HomeMy WebLinkAboutItem 4.08 DubBlvdWidening01-10 CITY CLERK AGENDA STATEMENT CITY COUNCIL MEETING DATE: May 4, 2004 SUBJECT: Change Order Authorization - Contract No. 01-10, Dublin Boulevard Widening Project from Village Parkway To Sierra Court/Civic Plaza Report Prepared by: Melissa Morton, Public Works Director ATTACHMENTS: 1. Change Order Summary, together with Contract Change Orders 23, 28-42, 47, 5.0, 51, and 53-55 2. Budget Change Form RECOMMENDATION: 1. Approve Change Orders 23, 28-42, 47, 50, 51, and 53-55 .~4/~ 2. Approve budget change FINANCIAL STATEMENT: Total Construction Budget (CIP #96920) $ 3,076,793 DBW - Village Parkway to Sierra Court Total Construction Budget (CI~ #96080) $ 452,245 Dublin Boulevard Underground Utilities Total Construction Budget: $ 3,529,038 Original Contract Amount: $ 3,063,859.00 Total Approved Change Orders to Date: $234,302.61 Change Order Nos. 23, 28 through 42, 47, 50, 51 and 53 through 55: $259,419.94 Total Project Cost $3,557,581.55 Additional Funding Needed: ($ 28,544) The following budget change is required to fully fund payment of these change orders: Budget Change for CIP #96080 (to be reimbursed With Rule 20A funds): $18,298 Budget Change for CIP #96920 From Fund 300: $10~246 Total: $28,544 COPIES TO: Granite Construction ITEM NO. g:XmiscprojX,DBW VP to SierraXconstruction~agst Authorization (22 CCOs) DESCRIPTION: The Dublin Boulevard Widening Project is now complete, except for the required submittal by the Contractor of the project "As-Built" drawings, the final Report of Utilization of Disadvantaged Business, and the resolution of all remaining outstanding potential change orders and/or claims. Several Contract change orders have been accepted by the Contractor (Contract Change Orders 28, 30, 50, and 51). However, the Contractor requested additional wording for Contract Change Orders 23, 29, 31 through 42, 47, and 53 through 55 to include clarification that compensation for items on these Change Orders will cover direct costs only for work already completed. This language reserves the right for the Contractor to file claims to recover indirect costs. This is not consistent with accepted change order language. However to date, the Contractor has not filed any claims regarding any foUnd, potential, or pertinent delays related to the aforementioned change orders. The Contractor has agreed to the processing of these change orders unilaterally as the City and the Contractor have already agreed on the direct costs associated with the change orders. By approving the change orders at this time, the City will be able to pay the Contractor for the contract change order work completed by the Contractor and the subcontractors. This would provide fair compensation to the contractor for the work performed and would in no way diminish the City's rights with respect to these change orders. The total amount of all 22 change orders is $259,419.94 (see Attachment 1 for a summary of the costs and descriptions). Since the total amount of the change orders exceeds the authorization limit granted to the City Manager, it is necessary for the City Council to approve these change orders. Staff recommends that the City Council approve Change Orders 23, 28 through 42, 47, 50, 51, and 53 through 55. Staff further recommends that the Council approve the budget change in the amount of $28,543.55. Page 20h~)'7__.. CHANGE ORDER SUMMARY DATE: April 21, 2004 PROJECT NAME: Dublin Boulevard Widening, Village Parkway to Sierra Court/Civic Plaza CIP #: 96920 CONTRACT NO: 00-10 CONTRACTOR: Granite Construction, Inc. PERCENT COMPLETED: 100% CONTRACT AMOUNT: $3,063,859.00 APPROVED BUDGET AMT: $3,529,038 (includes CIP #96080 Budget) CHANGE ORDERS: CHANGE ORDER #1 $923.93 CHANGE ORDER #2 $24,500.00 CHANGE ORDER #3 $126,358.75 CHANGE ORDER #4 $3,826.00 CHANGE ORDER #5 $2,015.00 CHANGE ORDER #6 $3,473.00 CHANGE ORDER #7 TBD CHANGE ORDER #8 TBD CHANGE ORDER #9 Deleted CHANGE ORDER #10 $3,117.64 CHANGE ORDER #11 $1,260.00 CHANGE ORDER #12 $6,480.00 CHANGE ORDER #13 $2,904.00 CHANGE ORDER #14 $1,063.67 CHANGE ORDER #15 $1,225.00 CHANGE ORDER #16 $2,617.43 CHANGE ORDER #17 $1,628.00 CHANGE ORDER #18 $2,435.54 CHANGE ORDER #19 $10,329.03 CHANGE ORDER #20 $3,817.94 CHANGE ORDER #21 $11,145.00 CHANGE ORDER #22 $1,937.00 CHANGE ORDER #23 $15,536~00 CHANGE ORDER #24 $754.00 CHANGE ORDER #25 $11,245.84 CHANGE ORDER #26 $11,245.84 CHANGE ORDER #27 TBD CHANGE ORDER #28 $8,516.97 CHANGE ORDER #29 $14,842.00 CHANGE ORDER #30 $1,343.91 CHANGE ORDER #31 $3,528.69 CHANGE ORDER #32 $31,753.95 CHANGE ORDER #33 $2,769.00 CHANGE ORDER #34 $13,362.55 CHANGE ORDER #35 $3,560.00 CHANGE ORDER #36 $17,851.15 CHANGE ORDER #37 $11,646.11 CHANGE ORDER #38 $15,529.22 CHANGE ORDER #39 $16,773.16 CHANGE ORDER #40 $23,870.49 CHANGE ORDER g41 $14,952.87 CHANGE ORDER ~¢42 $8,651.39 CHANGE ORDER #-43 TBD CHANGE ORDER #44 TBD CHANGE ORDER #45 TBD CHANGE ORDER #N6 TBD CHANGE ORDER #47 $15,335.05 CHANGE ORDER fl48 TBD CHANGE ORDER ¢h49 TBD CHANGE ORDER #50 $9,384.11 CHANGE ORDER #51 $2,286.03 CHANGE ORDER #52 TBD CHANGE ORDER #53 $2,155.89 CHANGE ORDER #54 $11,713.82 CHANGE ORDER #55 $14,057.58 TOTAL OF CHANGE I ORDERS: $493,722.55 CURRENT CHANGE ORDER DESCRIPTION: I See attachment ADJUSTED CONTRACT AMOUNT: $3,557,581.55 PROGRESS PAYMENTS MADE: PAYMENT #1 $83,245.00 PAYMENT #2 $48,025.00 PAYMENT #3 $355,319.25 PAYMENT fl4 $246,247.75 PAYMENT #5 $126,817.00 PAYMENT #6 $63,316.00 PAYMENT #7 $120,965.85 PAYMENT #8 $333,568.00 PAYMENT #9 $95,260.94 PAYMENT #10 $163,858.75 PAYMENT #11 $48,411.64 PAYMENT #12 $337,343.86 PAYMENT #13 $153,201.72 PAYMENT #14 $128,430.18 PAYMENT #15 $234,476.15 PAYMENT #16 $367,939.90 PAYMENT #17 $398,895.00 PAYMENT #18 $138,419.10 PAYMENT #19 $60,685.00 PAYMENT #20 $12,554.47 TOTAL PROGRESS PAYMENTS: $3,516,980.56 REMAINING BALANCE ON CONTRACT: $40,600.99 RECOMMENDATION: APPROVED [// APPROVED 7-- APPROVED DENIED DENIED DENIED public Works Directo? City Manager ' '" Mayor Dublin Boulevard Widening Contract No. 01-10 Submitted Change Order Information A. Unilateral Acceptance: CCO No. Description Cost 23 (rev.) City Hall frontage drainage installation $15,536.00 29 Provide pavement fabric to Dublin Blvd. Lanes l&2 $14,842.00 31 Re-mobilize drill-rig and increase pile depth $ 3,528.69 32 (rev.) Refinish bridge deck $ 31,753.95 33 Provide lift operator for utility hangers $ 2,769.00 34 Provide wood lagging wall at abutments $13,362.55 35 Adjust and re-set utility opening (Pac Bell) $ 3,560.00 36 Various structural additional work items $17,851.15 37 Miscellaneous electrical additional items $11,646.11 38 Additional manpower to complete hangers $15,529.22 39 Miscellaneous pavement repair extra work $16,773.16 40 Block wall and driveway conform (north) $ 23,870.49 41 (rev.) Reconstruct Enterprise driveway (north) $14,952.87 42 (rev.) ProVide "SOnotube'' form support for retaining wall $ 8,651.39 47 Relocate exiSt. 6" backfl°w preventer $15,335.05 53 Miscellaneous surface improvements $ 2,155.89 54 Grind existing pavement along Dublin Blvd. $11,713.82 55 Miscellaneous extra site improvements $ 14,057.58 Subtotals: $237, 888.92 B. Contractual Acceptance: CCO No. Description Cost 28 Asphalt crack sealant for Dublin Blvd. $ 8,516.97 30 Traffic signal modifications per City Traffic Engineer $ 1,343.91 50 Misc. surfacing improvements $ 9,384.11 51 Repair existing DSRSD water facilities $ 2,286.03 Subtotals: $ 21,531.02 TOTAL: $259,419.94 4/20/04 CITY OF DUBLIN · 100 c~wc PLAZA, DUBLIN, CALIFORNIA 94568 .~ (925) 833-6630 * (925) 829-9248~3( CONTRACT CHANGE ORDER NO. 23 {rev,) DATE: June 18, 2003 Rev. 2/16/04 ...... ~r.~ ..~( .~ PAGE: 1 of 2 PROJECTIROAD: Dublin Boulevard Widening TO: Granite Construction, Inc, You am hereby directed to make the herein described changes from the plans and specifications or do the following ~escribed work not included in the plans and specifications on this contract. NOTE: This change order is not effective until approved by the City of Dublin Public Works Director. The description of work to be done, estimate of quantities, and prices to be paid are segregated be~een additional work at contract price, agreed price, and force account. Unless othe~ise stated, rotes for rental of equipment cover only such time as equipment is actually used and no allowance will be made for idle time. All other costs are non-compensible. This change order is requested by the Resident Representative/Ci~ Engineer. I. Extra Work at Agreed Upon Lump Sum Compensation Price: Provide and install new area drain and collection system in front of City Hall as requested in an effort to eliminate existing ponding adjacent the existing meandering p.c.c, pathway. This work includes re-grading the subject area for positive drainage, 12" HDPE storm pipe, 12" area drain and box, yard drain, 6" p:v.c, connection pipe and all labor, tools, materials, etc. as necessaw to complete the work as requested, and as directed by the Engineer. This work shall be provided on a force account basis as directed by the Resident Engineer and City Engineer for an agreed upon total aggregate amount of $15,536.00. All extra work shall comply with Sections 4-1.03D and 9-1.03 of the Standard Specifications. The agreed upon amount of $15,536.00 shall be the final amount agreed upon per submitted documentation and invoicing. All work shall be performed in accordance with Special Provisions, the applicable Standard Plans and Specifications, as verified by the City and/or as authorized by the Engineer. No additional compensation shall be made per this change order for said additional work. ESTIMATED AGGREGATE CONTRACT COST INCREASE: $15,536.00 BY REASON OF THIS CHANGE ORDER, THE TIME OF COMPLETION WILL BE ADJUSTED: 4 WORKING DAYS. SUBMITTED BY: APPROVAL RE~CO'~MENDED BY: APPROVED BY: · Schaaf Date 6/18/03 Fed Del Rosario Date~ ! MelFssa Morton / D~te L ~,,~lstruction Representative Senior Civil Engineer Public Works Director We, the undersigned contractor, have given careful consideration to the change proposed and hereby agree, if this proposal is approved, that we will provide all equipment, furnish all materials, except as may otherwise be noted above, and perform all services necessary for the work above specified, and will accept as full payment therefor the prices shown above. Accepted: Date Contractor: Granite Construction, Inc Signed By: Title: If the Contractor does not sign acceptance of this order, his/her attention is cirected to the requirements of the specifications as to proceeding with the ordered work and filing a written protest within the time therein specified. CITY oF DUBLIN , lo~ c~c PLAZA, OUBUN,~CALIFORNIA 94S68 4, (925) 833-6630 ~, {92S) 829-9248 F/~~ CONTRACT CHANGE ORDER NO. 28 CONTRACT NO: 01-10 STPL 5432 (006) TO: Granite Construction, inc. LJ' You are hereby directed ~:o' make the herein described changes from the plans and specifications or do the following described work not included in the plans and specificatiOns on this contract. NOTE: This change order is not effective until approved by the City of Dublin Public WOrks Director. The description of work to be.done, estimate of quantities, and pdces to be paid are segregated between additiOnal work at COntract price, · agreed price, and force acCOunt. Unless otherwise stated, rates for rental of .equipment cover only such time as equipment is actually used and no alloW, ance will be made for idle time. All other costs are non-compensible. This change order is' requested by City staff/Engineer. 