeo Shale, Hambre Sandstone,
Tice Shale and Ours an Sandstone, A more extensive discussion of the site geology is included
as Appendix B of this Plan of Control.
4748,1.500,01
November 1, 2006
DRAFT
6
J <-t 1J <bd
ENGEO
INCORPORATED
IV. Geologic Hazards
Geologic hazards identified for the site in the AKA and ENGEO reports include the following
items:
. Lateral stability or slope stability
. Erosion and sedimentation
· Seismically-induced ground shaking
Slope Instability
Earth stability is the GRAD's prime geotechnical concern at this site, This is not unique to this
project, but is of importance for hillside projects in the San Francisco Bay Area, This section
describes several types of slope instability which are within the GRAD's responsibility, subject
to the provisions of Section VI.
Landslides are a common geologic phenomenon and are part of the process of mass wasting.
Weathered or fractured bedrock and soil are transported downslope over geologic time as a result
of gravitational and hydrostatic forces, Landslides and earth movement in this bedrock formation
are typically rotational slumps and earthflows, Depth of movement is typically about 5 to
25 feet below the ground surface, In the winter rainy season, these earthflows can move at a rate
of several feet per day,
A landslide is a deposit of soil and/or bedrock moving downward from its original position under
the influence of gravity, Landslides include a variety of morphologies and are further defined by
type of materials, wetness, and mode of movement. They can consist of mass movements of
earth materials that are primarily intact, and occur along discrete shear surfaces. These surfaces
(shear or slip planes) can be rotational (conchoidal or concave), such as for earth slumps, or
planar, as for translational earth slide or bedrock block glides, Most landslides are truly
"complex landslides", sliding, falling and flowing with more than one type of movement and/or
material.
4748,1.500,01
November 1, 2006
DRAFT
7
:J6Db <DoL
ENGEO
INCORPORATED
According to the geotechnical reports for the project approximately 59 landslides have been
identified on the subject site. The geologic map showing the location of each of the landslides is
included as Plate 2, In general mitigation measures for the mapped landslides are to be
performed in accordance with the approved remedial grading plans for the project. The proposed
mitigation measures identified in the geotechnical report and the remedial grading plans include
the following: complete removal of the landslide and replacement with drained engineered fill,
removal and replacement of the lower portion of the landslide and replacement with a drained
engineered fill buttress, and removal and replacement of the upper portion of the landslide within
the grading limits and providing a keyway along the edge of the grading limits, According to the
geotechnical report for the project, landslides that are completely outside of the proposed grading
limits and pose no potential risk to the proposed development, will not be mitigated and will be
left in-place, As-built remedial grading plans are to be prepared following grading at the site to
show areas and locations where corrective grading was performed.
Slope failures are also often triggered by increased pore water pressure due to the infiltration of
rainwater. The resulting decrease of shear resistance (internal resistance to deformation by
shearing) can cause the slope to move. The level of the groundwater table varies with the
amount of rainfall for the area, If rainfall is higher than average during the winter season, the
water table will be higher than average on a hillslope and groundwater pressures may become
high, Under these conditions, hillside movement can be activated,
Soil creep is the slow, often imperceptible, deformation of slope materials under low stress
levels, which normally affects the shallow portion of the slopes, but can be deep seated where a
weak zone of soil or bedrock exists, It results from gravitational and seepage forces, and may be
indicative of conditions favorable for landsliding. Creep can be caused by wetting and drying of
clays, by solution and crystallization of salts, by the growth of roots, by burrowing animals and
by down slope movement of saturated ground, Colluvium refers to the thicker mantle of loose
4748,1.500,01
November 1, 2006
DRAFT
8
;;d.~ 110 ~d-
ENGEO
INCORPORA TED
soil and weathered bedrock debris that progresses down hillsides by creep, Colluvial deposits
are typically the result of soil creep and may be in a weak, unconsolidated state, making them
susceptible to landsliding if undercut. Colluvium is generally approximately 8 to 15 feet in
thickness, Landslides and colluvial deposits located within open space areas are natural
landforms that do not require mitigation except where they affect man-made improvements,
Potential mitigation and repair measures for GRAD areas near development are discussed in
Section VII.
Erosion and Sedimentation
The District shall also be concerned with erosion and sedimentation in open space or affecting
established lots or improvements, Erosion is defined as the process by which earth materials are
loosened and removed by running water on the ground surface or in the subsurface,
Sedimentation is the depositing or settling of soil or rock particles from a state of suspension in a
liquid,
Hilly terrain in open space, either in a natural condition or particularly on excavated slopes, can
be subject to erosion, Landslide deposits which are sometimes in a loosened condition are
particularly prone to erosion, Earth flow, debris flow and mud flow landslides typically have an
area of deposition or accumulation (sedimentation area) at their base, Graded slopes in the
District, particularly those in excess of 20 feet in vertical height or those not sufficiently
vegetated, can be subject to erosion and therefore, a source of transported sediment.
Seismically-Induced Ground Shaking
As identified in the geotechnical reports, an earthquake of moderate to high magnitude generated
within the San Francisco Bay Region could cause considerable ground shaking at the site, similar to
that which has occurred in the past. Seismic slope stability has been considered in the ENGEO
4748.1.500,01
November 1, 2006
DRAFT
9
dvl~ '6 L
ENGEO
INCORPORATED
remedial grading plans for engineered fill slopes at the site, On unimproved open space slopes,
seismically-generated slope failures may occur in open-space areas outside the development
limits,
4748,1,500,01
November 1, 2006
DRAFT
10
~'6D()gL
EM3EO
INCORPORATED
v. Criteria for GHAD Responsibility
Prevention, Mitigation, Abatement and/or Control of Geologic Hazards
Subject to the following exceptions, the primary mission of the GHAD shall be the prevention,
mitigation, abatement and/or control of geologic hazards within its boundaries that have
damaged, or that pose a significant threat of damage to site improvements within the GHAD
boundaries, As used herein, the term "site improvements" means buildings and outbuildings,
roads, sidewalks, utilities and associated facilities/structures and geologic stabilization features,
Exceptions
The intent of this Plan of Control is not to extend the GHAD's responsibilities to every potential
situation of slope instability, Specifically, the following are excluded from the GHAD's
responsibilities:
Isolated or Remote Slope Instability
The GHAD shall not have responsibility to monitor, abate, mitigate or control isolated or remote
slope instability that does not involve damage to or pose a significant threat to damage (a) site
improvements or (b) off-site improvements if the threat of damage or damage is not caused by
property or site improvements for which the GHAD is responsible.
Single Property
The GHAD will not prevent, mitigate, abate or control geologic hazards which are limited in
area to a single parcel of property not owned by the GHAD unless the geologic hazard has
damaged, or poses a significant threat of damage, to site improvements located on other property
4748.1.500.01
November 1,2006
DRAFT
11
dv q 1J <Do.
ENGEO
INCORPORATED
within the GHAD boundaries, This exclusion does not apply to geologic hazards existing on
common area property owned by the HOA or within the GHAD-owned Property,
Geologic Hazards Resulting From Negligence of Property Owner
The GHAD may, in the GHAD manager's sole discretion, decline to prevent, mitigate, abate or
control geologic hazards which occurred or resulted from any negligence of the homeowner
and/or the homeowner's contractors, agents or employees in developing, investigating, grading,
constructing, maintaining or performing or not performing any post-development work on the
subject property,
Vertical Movement or Creep Due to Shrink Swell or Settlement
Vertical movement due to shrink -swell of expansive soils or settlement of fills is expected at the
site as with many residential developments in the area. Damage to site improvements resulting
from shrink swell or settlement of fills is not the responsibility ofthe GHAD,
4748,1.500,01
November 1, 2006
DRAFT
12
'3 () ZfJ <6;;~
ENGEO
INCORPORA TED
Protected Wildlife Habitat
The GHAD will not prevent, mitigate, abate or control isolated geologic hazards which are
limited to mitigation areas and/or protected wildlife habitat unless the geologic hazard has
damaged, or poses a significant threat of damage, to site improvements located on property
within the GHAD boundaries,
Property Not Accepted
The GHAD shall not have responsibility to repair damaged site improvements which are situated
on a parcel of real property that the GHAD has not accepted in accordance with Section VI,
below.
Damage to GHAD Accepted Property from Landslide Originating on Property not Accepted by
GHAD
The GHAD may monitor, abate, mitigate or control slope instability on a parcel of real property
which (1) the GHAD has not accepted in accordance with Section VI, below, and (2) that is not
excluded from GHAD responsibility by Paragraphs 1 and 2; provided that GHAD responsibility
on such parcel shall be limited to the extent necessary to address damage or a significant threat to
damage site improvements which are within a parcel of real property which the GHAD has
accepted in accordance with Section VI, below,
GHAD Funding or Reimbursement for Damaged or Destroyed Structures or Site Improvements
In the event that improvements (including residences, landscape, hardscape, or any other
structure) are damaged or destroyed due to, or as a result of, a geologic hazard, the GHAD may
fund or reimburse the property owner for the expenses necessary to repair or replace the
4748,1.500,01
November 1, 2006
DRAFT
13
:3 I '1J ~d-
ENC3EO
INCORPORATED
damaged or destroyed structure, site improvement or landscaping, Unless authorized by the
Board of Directors, the dollar amount of the GRAD funding or reimbursement may not exceed
an aggregate of ten percent (10%) of the costs incurred by the GRAD in preventing, mitigating,
abating or controlling the geologic hazard responsible for the damage,
4748,1,500.01
November 1, 2006
DRAFT
14
7ZfJ ~.CY
EM3EO
INCORPORATED
VI. Acceptance
Activation of Assessment
An annual assessment shall be fully authorized, prior to recordation of the Final Map in
accordance with the Conditions of Approval, on all residential parcels in the GRAD and may be
increased as provided by law to achieve the purposes of the GRAD and this Plan of Control.
The assessment shall be levied by the GRAD on each individual residential parcel beginning the
first fiscal year following issuance of a building permit for that parcel.
Responsibility for GHAD Activities
Except as provided for in Section V, the party that, on the date the Final Map within the
boundaries of the GRAD is recorded in the Official Records of Alameda County, owns the
developable parcels shown on the Final Map shall have the responsibility to perfonn all the
activities of the GRAD on property within the final Map prior to transfer of such property to the
GRAD. Pursuant to this Plan of Control, such responsibility shall automatically transfer to the
GRAD at 9:00 a,m, on the day exactly three years after the completion and city approval of the
grading for the Schaefer Ranch Project, or exactly three years, after the first occupancy permit
for the Schaefer Ranch Project is issued by the City, whichever is later, and provided the
improvements required by the Conditions of Approval for the Schaefer Ranch Project have been
accepted, This transfer date may be extended at the sole discretion of the owners of the GRAD
Property to be transferred, provided that the owners continue to perform the GHAD's activities
and that the assessments continue to be levied during the extension period and that notice of such
extension is delivered to the GRAD manager at least 30 days prior to the transfer date, The
approximate three-year period between the levying of the GRAD assessment and the GRAD
transfer will allow the GRAD to accumulate reserve funds without incurring significant
expenses,
4748,1.500,01
November 1,2006
DRAfT
15
~ ~ '1J <6 ()-"
EM3EO
INCORPORATED
VII. Schaefer Ranch GHAD Management Plan
The GRAD will subject to the criteria outlined in Section V, monitor, mitigate and repair
landslide or erosion hazards within the GRAD boundaries, Subject to the same criteria, the
OHAD will also monitor, maintain, and repair the following within the GRAD boundary.
