HomeMy WebLinkAboutItem 4.07 CaEnergyBatteryBackup CITY CLERK FILE # 600-50 AGENDA STATEMENT CITY COUNCIL MEETING DATE: October 1, 2002 SUBJECT: Agreement with California Energy Commission for Battery Backup System (BBS) Grant Funds Report Prepared by: Lee S. Thompson, Public Works Director ATTACHMENTS: 1) Resolution Approving Agreement 2) Budget Change Form (New Revenue Source) 3) Agreement RECOMMENDATION: ~L/' 2 I~/Q ~ 1~) Adopt resolution approving agreement <~ Approve budget change FINANCIAL STATEMENT: The total Capital Improvement Project budget for installation of Traffic Signal Battery Backup Systems at eight intersections is $146,150. The approved grant, which funds 70% of the cost of the battery backup units only, is for $22,400. The project is budgeted in the General Fund with the expectation of receiving partial funding through this grant. The net effect of the project to the General Fund is $123,750. DESCRIPTION: On May 21, 2002, the City Council authorized Staffto apply for grant funding toward the cost of battery backup systems (BBS) for several major intersections. Staff has received notification that this grant funding has been approved. The California Energy Commission has provided an agreement containing terms and conditions that will be applied to the grant. This agreement has been reviewed and approved by the City Attorney's office. The deadline date to remm the agreement to the Energy Commission is October 3rd. The traffic signal battery backups area safety feature proposed for eight of the City's more heavily traveled intersections. These units will allow the intersections to continue to operate for approximately two hours in the event of a power failure. As noted in the Financial Statement above, the total budget for the Capital Improvement Project is $146,150. This project includes converting all of the yellow indications, pedestrian "walk" indications, and programmed visibility signal heads to light emitting diodes (LED) at the subject intersections so that the signals will be fully functional when running on battery power. Other costs include advertising, COPIES TO: ITEM NO. __~ g:~aiscproj\bbs~gst cec agrt /~.~ markup and labor costs, and contract inspection thrOugh Alameda County. The grant funding is calculated as follows: Total maximum cost allowed for battery backup units (material only) $ 4,000 Multiplied by 8 intersections x 8 Total BBS cost: $32,000 x 70% Maximum grant funding at 70% of cost: $22,400 The eight intersections proposed to receive BBS units are: Dublin Boulevard/San Ramon Road Dublin Boulevard/Regional Street Dublin Boulevard/Vil~e Parkway Dublin Boulevard/Dougherty Road Hacienda Drive/Hacienda Crossings Dublin Boulevard/Tassajara Road Amador Valley Boulevard/San Ramon Road Amador Valley Boulevard/Village Parkway The existing BBS at Dublin Boulevard/Hacienda Drive currently operates in flashing red mode and is proposed to be converted to full operation; however, the grant will not fund improvements to existing BBS systems. The agreement outlines a number of conditions relating to contract compliance with certain State and Federal laws that are already a standard part of the City's bid documents. In addition, there are quarterly reporting requirements regarding the stares of the project, and a final report required at the end. Staff is proceeding to develop plans and specifications for the work. The project cannot be advertised until this agreement has been signed by both parties. Staff recommends that the City Council adopt the resolution approving the agreement and approve the budget change form (new revenue source). RESOLUTION NO. - 2002 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF DUBLIN APPROVING AGREEMENT WITH CALIFORNIA ENERGY COMMISSION FOR GRANT FUNDING WHEREAS, in May of 2002, the Dublin City Council approved application for grant funding related to traffic signal battery backup systems; and WHEREAS, the California Energy Commission has notified the City that the grant funding has been approved; and WHEREAS, the California Energy Commission requires that an agreement be executed whiCh contains terms and conditions for the grant; NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Dublin approves the agreement for Grant Number BBS-02K-026, the term of said agreement being from August 14, 2002, to August 31, 2003. ~ BE IT FURTHER RESOLVED that the Mayor is authorized to execute the agreement. PASSED, APPROVED AND ADOPTED this 1 st day of October, 2002. ~ AYE S: NOES: ABSENT: ABSTAIN: Mayor ATTEST: City Clerk gAmiscproj~bbs[reso cec agrt CITY OF DUBLIN BUDGET CHANGE FORM CHANGE FORM # New Appropriations (City Council Approval Required): Budget Transfers: __ From Unappropriated Reserves From Budgeted Contingent Reserve (1080-799.000) (If Other than General Fund, Fund No - Within Same Department Activity x From New Revenues Between Departments (City Council Approval Required) Other Name: Name: California Energy Commission Grant $22,400.00 Account #: 001-555-016 Account #: Name: Name: Account #: Account #: Name: Name: Account #: Account #: Name: Name: Account #: Account #: Name: Name: Account #: Account #: ASD/Fin Mgr '/--~.~_~c( ~'L----r.~~ Date: Signature REASON FOR BLrDGET CHANGE ENTRY: Establish new revenue account for grant funding related to Traffic Signal Battery Backup Capital Improvement Project. City Manager: Date: Signature As approved at the City Council Meeting on: Date: Mayor: Date: Signature Posted By: Date: Signature GAFREDWORDIBudget Change Form battery backup grant.doc STATE OF CALIFORNIA CALIFORNIA ENERGY COMMISSION ~RAN~' AGREEMENT CEC t46 (Rev. 7/91) This agreement is official notification of a grant award from the California Energy Commission. The attachments listed below are incorporated as part of this grant agreement. RECIPIENT GRANT NUMSER City of Dublin BBS-02K-026 ADDRESS TERM 100 Civic Plaza, Dublin, CA 94568 8/14/02 - 8/31/03 CEC PROJECT MANAGER =HONE California Energy Commission, David Rubens (916) 651-9857 ADDRESS 1516 9th St.-MS-26, Sacramento, CA 95814 PROJECT DESCRIPTION This project involves the installation of New Battery Backup Systems (BBS) for traffic signals using light emitting diodes (LED). CEC: $ 22,400.00 PROGRAM I =UND TITLE Battery Backup Systems for Traffic Control I Renewable Energy Loan Loss Reserve Fund AMOUNT ENOUMBERED 'TENt I CHAPTER STATUTE FISCAL YEARo 2/03 $ 22,400.00 3360-601-8100 6XX 01 MATOH SHARE PURPOSE OF EXPENDITURE $118,900.00 Matching Grant Program to Provide Battery Backup for Traffic Control Signal TOTAL OPTIONAL USE $141,300.00 4400-702-44011 I hereby certify upon my own personal knowledge that budgeted funds are available for the pedod and purpose stated above SIGNATUREOFACOOUNTING¢~ (~/~%.(~ ,'~ ('~ The undersigned parties have read the a~chmen~s to t is~greement and will comply with the standards and requirements contained therein. CALIFORNIA ENERGY COMMISSION RECIPIENT ATTACHMENTS TITLE 1. Terms and Conditions 2. Work Statement 3. Budget GRANT NOT SUBJECT TO DGS APPROVAL 4. Resolution PER ATTORNEY GENERAL OPINIONS 5. Special Conditions ' GL-36 TERMS AND CONDITIONS FOR BATTERY BACKUP SYSTEM GRANTS AWARD # BBS - 02K- 026 TERMS AND CONDITIONS TABLE OF CONTENTS SECTION PAGE NO. 1. Grant Agreement ....................................................................................................................... 1 2. AttacN'nenrs and References ..................................................................................................... 1 3. Funding Limitations .................................................................................................................. 2. 4. Due Diligence ............................................................................................................................ 2 5. Products ..................................................................................................................................... 2 6. Reports ....................................................................................................................................... 2 7. Legal Statement on Reports and Products ................................................................................ 4 8. Amendments ............................................................................................................................. 4 9. Contracting and Procurement Procedures ................................................................................ 4 10. Bonding and Insurance .............................................................................................................. 5 11. Permits and Clearances ............................................................................................................. 6 12. Equipment ......................................................................................... : ....................................... 