1. Extra Work at Agreed Upon Lump Sum CompenSation Price: Provide asphalt surface crack sealant to various exposed locations along Dublin BoUlevard as requested by the City. The additional Type Usealant was determined to be a necessary preventative measure prior to pavement overlay improvement. (See attached Granite Memo No. 227 and City Memo 221 for additional information 'and support documentation). This work shall be provided on a force account basis as directed by the Engineer for an agreed upon amount of $ 8,516.97 inclusive of application of the crack sealant (approximately 3,903 LP-") and traffic control measures. All extra work shall comply with Sections 4-I.03D and 9-1.03 of the Standard Specifications. The agreed upon amount of $8,516.97 shall be the final amount ag~=cfl~bP~l~ ~per submitted documentation and inclusive of all mark-ups, time extensions, delay, overhead (home and field).:?proflt, d[i~'~ and/or indirect costs, and effects on subcontractors and suppliers of any tier, and as directed by the Engineer. A:II work shall be performed in accordance with Special provisions, the applicable Standard 'Plans and Specifications, as verified bY the City and/or as authorized by the Engineer. No additional compensation shall be made per this change order for said additional work. The contractor waives all further claims for costs and effects caused 'by any of the above and/or herein described changes. ESTIMATED COST INCREASE: $ 8,St6.97 BY REASON OF THIS CHANGE ORDER, THE TIME OF.COMPLETION.WILL BE ADJUSTED: 0.~.. WORKING DAYS. SUBMITTED BY: . APPROV~_L ~MMENDED BY': APPROVED BY: / Ja~ne~.M. SchaafU ' Date. 12/08/~0,~3 ~F~rd Del RoSario ' Oat~ / ~ Date' \"/'~tVe, the underSigned contractor, have given careful consideration to the change proposed and hereby agree, if this proposal is approved, that we will provide all equipment, furnish all materials, except as may otherwise be noted above, and perform all-services necessary for the work above specified, and will accept as full payment therefor the prices shown above: Accepted: Date L~/X.,~/,O V r, Granite construction, ,nc If the Contractor does not sign acceptance of this order, his/her attention is directed to the requirements of the specifications as to proceeding with the ordered work and filing a written protest within the time therein specified. CITY OF DU'BLIN .,. ,~00 c~vlc PLAZA, DUBLIN, CAUFORNIA 94668 ,;, (925) 833-6630 ~. (925) 829-9248'F'AX CONTRACT CHANGE ORDER NO. 29 DATE: December 8, 2003 (rev. 3,16104) J-~ jJ'~j~fl~'T~J-~, : PAGE: 1 of 1 PROJECT/ROAD: Dublin Boulevard Widening Jl ~ llJ CONTRACT NO: 01-10 STPL 5432 (006) ~J~.~AP~ ~. ~l,.~u ~'~ [_~J~l TO: Granite Construction, Inc ......................... You are hereby directed to make the herein described changes from the plans and specifications or do the following described work not included in the plans and specifications on this contract. NOTE: This change order is not effective until approved by the City of Dublin Public Works Director. The description of work to be done, estimate of quantities, and prices to be paid are segregated between additional work at contract price, agreed price, and force account. Unless otherwise stated, rates for rental of equipment cover only such time as equipment is actually used and no allowance will be made for idle time. All other costs are non-compensible. This change order is requested by City staff/Engineer. I. Extra Work at Agreed Upon Lump Sum Compensation Pdce: Provide pavement fabric to the prescribed lane numbers 1 and 2 for both eastbound and westbound travel, inclusive of turn pockets, along Dublin Boulevard as requested by the City· The pavement fabdc was determined to be a necessary future erosi0n/weadng preventative measure pdor to pavement overlay improvement. (See attached Granite Memo No. 226 and City Memo 201 for additional information and support documentation). This work shall be provided on a force account basis as directed by the Engineer for an agreed upon amount of $14,842 inclusive placement of the paving fabric (approximately 8,200 SQM) and traffic control measures. All extra work shall comply with Sections 4-1.03D and 9-1.03 of the Standard Specifications. The agreed upon amount of $14,842 shall be the final amount agreed upon per submitted documentation and inclusive of all materials mark-ups, time extensions, delay, overhead (home and field) profit, direct and/or indirect costs, and effects on subcontractors and suppliers of any tier, and as directed by the Engineer. Ali work shall be performed in accordance with Special Provisions, the applicable Standard Plans and Specifications, as vedfied by the City and/or as authorized by the Engineer. No additional compensation shall be made per this change order for said additional work. The contractor waives all further claims for costs and effects caused by any of the above and/or herein described changes. ESTIMATED COST INCREASE: $14,842.00 BY REASON OF THIS CHANGE ORDER, THE TIME OF COMPLETION WILL BE ADJUSTED: 1 WORKING DAYS. SUBMITTED BY: APP, ROV~AJ.~E~ENDED BY: APPROVED BY: · Schaaf Date 12/08/03 F~rd Del Rosario Date oTstruction Representative Senior Civil Engineer Public Works Director VVe, the undersigned contractor, have given careful consideration to the change proposed and hereby agree, if this proposal is approved, that we will provide all equipment, furnish all materials, except as may otherwise be noted above, and perform all services necessary for the work above specified, and will accept as full payment therefor the prices shown above. . Accepted: Date Contractor: Granite Construction, Inc Signed By:. Title: If the Contractor does not sign acceptance of this order, his/her attention is directed to the requirements of the specifications as'to proceeding with the ordered work and filing a written protest within the time therein specified. CITY OF DUBLIN ,, 400 civic PLAZA, DUBLIN, CALIFORNIA 94568 ~. (925) 833-6630 ~. (925) 829-9248 FAX CONTRACT CHANGE ORDER NO. 30 DATE: December 9, 2003 (rev. 1/16/04) PAGE: 1 of 1 PROJECT/ROAD: Dublin Boulevard Widening CONTRACT NO: 01-10 STPL 5432 (006) TO: Granite Construction, inc. You are hereby directed to make the herein described changes from the plans and specifications or do the following described work not included in the plans and specifications on this contract. NOTE: This change order is not effective until approved by the City of Dublin Public Works Director. The description of work to be done, estimate of quantities, and prices to be paid are segregated between additional work at contract price, agreed price, and force account. Unless othenvise stated, rates for rental of equipment cover only Such time as equipment is actually used and no allowance will be made for idle time. All other costs are non-compensible. This change order is requested by City staff/Engineer. I. Extra Work at Agreed Upon Lump Sum Compensation Pdce: Provide vadous traffic signal modifications as requested by the City Traffic Engineer per visibility and location improvements. (See attached Granite Memo No.'s 0217 and 0218 for additional information and support documentation). The additional work is as follows: A. Reconfigure signal mast arm length and re-set tenons on Pole "F" on Dublin Blvd. at Clark Avenue- $ 840.59 B. Connect pedestrian pushbutton (overtime) as directed by County forces at Sierra/Dublin intersection- $ 503.32 Subtotal- $1,343.91 This work shall be completed on a force account basis as directed by the Traffic Engineer for an agreed upon total aggregate amount of $ 1,343.91. All extra work shall comply with Sections 4-1.03D and 9-1.03 of the Standard Specifications. The agreed upon amount of $1,343.91 shall be the final amount agreed upon per submitted documentation and inclusive of all materials, mark-ups, time extensions, delay, overhead (home and field) profit, direct and/or indirect costs, and effects on subcontractors and suppliers of any tier, and as directed by the Engineer. All work shall be performed in accordance with Special Provisions, the applicable Standard Plans and Specifications, as vedfied by the City and/or as authorized by the Engineer. No additional compensation shall be made per this change order for said additional work. The contractor waives all further claims for costs and effects caused by any of the above and/or herein described changes. ESTIMATED COST INCREASE: $ t,343.91 BY REASON OF THIS CHANGE ORDER, THE TIME OF COMPLETION WILL BE ADJUSTED: 0 WORKING DAYS. SUBMITTED BY: APPROVAL,~I~E~OMMENDED BY: APPROVED BY: ,~a~es M Schaaf~ Date 12/08/03 ,FCerd Del Rosari~ Date Meh~s~ Morton Dat~ ehstruction Representative Senior Civil Engineer Public Works Director We, the undersigned contractor, have given careful consideration to the change proposed and hereby agree, if this proposal is approved, that we will provide all equipment, furnish all materials, except as may otherwise be noted above, and perform all services necessary for the work above specified, and will accept as full payment therefor the prices shown above. J~ ! ,, Accepted: Date ~/]3/0'7' * Contractor: Granite Construction, inc If th C ntract ,~,t tan this order, his/her attention is directed to the requirements of the specifications as to proceeding with the ordered work and filing a wdtten protest within the time therein specified. CONTRACT CHANGE ORDER NO. 31 PROJECT/ROAD: Dublin Boulevard Widening tli!- CONTRACT NO: 0t-10 STPL 5432 (006) LJ~JL_~:-~I ,.lU IU TO: Granite Construction, Inc. - ....................... You are hereby directed to make the herein described changes from the plans and specifications or do the following described work not included in the plans and specifications on this contract. NOTE: This change order is not effective until approved by the City of Dublin Public Works Director. The description of work to be done, estimate of quantities, and prices to be paid are segregated between additional work at contract price, agreed price, and force account. Unless otherwise stated, rates for rental of equipment cover only such time as equipment is actually used and no allowance will be made for idle time. All other costs are non-compensible. This change order is requested by the Resident Representative/City GeotechnicalEngineer. I. Extra Work at Agreed Upon Lump Sum Compensation Price: Provide the following items of work necessary for the completion and continuation of planned im provement(s) of the project in consideration to Bid Item No.'s 71 and 73, "Drive Pile (Class 625C)" and Drive Pile (Class 400C)" respectively. This is work necessary to provide additional piling depth and Icad bearing capacity for the pilings per project and geotechnical engineer recommendations respective to the pending structural pilings per actual field conditions. a. Remobilize drill rig to pre-drill additional piling casing depth to necessary tip elevation and strength calculations. (See Granite memo no. 0235 for additional detail). Agreed Lump Sum Cost: $1,653.75 b. Additional pile driving depth beyond plan limits to meet specified depth and pile strength per Geothecnical Engineer recommendations. (See Granite memo no. 0234 for additional information). Agreed Lump Sum Cost $1,874.94 Total Aggregate Amount $ 3,528. 69 This work shall be provided on a force account basis as directed by the Resident Engineer and City Traffic Engineer for an agreed upon total aggregate amount of $ 3,528.69. All extra work shall comply with Sections 4-1.03D and 9-1.03 of the Standard Specifications. The agreed upon amount of $ 3,528.69 shall be the final amount agreed upon per submitted documentation and inclusive of all materials, mark-ups, time extensions, delay, overhead (home and field) profit, direct and/or indirect costs, and effects on subcontractors and suppliers of any tier, and as directed by the Engineer. All work shall be performed in accordance with Special Provisions, the applicable Standard Plans and Specifications, as verified by the City and/or as authorized by the Engineer. No additional compensation shall be made per this change order for said additional work. The contractor waives all further claims for costs and effects caused by any of the above and/or herein described changes. ESTIMATED COST INCREASE: $ 3,528.69 BY REASON OF THIS CHANGE ORDER, THE TIME OF COMPLETION WILL BE ADJUSTED: 2 WORKING DAYS. Constructio(nk.