Loading...
HomeMy WebLinkAboutItem 4.03 CivicCtrRoofRepair CITY CLERK File # D~[Q][Q]-~ AGENDA STATEMENT CITY COUNCIL MEETING DATE: November 2, 2004 SUBJECT: Award of Bid - Contract 04-11, Civic Center Roof Repair Report Prepared by: Melissa Morton, Public Works Director ATTACHMENTS: Resolution RECOMMENDATION:J3 ~Pt resolution awarding Contract 04-11 to RoSa Construction FINANCIAL STATEMENT: There are sufficient funds budgeted for this project. The following bids were received: RoSa Construction Rainbow Waterproofing $79,884.00 $98,605.00 DESCRIPTION: This project would include the removal of all of the concrete deck pavers and gravel bedding on the roof deck outside the City Manager's Office, installation of a lightweight concrete surface, and replacement of the roof drains. The concrete surface is proposed to be stamped to resemble the deck tiles and would continue to function as a deck. The concrete pavers would be salvaged and used elsewhere in the City in the future as needed. When this Capital Improvement Project was budgeted, it was originally anticipated that the pavers would be removed and replaced on the deck, and the amount budget reflected this labor-intensive operation. The current project design is more efficient and more cost-effective; therefore, the bids are significantly less than the amount budgeted. Subsequent to the water remediation project constructed this past Spring, some minor leaking was discovered in the storage outbuildings to the west of the Civic Center. Since the funds are already budgeted, it is proposed to negotiate with the low bidder to repair these leaks and apply waterproofing to the concrete block outbuildings as a change order to this roof deck project. A total of two (2) bids were received. The low bidder is RoSa Construction with a bid of $79,884.00. Staff has reviewed the low bidder's proposal and is familiar with this firm's work. Therefore, Staff recommends that the City Council adopt the resolution awarding Contract 04-11 to RoSa Construction. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _l1li_ _ _ _ _ _ _ _ _ _ _ _ _1IiiI _ _ _ - - - - - - - - - -- - - - - - -- COPIES TO: Bidders g:\miscproj\ccroof04-05\agstaward lðù l ITEM NO.--M eJ !fi6 f RESOLUTION NO. -04 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF DUBLIN ********************** AWARDING CONTRACT 04-11 CIVIC CENTER ROOF REPAIR TO ROSA CONSTRUCTION WHEREAS, the City of Dublin did, on October 12, 2004, publicly open, examine, and declare all sealed bids for doing the work described in the approved Plans, Specifications, and Modifications for Contract 04-11, Civic Center Roof Repair, authorized by the City Council on September 21,2004, which Plans, Specifications, and Modifications are hereby expressly referred to for a description of said work and for all particulars relative to the proceedings under the request for bids; and WHEREAS, said bids were submitted to the Director of Public Works, who has recommended that the bid hereinafter mentioned is the lowest and best bid for doing said work; NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Dublin does hereby award City of Dublin Contract 04-11, Civic Center Roof Repair, to the lowest responsible bidder therefor, to wit, RoSa Construction, with a bid of Seventy-Nine Thousand, Eight Hundred Eighty Four Dollars ($79,884), the particulars of which bid are on file in the Office of the Director of Public Works. BE IT FURTHER RESOLVED that the Mayor is authorized to execute the agreement. PASSED, APPROVED AND ADOPTED this 2nd day of November, 2004. AYES: NOES: ABSENT: ABSTAINING: Mayor ATTEST: City Clerk g: ImiscprojlccroofV4-05\resoawrd \ \- ~-()t.. 4. ~ At~ VY\ t.v\+