6 13. Termination ............................................................................................................................... 6 14. Travel and Per Diem ................................................................................................................. 6 15. License ....................................................................................................................................... 7 16. Standard of Performance ........................................................................................................... 8 17. Payment of Funds ...................................................................................................................... 8 18. Fiscal Accounting Requirements ............................................................................................ 10 19. Indemnification ....................................................................................................................... 11 20. Disputes ............................................................................................................................... '.... 11 21. Workers' Compensation Insurance ......................................................................................... 13 22, General Provisions .................................................................................................................. 13 23. Certifications & Compliance .................................................................................................. 15 AWARD # BBS - 02K - 026 TERMS AND CONDITIONS 1. Grant Agreement This project is being funded with a grant ~from the California Energy Commission (Commission). Funding for this project was authorized by Senate Bill No. 84XX, Chapter 6, Statutes of 2001, and consists of funds from the Renewable Energy Loan Loss Reserve Fund. This Agreement is comprised of the grant funding award, the Terms and Conditions, and all attachments. These Terms and Conditions are standard requirements for grant awards. The Commission may impose additional special conditions in this grant Agreement which address the unique ctmumstances of this project. Special conditions that conflict with these standard provisions take precedence. The Recipient shall sign all six copies of this Agreement and return five signed packages to the Commission's Grants and Loans Office within 30 days. Failure to meet this requirement may result in the forfeiture of this award. When all required signatures are obtained, an executed copy will be returned to the Recipient. Commission-funded work cannot begin prior to the Agreement term date. This Agreement is not effective until it is signed by all parties. 2. Attachments and References The following are attached and hereby expressly incorporated into this Agreement. · Work Statement. · Budget. · Resolution of'the Recipient or Local Jurisdiction Governing Body (if applicable). Resolution 0fthe California Energy Commission (if applicable). · Special Conditions The Office of Management and Budget (OMB) Circular identified below is incorporated by reference as part of this Agreement. These Terms and Conditions and any Special Conditions take precedence over the circulars and/or regulations. The OMB Circular is used to help guide the administration of the award when questions arise during the course of performance of the award. The Conmaission reserves the right to use as much or as little of each circular or regulation it deems necessary to administer the award in good faith and consistent with prudent fiscal management of public funds. OMB Circulars may be accessed on the OMB web site at www.whitehouse.gov/omb/circulars/index.html or by calling the Office of Administration, Publications Office, at (202) 395-7332. · OMB Circular A-87: Cost Principles for State, Local and Tribal Governments. BBS~T&C Non Fed Grant Boilerplate-rev.3-29-02 1 08/22/02 ' ' AWARD # BBS - 02K - 026 3. Funding Limitations Any federal, state, and local laws and regulations applicable to your project not expressly listed in this A~eernenr are incorporated herein as part of this Agreement. 4. Due Diligence The Recipient is required to take timely actions which, taken collectively, move this project to completion. The Commission Project Manager will periodically evaluate the schedule for completion of Work Statement tasks. If the Comn-fission Project Manager determines (1) the Recipient is not being diligent in completing the tasks in the Work Statement or (2) the time remaining in the funding award is insufficient to complete all project work tasks not later than the Agreement term date, the Project Manager may recommend to the Policy Committee of the Commission (Committee) that this Agreement be terminated, and the Committee may, without prejudice to any of its remedies, terminate this Agreement. 5. Products Products are defined as any tangible item specified in the Work Statement. Unless otherxvise directed, draft copies of all products identified in the Work Statement shall be submitted to the Commission Project Manager for review and comment. The Recipient will subnqit an original and two copies of the final version of all products to the Conmfission Project Manager. 6. Reports a. Progress Reports The Recipient shall submit progress reports to the Commission Project Manager as indicated in the Special Conditions or Work Statement. At a minimum, each progress report shall include the following: Work Statement: This section should include a brief restatement of the approved tasks in the Work Statement and a report on the status of each. Included should be a discussion of any products due and whether or not the project is progressing according to schedule. This section also should include a discussion of any problems encountered, proposed changes to the tasks in the Work Statement, and anticipated accomplishments in the upcoming quarter. Financial Status: This section should include a narrative report comparing costs to date with the approved Budget. The report should state whether or not the project is progressing within the approved Budget and discuss any proposed changes. Additional Information: Additional information required in .the progress reports may be specified in the Work Statement or Special Conditions. I3BS-T&C Non Fed Grant Boilerplate-rev.3-29-02 2 08/22/02 AWARD # BBS - 02K - 026 b. Final Reports A draft final report shall be submitted to the Commission Project Manager no later than 60 days prior to the end of the Ageement term. At a minimum, the report shall include: · Table of Contents. · Abstract. · A brief summary of the objectives of the project and how these objectives ~vere accomplished. · Any findings, conclusions, or recommendations for follow-up or ongoing activities that might result from the successful completion of the project. · A statement of future intent of the grant Recipient to maintain or further develop the project. · A Payment Request form for the final payment (including any retention). · Any additional information specified in the Work Statement or Special Conditions. The Commission Project Manager will review the draft report. The Recipient will incorporate applicable comments and submit the final report (the original and two copies) to the Commission Project Manager. Upon receipt of the final report, the Commission Project Manager shall ensure that all work has been satisfactorily completed. c. Rights in Reports The Commission reserves the fight to use and reproduce all reports and data produced and delivered pursuant to this Agreement, and reserves the fight to authorize others to use or reproduce such materials. Each report becomes the property of the Commission d. Failure to Comply with Reporting Requirements Failure to comply with the reporting requirements contained in this award will be considered a material noncompliance with the terms of the award. Noncompliance may result in ~vithholding of future payments, suspension or termination of the current award, and withholding of future awards. A willful failure to perform, a history of failure to perform, or unsatisfactory performance of this and/or other BBS-T&C Non Fed Grant Boilerplate-rev.3-29-02 3 08/22/02 AWARD # BBS - 02K - 026 financial assistance awards, may also result in a debarment action to preclude future awards. 