~presenta~ve Senior CMl Engineer Public Works Director We, the undersigned contractor, have given careful consideration to the change proposed and hereby agree, if this proposal is approved, that we will provide all equipment, furnish all materials, except as may otherwise be noted above, and perform all services necessary for the work above specified, and will accept as full payment therefor the prices shown above. Accepted: Date Contractor: Granite Construction, Inc Signed By: Title: If the Contractor does not sign acceptance of this order, his/her attention is directed to the requirements of the specifications as to proceeding with the ordered work and filing a written protest within the time therein specified. CITY OF DUBLIN 4. 400 c~wc PLAZA, DUBLIN, CALIFORNIA 94568 4. (925) 833-6630 4. (925) 629-9248 FAX CONTRACT CHANGE ORDER NO. 32 (rev.) DATE: December 18, 2003 (rev. 2/17/04) ~ ~.~-~ ~~, PAGE: 1 of 2 PROJECT/ROAD: Dublin Boulevard Widening TQ: Granite Construction; lnc .... You are hereby directed to make the herein described changes from the plans and specifications or do the following described work not included in the plans and specifications on this contract. NOTE: This change order is not. effective until approved by the City of Dublin Public Works Director. The description of work to be done, estimate of quantities, and prices to be paid are segregated be~een additional work at contract price agreed price, and force account. Unless othe~ise stated, rates for rental of ecuipment cover only such time as equipment is actually used and no allowance will be made for idle time. All other costs are non-compensible. This change order is requested by the Resident Re presentative/Ci~ Engineer. I. Extra Work at Agreed Upon' Lump Sum Compensation Price: Provide the following items of work necessary for the final completion and modification of planned improvement(s) of the project in consideration to Bid Item No. 78,"Refinish Bridge Deck". This is work was deemed necessary to provide revised method of removal and the refinishing of portions of the south and northsides of the existing bridge deck upon the removal and subsequent findings of substantial steel reinforcement for the concrete traffic barrier to be removed which damaged portio ns of the surfacing upon removal operations. I. Add Agreed Upon Lump Sum Item: a. Provide revised deck refinishing labor and material to southside and northside deck upon p.c.c, barrier removal inclusive of minor traffic control and temporary steel safety plating. (See Granite memo no. 0231 and City Memos for additional detail and support). Agreed Lump Sum Cost: $ 35,273.95 II. Delete Bid Item: b. Bid Item No. 78,"Refinish Bridge Deck" -22 SQM @ $160.00/SQM: $ 3,520.00 Total Aggregate Compensatory Amount $ 31,753.95 This work shall be provided on a force account basis as directed by the Resident Engineer and City Engineer for an agreed upon total balanced aggregate amount of $ 31,753.95. All extra work shall comply with Sections 4-1.03D and 9-1.03 of the Standard Specifications. The agreed upon amount of $ 31,753.95 shall be the final amount agreed upon per submitted documentation and inclusive of all materials, mark-ups, time extensions, delay, overhead (home and field) profit, direct and/or indirect costs, and effects on subcontractors and suppliers of any tier, and as directed by the Engineer. All work shall be performed in accordance with Special Provisions, the applicable Standard Plans and Specifications, as verified by the City and/or as authorized by the Engineer. No additional compensation shall be made per this change order for said additional work. The contractor waives all further claims for costs and effects caused by any of the above and/or harem described changes. ESTIMATED AGGREGATE CONTRACT COST INCREASE: $ 31,753.95 BY REASON OF THIS CHANGE ORDER, THE TIME OF COMPLETION WILL BE ADJUSTED: 8 _ WORKING DAYS. Pa.~ 2 CCO NO. 32 (rev.) 2/17/04 SUBMITTED BY: , . , MENDED BY: APPROVED BY: Ja haaf Date 12/18/03 '~eerd Del Rosario Date~ i ~ Meli~sa Morton r i~.ate/ / Co~str~ction Representative Senior Civil Engineer Public Works Director We, the undersigned contractor, have given careful consideration to the change proposed and hereby agree, if this proposal is approved, that we will provide all equipment, furnish all materials, except as may otherwise be noted above, and perform all services necessary for the work above specified, and will accept as full payment therefor the prices shown above. Accepted: Date Contractor: Granite Construction, Inc Signed By: Title: If the Contractor does not sign acceptance of this order, his/her attention is directed to the requirements of the specifications as to proceeding with the ordered work and filing a written protest within the time therein specified. -,- CITY OF DUBLIN ,. 400 c~vlc PLAZA, DUBLIN, CALIFORNIA 94560 .t. (925) 033.6630 .t. (925) CONTRACT CHANGE ORDER NO. 33 DATE: December 18, 2003 (rev. 3/16/04) Il ~PAGE:~' 1 of PROJECT/ROAD: Dublin Boulevard Widening CONTRACT NO: 0'l-t0 STPL 5432 (006) TO: Granite Construction, Inc. - You are hereby directed to make the herein described changes from the plans and specifications or do the following described work not included in the plans and specifications on this contract. NOTE: This change order is not effective until approved by the City of Dublin Public Works Director. The description of work to be done, estimate of quantities, and prices to be paid are segregated between additional work at contract price, agreed pdce, and force account. Unless otherwise stated, rates for rental of equipment cover only such time as equipment is actually used and no allowance will be made for idle time. All other costs are non-compensible. This change order is requested by the Resident Representative/City Engineer. I. Extra Work at Agreed Upon Lump Sum Compensation Pdce: Provide the following item of work necessary fo[ the final completion and modification of planned utility hanger improvement(s) of the project in consideration to..Bid Item No.'s JT4 and JT6 in consideration to recent Contract Change Order No.'s 25 and 26 for Rule 20A improvements. This is work was deemed necessary to provide revised method of hanging the requ ired utility conduits under the bddge deck for PG&E and Pacific Bell and the verification via magnometer under the bddge deck (soffit) to avoid conflicts. (See Granite Memo No. 0236for additional information and support documentation as attached). A. Provide lift operator for steel rebar verification: Agreed Lump Sum increase in cost @ $ 2,769.00 Subtotal Cost: $ 2,769.00 This work shall be provided on a force account basis as directed by the Resident Engineer and City Engineer for an agreed upon total balanced aggregate amount of $ 2,769.00. All extra work shall comply with Sections 4-1.03D and 9-1.03 of the Standard Specifications. The agreed upon amount of $ 2,769.00 shall be the final amount agreed upon per submitted documentation and inclusive of all materials, mark-ups, time extensions, delay, overhead (home and field) profit, direct and/or indirect costs, and effects on subcontractors and suppliers of any tier, and as directed by the Engineer. All work shall be performed in accordance with Special Provisions, the applicable Standard Plans and Specifications, as verified by the City and/or as authorized by the Engineer. No additional compensation shall be made per this change order for said additional work. The contractor waives all further claims for costs and effects caused by any of the above and/or herein described changes. ESTIMATED AGGREGATE CONTRACT COST INCREASE: $ 2,769.00 BY REASON OF THIS CHANGE ORDER, THE TIME OF COMPLETION WILL BE ADJUSTED: 2 WORKING DAYS. SUBMITTED BY: APPROVAL P~=C~MMENDED BY: APPROVED BY: Date 12/18/03 ' F~rd Del Rosario ~' Meliss~ Morton / ioS' ~. Schaaf ruction Representative Senior Civil Engineer Public Works Director We, the undersigned contractor, have given careful consideration to the change proposed and hereby agree, if this proposal is approved, that we. will provide all equipment, furnish all materials, except as may otherwise be noted above, and perform all services necessary for the work above specified, and will accept as full payment therefor the pdces shown above. Accepted: Date Contractor: Granite Construction, Inc Signed By: Title: If the Contractor does not sign acceptance of this order, his/her attention is directed to the requirements of the specifications as to proceeding with the ordered work and filing a written protest within the time therein specified. CITY OF DUBLIN · 400 cw~c PL.~.A, DUBUN, CALIFORNIA 94568 ~. (925) 833-6930 .~ (925) 829-9248 FAX CONTRACT CHANGE ORDER NO. 34 DATE: December 18, 2003 (rev. 3/17/04) PAGE: I of 2 PROJECT/ROAD: Dublin Boulevard Widening CONTRACT NO: 01-10 STPL 5432 (006) TO: Granite Construction, Inc. . You are hereby directed to make the herein described changes from the plans and specifications or do the following c~escdbed work not included in the plans and specifications on this contract. NOTE: This change order is not effective until approved by the City of Dublin Public Works Director. The description of work to be done, estimate of quantities, and prices to be paid are segregated between additional work at contract pdce, agreed price, and force account. Unless otherwise stated, rates for rental of equipment cover only such time as equipment is actually used and no allowance will be made for idle time. All other costs are non-compensible. This change order is requested by the Resident Representative/City Engineer. I. Extra Work at Agreed Upon Lump Sum Corn pensation Price: Provide wood lagging (retaining) walls as deemed necessary for the protection of the existing slopes adjacent the Abutments on the eastside of th~ bridge facility not provided for within the plans. This work is directed by the City in an effort to provide additional slope protection upon ~the completion of the bridge facility widening. (See Granite Memo No. 0233 and City Memo for additional information and support documentation as attached). A. Construct wood retaining wall at Abutment No. 1 and2 Eastern slopes: Agreed Lump Sum cost @ $13,362.55 Subtotal Cost: $13,362.55 This work shall be provided on a force account basis as directed by the Resident Engineer and City Engineer for an agreed upon total amount of $ 13,362.55.00. All extra work shall comply with Sections 4-1.03D and 9-1.03 of the Standard Specifications. The agreed upon amount of $ 13,362.55 shall be the final amount agreed upon per submitted documentation and inclusive of all materials, mark-ups, time extensions, delay, overhead (home and field) profit, direct and/or indirect costs, and effects on subcontractors and suppliers of any tier, and as directed by the Engineer. All work shall be performed in accordance with Special Provisions, the applicable Standard Plans and Specifications, as verified by the City and/or as authorized by the Engineer. No additional compensation shall be made per this change order for said additional work. The contractor waives all further claims for costs and effects caused by any' of the above and/or herein described changes. ESTIMATED AGGREGATE CONTRACT COST INCREASE: $13,362.55 BY REASON OF THIS CHANGE ORDER, THE TIME OF COMPLETION WILL BE ADJUSTED: 7 WORKING DAYS. SUBMITTED BY: APPROVAL ~MMENDED BY: APPROVED BY: M. Schaaf Date 12/18/03 .