. Detention Basins and Water Quality Basins on Parcels "R", "0" and "V", including
structures, vegetation and sediment removal
. Maintenance and repair of EVA and access Roads,
. Erosion repairs.
. Revegetation and vegetation control, including fire break mowing, weeding and additional
hydro seeding as deemed necessary,
. Sediment removal from concrete structures (applies only to open-space catch basins, field
inlets, V-ditches and stormdrain pipes),
. Slope stabilization (includes minor landsliding and debris bench clearing),
. Subdrain outfall maintenance,
. Open-space stormdrain pipe and V-ditch replacement.
. Any other duties that the OHAD manager deems necessary for the management of areas
within the GRAD boundaries,
The GRAD will be authorized to maintain the geologic stabilization features (e.g. ditches, benches,
walls, etc.) in the open space, and the unimproved areas including the hillside slopes extending
uphill from debris benches and common areas outside of the private lot boundaries except where
noted in section X. The GRAD's maintenance responsibilities include prevention, abatement, and
control of landslide and erosion hazards within the subdivision open space and hillsides, as provided
in Section V.
4748,1.500.01
November 1, 2006
DRAFT
16
2>t..f ~ 6 Cr
ENGEO
INCORPORATED
General maintenance of the surface drainage improvements in the open space and on the hillsides,
such as the concrete V-ditches, will be the GRAD's responsibility, The GRAD is also responsible
for general maintenance of the stormdrain inlets and outlets in open space as well as the sub drain
outlets, Potential geologic hazards such as landslides and slope erosion within the open space,
including the unimproved hillsides, shall be the responsibility of the GRAD in accordance with
Section V of this report, Clearing of fire breaks and general maintenance of the open space (other
than hazard abatement) will be performed by the GRAD,
Landslide Mitigation for Existing Landslides and Erosion Features
For existing landslide areas the following mitigation measures have been proposed within the
geotechnical investigation reports. General landslide mitigation measures and potential GHAD
maintenance and monitoring activities are shown below.
Landslide Proposed Corrective Potential GRAD Maintenance or Monitoring .
Designations Measures
B-1 Complete removal Routine observation during periodic site monitoring events.
Remove and replace lower Upslope portions of Bedrock Landslide above the repair
portion of landslide to remain, Observation of this area during periodic site
B-2 underlying improvements, monitoring events, Higher potential for corrective work in
Provide intervening future if landslide debris movement impacts rebuilt portion
deposition area of slope or site improvements. See Section vn for potential
landslide mitigation techniques.
None Required Landslide to remain in place, Routine observation during
B-3 Outside of grading limits
and within open space area periodic site monitoring events,
B-4 Complete removal Routine observation during periodic site monitoring events,
B-5 Complete removal Routine observation during periodic site monitoring events,
B-6 Complete removal Routine observation during periodic site monitoring events,
None Required Landslide to remain in place, Routine observation during
B-7 Outside of grading limits
and within open space area periodic site monitoring events,
L-l Complete removal Routine observation during periodic site monitoring events,
L-2 Complete removal Routine observation during periodic site monitoring events.
Removal of the upper portion Lower portion of landslide within open space area and
L-3 of the landslide within grading outside of grading limits to remain, Routine observation
limits during periodic site monitoring events,
4748.1.500.01
November 1, 2006
DRAFT
17
36"li6 (;6
ENGEO
INCORPORATED
Landslide Proposed Corrective Potential GHAD Maintenance or Monitoring Activities
Designations Measures
None Required Landslide to remain in place, Routine observation during
L-4 Outside of grading limits
and within open space area periodic site monitoring events.
None Required Landslide to remain in place. Routine observation during
L-5 Outside of grading limits
and within open space area periodic site monitoring events,
None Required Landslide to remain in place, Routine observation during
L-6 Outside of grading limits
and within open space area periodic site monitoring events.
None Required Landslide to remain in place, Routine observation during
L-7 Outside of grading limits
and within open space area periodic site monitoring events,
Shallow upslope margins of landslide above the repair to
remam. Observation of this area during periodic site
Removal of the lower portion monitoring events. Higher potential for maintenance or
L-8 of the landslide within cut corrective work in future iflandslide debris is shed on to
slope rebuild area. benches of rebuilt slope or shallow movement impacts
rebuilt portion of slope or site improvements, See Section
vn for potential landslide mitigation techniques.
Remove and replace lower Shallow upslope margins of landslide above the repair to
portion of landslide remain, Observation of this area during periodic site
L-9 underlying improvements, monitoring events. Higher potential for maintenance or
corrective work in future iflandslide debris is shed into
Provide intervening intervening debris deposition area. See Section VII for
deposition area potential landslide mitigation techniques.
L-10 Complete removal Routine observation during periodic site monitoring events.
L-11 Complete removal Routine observation during periodic site monitoring events.
Remove and replace more Shallow upslope portion of landslide above the repair to
significant lower portion of remain. Observation of this area during periodic site
L-12 landslide underlying monitoring events. Higher potential for maintenance or
improvements, Provide corrective work in future if landslide debris is shed into
intervening debris deposition area, See Section VII for
intervening deposition area potential landslide mitigation techniques.
Remove and replace lower Upslope portion of landslide above the repair to remain.
portion of landslide Observation of this area during periodic site monitoring
L-13 underlying improvements, events. Higher potential for maintenance or corrective work
Provide intervening in future if landslide debris is shed into intervening debris
deposition area deposition area, See Section vn for potential landslide
mitigation techniques.
Remove and replace lower Upslope portion of landslide above the repair to remain.
L-14 portion of landslide Observation of this area during periodic site monitoring
underlying improvements, events, Higher potential for maintenance or corrective work
4748,1.500,01
November 1, 2006
DRAFT
18
:3.~ tJD <6.~.
ENGEO
INCORPORA TED
Landslide Proposed Corrective Potential GHAD Maintenance or Monitoring Activities
Deshmations Measures
Provide intervening in future iflandslide debris is shed into intervening debris
deposition area deposition area, See Section VlI for potential landslide
mitigation techniques.
Shallow upslope margins of landslide above the repair to
Removal of the more remain, Observation of this area during periodic site
significant lower portion of the monitoring events, Higher potential for maintenance or
L-15 corrective work in future iflandslide debris is shed on to
landslide within cut slope benches of rebuilt slope or shallow movement impacts
rebuild area. rebuilt portion of slope or site improvements, See Section
VlI for potential landslide mitigation techniques.
Shallow upslope margins of landslide above the repair to
Removal of the more remain, Observation of this area during periodic site
significant lower portion of the monitoring events, Higher potential for maintenance or
L-16 corrective work in future if landslide debris is shed on to
landslide within cut slope benches of rebuilt slope or shallow movement impacts
rebuild area, rebuilt portion of slope or site improvements, See Section
vn for potential landslide mitigation techniques,
Shallow upslope margins of landslide above the repair to
Removal of the more remain. Observation of this area during periodic site
significant lower portion of the monitoring events. Higher potential for maintenance or
L-17 corrective work in future iflandslide debris is shed on to
landslide within cut slope benches of rebuilt slope or shallow movement impacts
rebuild area, rebuilt portion of slope or site improvements, See Section
VlI for potential landslide mitigation techniques,
None Required Landslide to remain in place. Routine observation during
L-18 Outside of grading limits
and within open space area periodic site monitoring events.
Removal of the upper portion Lower portion of landslide within open space area and
L-19 of the landslide within grading outside of grading limits to remain, Routine observation
limits during periodic site monitoring events,
None Required Landslide to remain in place, Routine observation during
L-20 Outside of grading limits
and within open space area periodic site monitoring events,
L-2l Complete removal Routine observation during periodic site monitoring events,
L-22 Complete removal Routine observation during periodic site monitoring events.
L-23 Complete removal Routine observation during periodic site monitoring events.
L-24 Complete removal Routine observation during periodic site monitoring events.
L-25 Complete removal Routine observation during periodic site monitoring events,
L-26 Complete removal Routine observation during periodic site monitoring events,
L-27 Complete removal Routine observation during periodic site monitoring events.
L-28 Complete removal Routine observation during periodic site monitoring events.
L-29 Complete removal Routine observation during periodic site monitoring events,
4748.1.500,01
November 1, 2006
DRAFT
19
~&;
INCORPORATED
Landslide Proposed Corrective Potential GHAD Maintenance or Monitoring Activities
Designations Measures
L-30 Complete removal Routine observation during periodic site monitoring events.
Upslope portion oflandslide above the repair to remain.
Remove and Replace Observation of this area during periodic site monitoring
Portions Underlying events, Higher potential for maintenance or corrective work
L-3l Improvements, Construct in future if landslide debris is shed on to benches of rebuilt
Buttress and Debris slope or shallow movement impacts rebuilt portion of slope
Catchment Bench or site improvements, See Section VII for potential landslide
mitigation techniques.
L-32 Complete removal Routine observation during periodic site monitoring events.
None Required Landslide to remain in place, Routine observation during
L-33 Outside of grading limits
and within open space area periodic site monitoring events.
None Required Landslide to remain in place, Routine observation during
L-34 Outside of grading limits
and within open space area periodic site monitoring events,
None Required Landslide to remain in place, Routine observation during
L-35 Outside of grading limits
and within open space area periodic site monitoring events.
None Required Landslide to remain in place. Routine observation during
L-36 Outside of grading limits
and within open space area periodic site monitoring events,
None Required Landslide to remain in place, Routine observation during
L-37 Outside of grading limits
and within open space area periodic site monitoring events.
Lower portion of landslide within open space area and
Remove and Replace outside of grading limits to remain, Observation of this
Portions Underlying area during periodic site monitoring events, Higher potential
L-38 Improvements, Construct for corrective work in future if downslope movement of
Buttress Key at Upper landslide leads to regression of heads carp into areas of site
Landslide Limits, improvements. See Section vn for potential landslide
mitigation techniques.
None Required Landslide to remain in place. Routine observation during
L-39 Outside of grading limits
and within open space area periodic site monitoring events.
None Required Landslide to remain in place, Routine observation during
L-40 Outside of grading limits
and within open space area periodic site monitoring events,
None Required Landslide to remain in place, Routine observation during
L-41 Outside of grading limits
and within open space area periodic site monitoring events,
L-42 None Required Routine observation during periodic site monitoring events.