7. Legal Statement on Reports and Prodacts No product or report produced as a' result of work funded by this program shall be represented to be endorsed by the Commission, and all such products or reports shall include the following statement: LEGAL NOTICE This document ;vas prepared as a result of work sponsored by the California Energy Conmfission. It does nor necessarily represent the views &the Energy Commission, its employees, or the State of California. The Commission, the State of California, its employees, contractors, and subcontractors make no ;varranty, express or implied, and assume no legal liability for the information in this document; nor does any party represent that the use of this information will not infringe upon privately owned rights. & Amendments Changes to the Work Statement, changes to specific line items in the budget, or both, may be made under certain conditions. Such changes must not alter the original scope or purpose of the project or program as proposed in the grant application. Such changes must not appreciably affect the value of the project or program. Work Statement changes and/or cumulative transfers among budget line items that exceed 10 percent of the grant award require advance ~vritten approval of the Commission Project Manager and Grants and Loans Office. All requests must be submitted directly to the Commission Project Manager in writing and include a description of the proposed change, revised attachment(s), and the reasons for the change. If the change is approved, the affected sections of the Agreement will be amended and signed by the Commission Project Manager, Grants and Loans Office, and the Recipient's author/zed representative. 9. Contracting attd Procurement Procedures This section provides general requirements for an agreement between the Recipient and a third party ("subcontractor"). The Recipient is required, where feasible, to employ contracting and procurement practices that promote open comPetition for all goods and services needed to complete this project. Recipient shall obtain price quotes from an adequate number of sources for all subcontracts. Subcontracting criteria are specified in the applicable OMB Circulars and/or federal regulations incorporated by reference in this Agreement. The Commission will defer to the Recipient's own regulations and procedures as long as they reflect applicable state and local laws and regulations and are not in conflict with the minimum standards specified in this Agreement and any OMB Circulars and/or federal regulations incorporated by reference in this Agreement. BBS-T&C Non Fed Grant Boi: :rplate-rev.3-29-02 4 08/22/02 ' ' AWARD # BBS - 02K - 026 Upon request, the Recipient must submit to the Commission Project Manager a copy of all solicitations for services or products required to carry out the terms of this Agreement, copies of the proposals or bids received, and copies of subcontracts executed. If a specific subcontractor was identified in the original grant application and the grant was evaluated based in part on this subcontractor's qualifications, then prior written approva! from the Commission Project Manager is required before substituting a new subcontractor. The Recipient is responsible for handling all contractual and administrative issues arising out of or related to any subcontracts it enters into under this Agreement. All subcontracts must incorporate all of the folloxving: · A clear and accurate description of the material, products, or services to be procured as well as a detailed budget and timeline. · Provisions which allow for administrative, contractual, or legal remedies in instances where subcontractors violate or breach contract terms, and provide for such sanctions and penalties as may be appropriate. · Provisions for termination by the Recipient including termination procedures and the basis for settlement. · Language conforming to the "Nondiscrimination" provision in this Agreement. · Any additional requirements specified in the OMB Circulars incorporated by reference in this Agreement. · The Standard of Performance provisions specified in this Agreement. Audit provisions regarding record retention specified in this Agreement. · Language conforming to the "Indemnification" provision in this Agreement. · Lang,/age conforming to the "License" provision in this Agreement. Failure to comply with the above requirements may result in the termination of this Agreement. 10. Bonding and Insurance The Recipient will follow its own bonding and insurance requirements relating to bid guarantees, performance bonds, and payment bonds without regard to the dollar value of the subcontract(s) as long as they reflect applicable state and local laws and regulations and are not in conflict with the minimum standards specified in the OMB Circulars incorporated by reference in this Agreement. BBS-T&C Non Fed Grant Boilerplate-rev.3-29-02 5 08/22/02 AWARD # BBS - 02K - 026 I1. Permits and Cleara~tces The Recipient is responsible for ensuring all necessary permits and environmental documents are prepared and clearances are obtained from the appropriate agencies. 12. Equipment Title to equipment acquired by the Recipient with grant funds shall vest in the Recipient. The Recipient shall use the equipment in the project or program for which it was acquired as long as needed, ~vhether or not the project or program continues to be supported by grant fitnds and shall not encumber the property without Commission Project Manager approval. When no longer needed for the original project or pro,am, the Recipient shall contact the Commission Project Manager for disposition instructions. Recipient should refer to the OMB Circulars and/or federal regulations incorporated by reference in this Agreement. 13. Tertnination This project may be terminated for any reason set forth belo~v. a. With Cause In the event of any breach by the Recipient of the conditions set forth in this Agreement, the Commission Policy Committee may, without prejudice to any of its legal remedies, terminate this Agreement for cause upon five (5) days written notice to the Recipient. b, Without Cause The Commission Policy Committee may, at its option, terminate this Agreement without cause in whole or in part, upon ~ving tlzirty (30) days advance notice in writing to the Recipient by certified mail, return receipt requested. In such event, the Recipient agrees to use all reasonable efforts to mitigate the Recipient's expenses and obligations hereunder. Also in such event, the Commission shall pay the Recipient for all satisfactory services work performed and expenses incurred within 30 days after such notice of tenrtination which could not by reasonable efforts of the Recipient have been avoided, but not in excess of the maximum payable under this Agreement. 14. Travel and Per Diem For purposes of payment, Recipient's headquarters shall be considered the location of the Recipient's office where the employees assigned responsibilities for this award are permanently assi~ed. Travel expenditures not listed in this section cannot be reimbursed. BBS-T&C Non Fed Grant Boil erplate-rev.3-29-02 6 08/22/02 Travel not listed in the Budget section of this Agreement shall require prior written authorization from the Commission Project Manager. Recipient shall be reimbursed for authorized travel and per diem up to, but not to exceed, the rates allowed nonrepresented state employees. A copy of the current allowable reimbursement rates can be obtained by contacting the Coffin-fission's Grants and Loans O f'fice at (916) 654-4381. Travel expense claims must detail expenses using the allowable rates, and Recipient must sign and date the travel expense claim before submitting the travel expense claim to the Commission for payment. Expenses must be listed by trip including dates and times of departure and return. Travel expense claims and supporting receipts and expense documentation shall be attached to the Recipient's Payment Request. A vehicle license number is required when claiming mileage, parldng, or toll charges. Questions regarding allowable travel expenses or per diem should be addressed to the Commission Project Manager. 