Loading...
HomeMy WebLinkAboutItem 4.05 ToBid 2003-04 Slurry CITY CLERK AGENDA STATEMENT File# 600-35 C'rTY COUNCI'L I~IEET'rNG DATE: July l, 2003 SUBJECT: Authorization to Solicit Bids for Contract No. 03-14, 2003-2004 Annual Slurry Seal Program Report Prepared by: Lee $. Thompson, Public Works Director ATTACHMENTS: 1) Map of streets to be slurry sealed 2) Specification to be available at the City Council meeting RECOMMENDATION: /)~[,/[~'~Authorize Staff to adVertise for bids. FINANCIAL STATE~iVIENT: Proposed FY 2003-2004 budget for this capital project: FY 2003-2004 ITEMS OF WORK Budget Salaries/inspections/miscellaneous: $ 18,000 Improvements* (Including striping) $304,886 TOTAL: $322._886 * Pavement repairs (approximately $9,510) were performed as part of the 2002-2003 Annual Street Overlay Program as a cost savings measure as the scope of work was similar to the overlay repair work. This project is funded by Gas Tax monies (Fund 206). DESCRIPTION: Slurry seal is a preventative maintenance technique used to prolong the life of asphalt concrete surfacing. Slurry consists of a sand/oil mixture which seals cracks and provides a new uniform wearing surface. City streets are slurry sealed approximately every five to seven years, depending upon the level of wear. The following streets are scheduled to be slurry sealed as part of the 2003-2004 contract: Rolling Hills Drive Amarillo Road Tory Way Hillrose Drive Eden Street Ebensburg Lane Sunwood Drive Mansfield Avenue Hemlock Street Emerald Avenue Burton Street Betlen Drive (West end to Hansen Drive) San Ramon Road (North City Limit to Silvergate Drive) Ann Arbor Way COPIES TO: ITEM NO. 4-~ g:\mntcproj\slurry~AS authorize 03-14 ~, cj"i~.> "~--" Failed pavement repairs, which are required prior to the placement of slurry seal, were performed as part of the 2002-2003 Annual Street Overlay contract as a cost savings measure. Staff recommends that the City Council authorize Staff to advertise for bids for Contract No. 03-14, 2003-2004 Annual Slurry Seal Program. Page 2 % ~ ,~,,,~:,~ 2003 2004 Annual Street Slurry Seal Program ~,~:~,,~,.: ~:~,~' ~.:'~,:;~.~.~:: Location Map Pavement Resurfacing - Slurry Seal -- Streets