~Fj~rd Del Rosado ' Date ' ! ~ r~ellssa Morion uat~ . . onstruction Representative Senior Civil Engineer Public Works Director We', .the undersigned contractor, have given careful consideration to the change proposed and I~ereby ~ree, if this proposal is approved, that we will provide ail equipment, furnish all materials, except as may otherwise be noted above, and perform all services necessary for the work above specified, and will accept as full payment therefor the prices shown above. Accepted: Date Contracto~ Granite Construction, Inc Signed By: Title: If the Contractor does not sign acceptance of this order, his/her attention is directed to the requirements of the specifications as to proceeding with the ordered work and filing a written protest within the time therein specified. CITY OF DUBLIN .,. 400 crvic PLAZA, DUBLIN, CALIFORNIA 94568 .~ (925) 833-6630 ~. (925) 829.9248 FAX CONTRACT CHANGE ORDER NO. 35 DATE: December 18, 2003 (rev. 3/17/04) jr-~(~r~ j~.~r~ PAGE: 1 of PROJECT/ROAD: Dublin Boulevard Widening CONTRACT NO: 01-10 STPL 5432 (006) TO: Granite Construction, Inc. You are hereby directed to make the herein described changes from the plans and specifications or do the following described work not included in the plans and specifications on this contract. NOTE: This change order is not effective until approved by the City of Dublin Public Works Director. The description of work to be done, estimate of quantities, and prices to be paid are segregated between additional work at contract price, agreed price, and force account. Unless othenvise stated, rates for rental of equipment cover only such time as equipment is actually used and no allowance will be made for idle time. All other costs are non-compensible. This change order, is requested by the Resident Representative/City Engineer. I. Extra Work at Agreed Upon Lump Sum Compensation Price: Adjust and re-set utility openings respective to Pacific Bell as deemed necessary to match recently completed duct bank trenching at the Abutment No.1 (southside) of the bddge facility in consideration of the planned location per the plans. This work is directed by the City in an effort to provide proper opening point to accept the Pacific Bell ducts at the completion of the bridge facility widening. (See Granite Memo No. 075 and City Memo for additional information and support documentation as attached). A. Re-set and locate adjusted utility opening at Abutment No. 1' Agreed Lump Sum cost @ $ 3,560.00 Subtotal Cost:' $ 3,560. O0 This work shall be provided on a force account basis as directed by the Resident Engineer and City Engineer for an agreed upon total amount of $ 3,560.00. All extra work shall comply with Sections 4-1.03D and 9-1.03 of the Standard Specifications. The agreed upon amount of $ 3,560.00 shall be the final amount agreed upon per submitted documentation and inclusive of all materials, mark-ups, time extensions, delay, overhead (home and field) profit, direct and/or indirect costs, and effects on subcontractors and suppliers of any tier, and as directed by the Engineer. All work shall be performed in accordance with Special Provisions, the applicable Standard Plans and Specifications, as verified by the City and/or as authorized by the Engineer. No additional compensation shall be made per this change order for said additional work. 'The contractor waives all further claims for costs and effects caused by any of the above and/or herein desCribed changes. ESTIMATED AGGREGATE CONTRACT COST INCREASE: $ 3,560.00 BY REASON OF THIS CHANGE ORDER, THE TIME OF COMPLETION WILL BE ADJUSTED: ~ WORKING DAYS. SUBMITTED BY: APPROVAL RECOMMENDED BY: APPROVED BY: .~a~es M. Schaaf Date 12/18/03 FCrd Del Rosado Datd / -- I~leli~sa Morton ~ - Date/ (~hstruction Representative Senior Civil Engineer Public Works Director We, the undersigned contractor, have given careful consideration to the change proposed and hereby agree, if this proposal is approved, that we will provide all equipment, furnish all materials, except as may otherwise be noted above, and perform all services necessary for the work above specified, and will accept as full payment therefor the prices shown above, Accepted: Date Contractor: Granite Construction, Inc Signed By:. Title: If the Contractor does not sign acceptance of this order, his/her attention is directed to the requirements of the specifications as to proceeding with the ordered work and filing a written protest within the time therein specified. CITY OF DUBLIN · ~00 mvlc PLAZA, DUBLIN, CALIFORNIA 94568 4. (S25) 833-6630 .t. (S25) 829-9248 FAX CONTRACT CHANGE ORDER NO. 36 DATE: December 18, 2003 (rev. 3/17/04) PAGE: 1 of 2 PROJECT/ROAD: Dublin Boulevard Widening CONTRACT NO: 01-10 STPL 5432 (006) TO: Granite Construction, Inc ......................... You are hereby directed to make the herein described changes from the plans and specifications or do the following described work not included in the plans and specifications on this contract. NOTE: This change order is not effective until approved by the City of Dublin Public Works Director. The description of work to be done, estimate of quantities, and prices to be paid are segregated between additional work at contract price, agreed price, and force account. Unless otherwise stated, rates for rental of equipment cover only such time as equipment is actually used and no allowance will be made for idle time. All other costs are non-compensible. This change order is requested by the Resident Representative/City Traffic Engineer. I. Extra Work at Agreed Upon Lump Sum Compensation Pdce: Provide the following items of work necessary for the completion and continuation of planned improvement(s) of the project respective to the bridge construction effort and as directed by the Engineer and City. a. Remobilize concrete pump and labor for the southside column pours (Bent No.'s 2 and 3) to accommodate column reinforcement fanning adjustment and cladfy concrete pour mix and method. (See Granite memo no. 077 for additional detail). Agreed Lump Sum Cost: $ 5,947.00 b. Remobilize drill fig in an effort to re-set and ddll piling to increased tip depth per recommendations by the project geotechnical engineer and bridge engineer at Abutment No.5 and Bent No. 3 (southside). (See Granite memo no. 064 for additional information). Agreed Lump Sum Cost: $ 3,888.15 c. Provide revised falsework plan upon engineer's review of pending field conditions to accommodate potential adjusted column separation at Bent No. 4 for the northside in an effort to avoid conflict with the existing Zone 7 66" storm drain outfall facility. (See Granite memo no. 140 for additional information). Agreed Lump Sum Cost: $ 2,982.00 d. Re-set column rebar cages to increased tip depth to meet pile strength criteda and specifiec tip elevations as directed by the geotechnical and bridge engineers at Bent No. 4 (southside) due to found field conditions. (See Granite memo and City letter of 12/03/03 for additional information). Agreed Lump Sum Cost: $ 5,034.00 Aggregate Total Lump Sum Cost: $17, 851.15 This work shall be provided on a force account basiS as directed by the Resident Engineer and City Traffic Engineer for an agreed upon total aggregate amount of $17,851.15. All extra work shall comply with Sections 4-1.03D and 9-1.03 of the Standard Specifications. The agreed upon amount of $17,851.15 shall be the final amount agreed upon per submitted documentation and inclusive of ali materials, mark-ups, time extensions, delay, overhead (home and field) profit, direct and/or indirect costs, and effects on subcontractors and sUppliers of any tier, and as directed by the Engineer. All work shall be performed in accordance with Special Provisions, the applicable Standard Plans and Specifications, as vedfied by the City and/or as authorized by the Engineer. No additional compensation shall be made per this change order for said additional work. The contractor waives all further claims for costs and effects caused by any of the above and/or herein described changes. · " 90q q ESTIMATED COST INCREASE: $17,851.15 BY REASON OF THIS CHANGE ORDER, THE TIME OF COMPLETION WILL BE ADJUSTED: 5 WORKING DAYS. SUBMITTED BY: APPROV~. R~MENDED BY: APPROVED BY: James M f' Date 12/18t03 e 13~te / / Constructo~ Representative Senior Civil Engineer Public Works Director We, the undersigned contractor, have given careful consideration to the change proposed and hereby agree, if this proposal is approved, that we will provide all equipment, furnish all materials, except as may otherwise be noted above, and perform all services necessary for the work above specified, and will accept as full payment therefor the pdces shown above. Accepted: Date Contractor: Granite Construction, Inc Signed By:. Title: If the Contractor does not sign acceptance of this order, his/her attention is directed to the requirements of the specifications as to proceeding with the ordered work and filing a written protest within the time therein specified. CITY Off DUBLI~ ~. ~oo ¢~w¢ ~L~z~, ~u~, ¢~u~o~ ~ ~. (~) ~-~o ~. ¢~2~) ~-~4~ ~ ~O~TRACT CHA~GI::: O~DI:::~ ~O. ~? DATE: January 22, 2004 (rev. 3/17/04) ,' ~ PAGE: 1 of 2 PROJECT/ROAD: Dublin Boulevard Widening ;;~ CONTRACT NO: 01-10 STPL 5432 (006) TO: Granite Construction, Inc. - ....................... You are hereby directed to make the herein described changes from the plans and specifications or do the following described work not included in the plans and specifications o~'this contract. NOTE: This change order is not effective until approved by the City of Dublin Public Works Director. The description of work to be done, estimate of quantities, and prices to be paid are segregated between additional work at contract price, agreed price, and force account. Unless otherwise stated, rates for rental of equipment cover only such time as equipment is actually used and no allowance will be made for idle time. All other costs are non-compensible. This change order is requested by the Resident Representative/City. I. Extra Work at Agreed Upon Lump Sum Compensation Price: Provide the following items of work necessary for the completion of the project traffic signal and electrical items in consideration to Bid Item No.'s 103, 104 and 105, "Signal and Lighting (Location 1 )", "Signal and Lighting (Location 2)" and "Lighting (City Street)" respectively. This is work deemed necessary to provide satisfactory and necessary completion per actual field conditions in consideration of the project plans. a. Relocate westbound MAS bracket on mast arm at Clark Avenue. (See Granite memo no. 0221 for additional detail). Agreed Lump Sum Cost: $ 469.57 Relocate service conductors and corresponding conduit feed for Sports Park public restrooms from Sierra Drive. (See Granite memo no. 0222 for additional information). Agreed Lump Sum Cost $4,935.07 c. Reconnect power and service controller to PG&E service point for irrigation controller at Sierra/Dublin. (See Granite memo no. 0223 for additional information). Agreed Lump Sum Cost $2,175. 