15. License The Commission shall be granted a no-cost, nonexclusive, nontransferable, irrevocable ~vorldwide license to use or have practiced for or on behalf of the State of California inventions developed hereunder and patents or patent applications derived fi'om such inventions. Recipient must obtain agreements to effectuate this clause with all persons or entities obtaining ownership interest in the patented subject inventions. The Commission makes no claim to intellectual property that existed prior to this Agreement and was developed without Commission funding. If applicable, the Recipient gives notice that the items listed in the Intellectual Property attachment or exhibit have been developed without Commission funding and prior to the start of this Agreement. This list represents a brief description of the prior developed intellectual property. A detailed description of the intellectual property, as it exists on the effective date of this Agreement, may be necessary if Commission funds are used to further develop the listed intellectual property. This information will assist the parties to make an informed decision regarding intellectual property rights. The Commission shall be granted the no-cost use of the technical data first produced or specifically used in the performance of this Agreement. The Commission shall be granted a royalty-free nonexclusive, irrevocable, nontransferable worldwide license to produce, translate, publish, use and dispose of, and to authorize others to produce, translate, publish, use and dispose of all copyrightable material first produced or composed in the performance of this Agreement. BBS-'I'&C Non Fed Grant Boilerplate-rev.3-29-02 7 08/22/02 AWARD # BBS - 02K - 026 16. Standard of Perforntance Recipient, its subcontractors and their employees, in the performance of Recipient's work under this award shall be responsible for exercising the degree of skill and care required by customarily accepted good professional practices and procedures used in the Recipient's field. Any costs for failure to meet the foregoing standard or to correct otherwise defective work that requires re-perfom~ance of the work, as directed by Commission Project Manager, shall be borne in total by Recipient'and not the Commission. The failure of a project to achieve l~he performance goals and objectives stated in the Work Statement is not a basis for requesting re-performance unless the work conducted by Recipient and/or its subcontractors is deemed by the Cornmission to have failed the foregoing standard of performance. In the event Recipient/subcontractor fails to perform in accordance with the above standard: (1) Recipient/subcontractor will re-perform, at its own expense, any task which was not performed to the reasonable satisfaction of the Commission Project Manager. Any work re-performed pursuant to this paragraph shall be completed within the time limitations originally set forth for the specific task involved. Recipient/subcontractor shall work m~y overtime required to meet the deadline for the task at no additional cost to the Commission; (2) The Commission shall provide a new schedule for the re-performance of any task pursuant to this paragraph in the event that re-performance of a task within the original time limitations is nor feasible; m~d (3) The Commission shall have the option to direct Recipient/subcontractor not to re- perform any task which ,,vas not performed to the reasonable satisfaction of the Commission Project Manager pursuant to application of (1) and (2) above. In the event the Commission directs Recipient/subcontractor not to re-perform a task, the Commission and Recipient shall negotiate a reasonable settlement' for satisfactory work performed. No previous payment shall be considered a waiver of the Commission's right to reimbursement. Nothing contained in this section is intended to limit any of the rights or remedies which the Commission may have under law. 17. Payment of Funds a. Payment Requests The Recipient may request payment from the Commission at any time during the term of this Agreement although it is preferred that payment requests be submitted with the progress reports. BBS-T&C Non Fed Grant Boilerplate-rev.3-29-02 8 08/22/02 AWARD # BBS - 02K - 026 Payments will generally be made on a reimbursement basis for Recipient expenditures, i.e., after the Recipient has paid for a service, product, supplies, or other approved budget item. No reimbursement for food or beverages shall be made other than allowable per diem charges. As a general rule, advance payments are not allowed. The Commission, at its sole discretion, may honor advance payment requests if warranted by compelling need. Advance payments shall only be made upon the satisfaction of conditions intended to protect gq'ant funds from loss or misuse, including (1) depositing all advance payments into a separate interest-earning account; (2) reporting interest earned on advance pa3qnents to the Commission Project Manager; (3) the accounting of all advance payments within a timeframe specified by the Grants and Loans Office; (4) retunfing all unused advance payments and interest or portion thereof, within 60 days of the termination of this Agreement; and (5) other conditions as specified by the Grants and Loans Office. Funds in this award have a limited period in which they must be expended. Al1 Recipient expenditures must occur prior to the end of the term of this Agreement. b. Documentation All payment requests must be submitted using a completed Payment Request form (Exhibit A). This form must be accompanied by an itemized list of all charges and copies of all receipts or invoices necessary to document these charges for both Commission and match share. Any payment request that is submitted without the itemization will not be authorized. If the itemization or documentation is incomplete, inadequate, or inaccurate, the Commission Project Manager will inform the Recipient and hold the invoice until all required information is received or corrected. Any penalties imposed on the Recipient by a subcontractor because of delays in payment will be paid by the Recipient. c. Release of Funds The Commission Project Manager will not process any payment request during the Agreement term until the following conditions have been met: All required reports have been submitted and are satisfactory to the Commission Project Manager. · All applicable special conditions have been met. All a~propriate pemfits or permit waivers from governmental agencies have been issued to the Recipient and copies have been received by the Cormnission Project Man ager. BBS-T&C Non Fed Grant Boilerplate-rev.3-29-02 9 08/22/02 · All products due have been submitted and are satisfactory to the Commission Project Manager. · Other prepayment conditions as may be required by the Commission Project .Manager have been met. Such conditions will be specified in writing ahead of time, if possible. d. Retention It is the Conmqission's policy to retain 10 percent of any payment request or 10 percent of.the total Commission award at the end of the project. After the project is complete the Recipient must submit a completed payment request form requesting release of the retention. The Commission Project Manager will review the project file and, when satisfied that the terms of the funding Agreement have been fulfilled, will authorize release of the retention. e. State Controller's Office Payments are made by the State Controller's Office. l& I~¥scal Accounting Requirements The Recipient shall review and comply with the administrative requirements outlined in the applicable sections of the OMB circulars and/or federal regulations incorporated as part of the funding Agreement. The OMI3 circulars and/or federal regulations are supplemented with the following requirements: a. Accounting and Financi al Methods The Recipient shall establish a separate ledger account or fund for receipt and disbursement of Cormziission funds for each project funded by the Commission. Expenditure details must be maintained in accordance with the approved budget details using appropriate accounting practices. b. Retention of Records The Recipient shall retain all project records (including financial records, progress reports, and payment requests) for a minimum of three (3) years after the project has been formally concluded, or final payment received, whichever is later, unless otherwise specified in the funding Agreement. Records for nonexpendable personal property acquired with grant funds shall be retained for three years after its final disposition. BBS-T&C Non Fed Grant Boilerplate-rcv.3-29-02 l 0 08/22/02 c. Audits Upon written request from the Commission, the Recipient shall provide detailed documentation of all expenses at any time throughout the project. In addition, the Recipient agrees to allow the Commission or any other agency of the state, upon written request, to have reasonable access to and the right of inspection of all records that pertain to the project during the term of this Agreement and for a period of three (3) years thereafter. Further, the Recipient agrees to incorporate an audit of this project within any scheduled audits, when specifically requested by the state. Recipient agrees to include a similar fight to audit in any subcontract. Recipients m'e strongly encouraged to conduct annual attdits in accordance with the single audit concept. The Recipient should provide two copies of the independent audit report and any resulting comments and correspondence to the Commission Project Manager within 30 days of the completion of such audits. d. Match or Cost Share (match) If the Budget includes match, the Recipient's commitment of resources, as described in this Agreement, is a required expenditure for receipt of Commission funds. Grant funds will be released only if the required match percentages are expended. The Recipient must maintain accounting records detailing the expenditure of the match (actual cash and in-kind services) and provide complete documentation of expenditures as described under "Payment of Funds." 