Outside of grading limits
4748,1,500,01
November 1, 2006
DRAFT
20
r'. .. 0
? '6116 D;)
EN<3EO
L-43
L-44
L-45
L-46
L-47
L-48
L-49
L-50
L-5l
L-52
Proposed Corrective
Measures
and within 0 en s ace area
None Required
Outside of grading limits
and within 0 en s ace area
None Required
Outside of grading limits
and within 0 en s ace area
None Required
Outside of grading limits
and within 0 en s ace area
None Required
Outside of grading limits
and within 0 en s ace area
None Required
Outside of grading limits
and within 0 en s ace area
None Required
Outside of grading limits
and within 0 en s ace area
None Required
Outside of grading limits
and within 0 en s ace area
None Required
Outside of grading limits
and within 0 en s ace area
None Required
Outside of grading limits
and within 0 en s ace area
None Required
Outside of grading limits
and within open space area
INCORPORATED
Potential GHAD Maintenance or Monitorin
Landslide to remain in place, Routine observation during
periodic site monitoring events,
Landslide to remain in place, Routine observation during
periodic site monitoring events.
Landslide to remain in place. Routine observation during
periodic site monitoring events,
Landslide to remain in place, Routine observation during
periodic site monitoring events,
Landslide to remain in place. Routine observation during
periodic site monitoring events,
Landslide to remain in place, Routine observation during
periodic site monitoring events.
Landslide to remain in place, Routine observation during
periodic site monitoring events,
Landslide to remain in place. Routine observation during
periodic site monitoring events,
Landslide to remain in place, Routine observation during
periodic site monitoring events.
Landslide to remain in place, Routine observation during
periodic site monitoring events.
Geotechnical Techniques for Mitigation of Landslide and Erosion Hazards
The techniques which may be employed by the GHAD to prevent, mitigate, abate, or control
geologic hazards include, but are not necessarily limited to:
A. Removal of the unstable earth mass,
4748,1.500.01
November 1,2006
DRAFT
21
3qtr.~ ~~
ENG~O
INCORPORA TED
B, Stabilization (either partial or total) of the landslide by removal and replacement with
compacted, drained fill,
C. Construction of structures to retain or divert landslide material or sediment.
D, Construction of erosion control devices such as gabions, riprap, geotextiles, or lined
ditches,
E, Placement of drained engineered buttress fill.
F, Placement of subsurface drainage devices; (e,g, underdrains, or horizontal drilled drains),
G, Slope correction (e,g, gradient change, biotechnical stabilization, slope trimming or
contouring),
H, Construction of additional surface ditches and/or detention basins, silt fences, sediment
traps, or backfill or erosion channels,
Potential landslide and erosion hazards can be mitigated best by controlling soil saturation and
water runoff and by maintaining the surface and subsurface drainage system, Maintenance shall
be provided for lined surface drainage ditches and drainage terraces including debris benches or
drop inlets.
4748,1.500,01
November 1, 2006
DRAFT
22
~ 0 ~ ~d
ENGEO
INCORPORATED
VIII. Priority of GHAD Expenditures
Emergency response and scheduled repair expenditures by the GRAD are to be assigned a
priority at the discretion of the GRAD manager based upon available funds and the approved
operating budget. GRAD expenditures shall be prioritized as follows in descending order of
priority:
A. Prevention, mitigation, abatement or control of geologic hazards that have either
damaged or pose a significant threat of damage to residences, critical underground
utilities or paved streets.
B. Prevention, mitigation, abatement or control of geologic hazards which have either
damaged or pose a significant threat of damage to ancillary structures, including but not
limited to the detention basins, or community buildings.
C, Prevention, mitigation, abatement or control of geologic hazards which have either
damaged or pose a significant threat of damage to open space amenities including
vegetation that part of the irrigated, maintained, ornamental landscaping,
D, Prevention, mitigation, abatement or control of geologic hazards existing entirely on
open-space property and which have neither damaged nor pose a significant threat of
damage to any site improvements,
4748,1,500,01
November 1,2006
DRAFT
23
Jk~Jd-
INCORPORATED
IX. Biotechnical Recommendations for Prevention and Mitigation of Existing or Potential
Erosion Hazards
Maintenance of vegetative cover is important on all slopes cut or fill, Vegetation provides a
protective role on soil and exposed rock. It absorbs the impact of raindrops, reduces the velocity
of runoff, and retards erosion,
The GRAD may plant carefully selected and placed biological elements (plants), In addition, if
the GRAD manager determines that it is necessary, biotechnical slope protection may also
involve the use of mechanical elements or structures in combination with biological elements to
provide erosion control and help prevent small-scale slope failures, Locally, crib walls, welded-
wire walls, gabion walls, rock walls, riprap, and reinforced earth walls used in combination with
carefully selected and planted vegetation can provide high quality slope protection, The
vegetation may be planted on the slope above a low retaining structure or toe wall, or the
interstices of the structure can be planted,
4748.1.500,01
November 1, 2006
DRAFT
24
42.11) ~'2~
ENGEO
INCORPORATED
x. Maintenance and Monitoring Schedule
Geologic features and GHAD maintained facilities should be inspected by GHAD staff or
GHAD-assigned consultants as presented below, The annual budget should be calculated so that
inspections will be scheduled to occur two times per year and as necessary after heavy rainfall
events that is defined as greater than 1 inch of rainfall in a 12-hour period, The inspections
should be scheduled to take place in October, prior to the first significant rainfall; mid-winter as
necessary during heavy rainfall years or events; and in early April, at the end of the rainy season,
The frequency of the inspections should be increased in years of higher than average rainfall
intensity and recurrence, The timing, frequency and other details regarding such maintenance,
inspection and similar activities will be set forth in the Management Plan prepared by the GHAD
manager.
It is our understanding that in some instances slopes, benches and drainage structures which are
to be maintained by the GHAD shall extend across private parcels, Access for maintenance and
repair of these features shall be granted to the GHAD through easements established in favor of
the GHAD.
The GHAD shall obtain copies of geologic or geotechnical exploration reports related to site
development and keep these reports on file in the records of the GHAD, In addition, copies of
any earthwork-related testing and observation reports that will be finalized at the completion of
grading, when as-built drawings are available, shall be maintained as part of the GHAD records,
Following are guidelines for a monitoring plan, The actual scope and frequency of monitoring
events shall be at the discretion of the GHAD manager.
. The General Manager's engineer and/or geologist should inspect the lined surface ditches on
a regular schedule, If possible, inspections should be scheduled twice each year, budget
permitting, One inspection should be in the fall prior to the onset of winter rains, The
4748,1.500,01
November 1, 2006
DRAFT
25
y,~. DV 32-
ENGEO
INCORPORATED
inspector should check for sedimentation, cracking or shifting of the concrete-lined ditches.
Repairs and maintenance should be performed on a regular schedule, Excess silt or sediment
in ditches should be removed and cracked or broken ditches should be patched or repaired as
required prior to the beginning of the next rainy season,
. Subsurface drain outlets and horizontal drilled drain outlets, if any, should be inspected on a
regular basis. Water flowing from these outlets should be measured and recorded during
each inspection, If possible, inspections should be scheduled twice each year, preferably in
the fall and spring, Any suspicious interruption in flow should signal a need to unplug or
clean the affected drain.
. Inlets, outfalls or trash racks, if used, must be kept free of debris and spillways maintained,
Attention should be given to plantings or other obstructions which may interfere with access
by power equipment.
The detention basins and water quality ponds on Parcels "R", "G" and "V" should be monitored
4 times each year, as appropriate, The monitoring schedule should occur in January, April,
October, and as necessary during heavy rainfall events, A more detailed schedule of monitoring
items and sample monitoring report forms are included in the detention basin monitoring and
maintenance section presented in Appendix A,
An annual inspection shall be made by the engineer and/or engineering geologist to assess the
effectiveness of the preventive maintenance program and to make recommendations as to which
landslide or erosion measures should be undertaken in the next fiscal year. Any appropriate
site-specific study of landslide or erosion conditions shall be determined at that time,
Consultants, if necessary, will be retained to undertake the needed studies, An annual inspection
report shall be prepared by the GRAD Engineer and/or engineering geologist for the GRAD,
Distribution of the annual report along with the budget information shall include City of Dublin