09 d. Provide revised street ight bases' and configuration in conflict with planned curb and gutter location (too narrow). (See Granite memo no. 0224 for additional information). Agreed Lump Sum Cost $1,567.03 e. Change display information on traffic signal locations "B" and "C" at Sierra per SFE PCO No. 39 as requested. (See Granite memo no. 0224 for additional information). Agreed Lump Sum Cost $2,499.35 Total Aggregate Amount $11,646.11 COO NO. 37 3/17/04 This work shall be provided on a force account basis as directed by the Resident Engineer and City Traffic Engineer for an agreed upon total aggregate amount of $11,646.11 All extra work shall comply with Sections 4-1.03D and 9-1.03 of the Standard Specifications. The agreed upon amount of $11,646.11 shall be the final amount agreed upon per submitted documentation and inclusive of all materials, mark-ups, time extensions, delay, overhead (home and field) profit, direct and/or indirect costs, and effects on subcontractors and suppliers of any tier, and as directed by the Engineer. All work shall be performed in accordance with Special Provisions, the applicable Standard Plans and Specifications, as verified by the City and/or as authorized by the Engineer. No additional compensation shall be made per this change order for said additional work. The contractor waives all further claims for costs and effects caused by any of the above and/or herein described changes. ESTIMATED COST INCREASE: $11,646.1'1 BY REASON OF THIS CHANGE ORDER, THE TIME OF COMPLETION WiLL BE ADJUSTED: 6 WORKING DAYS. SUBMITTED BY: APPROV,~L R~MENDED BY: APPROVED BY: Jam+s'M. Schaaf Date 1/22/04 ' F--~rd Del Rosario uate , --L-~. T~onlpsun-- ~- Date/ Senior Civil Engineer C?,~/¢truction Representative Public Wo~s Director We, the undersigned contractor, have given careful consideration to the change proposed and hereby agree, if this proposal is approved, that we will provide all equipment, furnish all materials, except as may otherwise be noted above, and perform all services necessary for the work above specified, and will accept as full payment therefor the prices shown above. Accepted: Date Contractor: Granite Construction, Jnc Signed By: Title: If the Contractor does not s~gn acceptance of this order, his/her attention is directed to the requirements of the specifications as to proceeding with the ordered work and filing a written protest within the time therein specified. CITY OF DUBLIN ~. 400 c,v;c PLAZA, DUBLIN, CALIFORNIA 94668 a. (926) 833-6630 a. (925)829-9248 FAX CONTRACT CHANGE ORDER NO. 38 DATE: January 22, 2004 (rev 3/17/04) ~_ Rtl{ J[ 4 '~ ~ll PAGE: 1 of 2 PROJECT/ROAD: Dublin Boulevard Widening CONTRACT NO: 01-10 STPL 5432 (006) TO: Granite Construction, inc. You are hereby directed to make the herein described changes from the plans and specifications or do the following described work not included in the plans and specifications on this contract. NOTE: This change order is not effective until approved by the City of Dublin Public Works Director. The description of work to be done, estimate of quantities, and prices to be paid are segregated between additional work at contract price, agreed price, and force account. Unless otherwise stated, rates for rental of equipment cover only such time as equipment is actually used and no allowance will be made for idle time. All other costs are non-compensible. This change order is requested by the Rule 20A and City/Engineer. I. Extra Work at Agreed Upon Lump Sum Compensation Price: Modification and lost production time per the planned utility hanger fabrication and materials for pacific Gas and Electric Rule 20A installation(s) and power transfer to underground affecting Bid items JT4 and JT6 as discussed with City and Rule 20A agency staffs. This work includes additional time and materials labor as necessary to provide the modified hangers to fit existing field conditions and requirements for vertical compliance by Zone 7, delay and installation costs to' procure the necessary items for proper placement as approved by PG&E, inclusive of exPedited work detail for scheduling purposes to accommodate the pending planned relocation dates for utility transference to underground. (See Granite Memo No.'s 0219, 0220 and 0216 for additional information and support documentation as attached). A. Premium manpower to assist PG&E personnel: Agreed Lump SUm increase in cost @ $ 521.82 B. Manpower delays for acceleration per hanger modifications: Agreed Lump Sum increase in cost (~ $ 3,376.95 C. Utility/traffic signal pole conflict per revised overhead delays: Agreed Lump Sum increase in cost @ $11,630.45 Subtotal Cost: $15,529.22 This work shall be provided on a force account basis as directed by the Engineer for an agreed upon total aggregate amount of $15,529.22. All extra work shall comply with Sections 4-1.03D and 9-1.03 of the Standard Specifications. The agreed upon amount of $15,529.22 shall be the final amount agreed upon per submitted documentation and inclusive of all materials, mark-ups, time extensions, delay, overhead (home and field) profit, direct and/or indirect costs, and effects on subcontractors and suppliers of any tier, and as directed by the Engineer. All work shall be performed in accordance with Special Provisions, the applicable Standard Plans and Specifications, as vedfied by the City and/or as authorized by the Engineer. No additional compensation shall be made per this change order for said additional work. The contractor waives all further claims for costs and effects caused by any of the above and/or herein described changes. ESTIMATED COST INCREASE: $15,S29.22 BY REASON OF THIS CHANGE ORDER, THE TIME OF COMPLETION WILL BE ADJUSTED: 9 WORKING DAYS. SUBMITTED BY: APP. Rov_~ R~"~IVIMENDED BY: APPROVED BY: J~ar~es M. Schaaf Date 1/08/04 - F~rd Del Rosario Date I / Meliss~ Morton Date O~struction Representative Senior Civil Engineer Public Works Director We, the undersigned contractor, have given careful consideration to the change proposed and hereby agree, if this proposal is approved, that we will provide all equipment, furnish all materials, except as may otherwise :be noted above, and perform all services necessary for the work above specified, and will accept as full payment therefor 'the- prices shown above. Accepted: Date Contractor: Granite Construction, Inc Signed By:. Title: If the Contractor does not sign acceptance of this order, his/her attention is directed to the requirements of the specifications as to proceeding with the ordered work and filing a written protest within the time therein specified.  DUBLIN 100 CIVIC PLAZA, DUBLIN, CAMFORNIA 94568 ,~. (925)833-6630 ~. (925) 829-9248FAX CITY OF CONTRACT CHANGE ORDER NO. 39 DATE: January 28, 2004 PAGE: 1 of 2 PROJECT/ROAD: Dublin Boulevard Widening CONTRACT NO: 0'l-10 STPL 5432 (006) TO: Granite Construction, Inc. You are hereby directed to make the herein described changes from the plans and specifications or do the following described work not included in the plans and specifications on this contract. NOTE: This change order is not effective until approved by the City of Dublin Public Works Director. The description of work to be done, estimate of quantities, and prices to be paid are segregated between additional work at contract price, agreed price, and force account. Unless othe[wise stated, rates for rental of equipment cover only such time as equipment is actually used and no allowance will be made for idle time. All other costs are non-compensible. This change order is requested by the Resident Representative/City. I. Extra Work at Agreed Upon Lump Sum Compensation Price: Provide the following items of work necessary for the completion of vadous surface improvements as necessary for the satisfactory completion of the work in consideration of the project plans. This is work deemed necessary as requested by the City and Resident Engineer to provide effective improvements per actual field conditions in consideration of the project plans and specifications. a. Grade and excavate existing landscaping area and place p.c.c, strip between the back of walk and existing parking curbline as requested in agreement with the property owner between approx. Station 12+63 to Station 13+28 It.. (See Granite memo no. 0255 for additional detail). Agreed Lump Sum Cost: $ 2, 534. 84 b. Provide subgrade pavement fortification for thee existing Zone 7 pathway and trail for the eastside under the existing bridge deck inclusive of excavation and replacement of engineered subgrade material in an effort to minimize future erosion. (See Granite memo no. 0267 for additional information). Agreed Lump Sum Cost $ 7,372.40 c. Repair existing pavement cracks and joint separations at various locations along Dublin Blvd. within the project limits for both eastbound and westbound travel lanes respective to the existing p.c.c, slab (existing sub-roadway). (See Granite memo no. 0253 for additional information). Agreed Lump Sum Cost $ 6,865.92 Total Aggregate Amount $16, 773.16 This work shall be provided on a force account basis as directed by the Resident Engineer and City Traffic Engineer for an agreed upon total aggregate amount of $16,773.16 All extra work shall comply with Sections 4-1.03D and 9-1.03 of the Standard Specifications. The agreed upon amount of $16,773.16 shall be the final amount agreed upon per submitted documentation and inclusive of all materials, mark-ups, time extensions, delay, overhead (home and field) profit, direct and/or indirect costs, and effects on subcontractors and suppliers of any tier, and as directed by the Engineer. All work shall be performed in accordance with Special Provisions, the applicable Standard Plans and Specifications, as verified by the City and/or as authorized by the Engineer. No additional compensation shall be made per this change order for said additional work. The contractor waives all further claims for costs and effects caused by any of the above and/or herein described changes. ESTIMATED COST INCREASE: $16,773.16 BY REASON OF THIS CHANGE ORDER, THE TIME OF COMPLETION WILL BE ADJUSTED: 6 WORKING DAYS. SUBMITTED BY: APPRO_V~MENDED BY: APPROVED BY: · Schaaf Date 1/27/04 Del Rosario Date Melissa Morton D~te/ (~struction Representative Senior Civil Engineer Public Works Director We, the undersigned contractor, have given careful consideration to the change proposed and hereby agree, if this proposal is approved, that we will provide all equipment, furnish all materials, except as may otherwise be noted above, and perform all services necessary for the work above specified, and will accept as full payment therefor the pdces shown above. Accepted: Date Contractor. Granite Construction, Inc Signed By: Title: If the Contractor does not sign acceptance of this order, his/her attention is directed to the requirements of the specifications as to proceeding with the ordered work and filing a written protest within the time therein specified. " ~ CITY OF DUBLIN 4, 100 ClVIC PLAZA, DUBLIN, CALIFORNIA 94568 .t. (925)833..6630 a, (925)829-9248FAX CONTRACT CHANGE ORDER NO. 40 DATE: January 28, 2004 (rev. 3-17-04) ~ PAGE: I of 2 ESTIMATED COST INCREASE: $16,773.16 BY REASON OF THIS CHANGE ORDER, THE TIME OF COMPLETION WILL BE ADJUSTED: 6 WORKING DAYS. SUBMITTED BY: APPROy _~..R~'OI~MENDED BY: APPROVED By: . · Schaaf Date 1t27104 at ~erd Del R(~sario Melissa Morton D~te / (~struction Representative Senior Civil Engineer Public Works Director We, the undersigned contractor, have given careful consideration to the change proposed and hereby agree, if this proposal is approved, that we will provide all equipment, furnish all materials, except as may otherwise be noted above, and perform all services necessary for the work above specified, and will accept as full payment therefor the pdces shown above. Accepted: Date Contractor:. Granite Construction, Inc Signed By:. Title: If the Contractor does not sign acceptance of this order, his/her attention is directed to the requirements of the specifications as to proceeding with the ordered work and filing a written protest within the time therein specified. ESTIMATED COST INCREASE: $ 23,870.49 BY REASON Of THIS CHANGE ORDER, THE TIME OF COMPLETION WILL BE ADJUSTED: 4 WORKING DAYS. SUBMITTED BY: APPRO~ ~.V,~R/E~MENDED BY: APPROVED BY: j chaaf Date 1/27/04 te Melis~a Morton Date" Co, ruction Representative Public Works Director We, the undersigned contractor, have given careful consideration to the change proposed and hereby agree, if this proposal is approved, that we will provide all equipment, furnish all materials, except as may otherwise be noted above, and perform all services necessary for the work above specified, and will accept as full payment therefor the pdces shown above. Accepted: Date Contractor: Granite Construction, Inc Signed By:, Title: If the Contractor does not sign acceptance of this order, his/her attention is directed to the requirements of the specifications as to proceeding with the ordered work and filing a written protest within the time therein specified. CITY OF DUBLIN .,. ~00 Cr~lC PLAZA, DUBLIN, CALIFORNIA 94568 4, (025) 833-6630 4, (925) 829-9249 FAX DUBLIN civic PLAZA, DUBLIN, CALIFORNIA 94568 (925) 833-6630 (925) 829-9248 FAX CITY OF ~. 