19. Indemnification The Recipient agrees to indemnify, defend, and save harmless the state, its officers, agents, and employees from any and all claims and losses accruing or resulting to Recipient and to any and all contractors, subcontractors, materialmen, laborers, and any other person, firm, or corporation furnishing or supplying work, services, materials, or supplies in connection with the performance of this Agreement, and from any and all claims and losses accruing or resulting to any person, firm, or corporation ~vho may be injured or damaged by the Recipient in the performance of this Agreement. 20. Disputes In the event of a dispute or grievance between Recipient and the Commission regarding this Agreement, the following two-step procedure shall be followed by both parties. Recipient shall continue with responsibilities under this Agreement during any dispute. a. Commission Dispute Resolution The Recipient shall first discuss the problem informally with the Commission Project Manager. If the problem cannot be resolved at this stage, the Recipient must direct the grievance together with any evidence, in writing, to the Commission Grants and Loans Officer. The grievance-must state the issues in the dispute, the BBS-T&C Non Fed Grant Boilerplate-rev.3-29-02 1 1 08/22/02 AWARD # BBS - 02K - 026 legal attthority or other basis for the Recipient's position and the remedy sought. The Commission Grants and Loans Officer and the Program Office Manager must make a determination on the problem within ten (10) working'days after receipt of.the ~vritten communication from the Recipient. The Grants and Loans Officer shall respond in writing to the Recipient, indicating a decision supported by reasons. Should the Recipient disa~ee with the Grants and Loans Officer decision, the Recipient may appeal to the second level. The Recipient must prepare a letter indicating why the Grants and Loans Officer's decision is unacceptable, attaching to it the Recipient's original statement of the dispute with supporting documents, along with a copy of the Grants and Loans Officer's response. This letter shall be sent to the Executive Director at the Commission within ten (10) working days from'receipt of the Grants and Loans Officer's decision. The Executive Director or designee shall meet with the Recipient to review the issues raised. A written decision signed by the Executive Director or designee shall be returned to the Recipient within twenty (20) working days of receipt of the Recipient:s letter. The Executive Director may exercise the option of presenting the' decision to the Commission at a business meeting. Should the Recipient disagree with the Executive Director's decision, the Recipient may appeal to the Commission at a regularly scheduled business meeting. Recipient will be provided with the current procedures for placing the appeal on a Commission Business Meeting Agenda. b. Mutual Agreement for Arbitration Should the Commission's Dispute Resolution procedure described above fail to resolve a dispute or grievance to the.satisfaction of the Recipient, either party may seek to have the dispute or grievance resolved through binding arbitration. Both parties must consent before submitting the dispute to arbitration. The arbitration proceeding shall take place in Sacramento County, California, and shall be governed by the commercial arbitration rules of the American Arbitration Association (AAA) in effect on the date the arbitration is initiated. The dispute or grievance shall be resolved by one (1) arbitrator who is an expert in the particular field of the dispute or grievance. The arbitrator shall be selected in accordance with the aforementioned commercial arbitration rules. If arbitration is mutually decided by the parties, arbitration is in lieu of any court action and the decision rendered by the arbitrator shall be final (not appealable to a court through the civil process). However, judgement may be entered upon the arbitrator's decision and is enforceable in accordance with the applicable law in any court having jurisdiction over this Agreement. The demand for arbitration shall be made no later than six (6) months after the date of the termination of this Ag-reement, irrespective of when the dispute or grievance arose, and irrespective of the applicable statute of limitations for a suit based on the dispute or grievance. []BS-T&C Non Fed Grant Boilerplate-rev.3-29-02 1 2 08/22/02 AWARD # BBS - 02K - 026 The cost of arbitration shall be borne by the parties as follows: i) The AAA's administrative fees shall be borne equally by the parties; ii) The expense of a stenographer shall be borne by the party requesting a stenographic record; iii) Witness expenses for either side shall be paid by the party producing the witness; iv) Each party shall bear the cost of its own travel expenses; v) All other expenses shall be borne equally by the parties, unless the arbitrator apportions or assesses the expenses otherwise as part of his or her award. At the option of the parties, any or all of these arbitration costs may be deducted from any balance of Agreement funds. Both parties must agree, in writing, to utilize Agreement ftmds to pay for arbitration costs. If the parties do not mutually agree to binding arbitration, the sole forum to resolve the dispute is State court. 21. Vr'orkers' Compensation Inst~rance a. Recipient hereby warrants that it carries Worker's Compensation Insurance for all of its employees who will be engaged in the performance of this Agreement, and agrees to furnish to the Commission Project Manager satisfactory evidence of this insurance at any time the Commission Project Manager may request. b. If Recipient is self-insured for worker's compensation, it hereby warrants such self- insurance is permissible under the laws of the State of California and agrees to furnish to the Commission Project Manager satisfactory evidence of this insurance at any time the Commission Project Manager may request. 22. General Provisions a. Governing Law It is hereby cmderstood and agreed that this Agreement shall be governed by the laws of the State of California as to interpretation and performance. b. Independent Capacity The Recipient, and the agents and employees of the Recipient, in the performance of this Agreement, shall act in an independent capacity and not as officers or employees or agents of the State of California. BBS-T&C Non Fed Grant Boilerplate-rev.3-29-02 13 08/22/02 AWARD # BBS ~ 02K - 026 c. Assig-nment Without the written consent of the Commission in the form of a formal written amendment, this Agreement is not assig~nable or transferable by Recipient either in whole or in part. d. Timeliness Time is of the essence in this Agreement. e. Unenfm'ceable Provision In the event that any provision of this Agreement is unenforceable or held to be unenforceable, then the parties agree that all other provisions of this Agreement have force and effect and shall not be affected thereby. f. Waiver No waiver of any breach of this Agreement shall be held to be a waiver of any other or subsequent breach. All remedies afforded in this Agreement shall be taken and construed as cumulative, that is, in addition to every other remedy provided therein or by law. g. Assurances The Commission reserves the right to seek further written assurances from the Recipient and. its team that the work of the project under this Agreement will be performed consistent with the terms of the Agreement. h. Change in Business (1) Recipient shall promptly notify the Commission of the occurrence of each of the following:. (a) A change of address. (b) A change in the business name or ownership. (c) The existence of any litigation or other legal proceeding affecting the project. (d) The occurrence of any casualty or other loss to Project personnel, equipment or third parties of a type commonly covered by insurance. (e) Receipt of notice of any claim or potential claim against Recipient for patent, copyright, trademark, service mark and/or trade secret infringement that could affect the Commission's rights. BBS-T&C Non Fed Grant Boilerplate-rev.3-29-02 14 08/22/02 AWARD # BBS - 02K - 026 (2) Recipient shall not change or reorganize the type of business entity under ~vhich it does business except upon prior written notification to the Cominission. A change of business entity or name change requires an amendment assigning or novating the Agreement to the changed entity. In the event the Commission is not satisfied that the new entity can perform as the original Recipient, 'the Commission may terminate this Agreement as provided in the termination paragraph. i. Survival of Terms It is understood and' agreed that certain provisions shall survive the completion or termination date of this Agreement for any reason. The provisions include, but are not limited to: · "Pa3qnents o f Funds" · "Equipment" · "Change in