Public Works Director,
4748,1.500,01
November 1, 2006
DRAFT
26
vt Yri[) ~2-
EIVGEO
INCORPORA TED
SELECTED REFERENCES
Alan Kropp & Associates, 1997, Geotechnical Investigation, Schaefer Ranch Subdivision,
Dublin, California, Dated October, 1997, Project Number 1051-1 C,
California Department of Conservation, 1996, California Fault Parameter, Division of Mines and
Geology, Open File Report 96-08,
Crane, R., 1995, Geology of the Mount Diablo Region, in Geology of the Mount Diablo Region
Guidebook, Northern California Geological Society,
Dibblee, T,W., 1980, Preliminary geologic map of the Dublin quadrangle, Alameda and Contra
Costa Counties, California: D,S, Geological Survey, Open-File Report OF-80-537, scale
1 :24000,
ENGEO Inc" 2004, Supplemental Geotechnical Recommendations, Schaefer Ranch Project,
Dublin, California, dated January 29,2004, Project No.4748,1.001.01
ENGEO Inc" 2005, Geotechnical Recommendations for Existing Mitigation Pond PP10 at
Marshall Canyon, Schaefer Ranch Project, Dublin, California, dated April 14, 2005,
Project No.4748, 1.001.01
ENGEO Inc" 2005, Geotechnical Review of Mitigation and Watershed Enhancement Planting and
Grading Plans and Supplemental Geotechnical Criteria, Schaefer Ranch Project, Dublin,
California, dated June 9,2005, Project No.4748,1.001.01
ENGEO Inc., 2005, Recommendations for Settlement Monitoring of Planned Deep Fill Areas,
Schaefer Ranch Project, Dublin, California, dated June 26, 2005, Project
No.4748.1,OOl,Ol
ENGEO Inc" 2005, Recommendations for Settlement Monitoring of Planned Deep Fill Areas,
Schaefer Ranch Project, Dublin, California, dated August 17, 2005, Project
No.4748.1,OOl,Ol
Graymer, R, W., Jones, D, L. and Brabb, E, E" 1994, Preliminary Geologic Map Emphasizing
Bedrock Formations in Alameda County, California: OFR 96-252,
Federal Emergency Management Agency, 1982, National Flood Insurance Program, Flood
Insurance Rate Map (FIRM), Panel Number 065048 0025 B,
4748,1.500,01
November 1, 2006
DRAFT
L/0 irfJq;~
ENGEO
INCORPORATED
SELECTED REFERENCES (Continued)
Unruh, J, R, and Sawyer, T, L., 1997, Assessment of Blind Seismogenic Sources, Livermore
Valley, Eastern San Francisco Bay Region: Final Technical Report by William Lettis
Associates and Piedmont Geosciences Inc, for the U, S, Geologic Survey National
Earthquake Hazards Reduction Program,
Unruh, 2000, Characterization of Blind Seismogenic Sources in the Mt. Diablo-Livermore
Region, San Francisco Bay Area, California: Final Technical Report by William Lettis &
Associates for the U, S, Geologic Survey National Earthquake Hazards Reduction
Program,
Wagner, J. R., 1978, Late Cenozoic History of the Coast Ranges East of San Francisco Bay,
Ph,D, Dissertation, University of California, Berkeley,
Working Group on California Earthquake Probabilities, 1999, Earthquake Probabilities in the
San Francisco Bay Region: 2000 to 2030 - A Summary of Findings: USGS Open-File
Report 99-517,
4748,1.500,01
November 1, 2006
DRAFT
~fa ffb 97-
ENGEO
INCORPORATED
EXHIBIT A
P / A Design Resources
Legal Description
4748,1.500.01
November 1, 2006
DRAFT
eft rriJq .~
EXHIBIT " A"
GRAD
LEGAL DESCRIPTION
ALL THAT REAL PROPERTY SITUATE IN THE COUNTY OF ALAMEDA, STATE
OF CALIFORNIA, DESCRIBED AS FOLLOWS:
A PORTION OF SECTIONS 3 AND 4, TOWNSHIP 3 SOUTH, RANGE 1 WEST,
MOUNT DIABLO BASE AND MERIDAN, MORE PARTICULARLY DESCRIBED
AS FOLLOWS:
BEGINNING AT THE NORTHWEST CORNER OF SAID SECTION 4; THENCE
ALONG THE NORTH SECTION LINE OF SAID SECTION 4, SOUTH 89029'04"
EAST 2594.67 FEET TO THE NORTH ~ CORNER OF SAID SECTION 4; THENCE
CONTINUING ALONG SAID NORTH SECTION LINE SOUTH 89033'52" EAST
1715.15 FEET; THENCE ALONG THE ARC OF A NON-TANGENT CURVE, THE
RADIUS POINT OF WHICH BEARS SOUTH 79006'33" EAST, CONCAVE TO THE
EAST, HAVING A RADIUS OF 172.50 FEET, THROUGH A CENTRAL ANGLE OF
59027'40", AN ARC LENGTH OF 179.02 FEET; THENCE SOUTH 48034'13" EAST
145.11 FEET; THENCE ALONG THE ARC OF A CURVE, CONCAVE TO THE
SOUTHWEST, HAVING A RADIUS OF 237.50 FEET, THROUGH A CENTRAL
ANGLE OF 38035'04", AN ARC LENGTH OF 159.94 FEET; THENCE soum
09059'09" EAST 35.93 FEET; THENCE ALONG THE ARC OF A CURVE
CONCAVE TO THE WEST, HAVING A RADIUS OF 237.50 FEET, THROUGH A
CENTRAL ANGLE OF 26018'25", AN ARC LENGTH OF 109.05 FEET; THENCE
SOUTH 16019'16" WEST 108,23 FEET; THENCE SOUTH 73040'44" EAST 25.00
FEET; THENCE SOUTH 41019'00" EAST 438,12 FEET; THENCE SOUTH 32004'20"
EAST 249.89 FEET; THENCE SOUTH 18005'49" EAST 497,44 FEET; THENCE
SOUTH 02020'33" EAST 502,81 FEET; THENCE SOUTH 18035'08" EAST 176,93
FEET; THENCE SOUTH 00034'07" WEST 178.88 FEET; THENCE SOUTH 19009'21"
WEST 338.98 FEET; THENCE SOUTH 84055'54" WEST 227.56 FEET; THENCE
SOUTH 05004'06" EAST 174.32 FEET; THENCE SOUTH 15029'10" WEST 205.73
FEET; THENCE NORTH 89042'48" EAST 816.74 FEET; THENCE SOUTH 72027'42"
EAST 573.68 FEET; THENCE SOUTH 76044'06" EAST 299.82 FEET; THENCE
NORTH 86001'31" EAST 565.57 FEET; THENCE SOUTH 90000'00" EAST 118.45
FEET; THENCE NORTH 52015'21" EAST 238.87 FEET; THENCE SOUTH 80023'31"
EAST 145.72 FEET; THENCE SOUTH 57059'05" EAST 338,94 FEET; THENCE
SOUTH 86040'56" EAST 324.50 FEET; THENCE SOUTH 64023'41" EAST 479.65
FEET; THENCE ALONG THE ARC OF A NON-TANGENT CURVE, THE RADIUS
POINT OF WHICH BEARS NORTH 69000'53" EAST, CONCAVE TO THE
NORTHEAST, HAVING A RADIUS OF 559.94 FEET, THROUGH A CENTRAL
ANGLE OF 16017'59", AN ARC LENGTH OF 159,29 FEET; THENCE SOUTH
37017'05" EAST 53.18 FEET; THENCE SOUTH 52046'22" WEST 54,55 FEET;
THENCE SOUTH 62026'35" EAST 64.98 FEET; THENCE ALONG THE ARC OF A
NON-TANGENT CURVE, THE RADIUS POINT OF WHICH BEARS NORTH
. 'Zjb ~-d-
01024'28" EAST, CONCAVE TO THE NORTH, HAVING A RADIUS OF 450,00
FEET, THROUGH A CENTRAL ANGLE OF 11006'30", AN ARC LENGTH OF 87,24
FEET; THENCE NORTH 77029'03" WEST 57.82 FEET; THENCE ALONG THE ARC
OF A CURVE , CONCA VE TO THE SOUTH, HAVING A RADIUS OF 1175,00
FEET, THROUGH A CENTRAL ANGLE OF 16041 '54", AN ARC LENGTH OF
342.44 FEET, TO A POINT OF NON-TANGENCY, THE RADIUS POINT OF WIDCH
BEARS SOUTH 04010'57" EAST; THENCE SOUTH 24046'42" WEST 41.26 FEET;
THENCE SOUTH 79018'27" WEST 36.60 FEET; THENCE NORTH 34014'51" WEST
45.12 FEET; THENCE SOUTH 84049'07" WEST 386.53 FEET; THENCE ALONG
THE ARC OF A CURVE, CONCAVE TO THE NORTH, HAVING A RADIUS OF
1525,00 FEET, THROUGH A CENTRAL ANGLE OF 12024'50", AN ARC LENGTH
OF 330.42 FEET TO A POINT OF COMPOUND CURVATURE; THENCE ALONG
SAID COMPOUND CURVE, CONCAVE TO THE NORTH, HAVING A RADIUS
OF1l75.00 FEET, THROUGH A CENTRAL ANGLE OF 01050'23, AN ARC
LENGTH OF 37.73 FEET, TO A POINT OF NON-TANGENCY, THE RADIUS
POINT OF WHICH BEARS SOUTH 05023'34" WEST; THENCE SOUTH 27037'39"
WEST 122.22 FEET; THENCE SOUTH 64056'28" WEST 152.60 FEET; THENCE
NORTH 54005'20" WEST 225.92 FEET; THENCE SOUTH 87040'43" WEST 91.81
FEET; THENCE ALONG THE ARC OF A NON-TANGENT CURVE, THE RADIUS
POINT OF WHICH BEARS NORTH09()53'56" WEST, CONCAVE TO THE NORTH,
HAVING A RADIUS OF 1225.00 FEET, THROUGH A CENTRAL ANGLE OF
06025'39", AN ARC LENGTH OF 137.42 FEET, TO A POINT OF NON-TANGENCY,
THE RADIUS POINT OF WHICH BEARS NORTH 03028'17" WEST; THENCE
SOUTH 23037'03" WEST 164.40 FEET; THENCE SOUTH 74001 '35" WEST 195.64
FEET; THENCE NORTH 82039'32" WEST 204.1 0 FEET; THENCE NORTH
53044'04" WEST 255.59 FEET; THENCE SOUTH 82018'54" WEST 105.06 FEET;
THENCE SOUTH 19051'38" WEST 170.84 FEET; THENCE NORTH 89~7'OT'
WEST 115.61 FEET; THENCE NORTH 24059'58" WEST 154.13 FEET; THENCE
SOUTH 88055'16" WEST 216.17 FEET; THENCE SOUTH 19052'26" WEST 178.82
FEET; THENCE SOUTH 85017'16" WEST 320.99 FEET; THENCE NORTH
24024'25" WEST 140.61 FEET; THENCE SOUTH 86020'13" WEST 294.72 FEET;
THENCE SOUTH 48049'53" WEST 102.97 FEET; THENCE NORTH 66031'21"
WEST 232.99 FEET; THENCE NORTH 43002'38" WEST 241.96 FEET; THENCE
NORTH 74041 '36" WEST 484.10 FEET; THENCE SOUTH 81008'09" WEST 378.64
FEET; THENCE NORTH 41039'34" WEST 426.98 FEET; THENCE NORTH
60033'37" WEST 260.44 FEET; THENCE SOUTH 78003'55" WEST 380.38 FEET;
THENCE SOUTH 53016'10" WEST 2.43 FEET; THENCE ALONG THE ARC OF A
CURVE, CONCAVE TO THE SOUTHEAST, HAVING A RADIUS OF 389.00,
THROUGH A CENTRAL ANGLE OF 26002'14", AN ARC LENGTH OF 176.78
FEET; THENCE SOUTH 27013'56" WEST 74.74 FEET; THENCE, ALONG THE ARC
OF A NON-TANGENT CURVE, THE RADIUS POINT OF WHICH BEARS SOUTH
69001 '00" EAST, CONCAVE TO THE EAST, HAVING A RADIUS OF 650.00 FEET,
THROUGH A CENTRAL ANGLE OF 04029'19", AN ARCH LENGTH OF 50.92
FEET; THENCE SOUTH 16029'42" WEST 18.85 FEET; THENCE NORTH 74030'24"
WEST 300.19 FEET; THENCE NORTH 67022'45" WEST 458.31 FEET; THENCE
NORTH 76011'25" WEST 458,62 FEET; THENCE NORTH Sr58'44" WEST 407.40
jh Cf; b
FEET; THENCE NORTH 76012'50''WEST 301.13 FEET; THENCE NORTH 81006'38"
WEST 222.75 FEET; THENCE NORTH 55021'20" WEST 274.44 FEET; THENCE
SOUTH 70039'55''WEST 123.83 FEET; THENCE NORTH 03008'04" EAST 558.44
FEET; THENCE SOUTH 88022'02" EAST 890.26 FEET; THENCE NORTH 01037'58"
EAST 583.44 FEET; THENCE NORTH 62027'25" EAST 539.69 FEET; THENCE
ALONG THE ARC OF A NON-TANGENT CURVE, THE RADIUS POINT OF
WHICH BEARS NORTH 24024'16" EAST, CONCAVE TO THE NORTHEAST,
HAVING A RADIUS OF 8030.00 FEET, THROUGH A CENTRAL ANGLE OF
00020'22", AN ARC LENGTH OF 47.56 FEET TO A POINT ON A REVERSE
CURVE; THENCE ALONG THE ARC OF A REVERSE CURVE, CONCAVE TO
THE SOUTHWEST, HAVING A RADIUS OF 1570.00 FEET, THROUGH A
CENTRAL ANGLE OF 06024'00", AN ARC LENGTH OF 175.37 FEET, TO A POINT
OF NON-TANGENCY, THE RADIUS POINT OF WHICH BEARS SOUTH 18020'38"
WEST; THENCE SOUTH 62027'25" WEST 341.72 FEET; THENCE NORTH
75052'39" WEST 963.67 FEET; THENCE NORTH 00030'45" WEST 319.35 FEET;
THENCE NORTH 00050'31" EAST 1362,44 FEET TO THE POINT OF
BEGINNING.