400 * * CONTRACT CHANGE ORDER NO. 41 (rev.) CONTRACT NO: 01-10 STPL 5432 (006) U[~~ [J' ~e~ TO: Granite Construction, Inc. -o--.~ ......... = ......... You are hereby directed to make the herein described changes from the plans and specifications or do the following described work not included in the plans and specifications on this contract. NOTE: This change order is not effective until approved by the City of Dublin Public Works Director. The description of work to be done, estimate of quantities, and prices to be paid are segregated between additional work at contract price, agreed price, and force account. Unless otherwise stated, rates for rental of equipment cover only such time as equipment is actually used and no allowance will be made for idle time. All other costs are non-compensible. This change order is requested by the Resident Representative/City. I. Extra Work at Agreed Upon Lump Sum Compensation Price: Reconstruct the existing driveway at Sta. 11+78 (Enterprise Rental Car) to provide adequate conform and taper to supplement Plan Details on Sheet C-8 of the project plans, inclusive of resetting the existing drainage inlet, in an effort to meet existing field conditions and effective entrance/exit conditions as directed by the Engineer. (See Granite Memo No.'s 0246 and 282 for additional information). Total Aggregate Amount $14,952.87 This work shall be provided on a force account basis as directed by the Resident Engineer and City Traffic Engineer for an agreed upon total aggregate amount of $14,952.87. Alt extra work shall comply with Sections 4-1.03D and 9-1.03 of the Standard Specifications. The agreed.upon amount of $14,952.87 shall be the final amount agreed upon per submitted documentation and inclusive of all materials, mark-ups, time extensions, delay, overhead (home and field) profit, direct and/or indirect costs, and effects on subcontractors and suppliers of any tier, and as directed by the Engineer. All work shall be performed in accordance with Special Provisions, the applicable Standard Plans and Specifications, as verified by the City and/or as authorized by the Engineer. No additional compensation shall be made per this change order for said additional work. The contractor waives all further claims for costs and effects caused by any of the above and/or herein described changes. ESTIMATED COST INCREASE: $14,952.87 BY REASON OF THIS CHANGE ORDER, THE TIME OF COMPLETION WILL BE ADJUSTED: 3 WORKING DAYS. SUBMITTED BY: APPRO .y_~L R,~"~MMENDED BY: APPROVED BY: · Schaaf Date 1/27/04 ,~(~rd Del Rosario ' Date -- .--=ee-~4,~¢~ te Oe~nstruction Representative Senior Civil Engineer Public Works Director CCO No. 41 3/17/04 (rev.) We, the undersigned contractor, have given careful consideration to the change proposed and hereby agree, if this proposal is approved, that we will provide all equipment, furnish all materials, except as may otherwise be noted above, and perform all services necessary for the work above specified, and will accept as full payment therefor the prices shown above. Accepted: Date Contractor: Granite Construction, Inc Sig ned By: Title: If the Contractor does not sign acceptance of this order, his/her attention is directed to the requirements of the specifications as to proceeding with the ordered work and filing a written protest within the time therein specified. CITY OF DUBLIN ~. loo CIVIC PLAZA, DUBLIN, CALIFORNIA 94568 & (925) 833-6630 ./. (925) CONTRACT CHANGE ORDER NO. 42 (rev) DATE: February 3, 2004 (rev. 2/13/-4) /'~ . . t~ PAGE: I of 2 PROJECT/ROAD: Dublin Boulevard Widening ~ CONTRACT NO: 01-10 STPL 5432 (006) TO: Granite Construction, Inc ...... You are hereby directed to make the herein described changes from the plans and specifications or do the following described work not included in the plans and specifications on this contract. NOTE: This change order is not effective until approved by the City of Dublin Public Works Director. The description of work to be done, estimate of quantities, and prices to be paid are segregated between additional work at contract price, agreed price, and force account, unless otherwise stated, rates for rental of equipment cover only such time as ecuipment is actually used and no allowance will be made for idle time. All other costs are non-compensible. This change order is requested by the Resident Representative/Contractor. I. Extra Work at Agreed Upon Lump Sum Compensation Price: Provide the following items of work necessary for the proper completion and continuation of planned improvement(s) of the project in consideration to Bid Item No. 75, "Structural Concrete (Retaining WalI-Precast Panel)". This is work was deemed necessary per the project Geotechnical and Structural Engineer's recommendations respective to the pending structural retaining wall adjacent the Zone 7 access road and public pathway per actual field conditions in conflict with the plans. a. Provide "Sonotube" form support for the planned retaining wall piling adjacent the public access trail (set and pour) to accommodate the actual field conditions in conflict with the project plans as the required piling depth exposed the top portion of the necessary piling locations by approximately 0.67-1.0 M +/- along the wall alignment. (See Granite memo no. 0232 for additional detail). Agreed Lump Sum Cost: $ 8,651.39 This work shall be provided by force account basis as directed by the Resident Engineer and Project Structural Engineer for an agreed upon total aggregate amount of $ 8,651.39. All extra work shall comply with Sections 4-1.03D and 9-1.03 of the Standard Specifications. The agreed upon amount of $ 8,651.39 shall be the final amount agreed upon per submitted documentation and inclusive of all materials, mark-ups, time extensions, delay, overhead (home and field) profit, direct and/or indirect costs, and effects on subcontractors and suppliers of any tier, and as directed by the Engineer. All work shall be performed in accordance with Special Provisions, the applicable Standard Plans and Specifications, as verified by the City and/or as authorized by the Engineer. No additional compensation shall be made per this change order for said additional work. The contractor waives all further claims for costs and effects caused by any of the above and/or herein described changes. ESTIMATED COST INCREASE: $ 8,651.39 BY REASON OF THIS CHANGE ORDER, THE TIME OF COMPLETION WILL BE ADJUSTED: ~ WORKING DAYS. SUBMITTED BY: APPROVALREC-O~MENDED BY: APPROVED BY: M. Schaaf Date 2/03/04 Fefd Del Rosario Date / ! -- Melis~a Moron ~ Date C~q~nstruction Representative Senior Civil Engineer Public Works Director Page 2 CCO No. 42 (rev) 2/'13/04 We, the 'undersigned contractor, have given careful consideration to the change proposed and hereby agree, if this proposal is approved, that we will provide all' equipment, furnish all materials, except as may otherwise be noted above, and perform all services necessary for the work above specified, and will accept as full payment therefor the Prices shown above. Accepted: Date Contractor: Granite Construction, lnc Signed By:. Title: If the Contractor does not sign acceptance of this order, his/her attention is directed to the requirements of the specifications as to proceeding with the ordered work and filing a written protest within the time therein specified. CITY OF DUBLIN ~. *~00 mvlc PLAZA, DUBLIN, CALIFORNIA 94568 .1. (925) 833-6630 ~. (925) 829-6248 FAX CONTRACT CHANGE ORDER NO. 47 DATE: February 27, 2004 (rev, 3/25/04) PAGE: I of~.2 PROJECT/ROAD: Dublin Boulevard Widening CONTRACT NO: 0'1-'10 STPL 5432 (006) TO: Granite Construction, Inc. You are hereby directed to make the herein described changes from the plans and specifications or do the following described work not included in the plans and specifications on this contract. NOTE: This change order is not effective until approved by the City of Dublin Public Works Director. The description of work to be done, estimate of quantities, and prices to be paid are segregated between additional work at contract price, agreed price, and force account. Unless otherwise stated, rates for rental of equipment cover only such time as equipment is actually used and no allowance will be made for idle time. All other costs are non-compensible. This change order is requested by the Resident Representative/Project Engineer and City. I. Extra Work at A.qreed Upon Lump Sum Compensation Price: Relocate and upgrade of the existing 6" backflow preventer (private) serving the Athen's Burger restaurant at 6999 Dublin Boulevard as required by the Alameda County Fire Marshall for code compliance requiring a double-check valve assembly not originally as shown on the project plans. This work includes re-grading and setting the subject area for the required valve positioning, off-haul of spoils, new valve, service line, check valve and pipe material, flushing of service line per County Fire Marshall and all labor, tools, materials, etc. as necessary to complete the work as requested, and as directed by the Engineer. (See Granite memo no. 0275/031 land City correspondence no. 256 for additional detail). This work shall be provided by force account basis as directed by the Resident Engineer and Project Engineer for an agreed upon total aggregate amount of $15,335.05. All extra work shall comply with Sections 4-1.03D and 9-1.03 of the Standard Specifications. The agreed upon amount of $15,335.05 shall be the final amount agreed upon per submitted documentation and inclusive of all materials, mark-ups, time extensions, premium labor, delay, overhead (home and field) profit, direct and/or indirect costs, and effects on subcontractors and suppliers of any tier, and as directed by the Engineer. All work shall be performed in accordance with Special Provisions, the applicable Standard Plans and Specifications, as verified by the City and/or as authorized by the Engineer. No additional compensation shall be made per this change order for said additional work. The contractor waives all further claims for costs and effects caused by any of the above and/or herein described changes. ESTIMATED COST INCREASE: $ t5,335.05 BY REASON OF THIS CHANGE ORDER,' THE TIME OF COMPLETION WILL BE ADJUSTED: 4 WORKING DAYS. Ja~ M; sc~af w D~e ~27~4 "' F}rd ~1 R~rio : Da{4 [ ; Melis~ MoAon ' m- b~e Cd~m~ Repre~t~e ~ior Ci~l Engin~r Public W~s Dire~or Page 2 ceo No. 47 (rev.) We, the undersigned contractor, have given careful consideration to the change proposed and hereby agree, if this proposal is approved, that we will provide all equipment, furnish all materials, except as may otherwise be noted above, and perform all services necessary for the work above specified, and will accept as full payment therefor the prices shown above. Accepted: Date Contractor: Granite Construction, Inc Signed By: Title: If the Contractor does not sign acceptance of this order, his/her attention is directed to the requirements of the specifications as to proceeding with the ordered work and filing a written protest within the time therein specified. CITY OF DUBLIN · loo c~wc PLAZA, DUBLIN, CALIFORNIA 94568 ,~ (925) 833-6630 * (925) 829-9248 FAX CONTRACT CHANGE ORDER NO. 50 PROJECT/ROAD.'Dublin Boulevard Widening APR co.T.