Business" · "Disputes" · "Termination" · "Audit" · "Indemnification" · "License" · "Fiscal Accounting Requirements" 23. Certifications& Compliance a. Federal, State & Local Laws Recipient shall comply with all applicable federal, state and local laws, rules and regulations. b. Nondiscrimination Statement of Compliance During the performance of this Agreement, Recipient and its subc6ntractors shall not unlawfully discriminate, harass or allow harassment, against any employee or applicant for employment because of sex, sexual orientation, race, color, ancestry, religious creed, national origin, disability (including HIV and AIDS), medical condition (cancer), age, marital status, and denial of family care leave. Recipient and its subcontractors shall insure that the evaluation and treatment of their employees and applicants for employment are free of such discrimination and harassment. Recipient and its subcontractors shall comply with the provisions of the Fair Employment and Housing Act (Government Code Sections 12990 et seq.) and the applicable regulations promulgated thereunder (California Code of Regulations, Title 2, Section 7285.0 et seq.). The applicable regulations of the Fair Employment and Housing Commission implementing Government Code Section 12990 (a-f), set forth in Chapter 5 of Division 4 of Title 2 of the BBS-T&C Non Fed Grant Boilerplate-rev. 3-29-02 1 5 08/22/02 AWARD # BBS - 02K - 026 California Code of Regulations are incorporated into this Agreement by reference and made a part of it as if set forth in full. Recipient and its subcontractors shall give written notice of their obligations under this clause to labor organizations with which they have a collective bargaining or other Agreement. The Recipient shall include the nondiscrimination and compliance provisions of this clause in all subcontracts to perform work under this Agreement. c. Drug Free Workplace Certification By si=o-ning this Agreement, the Recipient hereby certifies under penalty of perjury under the laws of the State of California that the Recipient will comply with the requirements of the Drug-Free Workplace Act of 1990 (Government. Code Section 8350 et seq.) and will provide a drug-free workplace by taking the following actions: i) Publish a statement notifying employees that unlawful manufacture, distribution, dispensation, possession, or use of a controlled substance is prohibited and specifying actions to be taken against employees for violations as required by Government Code Section 8355(a). ii) Establish a Drug-Free Awareness Program as required by Government Code Section 8355(b) to inform employees about all of the following: · The dangers of drug abuse in the workplace; · The person's or organization's policy of maintaining a drug-free workplace; · Any available counseling, rehabilitation, and employee assistance programs; and · Penalties that may be imposed upon employees for drug abuse violation s. iii) Provide, as required by Government Code Section 8355(c), that every employee who works on the proposed project: · Will receive a copy of the company's drug-free policy statement; · Will agree to abide by the terms of the company's statement as a condition of employment on the project. Failure to comply with these requirements may result in suspension of payments under the Agreement or termination of the Agreement or both, and the Recipient may be ineligible for any fiXure state awards if the Commission determines that any of the following has occurred: (1) the Recipient has made false certification, or (2) violates the certification by failing to carry out the requirements as noted above. BBS-T&C Non Fed Grant Boilerplate-rev.3-29-02 16 08/22/02 AWARD # BBS - 02K - 026 Recycling Certification The Recipient shall certify in writing under penalty of perjury, the minimum, if not exact, percentage of recycled content, both post consumer waste and secondary waste as defined in the Public Contract Code, Sections 12161 and 12200, in materials, goods, or supplies offered or products used in the performance of this Agreement, regardless of whether the product meets the required recycled product percentage as defined in the Public Contract Code, Sections 12161 and 12200. Recipient may certify that the product contains zero recycled content. e. Child Support Compliance Act (Applicable to California Employers) For any Agreement in excess of $100,000, the Recipient acknowledges that: i) It recognizes the importance of child and family support obligations and shall fully comply with all applicable state and federal laxvs relating to child and family support enforcement, including, but not limited to, disclosure of information and compliance with earnings assignment ..... orders, as provided in Chapter 8 (commencing with section 5200) of Part 5 of Division 9 of the Family Code; and ii) To the best of its knowledge is fully complying with the earnings assignrnent orders of all employees and is providing the names of all new employees to the New Hire Registry maintained by the California Employment Development Department. f. Americans With Disabilities Act By signing this Agreement, Recipient assures the State that it complies with the Americans with Disabilities Act (ADA) of 1990 (42 U.S.C. 12101, et seq.), which prohibits discrimination on the basis of disability, as well as applicable regulations and guidelines issued pursuant to the ADA. g. Union Activity By signing this Agreement, the Recipient hereby certifies that Recipient will not use grant funds for m~y expenses to assist, promote, or deter union organizing. Any Recipient that makes expenditures to assist, promote, or deter union organizing shall maintain records sufficient to show that state funds have not been used for those expenditures. (Govermnent Code Section 16645.2) BBS-T&C Non Fed Grant Boil erplate-rev.3-29-02 17 08/22/02 AWARD # BBS - 02K - 026 EXHIBIT A PAYMENT REQUEST FORM BBS-T&C Non Fed Grant Boilerplate-rev.3-29-02 1 8 08/22/02 ' STATE OF CALIFORNIA CALIFORNIA ENERGY COMMISSION FiNANOIAL STATUS REPORT OR PAYMENT REQUEST Payment RequestNo.: Grant CEC211-(a) (Re,/. 1/0]) [/lslruction$ are olt the reverse Recipient Type of Request Amount of this Request {Name and Address) Reimbursement Status Report Only $ Release Retention Period Covered by this Request Funding History Funds Requested to Date: $ to Funds Received to Date: Grant No. Recipient ID No. Approved Project Term Expenses to Date: $ Funds on Hand: Interest Earned to Date: S to EN E RGY COM M I SS ION SHA RE Expenses Expenses Obligations Remaining Line Item Budget this Period to Date Not Yet Paid Balance Personnel Fringe Benefits Travel Equipment Supplies Contractual Construction Other Indirect TOTAL MATCH SHARE Expenses Expenses Obligations Remaining Line Item Budget this Period to Date Not Yet Paid Balance Personnel Fringe Benefits Travel Equipment SuppIies Contractual Construction Other Indirect TOTAL GRAND TOTAL RECIPIENT CERTIFICATION ENERGY COMMISSION USE ONLY (-NS-) 1 certify to the best of my knowledge and belief that this report is correct and complete and all Amount Authorized outlays and obligations are for the purposes set forth in the funding Agreement. No grant fnnds will be used to assist, promote, o,' deter union organizing. Signature of Authorized Certifying Officer Date Retentioi: Yes No Type or Print Name and Title Phone Fiscal Year ENERGY COMMISSION APPROVALS Appropriation Code Commission Project Manager Date ACCOUNTING OFFICE USE ONLY Commission Program Manager Date Retention Grants Office Dale Amount Scheduled T & C -Form CEC 21 la 19 July 2001 INSTRUCTIONS Payment Request No.: Begin xvith the number 1 on your Interest Earned to Date: Show all interest earned on first payment request and consecutively number each previously advanced funds. subsequent payment request. The last payment request should include the notation, "Final." Line Items: The following budget categories apply to all expenditures invoiced. Recipient (Name and Complete Address): Same as "Recipient" on the Grant Agreement. Address should · Budget: Show by line item the budget as shown in the include the city, state, and zip code. Grant Agreement. Type of Request: Indicate if this is a "Reimbursement" or · Expenses this Period: Show by line item the actual "Status Report Only." Be sure to provide backup payments made by the Recipient during the period documentation. If no funds are being requested, check covered by this report. "Status Report Only." · Expenses to Date: Show by line item the cumulative Amount of this Request: This line shows the amount total of all expenses from the beginning of the project currently being requested. Indicate the amount being through and including the period covered by this requested, report. Period Covered by this Report: The time period covered · Obligations Not Yet Paid: Show by line item all' by this request. The first day of