Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Item 7.1 Alamo Creek Bike Path
CITY CLERK AGI=NDA STATI=MI=NT CITY COUNCIL MEETING DATE: February 3, 2004 SUBJECT: Approve Fence Design and Contract Change Order No. 4 for Contract No. 03-08, Alamo Creek Bike Path - Amador Valley Boulevard to North City Limits Report Prepared by: Melissa Morton, Public Works Director ATTACHMENTS: 1) Contract Change Order No. 4 with Fence Detail 2) Photograph 'of Fence Type 3) Photograph of Location where Fence is to be Installed 4) Project Site Map RECOMMENDATION: _ ,,//l) Approve Fence Design ) Approve Contract Change Order No. 4 for Contract No. 03-08, Alamo Creek Bike Path - Amador Valley Boulevard '///~ to North City Limits FINANCIAL STATEMENT: The cost to install 200 lineal feet of fencing along a portion of the east side of the Alamo Creek Bike Path is $5,525.00. Adequate funds remain in the project budget for the fence installation from the · Measure B Bicycle & Pedestrian Fund. DESCRIPTION: On August 19, 2003, the City Council awarded Contract No. 03-08, Alamo Creek Bike Path from Amador Valley Boulevard to North City Limits, to GradeTech, Inc. This project paved the existing Zone 7 maintenance road along the west side of the Alamo Creek from Amador Valley Boulevard to the northern City limits. The path is 12 feet wide with an existing concrete v-ditch to control drainage. The project also included the installation of a raised pedestrian crosswalk on Willow Creek Drive. At its regularly scheduled meeting on October 21, 2003, the City Council directed Staff to install 200 feet of fencing along the creek side of the bike path directly south of Alamo Creek Park. The residents expressed a concern that users of the bike path would wander off the path and down into the creek to disturb the wildlife and plantings. Council directed Staff to return to the Council for approval of the fence design. COPIES TO: GradeTech, Inc. Zone 7 Water Agency Residents adjacent to path ITEM NO. g:~niscprojLAlamo creek bike pathLAS CCO4 I ~.~ ~ After reviewing several fence designs and discussing the various options with Zone 7 Water Agency staff, Zone 7 indicated that the four-foot-high black vinyl-clad chainlink fence (as pictured in Attachment 2) conforms to the Zone 7 fence standard. A 20-foot gate is included to allow Zone 7 maintena¢ce crews quick access to the creek channel below tO clear debris/obstructions, insuring channel capacity is sustained during high flow storms. The fence will be installed over the course of 200 lineal feet along the ~reek side of the bike path south of Alamo Creek Park (as shown on Attachment 3) and should deter people from wandering off the path at this location. Once the fencing type was established, Staff requested an estimate from the contractor. The con.tractor for the bike path project has agreed to install the fence at a lump sum price of $5,525. Staff believes this price to be less than the cost of an independently bid contract. Staff recommends that the City Council approve the fence design. Staff further recommends that the City Council approve Change Order No. 4 for Contract No. 03-08, Alamo Creek Bike Path - Amador Valley Boulevard to North City Limits. Page 2 Cr~'7---- ~ CITY OF ,DUBLIN ~. ~00 civic PLAZA, DUBLIN, CALIFORNIA 94568 .t. (925) 833-6630 .t. (92§) 829.9248 FAX CONTRACT CHANGE ORDER NO. 4 DATE: January 15, 2004 PAGE: '1 of 2 PROJECT/ROAD: Alamo Creek Bike Path - Amador Valley Boulevard to North City Limit~ - CONTRACT NO: 03-08' TO: GradeTech, Inc., P:O. Box 1728, San Ramon, CA 94583 You are hereby directed to make the herein described changes from the plans and specifications or do the following described work not included in the plans and specifications on this contract. Please note that this change order is not effective until approved by the Public Works Director. This change order is requested by the City. Furnish all materials, equipment and labor to install approximately 200 LF of 4! high black vinyl $5,525.00 clad chain link fence with one 20' gate per the attached Detail and as directed by the Engineer. This extra work shall be paid for at tl~e agreed lump sum price of $5,525.00. ESTIMATED TOTAL COST INCREASE: $5,525.00 BY REASON OF THIS CHANGE ORDER, THE TIME OF COMPLETION WILL BE ADJUSTED 10 WORKING DAYS. Associate Civil Engineer Public Works Director City Manager We, the undersigned contractor, have given careful consideration to the change proposed and hereb~ agree, if this proposal is approved, that we will provide all equipment, furnish all materials, except as may otherwise be noted above, and perform ali services necessary for the work above specified, and will accept as full payment therefor the prices shown above. Accepted: Date Contractor: Signed By: Title: If the Contractor does not sign acceptance of this order, his/her ~ specifications as to proceeding with the ordered work and filing a written ~Y-~' ~ ' [ ~ ~1 ©~')( L I ' , - '1 .. . · · .~l ~.. .~-~j . I.,U~I · - jt~J~, · 4~ ': . ~ ' · ' ~ ' Got~ ~ost · ~ta /Sine. S~dul~ · ~ .fa~ic ~to ro~ with Sea Schadd l-- ' ' : ' ' -.- ~~~ .... ............. . PULL P~T i GAT[ POST SCHEDU~ GENERAL NOTES~'' ~ GA~ WlOTH, J O.O. - ~ T~ENT ' :Over 6'thrul~' ' 4.5~' ~ ~ 'Joy unless oth~se indicated. ~Ov.rl~'th~ 18' 5.563" ~ All hardware, lhall bo Industrial Hardware Grade. ~ Bra~ng it lhe lam~ o~ bath ~s of 'corner post~ . . 4.~a wiris, post clips and ,h~ ri~Qs shall be No.g ' ~ ZONE 7 ~wN:W,SO . WATER CONSERvATIoN DISTRICT · '. 4 FOOT HIGH A.~~__' ' ,'. ' OrR~I~INK FENCE .... . REVISIONS ' ' ' CONTRACT NO. 03-08 ALAMO CREEK BIKE PATH - AMADOR VALLEY BLVD. TO NORTH CITY LIMITS FENCING DETAIL. TYPICAL 4' CHAIN LINK FENCE CONTRACT NO. 03-08 ALAMO CREEK BIKE PATH - AMADOR VALLEY BLVD. TO NORTH CITY LIMITS FENCE LOCATIO,N -- PROPOSED 4' HIGH CHAIN LINK FENCE (APPROXIMATELY 200 LF)