^c .o: s PL5432(006) TO: Granite Construction, Inc .......................... You are hereby directed to make the herein described changes from the plans and specifications or do the following described work not included in the plans and specifications on this contract. NOTE: This change order is not effective until approved by the City of Dub[in Public Works Director. The description of work to be done, estimate of quantities, and prices to be paid are segregated between additional work at contract pnce, agreed price, and force account. Unless othe~ise stated, rates for rental of equipment cover only such time as equipment is actually used and no allowance will be made for idle time. All other costs are non-compensible. This change order is requested by the Resident Re presentative/City. I. Extra Work at Agreed Upon Lump Sum Compensation Price: Provide the following items of work respective to median island improvement and pavement repairs. This is work deemed necessary to provide satisfactory and necessary completion per actual field conditions ~n consideration of the project plans and in an effort to minimize future maintenance considerations. a. Grout retaining wall panel joints along the Zone 7-E.B.R.P. public trail as directed. (See Granite memo no. 0296 for additional information). Agreed Lump Sum Cost: $ 590. 33 b. Complete redwood headers and placement of decomposed granite pathway material adjacent the City police driveway entrance within the existing landscaping buffer area as directed. (See Granite memo no. 0296 for additional information). Agreed Lump Sum Cost $ 838.58 c. Grade existing National Food Laboratory to provide a 3:1 finished slope in consideration of the proiect plans, erosion control, future landscaping and as directed by the Engineer. (See Granite memo no. 0299 for additional information). Agreed Lump Sum Cost $1,526.16 d. Place additiona steel reinforcement within the proposed bus turnouts per City detail. (See Granite memo no. 0301 for additional information). Agreed Lump Sum Cost $1,291.00 e. Remove existing crosswalk striping at the Sierra and Clark-Dublin intersections during temporary staging operations as directed by the Traffic Engineer. (See Granite memo no. 0301 for additional information). Agreed Lump Sum Cost $1,890.00 f. Place additional steel reinforcement at the proposed Clark Avenue valley gutter per City detail. (See Granite memo no. 0301 for additional information). Agreed Lump Sum Cost $ 490.00 ; ,p.a..ge 2~ ,~ (~LJf L~ 7,, C~co, r~.~.'50 ~/~3/o~ g. Place additional steel reinforcement at the proposed NFL and Albertson's driveways per City detail. · (See Granite memo no. 0301 for additional information). Agreed Lump Sum Cost $1,706.10 h. Field modify as directed by the Engineer planned handicap access ramp at the SW corner of Sierra and Dublin to accommodate City detail. (See Granite memo no. 0301 for additional information). Agreed Lump Sum Cost $ 795.00 i. Regrade planned sidewalk frontage at Albertson's as directed by the Engineer to accommodate City detail. (See Granite memo no. 0301 for additional information). Agreed Lump Sum Cost $ 257.00 Total Aggregate Amount $ 9,384.11 This work shall be provided on a force account basis as directed by the Resident Engineer and City Engineer for an agreed upon total aggregate amount of $ 9,384.11 All extra work shall comply with Sections 4-1.03D and 9-1.03 of the Standard Specifications. The agreed upon amount of $ 9,384.11 shall be the final amount agreed upon per submitted documentation and inclusive of all materials, equipment, mark-ups, time extensions, delay, overhead (home and field) profit, direct and/or indirect costs, and effects on subcontractors and suppliers of any tier, ahd as directed by the Engineer. All work shall be performed in accordance with Special Provisions, the applicable Standard Plans and Specifications, as verified by the City and/or as authorized by the Engineer. No additional compensation shall be made per this change order for said additional work. The contractor waives all further claims for costs and effects caused by any of the above and/or herein described changes. ESTIMATED COST INCREASE: $ 9,384.11 BY REASON OF THIS CHANGE ORDER, THE TIME OF COMPLETION WILL BE ADJUSTED: 0 WORKING DAYS. (deferred as requested by contractor) SUBMITTED BY'. APPROV,~. R~MENDED BY: APPROVED BY: ~an/es M. Schaaf kD Date 3/13/04 F d Del Rosario -' Dat~ F_¢d. . . . Me[i~'sa Morton / Da~ iC~r~§truction Representative Semor Ciwl Engineer Public Works Director We, the undersigned contractor, have given careful consideration to the change proposed and hereby agree, if this proposal ~s approved, that we will provide all equipment, furnish all materials, except as may otherwise be noted above, and perform all services necessary for the work above specified, and will accept as full payment therefor the prices shown above. Accepted: Date ~/~' .,3/O ~/ Contractor: Granite Construction, Inc . SignedBy: ~:)~4 ~: Title: If the Contractor does not sign acceptance ~f this order, his/her attention is directed to the requirements of the specifications as to proceeding with the ordered work and Din g a written protest within the time therein specified. CITY OF DUBLIN ~00 civic PLAZA, DUBLIN, CALIFORNIA 94568 · (925) 833-6630 FAX CONTRACT CHANGE ORDER NO. 51 DATE: March 13, 2004 J~P~ ~. PAGE: 1 of 2 PROJECT/ROAD: Dublin Boulevard Widening CONTRACT NO: 0'1-10 STPL 5432 (006) TO: Granite Construction, lnc You are hereby directed to make the herein described changes from the plans and specifications or do the following described work not included in the plans anC specifications on this contract. NOTE: This change order is not effective until approved by the City of Dublin Public Works Director. The description of work to be done, estimate of quantities, and prices to be paid are segregated between additional work at contract price, agreed price, and force account. Unless otherwise stated, rates for rental of equipment cover only such time as equipment is actually used and no allowance will be made for idle time. All other costs are non-compensible. This change order ~s requested by the Resident Representative/DSRSD. I. Extra Work at Agreed Upon Lump Sum Compensation Price: Provide the following items of work respective to median island improvement and pavement repairs. This is work deemed necessary to provide satisfactory and necessary completion per actual field conditions in consideration of the project plans and in an effort to minimize future maintenance considerations. a. Repair existing settled water valve at the intersection of Clark Avenue and Dublin Blvd. as requested and as directed by DSRSD staff. (See Granite memo no. 0293 and City correspondence for additional detail). Agreed Lump Sum Cost: $1,658.41 b. Abandon existing %" water service at Sam'Claar as directed by the Engineer. (See Granite memo no. 0297 for additional information). Agreed Lump Sum Cost $ 627.62 Total Aggregate Amount $ 2, 286. 03 This work shall be provided on a force account basis as directed by the Resident Engineer and City Engineer for an agreed upon total aggregate amount of $ 2,286.03 All extra work shall comply with Sections 4-1.03D and 9-1.03 of the Standard Specifications. The agreed upon amount of $ 2,286.03 shall be the final amount agreed upon per submitted documentation and inclusive of all materials, equipment, mark-ups, time extensions, delay, overhead (home and field) profit, direct and/or indirect costs, and effects on subcontractors and suppliers of any tier, and as directed by the Engineer. All work shall be performed in accordance with Special Provisions, the applicable Standard Plans and Specifications, as verified by the City and/or as authorized by the Engineer. No additional compensation shall be made per this change order for said additional work. The contractor waives all further claims for costs and effects caused by any of the above and/or herein described changes. ESTIMATED COST INCREASE: $ 2,286.03 BY REASON OF THIS CHANGE ORDER, THE TIME OF COMPLETION WILL BE ADJUSTED: 0 WORKING DAYS. (deferred as requested by contractor) CG.9 No. 51 3/13/04 SUBMITTED BY: APPROVAL RF=~MENDED BY: APPROVED BY: Ca, es M. Sch?U Date 3/13/04 "~rd Del Rosario Date-- / Me~a Moron ' ~ D nst~c~on Representative Senior Civil Engineer Public Wo~s Director We, the undersigned contractor, have given careful consideration to the change proposed and hereby agree, if this proposal is approved, that we will provide all equipment, furnish all materials, except as may otherwise be noted above, and perform all services necessary for the work above specified, and will accept as full payment therefor the prices shown above: Accepted: Date ~j(~/0¢/ Contractor: Granite Construction, Inc If the Contractor does not sign acceptance of this order, his/her attention is directed to the requirements of the specifications as to proceeding with the ordered work and filing a written protest within the time therein specified. CITY OF DUBLIN ,. 400 crvtc ~ OUBUN. CAUFOr~A 94.~S · (92S) S3:}-~650 · (92S) 820-9248 FAX CONTRACT CHANGE ORDER NO. 53 PROJECT/ROAD: Dublin Boulevard Widening CONTRACT NO: 01-10 STPL 5432 (006) TO: Granite Construction, Inc. You are hereby directed to make the herein described changes from the plans and specifications or do the following described work not included in the plans and specifications on this contract. NOTE; This change order is not effective until approved by the City of Dublin Public Works Director. The description of work to be done, estimate of quantities, and prices to be paid are segregated between additional work at contract price, agreed price, and force account. Unless otherwise stated, rates for rental of equipment cover only such time as equipment is actually used and no allowance will be made for idle time. All other costs are non-compensible. This change order is requested by the Resident Representative/DSRSD. I. Extra Work at Agreed Upon Lump Sum Compensation Price: Provide the following items of work respective to median island improvement and pavement repairs. This is work deemed necessary to provide satisfactory and necessary completion per actual field conditions in consideration of the project plans and in an effort to minimize future maintenance considerations. a. Miscellaneous additional concrete itemwork within the project limits beyond odginal contract documents as follows: 1. Northwest corner return (adjacent California Carpets) at the Sierra/Dublin intersection- $ 398.00 2. Median opening at approx. Sra. 7+55 c/I (adjacent Big-O Tires)- $ 300.00 3. Replace PG&E sidewalk openings upon existing pole removals (2)- $ 499.00 (See Granite memo no. 0286 and City correspondence for additional detail). Agreed Lump Sum Cost: $1,197.00 b. Modify existing highway directional sign adjacent DSRSD offices for ADA compliant standards