.';\. .
CONTAINING 444.83 ACRES ( 19,376,631- SQ."FT.) MORE OR LESS..
I
j(-{)f- ~
EXHIBIT B
PIA Design Resources
GHAD Boundary Exhibit
4748.1.500,01
November 1, 2006
50 rfb ~L.
EM3EO
INCORPORA TED
DRAFT
MANUEL MACHADO
APN 85A-1400-001-03
EAST SA Y REGIONAL
PARK DISTRICT
APN 85A-2400-001-05
T.2S.
32
5
T.3S.
ACCEPTED 1/4 CORNER
ACCEPTED 1/4 CORNER
COUNTY OF ALAMEDA
589.29'04"E 2594.67'
589.33'52"E 1115"15'
CITY OF DUBLIN
t,
t")""
. ..,.
CC\j
:fl1O
g~
<:: ~
....
~
Q
l5
)..
'-
o
~
~
~
....
~
l5
)..
'-
~
o
(.)
~"
..,.C
C'
t")'"
oq:")lg
",,"'"
....Olg
~ci;:::
~<::~
(3<<:>
~<::
ffiCl.
Ci)<(
444.83t ACRES TOTAL
EXISTING
SCHAEFER
RESIDENCE
SERIES NO.
99-137918
5!~ 1:2-
EAST BA Y REGIONAL
PARK DISTRICT
APN 85A-2400-004-01
~
~
~
~
....
~
l5
)..
'-
~
g
R.1.W.
33 34
4 3
TRACT 6765
SCHAEFER RANCH
A PORTION OF SECTIONS 3 & 4, TOWNSHIP 3
SOUTH, RANGE 1 WEST,
MT. DIABLO BASE AND MERIDIAN.
CITY OF DUBLIN
ALAMEDA COUNTY, CAUFORNIA
ft~ Design Resources, Inc.
'71~ PlannIng - EnglnHrlng - Surveying
~
....
~
Q
l5
)..
'-
o
T.2S.
ACCEPTED 1/4 CORNER
T.3S.
R.1,W.
2700 Ygm,afo Vefley Roe(/, Suite 100
We/nut Cruk. Cefffornfe 94598-3462
SCALE: ,- " 400'
TEL 1925J 210-9300
NOVEMBER, 2006
EAST SA Y REGIONAL
PARK DISTRICT
APN 941-0018-008
~
~
j
~o
I
800
EAST SA Y REGIONAL PARK DISTRICT
APN 941-0018-009
INTERSTA TE 580
COUNTY OF
ALAMEDA
EXHIBIT '8'
GHAD BOUNDARY EXHIBIT
SHEET 1 OF 2
LINE TABLE
LINE LENGTH BEARING
Lt 145.11 S48034'13"E
L2 35"93 S09 "59 '09 "E
L3 108"23 S16019'16"W
L4 25.00 S73040'44"E
L5 438.12 S41019'00"E
L6 249.89 S32004'20"E
Ll 497.44 S18005'49"E
L8 S02.81 S02"20 '33 "E
L9 176.93 S18'35'08"E
LtO 178.88 SOO034'OrW
Ltl 338.98 S19'09'21"W
Ll2 227.S6 S84055'S4"W
Ll3 174.32 SOS004'06"E
Ll4 205.73 S15'29'10"W
Ll5 816.74 N89042'48"E
Ll6 573.68 S72"27'42"E
L17 299.82 S76044'06"E
Ll8 565.57 N86001'31"E
Ll9 118.45 S90000'00"E
L20 238.87 N52015'21"E
L21 14S.72 S80 023 '31"E
L22 338.94 SS7'S9'OS"E
L23 324.S0 S86040'S6"E
L24 479.6S S64023'41"E
L25 S3.18 S37'17'{)5"E
L26 54.S5 S52 046 '22"W
L27 64"98 S62"26'3S"E
L28 S7.82 N77'29'03"W
L29 41.26 S24046'42"W
L30 36.60 S79018'2rW
L31 45.12 N34014'SI"W
L32 386.53 S84049'OrW
L33 122"22 S27'37'39"W
L34 152.60 S64OS6'28"W
L35 225.92 N54'OS'20"W
L36 91.81 S87'40'43"W
L3? 164.40 S23037'03"W
P:\Orawings\03024-20 Sehaeler Ranch\Final MaplD3024-FM.dwg, 11/112006 1 :58:47 PM, Slallon e, PIA Deslgn Resources, Inc.
LINE TABLE
LINE LENGTH BEARING
L38 195.64 S74'OI'35"W
L39 204.10 N82 039 '32"W
L40 2S5.59 NS3044'04"W
L41 105.06 S82"18 '54 "W
L42 170"84 S19051'38"W
L43 115.61 N89027'OrW
L44 154.13 N24'59'58"W
L45 216"17 S88055'16"W
L46 178.82 S19 "52'26 "W
L47 320.99 S85017'16"W
L48 140"51 N24 024 '25"W
L49 294.72 S86020'13"W
LSO 102"97 S48049'53"W
L51 232.99 N66031'21"W
L52 241.96 N43002'38'W
L53 484.10 N74041'36"W
L54 378.64 S81008'09"W
L55 426.98 N41039'34"W
L56 260.44 N60033'3rw
L57 380.38 S78003'55"W
L58 18.85 S16029'42"W
L59 300.19 N74'30'24"W
L60 458.31 N6r22'45"W
L51 458.62 N75011'25"W
L52 407.40 N8r58'44"W
L63 301"13 N75012'50"W
L64 222.75 N81006'38"W
L85 274.44 N55021'20"W
L56 123.83 S70"39'55"W
L67 558.44 N03008'04"E
L88 890.26 S88 022 'orE
L59 583.44 NO 1037'58 "E
LlO 539.69 N62"27'25"E
LlI 341.72 S52"27'25"W
Ll2 319.35 NOO030'45"W
Ll3 2.43 SS3016'10"W
Ll4 74.74 S27'13'55"W
CURVE
C1
C2
C3
C4
C5
C6
C7
C8
C9
C10
C11
C12
C13
EXHIBIT 'B'
GHAD BOUNDARY EXHIBIT
CURVE DATA
DEL TA RADIUS
59.27'40" 172.50'
38'35'04" 237.50' "
28018'25" 237.50'
16'17'59" 559.94'
W06'30" 450.00'
16041'54" 1175.00'
12"24'50" 1525.00'
1"50'23" 1175.00'
6"25'39" 1225.00'
26'02'14" 389.00'
0'20'22" 8030.00'
6024'00" 1570.00'
4.29'19" 650.00'
LENGTH
179.02'
159.94'
109.05'
159.29'
87.24'
342.44'
330.42
37.73'
137.42'
175.78'
47.S6'
175.37'
50.92'
TRACT 6765
SCHAEFER RANCH
A PORTION OF SECTIONS 3 & 4, TOWNSHIP 3
SOUTH, RANGE 1 WEST,
MT. DIABLO BASE AND MERIDIAN.
CITY OF DUBLIN
ALAMEDA COUNTY, CALIFORNIA
ft~ Design Resources, Inc.
'7"~ PI.nnlng - EnglnelH'lng - Surveying
2700 Ygnaolo Val/ey Road, Suite 100
Walnut Craak, CaUfornla 94598,3462
TEL (925) 210-9300
NOVEMBER, 2006
SHEET 2 OF 2
!"-..'<' t1"' -7
Z-ttSvc--
",',
..;I
53 trtJ CZZ~
ENC3EO
INCORPORATED
P / A Design Resources
Open Space Exhibit
4748.1.500.01
November 1, 2006
DRAFT
-.-'.
""r'- I
, I
. I
I
~G : · .'
~ ~ rJr
· Y'J~~'fj ~ .~~
I V ~ ><', I 'Iff;:. '111/1.
II ~, "I ::I', ..v-
II 1,.~ I I ' "'~~' :;J;
) ~ 1'lTh\l dl'~ I ~,' "
: ~~ ~ T,~'~
L $ ~I~~~~ ' '~/V:H-
i .\\ I ~'I ,I "~
~~. ~.~' '" ,',/,'
.~ . ~ ,,' ~ · " ..' ~\ '~,"
VI" , I '~t~.
~\. l........... JIlJ, J' I I . rr+' LY ,
~'-' ~ '- JlJ!fj, (?;. ' J-r
1r~ ~ ,..., ~\:lY. '~
7" ~~-..;; ~ ~ ~l
~~ ~ ~ ~~!' ~ tJlh ~. ".
tg~ %" ~.~ ~ I:
- ( "I...~~~ LV/A
~ ~.~~..........;;~ .~~ :
,~:~~? ~~_,....~'fl~:~~~,~ ..,:~:~ ~ffm
I ""-.'- t-.. )~ "O'CQ A?<...~,6lI,.' $.<S ?, '( ___
~ ~:~ rt.:~~~_'>'~";~" '~
! I ~ :~~~ ,=l7- -.':'{:'~ .~ t\\~~
rjJP~ ~ . ~ ~ . "'~ ~ ~
'Ii ~ ~~'~~I~""'~~ ~~\~I:
fA ~\ .~... '//);7 ~~~\\V"v
l I /~f~~r_'~~nJ
)?',####_--~----""
, .
. :
. ,
Of
,
.,
, ,
II
I I
,/
,I
~:': !
" I
j/ I
. ,
,
, ,
.! r- -.._~
I~ ~ ~ ~ ~ ~ ~
it DDID~~DD m
.1 I II ~ ! ~ ~ ! IE
~! ~ ~ i1 I U
i i ! ! H II
a a ~ ~ ~I
I I P
I ~
..
j
..
..,
i j
: hi
: ~
I ~ a
S l
J
~i&>
~I
\J1~ I
~
~l\~
"
t i
\ ~
I l
~
!!: ~
." ~V
H~
~a- ...
H"
l;
z~ .
1...
ag i r
~ I 8
iI II iI
~ f.l
~ :t ~
{
!
J
I
.
I
.
,
(
.
