Loading...
HomeMy WebLinkAboutItem 4.04 LightRetrofitCivCntrAGENDA STATEMENT CITY CLERK FILE # 600-35 CITY COUNCIL MEETING DATE: August 21, 2001 SUBJECT: Request for Authorization to Advertise Contract 01-11, City Facilities Lighting Retrofit (Civic Center, Shannon Center, and Fire Station) for Bids Report Prepared by: Lee S. Thompson, Public Works Director ATTACHMENTS: Specification will be available at the City Council meeting RECOMMENDATION: ~{} Authorize Staffto advertise Contract 01-11 for bids FINANCIAL STATEMENT: The estimated Cost and payback information for this portion of the Energy Improvement CIP is as follows: Civic Center Shannon Center Fire Station Total Material & Labor Cost $25,500 $11,660 $4,700 $41,860 Project Administration $3,000 $1,000 $500 $4,500 Total: $28,500 $12,600 $5,200 $46,360 Estimated Rebate*: ($3,400) ($1,800) ($825) ($6,025) Net Cost: $25,1 O0 $1 O, 800 $4,375 $40,335 Est. Annual Energy Savings $9,100 $6,900 $5,000 $18,150 Est. Annual Maint. Savings $2,570 $800 $900 $4,270 Total Est. Annual Savings: $11,670 $7,700 $5,900 $25,270 Estimated Payback Period 2.15 years 1.40 years 0.74 years (avg.) 1.60 years *The original estimate provided for this project included a "double" rebate, which will not be available; these figures include a standard rebate. The payback period will be about 4 months longer than originally expected. The expenditure budget remains the same as originally proposed. DESCRIPTION: At the July 17th meeting, the City Council approved a three-part Capital Improvement Project related to emergency power and energy conservation. One element of this project is a lighting retrofit for the Civic Center, Shannon Comanunity Center, and Donohue Drive Fire Station. The relative costs and estimated energy cost savings for each facility are shown in the Financial Statement. As noted in the original report regarding this project, the cost g:~miscproj~lighting retrofit\agstauth COPIES TO: ITEM NO. information was based on the electric rates prior to the June 1 Surcharge, and so the actual payback time may be less. The project consists of replacing existing T-12 fluorescent lamps with energy efficient T-8 lamps and replacement of incandescent lamps with compact fluorescents. Replacement or retrofit of fixtures is included as needed. The project also includes replacement of existing ballasts with more energy efficient electronic ballasts and the proper disposal of hazardous material. It is recommended that the City Council authorize Staffto advertise for bids. Page 2