the period should be the day funds obligated on purchase orders, contracts, etc. for after the last day covered by your previous report. Example: which you have received an invoice but have not yet 1/14/94 to 3/31/94. paid. Grant No.: Same as "Grant Number" on the Grant · Remaining Balance: Show by line item the funds Agreement. This is the eight digit code assigned by the available for expenses or obligations. "Budget" minus Energy Comm/ssion (example 961-93-000). "Expenses to Date" minus "Obligations Not Yet Paid" equals "Remaining Balance." Recipient ID No.: This space is for an account number or other identifier that may be assigned by the Recipient Certification: Name, title and signature of authorized (optional). certifying official (usually the grant Recipient's project manager). Approved Project Term: This is the entire project period beginning with the date the project starts through the end Submit original and one copy to: date. This date should match the "Term" on the Grant Agreement unless you have received.a term extension. California Energy Commission Accounting Office Total Fnnds Requested to Date: Show the total of all 1516 Ninth Street, MS # 2 funds requested from the Energy Corm~xission prior to this Sacramento, CA 95814 request. Funds Received to Date: Show the total amount of funds received from the Energy Commission prior to this request. "Funds Requested to Date" minus any retention withheld" equals "Funds Received to date". Total E~penses to Date: ~Show the total expenses from the beginning of the project tba'ough and including the period covered by this report. This amount should be the same as the "Grand Total" expenses to date. Funds on Hand: This should be filled in only if you have received any advance funds from the Commission. If you have, show the balance of funds received. ("Funds Received to Date" minus "Expenses to Date" equals "Funds on Hand.") T & C -Form CEC 2 [ I a 20 July 2001 Exhibit C-2 Battery Backup Systems Work Statement and Schedule New Installations: LED Traffic Intersections BBS-02K-026 1. Submit executed governing body resolution to the Energy Commission. Product: Resolution Due Date: Prior to any payments made by Energy Commission. 2. Release bid documents for materials and labor. Product: A copy of the bid specifications for the system and cabinet. Due Date: 120 calendar days after execution of grant agreement. 3. Select system vendor and/or contractor. Product: A copy of the winning proposal. Due Date: 30 calendar days after release of bid doc~tments. 4. Prepare and sign an agreement with the vendor and/or contractor. Produ ct: A copy of the executed agreement. Due Date: 30 calendar days after selection of the vendor and/or contractor. 5. Install the system and begin operation. Product: Written notification of the installation and operation. Due Date: 60 calendar days after signing a~eement. 6. Prepare and submit quarterly~progress reports in accordance with Section 6 of these grant terms and conditions. Prod uct: Quarterly progress reports. Due Date: Progress reports are due quarterly by the 15th Of each month following the end of each calendar quarter during the term of this agreement. Progress reports shall adhere to the ~'ollowing schedule: Grant term begins August 14, 2002 Progress Reports are due: 1 st Quarter: 8/14/02-9/30/02 '10/15/02 2no Quarter: 10/1/02-12/31/02 '1/15/03 3~ Quarter: 1/1/03-3/31/03 4/1/03 4th Quarter: 4/1/03-~/30/03 7/1/03 Special Conditions 21 Exhibit C-2 Battery Backup Systems Work Statement and Schedule Ne~v Installations: LED Traffic Intersections BBS-02K-026 7. Prepare and submit a final report in accordance with the requirements in Section 6 of the grant terms and conditions. In addition, the final report shall include a summary of each BBS installation, the number of systems installed, and any problems that xvere encountered during the performance of this agreement. Product: Final Report Due Date: 60 days after the installation and operation of all systems authorized under this agreement. Special Conditions 22 CEC NEW BATTERY BACKUP SYSTEM TABLE A-2 NEW BATTERY BACK UP SYSTEMS ....... TRAFFIC INTERSECTION INFORMATION 'l'n~truotions For Completing The Below Table. Please Fill Columns A- I~ All The Other Columns Will Be ~ Automatically Calculated. If You Cannot Load This Spreadsheet Electronically, Contact David Rubens at 916-651-9857 Or E-Mail Him At drubens~energy.state.¢a.us COLUMN A:Thts Is The City Where The Intersection Is Located. If The Intersection Is In The Unincorporated Areas Of A County, Then Leave This Column Blank. COLUMN B:Enter The County Where The Intersection Is Located. COLUMN C:Enter The Intersection Location, Such As The Name Of The Cross Streets. COLUMN D: Indicate Whether There Are Any LED Signals At This Intersection. COLUMN E: Indicate The Maximum Number Of Vehicles That Travel Through This Intersection Daily COLUMN F: Indicate The Number Of Accidents Per Million Vehicles Per Year COLUMN G: Indicate Whether The Intersection Is Within One Mile Of An Elementary, Middle Or High School. COLUMN H: Indicate Whether The Speed Of The Approach Traffic On Each Cross Street Greater Than Or Equal To 45 Miles Per Hour. COLUMN I: Indicate Whether The Intersection Has Accessible Or Pre-Emption Controls J. CRITERIA 1: ). ARE THERE LED F. NUMBER OF '1. IS THE SPEED OF I. DOES THE BASED ON TRAFFIC SIGNALS AT INJURY THE APPROACH NTERSECTION HAVE NUMBER OF tHIS ACCIDENTS PER~- 13,,18 INTERSECTION TRAFFIC ON EACH PRE-EMPTION OR VEHICLEa~DAY NTERSECTION? E.~NUMBER OF MILLION VEHiCleS ,WITH!N~I.OMILE OF A STREET.~=46 MPH? OTHER CONTROLS? MAX POINTS = 6 CITY * l, COUNTY (Y/N) VEHICLES/DAY PER YEAR K~I28CHOO~L? (Y/N) (Y/N) 'i ''" .... (Y/N) Oublin Alameda Dublin BlvdJSan Ram Y 5512( ' N ' ' y Dublin Blvd./Regional Y 41110 y N y Dublin BlvdJVillage Pi Y 42262 y N y Dublin BIvd./Doughe~ y 70443 y N y Dublin Blvd./Taasajar; Y 30173 N y Amador Vly/Village Pk Y 36525 1 Y N y Amador Vly/San Ram( Y 42896 0 Y y Hacienda/Hacienda Xi 21323 0 Y 4 0 0 0 0 0 Battery Backup Systems for Traffic Control City of Dublin, BBS-02K-026 New Installations Match Share Budget Line Item Grant Recipient Match Total: Personnel $0 $0 $0 *Design & Project Management (160 hours ~$43.75/hr=$7,000) Ginger Russell, Admin. Analyst [l Fringe $0 $0 $0 *(30%=$3,000) Travel $0 $0 $0 Equipment $22,400 $0 $22,400 ($4.000/unit x 8 intersections x 70%) Supplies $0 $0 $0 Contractual $0 $35,334 $35,334 Contract inspection, Alameda Co. Signals (80 hrs ~ $I00) Contractor equipmenr procurement and installation cost ($27,334 inclusive) Construction $0 $0 $0 Other $0 $$83,566 $83,566 City paid portion of BBS $9,600 Yellow LED & PV head conversion (City expense) $43,610 BBS upgrade for l existing intersection (City expensed $3,000 Printing and advertising expense $I, 000 Conthzgency cost for tmforesee~z conditions $26,356 Indirect $0 $0 $0 Total $22,400 $118,900' $141,300 'Note, the City's capital project budget does not include salaries and benefits as these are paid from the operating budget. The total estimated cost of this project is S151,300. The City of Dublin's General Fund will be contributing $128,900 to the project. 24 BBS-02K-026 RESOLUTION NO: 02-0814-05 STATE OF CALIFORNIA STATE ENERGY RESOURCES CONSERVATION ANTI DEVELOPMENT COMMISSION RESOLUTION- RE: Battery Backup System Grants WHEREAS. pursuant to Public Resources Code Sections 25403~8. the State Energy Resources Conservation and Development Commissmn (Energy Commission) is authorized to provide grants to local governments for battery backup systems for traffic signals using light emitting diodes; and WI-IEREAS.-in order to be eligible for this grant, a local government must meet the Battery Backup Pro.am requirements contained in the grant application; and WHEREAS. the Energy Commission staff has reviewed all applications and has identified projects that meet the program requirements; and THEREFORE BE IT RESOLVED. the Energy Commission approves the staff recommendations for grants to be awarded to local governments as indicated in Tables A and B; and: FURTHER BE IT RESOLVED, that the Energy Commission authorizes the Executive Director or his designee to consider and approve any requests from the grant recipients for additions, deletions, or modifications to the project, provided as modified, the project remains eligible for financial assistance and does not require any additional money. Dated: August 14, 2002 STATE ENERGY RESOURCES CONSERVATION AND DEVELOPMENT COMMISSION WILLIAM J. KI~ESE Chairman 25 TABLE A Existing BBS Grant Summary Sheet City of Chino $22 496 $6 000 City of Claremont $22 841 $4 200 City of Corona $81 175 $14 400 · $106 451 $23 324 City of Elk Grove $40 339 $10 800 City of Encinitas $172 800 $48 222 City of Escondido $85 678 $21 000 City of Fontana $327 981 $86,400 City of Fremont $398 723 $17 864 City of Hayward $39,956 $7,830 City of Huntington Beach $22,549 $6,764 City of Laguna Niguel $325,839 $59,850 City of Lakewood $68,807 $17,052 City of Lompoc $92,400 $15,600 City of Milpitas $173,422 $40,800 City of Mission Viejo $136,007 $29,856 City of Paramount $167,790 $42,000 City of Poway $195,707 $45,600 City of Rancho Cucamonga $526,917 City of Rancho Mirage $113,550 $84,850 $23,879 City of Sacramento, Public Works $57,324 $11,040 City of San Diego $237,955 City of San Marcos $73,386 City of Temecula $100,245 $25 200 $24,596 $6 457 City of Vacaville $90,400 $20 821 City of Victorville $1,872 $1 872 City of Vista $7.3,587 $17 548 City of Westlake Village $190,986 $14 378 City of Westminster $226,990 $41 041 County of El Dorado $2,900 $870 County of Kern $59,417 $38,456 County of Marin $74,71.2' $9,600 County of Sacramento $377,916 $101,859 County of San Diego $505,680 $134,400 ce Monterey County Dept. of Public Works $65,500 . Town of Moraga $11,550 ~.