.
J
~'="~ /
~W
'((" y
.
I
.
,
~ ~~I
,
,
I) I
,
,
I
,
.
I
----,
.
.
o
.
,
h
t\
l
: /
./
---- -- -
~~
~~
~~
~~~
~Pliil
I~
~
~
~
~
@
~
~
;t
~
.
~
~
r11
ii~
:b.
~~
~:b
~~~
~ I'I'i · I.
!!i~
~~rtI
Ii) ~ 0'"1
!;;6~ +--
"'l"'-(~ r-8.
~ :b ii] \.S
~~, ~
i ~ ..... '-
PLATE 1
PIA Design Resources
Parcel Designation Plan
4748.1.500.01
November 1, 2006
f rtJ 1;~
ENGEO
INCORPORATED
DRAFT
G.H.A.D. PARCEL DESIGNA TION PLAN
CITY OF DUBLIN, CALIFORNIA
DATE: AUGUST 16, 2006
PLA TE 1
Ul
'/'
EXIST. SCHAEFER
RESIDENCE
PARCEL '/'
L__
Ul
lk.
LEGEND
PARCEL 'C-1'
G.H.A.D. OPEN SPACE PRESERVED WITH
CONSERVA TlON EASEMENT OVERLA Y ( ZONE ~')
G.H.A.D. OPEN SPACE WITH CONSERVATION EASEMENT OVERLAY (ZONE 'B')
@,1i.c
E.B.R.P.D. STAGING AREA WITH NO CONSERVA TION EASEMENT
CITY PARK PARCELS
STORM WATER DETENTION BASIN AND ACCESS
ROAD
Design Resources. Inc.
Planning _ Engineering _ Surveying
POND
DEVELOPMENT
SCALE: 1 If = 200 '
~ I
o 100 200 400
2700 Ygnacio Valley Road, Suite 100
Walnut Creek, California 94598-3462
TEL 1925} 210-9300
PLATE 2
ENGEO Incorporated
Geologic Map of Schaefer Ranch
4748.1.500.01
November 1, 2006
51 en 't~
ENGEO
INCORPORATED
DRAFT
~C)
~
-
~
~
.~
PI I
~
~ gj
!il ~ gj
~ !;1
~
~ III
~
~
~ ~
!
o ~
z
uS t!
~ 8
~ I ~
~
B
~
~ i * ~
~ ~ ~
8 ~ ~
~ g ~
8 ~ ~
g ~
'"
1 I
'. ...t I
\
.
I
.~, I
\ J : ~
I I
.
"IIiI
...
~
~
~ ~
~
g
s
i
'"
~
i
'" -~-
~ ~ ~
I
~
'" ~
8 ~
~ ~ I
~ ~
.0 ~
(I) (I)
E E
I- ~
,.,,, \
~\
~ ~ ,~
\~~ ~
\ \ \ \\ I I
I ) Ii/; 'iJ
~~
~1~
~~~ ~
~)I)
1
(
':f/
~I
)} I
II I;
o ~ 1/
J0' I
J 'i;]
0::
1..1
I) I,y///;I//,
~ ~~
::a /jj;1 ~ m
~?y ,II/;
~~~----) ~
~~
~A. ~~ '// '
~.~ Ii.
. 9fl/I//I//'
z
'/
n
..f
~
i
'"
g ~
~ ~
I ~
~ E-<
uS ~
~ z
i ~
~
~ ~
14 ~
::;J IS:
'" <:
~
~
~
Jr~
~~ f / .//////
~
Ii
i;l
~
I
/iA
~~
~%
eJ
~
~ ..l
! ~
I ~
rIl ~
--
~I
i
L i
rl{') i
i
~.J
;2j lil
~ ~
CQ A<
~ 0
~
1=1 S
~
..l ..l
I
~ ~
...
/,/~ /, !
!~
/;
/
W~
J.
lIt/II
'I ('II//,
z
rf/;
/fj)
~
/,
~
'/,/
%':/
~ ~~ :%
%~
~~
--.
1 ~,
~
~ !!,
~
.';
I"
I
II
~ \\
'~
\~;:Z
;\ \ /,~-Ft,
\ ,\ II (/ I
I J
I-
1'[
II
~l-
Il
~
"\
~--
--.1.-
z
~
::!
tl^
---
tr;&;
%
%
~
~f
\~\
~~
~~
.~ ~
~ ~
~ ~
., i ~ ~
~ ~ :;.:.~
i : ~.~
g: ~ l!'.l ~
,
~
j
';::
~
tJ
(j
g;
<:)
tJ
0:::
~
Vi
<:::'10:0"
::<( w'"
~ ... ~
~ lli'< Z
::5 0: lil
<:) O~
V) Q.
~ IIIiiiiiia.. 0: ~
~1t<"O~
~IUj~s
II
%
I
!5
= :Z
~
m
<:) <:)
'Q3!V~Od~OONl 030N ~O 1 35N 11311I~M 553~dX 3H nOH11M 31d~30X3 ~O 031 38 11 AVrl ~ON '~3 51 M 511YJI'l ANV A8 !~Vd NI ~O III 030nOO~d3~ 38 1 N A 31'l 00 SIH . V~ ONI 30N3 A8 S OZ c) ;;;~AdOO
"'
o
/5
~
'"
~
v
I.
vi
o
I
<0
~
g-
'0
~
~
Iii
~
z
~
f
'"
&i
:~
?
'"
..
"
~
1)
""
o
.l:
j
,/
<;
IX
g
;!;
S
!Z
if
'"
IX
::>
C>
G:
-'
<(
z
;;
"'
o
;::..,)t.::1' ~ 0-'
-...../ ) Iju {;; L./
ENGEO
INCORPORATED
APPENDIX A
ENGEO Incorporated
Water Quality - Detention Basin Monitoring and Maintenance
Schaefer Ranch, Dublin, California
August 15, 2006
4748.1.500.01
November 1, 2006
DRAFT
(Po UtJ'l7-
Project No.
4748.1.500.01
November I, 2006
Mr. Albert Seeno III
Schaefer Ranch Holdings LLC
4061 Port Chicago Highway, Suite H
Concord, CA 94520
Subject:
Schaefer Ranch
Dublin, California
WATER QUALITY - DETENTION BASIN MONITORING
AND MAINTENANCE
Dear Mr. Seeno:
As requested, we have prepared monitoring and maintenance recommendations for three Water
Quality-Detention Basins within the Schaefer Ranch development property in Dublin, California.
This is intended as a working document for use during maintenance of the water quality-
detention basins. The basins are designed as water quality and detention facilities to control peak
flood flows from the site. Maintenance of the basins will include, but not be limited to,
erosion/slope protection, vegetation management, sediment accumulation, trash/debris removal
and inspections of the inlet and outlet structures. The detention basins will be owned and
maintained by the Schaefer Ranch Geologic Hazard Abatement District (GHAD).
Weare pleased to have been of service to you on this proj ect and are prepared to consult further
with you and your design team.
Very truly yours,
ENGEO INCORPORATED
Prepared by:
Reviewed by:
J. Brooks Ramsdell
Senior Engineering Geologist
Theodore P. Bayham
Principal Engineer
fa \ ~'Z2-
ENGEO
INCORPORATED
INTRODUCTION................................ ............................................................................. ............ 1
Monitoring Schedule................................. ..................... .............................................. ........... 2
General Maintenance and Monitoring..................................................................................... 3
Inlet and Outlet Structures...................... .................................. ................. ....................... 3
Detention Basin Embankments............................ ...................................... ............ .......... 4
Vegetation...... ........................................ ................. ......... ................................................. 4
Maintenance of Access Roads.......................................................................................... 4
Fencing Repair........ ........ ..................... .................... ........ ............... .................................. 5
Mosquito Abatement...................................................................... ............ ........... ........... 5
Desilting and Clearing of Basin....................................................................................... 5
Detention Basin Catchment Area Inspection and Monitoring ......................................... 6
Emergency Response and Scheduled Remedial Repair .......................................................... 6
MONITORING REPORT
&?- UV~2-
ENGEO
INCORPORATED
INTRODUCTION
The purpose of this document is to provide a framework for the management and maintenance of
the Water Quality - Detention Basin at the Schaefer Ranch development. The three detention
basins are located throughout the Schaefer Ranch development property-one being near Dublin
Boulevard on the western edge of the property, one being near Dublin Boulevard in the south-
central portion of the property, and one east of 'Road A' on the eastern portion of the property.
The detention basins will be used to mitigate peak flows from the surface runoff on the subject
site.
Basin A is located in the western portion of the development, directly north of Dublin Boulevard.
The surrounding northwestern to eastern slopes serve as inlets for the detention basin. The outlet
for this basin is centrally located on the southern boundary of the basin, and runs westerly.
Interior slopes for the basin are planned to be up to 30 feet high with a slope gradient of
2: 1 (horizontal:vertical). An approximately 15-foot-wide bench extends around the top of the
debris basin berm on the south western boundaries of the basin. Slopes on the other side of the
road are proposed at a 2.5: 1 gradient, sloping down to the west. Slopes to the east of the basin are
at a 2:1 gradient, and are approximately 30 feet high.
Basin B, consisting of a water quality basin and a detention basin, is located in the south-central
portion of the development between Schaefer Road and Dublin Boulevard. The inlets for Basin
B are located northeast and east of the basin. The outlet for this basin is centrally located on the
western boundary of the basin, and runs westerly. The outlet for Basin B discharges into a new
closed conduit system. Interior slopes for the basin are planned to be up to 30 feet high with a
slope gradient of 3:1 (horizontal:vertical). An approximately 15-foot-wide bench extends around
the top of the debris basin berm on the south and western boundaries of the basin.
Basin C, consisting of a water quality basin and a detention basin, is located on the eastern
portion of the development, directly southeast of Road' A.' The inlets are centrally located on
4748.1.500.01
November 1, 2006
DRAFT
1
1.o3~7-
ENGEO
INCORPORATED
the western side of the basin. The outlet for this basin is located on the northern point of the
basin, and runs northwesterly. The outlet for Basin C discharges into a new closed conduit
system. Interior slopes for the basin are planned to be up to 40 feet high with slope gradients of
2.5: 1 (horizontal:vertical).
Monitoring Schedule
Quarterly monitoring during January, April, July and October is planned, with additional
monitoring within two working days after significant storm events (i.e. one inch of rainfall in a
12-hour period). Technicians retained by the GHAD will carry out site inspections and utilize the
Monitoring Report Form included at the back of this manual. Personnel and subcontractors
involved in detention basin management will be trained on reading the staff gauge, proper
pruning/cutting techniques, and inspection measures by the GHAD. A sample Inspection Report
is included at the end of this letter.
Each water quality basin has been designed to meter out detained runoff over 48 hours when the
basin water surface elevation is at the side opening flowline of the inlet pipe riser/overflow
structure. At this water surface elevation, residence time longer than 48 hours could be an
indication of sediment buildup (resulting in loss of actual water storage volume) or blockage of
outlet pipe. In this case actions should be taken to investigate the cause and corrective actions
should be implemented.