and safety. (See Granite memo no. 0302 for additional information). Agreed Lump Sum Cost $ 682.50 c. Grind existing epoxy surfacing for portion of westbound and eastbound travelway as directed by the Engineer. (See Granite memo no. 0314 for additional information). Agreed Lump Sum Cost $ 276.39 Total Aggregate Amount $ 2,155.89 This work shall be provided on a force account basis as directed by the Resident Engineer and City Engineer for an agreed upon total aggregate amount of $ 2,155.89. All extra work shall comply with Sections 4-1.03D and 9-1.03 of the Standard Specifications. The agreed upon amount of $ 2,155.89 shall be the final amount agreed upon per submitted documentation and inclusive of all materials, equipment, mark-ups, time extensions, delay, overhead (home and field) profit, direct and/or indirect costs, and effects on subcontractors and suppliers of any tier, and as directed by the Engineer. All work shall be performed in accordance with Special Previsions, the applicable Standard Plans and Specifications, as vedfied by the City and/or as authorized by the Engineer. No additional compensation shall be made per this change order for said additional work. The contractor waives all further claims for costs and effects caused by any of the above and/or herein described changes. page 2 CCO No. 53 3129104 ESTIMATED COST INCREASE: $ 2,155.89 BY REASON OF THIS CHANGE ORDER, THE TIME OF COMPLETION WILL BE ADJUSTED: 2 WORKING DAYS. ,S~B~iITTED BY: APPROVAt~R~MENDED BY: APPROVED BY: ]~Jar~es M. Schaaf U Date 3/29/04 e ' 'MelTssa Morton' ' / -' Da~ i~/C~ruction Representative Public Works Dire~or We the undersigned c~ctor haveilgi~en careful consideration to the change proposed and hereby agree, if this proposal is approved, tha{'.~e will provide ~11 equipment, furnish all materials, except as may otherwise be noted above, and perform all services necessary fo.r [~ Work above specified, and will accept as full payment therefor the pdces shown above. Accepted: Date Contractor';, Granite Construction, Inc Signed By: ...... Title: If the Contractor does not sign acceptance of,, this order, his/her attention is directed to the requirements of the specifications as to proceeding with the ordered work'ar*~d filir~g ~ Written protest within the time therein specified. CITY OF DUBLIN 400 c~wc PLAZ~ DUBLIN, CAUFORNIA 94668 .~ (925) 833-6630 ,~ (925) 829-9248 FAX CONTRACT CHANGE ORDER NO. 54 DATE: March 29, 2004 ~r~~~ PAGE: I of 2 PROJECT/ROAD: Dublin Boulevard Widening ~ CONTRACT NO: 01-10 STPL 5432 (006) TO: Granite Construction, Inc. You are hereby directed to make the herein described changes from the plans and specifications or do the following described work not included in the plans and specifications on this contract. NOTE: This change order is not effective until approved by the City of Dublin Public Works Director. The description of work to be done, estimate of quantities, and prices to be paid are segregated between additional work at contract price, agreed price, and force account. Unless otherwise stated, rates for rental of equipment cover only such time as equipment-is actually used and no allowance will be made for idle time. All other costs are non-compensible. This change order is requested by the Resident Representative and PG&E. I. Extra Work at Agreed Upon Lump Sum Compensation Pdce: Provide pavement grinding along edge of traveled way and median areas between the limits of work in consideration to the project plans as a required item of work not included within the contract quantity summary for compensation. This work shall be provided by force account basis as directed by the Resident Engineer and Project Structural Engineer for an agreed upon total aggregate amount of $11,71 3.82. All extra work shall comply with Sections 4-1.03D and 9-1.03 of the Standard Specifications. The agreed upon amount of $11,713.82 shall be the final amount agreed upon per submitted documentation and inclusive of all materials, mark-ups, time extensions, premium labor, delay, overhead (home and field) profit, direct and/or indirect costs, and effects on subcontractors and suppliers of any tier, and as directed by the Engineer. All work shall be performed in accordance with Special Provisions, the applicable Standard Plans and Specifications, as verified by the City and/or as authorized by the Engineer. No additional corn pensation shall be made per this change order for said additional work. The contractor waives all further claims for costs and effects caused by any of the above and/or herein described changes. ESTIMATED COST INCREASE: $11,7~3.82 BY REASON OF THIS CHANGE ORDER, THE TIME OF COMPLETION WILL BE ADJUSTED: 3 WORKING DAYS. SUBMITTED BY: APPROVAI~R~MENDED BY: APPROVED BY: ~erd Del Rosario ' Jerr~s M,"Scha~f L./ Date 3/29/04 ate Senior Civil Engineer ~o~fstruction Representative Public Works Director We, the undersigned contractor, have given careful consideration to the change proposed and hereby agree, if this proposal is approved, that we will provide all equipment, furnish all materials, except as may otherwise be noted above, and perform all services necessary for the work above specified, and will accept as full payment therefor the prices shown above. Accepted: Date Contractor: Granite Construction, Inc Signed By:. Title: If the Contractor does not sign acceptance of this order, his/her attention is directed to the requirements of the specifications as to proceeding with the ordered work and filing a written protest within the time therein specified. CITY OF DUBLIN CALIFORNIA 94568 4, 833.~630 .t, (925) 829-9248 FAX 100 CIVIC PLAZA, DUBLIN, (925) CONTRACT CHANGE ORDER NO. 55 DATE: March 29, 2004 PAGE: 1 of 2 PROJECT/ROAD: Dublin Boulevard Widening ~rt CONTRACT NO: 01-10 STPL 5432 (006) TO: Granite Construction, Inc. You are hereby directed to make the herein described changes from the plans and specifications or do the following described work not included in the plans and specifications on this contract. NOTE: This change order is not effective until approved by the City of Dublin Public Works Director. The description of work to be done, estimate of quantities, and prices to be paid are segregated between additional work at contract price, agreed price, and force 'account. Unless otherwise stated, rates for rental of equipment cover only such time as equipment is actually used and no allowance will be made for idle time. All other costs are non-compensible. This change order is requested by the Resident Representative/DSRSD. I. Extra Work at Agreed Upon Lump Sum Compensation Pdce: Provide the following items of work respective to median island improvement and pavement repairs. ThiS is work deemed necessary to provide satisfactory and necessary completion per actual field conditions in consideration of the project plans and in an effort to minimize future maintenance considerations. a. Place shredded bark mulch material at designated locations along Dublin Boulevard landscape frontages as directed by the City (See Granite memo no. 0297 and City correspondence for additional detail). Agreed Lump Sum Cost: $ 3,179.64 b. Correct flowline within gutter adjacent northwest comer of bridge deck at Enterprise Rental Car driveway. (See Granite memo no. 0296 for additional information). Agreed Lump Sum Cost $1,640.17 c. Place decomposed granite within existing tree wells (4 locations) along the northerly sidewalk between Clark Avenue and the limit of work as directed by the City via the public works maintenance division. (See Granite memo no. 0296 for additional information). Agreed Lump Sum Cost $ 412.38 d. Correct bridge ramp slope for ADA compliant slope at the ramp conform between the northwest bddge end and adjacent ddveway apron at the Enterprise Rental Car as directed by the Engineer. (See Granite memo no. 0298 for additional information). Agreed Lump Sum Cost $1,755.54 e. Re-grade existing portion of the eroded southest Zone 7 channel embankment approximately 50-ft. downstream from the bddge facility and construct RSP revetment as directed by the Engineer in an effort to mitigate future erosion as requested by the City. (See Granite memo no. 0293 for additional information). Agreed Lump Sum Cost $ 3, 642. 73 page 2 CCC No. 55 3/29/04 f. Excavate, re-grade and compact portion of the existing landscaped fr°ntage at the northwest return at the Sierra Court/Dublin Boulevard intersection for the placement of new a p.c.c, sidewalk extension and walkway area as directed at the request of the City via the adjacent property owner. (See Granite memo no. 0293 for additional information). Agreed Lump Sum Cost $ 3,427.12 Total Aggregate Amount $14, 057.58 This work shall be provided on a force account basis as directed by the Resident Engineer and City Engineer for an agreed' upon total aggregate amount of $14,057.58. All extra work shall comply with Sections 4-1.03D and 9~1.03 of the Standard Specifications. The agreed upon amount of $ 14,057.58 shall be the final amount agreed upon per submitted documentation and inclusive of all materials, equipment, mark-ups, time extensions, delay, overhead (home and field) profit, direct and/or indirect costs, and effects on subcontractors and suppliers of any tier, and as directed by the Engineer. Ail work shall be performed in accordance with Special Provisions, the applicable Standard Plans and Specifications, as verified by the City and/or as authorized by the Engineer. No additional compensation shall be made per this change order for said additional work. The contractor waives all further claims for costs and effects caused by any of the above and/or herein descdbed changes. ESTIMATED COST INCREASE: $ t4,057.58 BY REASON OF THIS CHANGE ORDER, THE TIME OF COMPLETION WILL BE ADJUSTED: 5 WORKING DAYS. SUBMITTED BY: ~APPROVAJ..R~MENDED BY: APPROVED BY: Schaaf Date 3/29/04 Fjord Del Rosario Date MelCssa Morton / Date/  ruction Representative Senior Civil Engineer Public Works Director We, the undersigned contractor, have given careful consideration to the change proposed and hereby agree, if this proposal is approved, that we will provide all equipment, furnish all materials, except as may otherwise be noted above, and perform all services necessary for the work above specified, and will accept as full payment therefor the prices shown above. Accepted: Date Contractor: Granite Construction, lnc Signed By: Title: If the Contractor does not sign acceptance of this order, his/her attention is directed to the requirements of the specifications as to proceeding with the ordered work and filing a written protest within the time therein specified. BUDGET CHANGE FORM , CH~GE FO~ ~ New Appropriations (C~ty Council Approval Required): Budget Transfers: From Unappropriated Rese~es From ~udgeted Con.gent Rescue (10800-799.000) (If Other than General Fund, Fund No - Within Same Depa~ent Activi~ From New Revenues Be~een Depa~ents (City CouncJt Approval Required) O~er Nme: Nme: Dublin Blvd Widening from Village $10,246 P~kway to Siena Cou~ - Improvem~ts Account f: Account ~: 300-96920-750-050 Name: Nme: Dubl~ Blvd Under~oUnding Utilities - $18,298 Village P~ay to Siena Cou~ Account ~: Account g: 001-96080-750-050 Name: ~VEN~ $18,298 Nme: General Fund - O~er Revenues - Reimb~sements Accost ~: Account g: 001-570-005 Nme: Nme: Account g: Account g: Name: Name: Account f: Account ~: ASD~inM~ ~~ ~ Date: '~~[ O~ Si~at~e ~ASON FOR B~GET CH~GE ENTRY: Additional monies required to fully ~d the pa~ent of~enty two ch~ge orders City Manager: ~ ~ Date: As approved at the City Council Meeting on: Date: Mayor: Date: Signature Posted By: Date: Signature H:ICC-FORMStFORM-budget ctlange, doc