~ $16,300 $3,150 · - TABLE B New BBS Summary Grant Sheet :.~:~'~;~.!~,;..~.:i.'~..~ ,%!¢, '.. ~...: ~:~ ~,.,,. ~ ,~ '~,...' ' '..~, .~ -.~. :~ ~......,,..~ .-.-.:..~....:.~ ~.. ,.., ..~......o ,~.-~..,~ ...... .~.,.,,~r~. ~:.,~. .0 City and County of San Francisco $556,000 $254,800 City of Antioch $51,093 $19,944 City of Adesia $71,600 $37,660 City of Atwater $24,000 $9,800 City of Baldwin Park $82,800 $36,540 City of Bell $25,200 $14,210 City of Brisbane $10,800 $6,090 City of Buena Park $127,558 $61,180 City of Burbank $88,000 $53,200 City of Ceres $55,000 $30,800 City of Chula Vista $850,000 $281,960 City of Claremont $30,891 $14,035 City of Clovis $30,891 $7,350 City of Commerce $210,500 $103,320 City of Concord $52,000 $26,950 City of Code Madera $18,000 $8,120 City of Costa Mesa $118,665 $113,664 City of Culver City $65,205 $42,000 ~ City of Cupertino. $86,400 $37,352 --4 City of Cypress $26,100 $14,700 City of Dinuba $4,000 $2,450 City of Dublin $141,300 $22,400 City of El Cajon $60,000 $42,000 City of Escondido $158,504 $103,600 City of Garden Grove $77,500 $29,925 City of Gilroy $45,900 $23,940 City of Hayward $75,871 $40,320 City of Highland $98,400 $10,800 City of Huntington Beach $416,000 $291,200 City of Imperial Beach $11,120 _ $5,320 City of Indio $68,000 $45,220 City of Inglewood $200,000 $89,600 City of La Mesa $198,355 $124,320 City of La Mirada $52,650 $31,850 City of Lancaster $123,480 $73,500 CitY of Larkspur $25,200 $9,643 City of Live Oak $5,398 $2,800 City of Livermore $145,000 $58,240 City of Lomita $28,200 $14,234 CEC r ..... TABLE B New BBS Summary Grant Sheet Cty of Lynwood I "'130 00" I , . ~, , u $57,050 City of Mill Valley $21,600 $19.285 City of Mission Viejo $306,000 $142,240 City of Montebello $250,000 $142,380 City of Monterey $35,200 $20.006 City of Monterey Park $543,926 $105.560 City of Moreno Valley $118,000 $49,000 City of National .City $35,000 $12,250 City of Novato $111,600 $46.284 City of Orange $204,000 $129,640 City of Palmdale $275.000 $95,550 City of Palo Alto $50,400 $28.420 City of Pico Rivera $42,500 $29,120 City of Pleasant Hill $50,000 $1§,600 City of Pleasanton $83,025 $70,525 City of Rancho Santa Margarita $166,975 $66,500 City of Redondo Beach $183,600 $103,530 City of Roseville $503,100 $330,400 City of Salinas $30,774 $14,700 City of San Buenaventura $88,000 $56,000 City of San Luis Obispo $40,000 $25,200 City of San Marcos $173,844 $86,800 City of San Rafael $91,200 $30,240 City of Santa Barbara $204,820 $204,820 City of Santa Fe Springs $117,096 $91,840 City of Santee $116,252 $70,470 City of Sausalito $32,400 $18,270 City of Sebastopol $8 000 $5,600 City of South Gate $104,000_ $72,800 City of Sunnyvale $458,900 $271,600 City of Temecul a $162,400 $101,805 City of Thousand Oaks $311,100 $124,9~0 City of Torrance $252,050 $145,6.00 City of Victorville $17,472 $17,472 City of Vista $105,995 $52,374 City of West Covina $302,110 $119,104 City of Yorba Linda $263,200 $109,200 City of Yuba City $79,923 $47,040 TABLE B New BBS Summary Grant Sheet Coun~ of Contra Costa $120,000 $44,800 Coun~ of El Dorado $75,600 $40,600 Coun~ of Marin $7,200 $5,600 Coun~ of San Luis Obispo, Dep. Of F $40,000 $26,600 County of Santa Clara $1,000,000 $287,140 Coun~ of Ventura $105,000 $33,320 Los Angeles Coun~of Public Works $410,000 $170,800 Town of Apple Valley $104,670 $44,100 Town of Loomis $14,400 $4,060 Town of Mora~a $29,500 $9,800 , . BBS-02K-026 RESOLUTION NO. :58 - 02 A RESOLUTION OF ~ crrY COUNCIL OF THE CITY OF DUBLIN AUTHORIZE~G APPLICATION TO CAI,II~ORNIA ENERGY COMMISSION FOR GRANT FUNDING 'RELATED TO TRAFFIC SIGNAL BATTERY BACKUP SYSTEMS WHEREAS, pursuant to Public Resources COde Section 25403.8, the State Energy Resources Conservation and Development Commission (Energy Commission) is authorized to provide grams to city, county, or city and county governments for battery.backup systems for tra~c signals; and WHEREAS, in order to be eligfble for funding, the battery backup systems must be used in conjunction with light emitting diode.traffic signals; NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Dublin authorizes the City to apply for funding from the Califomia Energy Commission for battery backup systems operating with light emitting diode traffic signals. BE IT FURTHER RESOLVED that if recommended for funding by the California Energy Commission, the City Council of the City of Dublin authorizes the City to accept a grant up to $21,280. BE IT FURTHER RESOLVED that the Public Works Director is hereby authorized and empowered to execute in the name of the City of Dublin all necessary documents to implement and carry out the purpose of this resolution and to undertake all actions necessary.to undertake and complete the energy efficiency project. PASSED, APPROVED AND ADOPTED this 21st day of May, 2002. AYES: Councilmembers McCormick, Oravetz, Sbranti and Zika and Mayor Lockhart NOES: None ABSENT: None ATTEST: ~// .... ~Mayor '~ City Clerk g: k~genrnisc bresobbs G:~CC-MTGSk2002-qtr2~41'LS-21-O2ireso-traffic aignaLdoc (Item 4.4) 30 BBS-02K-026 Special Conditions Battery Backup Systems (BBS) New Installations: LED Traffic Intersections 1. Resolution The recipient must provide to the Energy Commission (Commission) a signed resolution (or signed certified copy of same) authorizing acceptance of this agreement. The resolution shall also designate the person by title who is authorized and empowered to execute in the name of the agency all contracts, agreements, and amendments necessary to implement and carry out the project as defined by this agreement. This resolution must be submitted to the Energy Commission be_fore any payments are made to the agency for work authorized .... under this agreement. 2. Products The Commission project manager must receive 2 copies of the required products as indicated in the Work Statement, Exhibit C-2. The Commission project manager may contact the recfpient, a-s needed, to get clarification or request additional information on any product. Electronic copies may be acceptable for certain documents that do not'require an original signature. The Commission project manager shall determine if the documents are acceptable for electronic transmittal. 3. Payment of Funds a. Conditions for Grant Payment: The Commission will provide grants to supplement the cost of purchasing BBS for LED traffic signal intersections as described in Section 15 of the Grant Application. The Commission will authorize progress payments for the BBS that have been installed and are operational. Prior to payment, the Commission reserves the right to: 1) A pre- and post inspection; 2) Verify that all the projects have been installed and are operational; 3) Verify that each installed system correlates with the intersections indicated in the grant award; 4) Verify that the specifications for each installed system correlates with the specifications contained in Appendix B of the grant application; 5) Verify that the Commission grant is not used to supplement the cost of a project already funded by an IOU; 6) Verify that the Commission grant incentive does not include labor for these BBS installations as described in Section 15 of the Grant Application. Special Conditions, 08/29/02 Page 1 , ~. ,, BBS-02K-026 b. Situations for Denial of a Payment Request: Grant payments, either in whole or in part, will not be made in the event of any of the following' 1) The equipment purchased does not meet the requirements specified in Appendix B of the Grant Application. 2) The recipient fails to provide the required documentation. This documentation includes, but is not limited to, the requirements listed in grant ag reement. 3)The recipient requests reimbursement for labor. 4) A random audit or technical analysis conducted by the Commission or its' designated representatives determines that the installed project does not meet the terms and conditions of the grant agreement. Special Conditions, 08/29/02 Page 2