Sediment accumulation measurements will monitor the rate of sedimentation quarterly in the
detention basin and identify the need for removal. Some sedimentation is expected within the
basin; however, removal is planned only to the extent necessary for proper basin function.
4748.1.500.01
November 1, 2006
DRAFT
2
lJ; L\ frb ~2.
ENGEO
INCORPORATED
General Maintenance and Monitoring
Procedures for the following maintenance and monitoring items are presented in the following
section:
. Inspection and repair of inlet and outlet structures.
. Stabilization and/or repair of eroded areas or failures of the embankment surrounding the
Detention Basins.
. Pruning/cutting of the vegetation within and surrounding the Detention Basin.
. Maintenance of all access roadways.
. Monitoring any perimeter fencing for public safety.
. Mosquito Abatement.
. Sediment accumulation measurement and removal.
Inlet and Outlet Structures. Maintenance of inlet and outlet structures will involve the clearing
of debris and repair of the trash rack structure, as required to allow passage of storm flows. The
inlet and outlet structures should be observed during or immediately after large storm events to
avoid prolonged blockage. Any observed damage or apparent inoperability of the structures will
be reported to the GHAD Manager immediately.
In the event that the primary detention basin outlet is rendered inoperable during a major storm
event, the emergency overflow spillway should be allowed to operate as designed to pass the
storm flows. Emergency maintenance of the inoperable outlet structure should be undertaken at
such time, and with the equipment, that the GHAD Manager deems appropriate.
4748.1.500.01
November 1, 2006
DRAFT
3
tJ 5 r:t&2---
ENGEO
INCORPORATED
Detention Basin Embankments. Maintenance shall involve observation of the detention basin
embankment. The detention basin slopes should be inspected for obvious signs of vertical and/or
horizontal displacements. All embankment sides should be free of erosion, rills, slumps or
landslides. Any observed slope displacement should be reported to GHAD Manager
immediately. Any irrigation systems are to be monitored for proper function. Leaking or
malfunctioning irrigation systems will be repaired within two days of inspection.
Vegetation. Vegetation that does not preclude the proper functioning of the Detention Basins
should be allowed on the floor of the basin to aid in the trapping of sediment. Although
vegetative growth is generally encouraged, excess vegetation (defined as shrub and tree growth
in excess of 5 feet in height) must be removed from the basin floor by pruning. Herbicides will
not be used in the basin unless absolutely necessary. Such use shall be governed by all
applicable rules and regulations.
Vegetation removal will be accomplished by prumng with hand labor, unless aggressIve,
non-native species become pervasive, in which case other methods of removal can be initiated at
the discretion of the GHAD Manager. Activities will involve only the cutting and removing of
vegetation above the ground, e.g. mowing, rotary cutting, and chains awing, where the activity
neither substantially disturbs the root system nor involves mechanized pushing, dragging, or
other similar activities. No heavy equipment will be used within the detention basin for routine
vegetation control. The pruning debris will be removed from the basin in burlap or canvas
bundles and trucked to an authorized dumpsite reviewed and approved by the GHAD Manager.
Vegetation removed or destroyed during maintenance will be allowed to re-establish naturally
without replanting.
Maintenance of Access Roads. Maintenance of access roads and top ofberrn bench, as shown on
the improvement plans, will involve repair of excessive bumps, cracks and depressions such that
maintenance vehicles can easily navigate the roads. The roadways will be inspected on a
4748.1.500.01
November 1, 2006
DRAFT
4
l.4 lp f1[f6 v
ENGEO
INCORPORATED
semi-annual basis and repaired as needed. Any damage to or failures of the embankments near
the road will be reported to the GHAD Manager immediately.
Fencing Repair. Maintenance of fencing involves repair of all gaps, tears, sags and breaks such
that public safety is provided. All perimeter fencing will be monitored quarterly and maintained
in good condition without breaks or damage.
Mosquito Abatement. It is possible that mosquito abatement will not be required in the water
quality/detention basins due to the drying cycle in the summer months; however, if homeowner
complaints are received by the GHAD, the GHAD will contact Alameda County Vector Control.
Desilting and Clearing of Basin. Detention basin floors must be regularly cleared of excess
sediment and excess vegetation to enable proper flow characteristics. Failure to do so can create
flood hazards. The floor of the detention basin should be monitored on a semi-annual basis. If
sediment in excess of 18 inches or 10 percent of the storage capacity, whichever is greater, has
accumulated above design grades, the sediment should be removed. Sediment accumulation will
be measured with installed staff gauges. If vegetation in excess of 5 feet in height is present, it
will require removal as described in the Vegetation section. Vegetation accumulation will be
measured with a tape measure in at least four locations within the basin floor. Prior to sediment
removal or vegetation pruning, the procedure should be reviewed and authorized by the GHAD
Manager.
If sediment in excess of 18 inches or 10 percent of the storage capacity, whichever is greater, has
accumulated above design grades, sediment removal shall be undertaken before the next winter
season. The dry season is the preferred time of year for sediment removal. Sediment removal
for routine maintenance will be with small mechanized equipment, hand labor and wheelbarrows
as much as possible subject to compliance with regulatory agency requirements. Emergency
repairs may require use of larger equipment including, but not limited to, excavators. Sediment
4748.1.500.01
November 1, 2006
DRAFT
5
li~~~ f) A CZ -2,-
I..J
ENGEO
INCORPORATED
will be removed in small sections, with as little disturbance to existing vegetation as possible.
No heavy equipment will be used within the detention basin without permission from the GHAD
Manager.
The sediment should be disposed of in a legal manner. In general, due to the steepness of the site,
limited areas will be available to place the material from the detention basin on open space areas
of the parcel and any proposed disposal areas should be reviewed by the GHAD Manager in
consultation with a qualified biologist as necessary. The sediment will not be placed within
20 feet of a creek or drainage. The sediment will not be placed on sloping ground, or any area of
sensitive wildlife habitat. After spreading, the sediment will be hand seeded and covered with
straw mulch.
Detention Basin Catchment Area Inspection and Monitoring. Monitoring of the detention basin
shall involve visual inspection of the detention basin containment area and piezometer
measurement if installed. The detention basin catchment area should be inspected for obvious
signs of vertical and/or horizontal displacements. The base of the detention basin should be free
of erosion, rills, slumps or landslides.
Emergency Response and Scheduled Remedial Repair
Emergency response and scheduled repair expenditures are to be prioritized at the discretion of
the GHAD Manager based upon available funds and the approved operating budget. When
available funds are not sufficient to undertake all of the identified remedial and preventive
stabilization measures, the expenditures are to be prioritized as follows in descending order of
priority:
A. Prevention, mitigation, abatement or control of hazards that have either damaged or pose a
significant threat of damage to the detention basin embankments or spillway.
4748.1.500.01
November 1, 2006
DRAFT
6
I'"
([1 t> 0/112/
..J
ENGEO
INCORPORATED
B. Prevention, mitigation, abatement or control of hazards which have either damaged or pose a
significant threat of damage to ancillary structures, including but not limited to the inlet and
outlet pipes.
C. Prevention, mitigation, abatement or control of geologic hazards which have either damaged
or pose a significant threat of damage to the detention basin.
The techniques which may be employed by the Schaefer Ranch GHAD to prevent, mitigate,
abate, or control hazards include, but are not limited to, the following:
1. Repair, maintenance or replacement of inlet or outlet control valves and structures.
2. Stabilization (either partial or total) of levee embankments by removal and replacement with
compacted, drained fill.
3. Construction of erosion control measures. Whenever feasible, bioengineering techniques
will be utilized and are preferred over hard armor.
4. Placement of subsurface drainage devices (e.g. underdrains, or horizontal drilled drains).
5. Slope correction (e.g. gradient change, slope trimming or contouring).
6. Construction of additional surface ditches and/or detention basin, sediment traps, or backfill
of eroded channels.
4748.1.500.01
November 1, 2006
DRAFT
7
,,,\ .~
;.' .t{!j'/;/
v
ENGEO
INCORPORATED
MONITORING REPORT
Schaefer Ranch
Dublin, California
WATER QUALITY - DETENTION BASIN OPERATIONS AND MAINTENANCE
SITE MONITORING AND MAINTENANCE
REPORT FORM
(TO BE COMPLETED QUARTERLY IN JANUARY, APRIL, JULY AND OCTOBER AND
AS NECESSARY DURING HEAVY RAINFALL)
Inspector:
Weather Conditions:
Days since last rainfall:
Basin Water Level:
Date:
Dry season? _ Wet season?
Sediment Accumulated since Last Monitoring Event
MONITORED YES NO N!A COMMENTS! SUGGESTED MAINTENANCE
CONTROL
1. Are inlet and
outlet structures
functioning properly,
allowing the basin to
drain and are they in
satisfactory
condition?
2. Are access roads
in satisfactory
condition?
3. Is all perimeter
fencing in good
condition without
breaks, gaps or
damage?
4. Have the debris
racks been cleaned
and are they in good
condition?
5. Are embankments
surrounding the
basin in good
condition without
rills or failures?
4748.1.500.01
November 1, 2006
DRAFT
j/,,; 1-) .'
U IY'
ENGEO
INCORPORATED
MONITORED YES NO N!A COMMENTS! SUGGESTED MAINTENANCE
CONTROL
6. Is the vegetation
less than 5 feet in
height?
7. Are embankment
slopes protected with
mulch or vegetation?
8. Has sediment
removal been
undertaken in the
last 3 months?
9. Is there evidence
of chemical sheen or
odor, contaminated
runoff, litter or
blowing debris in or
near the basin?
10. Do any basin
devices require
maintenance to
provide more
effective function?
11. Are there signs
of leaking irrigation
systems?
12. Are there any
signs of vandalism?
13. Are mosquitoes
evident?
14. Has mosquito
abatement been
undertaken since the
last monitoring
event?
15. Are there
remedial/repair tasks
that should be
undertaken in the
near future?
4748.1.500.01
November 1, 2006
DRAFT
'11 Jh~'I/
ENGEO
INCORPORATED
MONITORED YES NO N/A COMMENTS! SUGGESTED MAINTENANCE
CONTROL
16. Is there evidence
or information
received in the last 3
months to indicate a
lengthy drain time?
"No" answers to Items 1-7 or "Yes" answers to Items 8-16 require a corrective action noted
on Page 3.
4748.1.500.01
November 1,2006
DRAFT
WATER QUALITY - BASIN OPERATIONS AND MAINTENANCE
SITE MONITORING AND MAINTENANCE
REPORT FORM (CONTINUED)
CORRECTIVE ACTIONS UNDERTAKEN
(If none required, enter date and "none")
12rro 1'~
ENGEO
INCORPORATED
DATE
DEFICIENCY NOTED
CORRECTIVE ACTION
4748.1.500.01
November 1, 2006
DRAFT
I ~ OOzz-
ENGEO
INCORPORATED
I DATE I DEFICIENCY NOTED I CORRECTIVE ACTION I
4748.1.500.01
November 1,2006
DRAFT
l~aoZ
ENGEO
INCORPORATED
APPENDIX B
ENGEO Incorporated
Site Geology
4748.1.500.01
November 1,2006
DRAFT
! 5 rf(j2/
ENGEO
INCORPORATED
Site Geology
Regional geologic maps of the area have been prepared by Dibblee (1980), Crane (1988) and
Graymer (1996). The most recent regional map prepared by Graymer indicates that the site is
underlain by late and middle Miocene rocks of the Briones Formation and undivided middle
Miocene marine rocks of the Monterey Group including the Rodeo Shale, Hambre Sandstone,
Tice Shale and Oursan Sandstone.
Major folds in the site vicinity include the Kaiser Creek Syncline and the Knife Anticline,
located north of the property, as shown on Plate 2. Two smaller unnamed folds that form a
syncline-anticline pair are present on the south limb of the Kaiser Creek Syncline as shown on
Plate 2. The axis of the syncline passes through the center of the Schaefer Ranch Property in a
northwesterly direction, trending along the center of Marshall Canyon, passing through the ridge
under Donlan Point (the "axis" is the center line of the fold; beds dip in opposite directions on
either side of the fold axis). The synclinal axis extends to near the south site boundary, passing
below the proposed Dublin Boulevard Extension. In the site vicinity, the major folds are
commonly associated with low-angle compressional faults known as "thrust faults", including
the Bollinger and Miller Creek Faults (Crane, undated, Dibblee, 1980, and Wagner, 1976). The
thrust faults are thought to be the result of the same regional compressional forces that have
caused the folding of the rocks in the East Bay Hills block. None of the thrust faults mapped in
the site vicinity are considered to be active by the State.
Detailed mapping of the property included within the GHAD boundaries was completed as part
of the Geotechnical Investigations completed by AKA (1997) and ENGEO, Incorporated (2004).
The results of these investigations are included in the geologic descriptions.
4748.1.500.01
November 1,2006
DRAFT
Lorlfv
ENGEO
INCORPORATED
Geologic Units
Undocumented Fill. There are existing undocumented fills on the property associated with stock
ponds, roads, and existing structures. The most extensive undocumented fill deposit appears to
be at the entrance to the property at Schaefer Ranch Road. Approximately 25 feet of stiff clay
interpreted to be undocumented fill was encountered in this location. It appears that this fill is
likely associated with the construction of the adjacent Interstate 580. Proposed remedial grading
includes the complete removal and replacement of this undocumented fill as well as other less
extensive undocumented fill deposits on the site within the grading limits of the project.
Alluvium. Most of the creeks typically have steep, V -shaped channels incised into bedrock or
landslide debris, with no significant alluvial deposits. Minor deposits of modern alluvium
associated with the existing creeks occur in the lower reaches of Marshall Canyon and Wagon
Wheel Canyon. These deposits appear to consist of 10 to 20 feet of relatively compressible,
sandy to gravelly clay. A more significant deposit of alluvium occurs at the entrance to the
property at Schaefer Ranch Road, where the base of the stiff silty to sandy clay was encountered
at 35 feet and 45 feet below the surface.
A soil deposit identified as an old alluvial terrace occurs along the existing entrance road on the
south side of the ridge, and is well exposed in a deep erosion gully. Exposures in the gully
consist of stratified silty sand with pebble lenses. ENGEO and AKA borings in the terrace
deposit record thicknesses varying from less than 10 feet to 44 feet. The deposit is dense and
relatively incompressible.
Residual Soil and Colluvium
The site bedrock is typically mantled with 3 to 5 feet of residual soil formed from weathering
and decomposition of the underlying bedrock. The weathering of the bedrock on the site
4748.1.500.01
November 1, 2006
DRAFT
'\ \. tl(j~I/
ENGEO
INCORPORATED
typically produces a fine-grained soil containing expansive clays. Colluvium is a soil deposit
formed from downslope movement and deposition of residual soil by such processes as
slopewash, sloughing/shallow sliding and creep. Mappable deposits of colluvium (typically
thicker than 5 feet) occur in most swales and ravines and at the bases of many slopes on the
property. The colluvium typically consists of expansive silty clay with rock fragments. The
composition of the colluvium varies with the composition of the underlying bedrock. Within
swales, the colluvial deposits tend to be relatively thicker and may be subject to flow or slip
downslope.
Landslides
Landslide deposits consist of masses of unconsolidated material and!or bedrock that have moved
downslope by sliding, falling, or flowing. Many landslides, ranging in size from very small to
large, occur on the site. The landslides include earth flows, debris flows, bedrock slumps and
translational landslides.
Shallow (less than 5 feet thick) to moderately deep (5 to 20 feet thick) earth flows are the most
prevalent types of landslide at the site. Shallow landslides occur on the steeper slopes, along
drainages and in swales. Larger, deep (greater than 20 feet) and deep-seated landslides (greater
than 30 feet) were also identified at the site.
Bedrock
Upper Miocene Marine and Nonmarine Sediments, Undifferentiated
The rocks underlying the center of the syncline, on the southwest side of Marshall Canyon,
appear to consist of interbedded claystone, siltstone and clay-cemented sandstone, including both
marine and nonmarine deposits. This unit was previously mapped by Dibblee (1980) as Pliocene
nonmarine rocks and by Graymer (1996) as "unnamed Miocene continental rocks". The
4748.1.500.01
November 1, 2006
DRAFT
I ~ [J'tJ6 t/
ENGEO
INCORPORATED
sandstone and siltstone units are weak to moderately strong and highly to moderately fractured.
Based on our experience with this mapped unit in the site vicinity and in projects to the north, we
would expect that it could contain occasional layers of weak, relatively expansive claystone.
Briones Formation
The marine Briones Formation, which underlies the upper portions of the highest site ridges,
consists mainly of brown, thickly-bedded, moderately-strong to strong, clay-cemented, fine- to
medium-grained lithic sandstone. Some units contain minor thin beds of siltstone, friable
sandstone and pebble conglomerate.
The most resistant beds in the Briones Formation are gray-brown, strong to very strong,
carbonate-cemented, medium- to coarse-grained sandstone that contains abundant shell
fragments.
Miocene Marine Sediments
In the south and east portions of the property, the slopes are underlain by interbedded marine
sandstone and siltstone of the undivided Monterey Group. As mapped by Dibblee (1980) this
unit is divided into an upper unit of sandstone with interbedded siltstone (Tmss) and a lower unit
consisting mainly of siltstone with minor interbedded sandstone (Tmsl). The sandstone is thickly
bedded, brown, weak to moderately strong, fine grained and clay cemented. The near-surface
exposures of sandstone are moderately to highly fractured; fracture spacing decreases with depth.
The siltstones are gray-brown to gray, massive to thinly bedded and weak. The siltstone locally
grades to clayey siltstone and claystone.
4748.1.500.01
November 1,2006
DRAFT
I q tJ61;-~
ENGEO
INCORPORATED
Groundwater
At the time of subsurface work groundwater has been encountered between 12 to 30 feet below
the ground surface. In general, the shallow groundwater was encountered locally within areas of
colluvium or deeply weathered bedrock. This water appears to be perched on the underlying
bedrock. Fluctuations in groundwater levels may occur seasonally and over a period of years
because of precipitation, changes in drainage patterns, irrigation and other factors. Future
irrigation may cause an overall rise in groundwater levels.
Seismic Sources
The seismicity of the Bay Area is dominated by the major active strike-slip faults. No State of
California-zoned active! faults are mapped crossing the GHAD property. The nearest State of
California-zoned, active2 faults are the Calveras fault located approximately 1 mile northeast of
the site and the Hayward Fault located approximately 6 miles southwest of the site. The Dublin
fault, a local strike-slip fault that passes 2,500 feet east of the property, is not considered active
by the State..
The Working Group on Northern California Earthquake Probabilities (WGEP, 2003) recently
evaluated the seismicity of the Bay Area. The WGEP estimated a 30-year probability of a
moment magnitude (Mw) 6.7 earthquake on one of the active Bay Area Faults of 62 percent. The
30-year probability of a 6.7 Mw earthquake for the Calaveras and Hayward Faults were estimated
at 11 percent and 27 percent, respectively. As discussed in the geotechnical investigations, there
J An active fault is defmed by the State Mining and Geology Board as one that has had surface displacement within
Holocene time (about the last 10,000 years) (Hart, 1994). The State of California has prepared maps designating zones for
special studies that contain these active earthquake faults.
4748.1.500.01
November 1,2006
DRAFT
/"~,'7
1:. V""- i", Uf..,
ENGEO
INCORPORATED
is a high probability that the site and any improvements will be subject to strong ground shaking
and some deformation of the site slopes during the lifetime of the project.
4748.1.500.01
November 1,2006
DRAFT
EXHIBIT B
NOTICE OF PUBLIC HEARING
6'q)6&
EXBIBIT ~
To the Resolution
<62.ub1)~
NOTICE OF PUBLIC HEARING
ON FORMATION OF THE SCHAEFER RANCH
GEOLOGIC HAZARD ABATEMENT DISTRICT
You are hereby notified that on December 5th, 2006 at 7:00 p.m. in the City
Council Chambers at 100 Civic Plaza, Dublin, California, 94568, the City
Council of the City of Dublin will consider the formation of the Schaefer Ranch
Geologic Hazard Abatement District ("Schaefer Ranch GHAD") pursuant to the
attached "Petition for Formation of the Schaefer Ranch Geologic Hazard
Abatement District Pursuant to Division 17 of the Public Resources Code of the
State of California" (the "Petition").
The territory proposed for inclusion in the Schaefer Ranch GHAD is located in
the area generally known as Schaefer Ranch, and is described in detail in the
Petition. The formation of the Schaefer Ranch GHAD will require the levy of an
assessment to pay for the costs and expenses of the activities described in the
plan of control for the Schaefer Ranch GHAD ("Plan of Control"). The Plan of
Control can be reviewed at City Hall at the address set forth below. The Plan
of Control may be duplicated at cost upon request.
The purpose of this hearing is to receive and consider any and all objections to
the formation of the Schaefer Ranch GHAD. Valid objections can be made in
writing, not later than the time set for hearing, by any owner of real property
within the boundaries of the territory proposed for annexation. Objections shall
contain a description of the land by lot, tract and map number, and shall be
signed by the owner of such property. Objections must be mailed or delivered
to the address set forth below and must otherwise comply with the provisions
of Public Resources Code Section 26564.
For further information contact Frank Navarro, Senior Civil Engineer, at 100 Civic
Plaza, Dublin, CA 94568 or at (925) 833-6630.
City Clerk, City of Dublin