Loading...
HomeMy WebLinkAboutItem 4.04 SwimCntr FenceSUBJECT: CITY CLERK FILE # 0600-35 AGENDA STATEMENT CITY couNcIL MEETING DATE:' MaY' 16;'2000 Award of Bid for Swim Center Fence Replacement Project (Contract 00-05) Report Prepared by Paul McCreary, Recreation Supervisor ATTACHMENTS: 1) Resolution of Award 2) Budget Change Form 3) Summary of Bid Results RECOMMENDATION: 1) Adopt resolution awarding contract to Golden Bay Fence Plus Iron Works, Inc., in the mount of $72,000 for the replacement of the fencing at the Dublin Swim Center. 2) Approve the budget change for to appropriate $27,225 fi:om reserves to Capital Improvement Project No. 95911 FINANCIAL STATEMENT: Budget $51,975 Low Bid $72,000 The base bid plus a 10% contingency is $79,200 which exceeds the funds budgeted for the improvements by $27,225. In order to award the bid, an additional appropriation in this amount from the Unappropriated General Fund Reserve is required. DESCRIPTION: At its meeting on April 4, 2000, the City CoUncil authorized Staff to advertise Contract 00-05 for bids. This project provides for the replacement of the existing chain link fencing at the Swim Center. The prOject was advertised in accordance with the City's ordinance and one bid was received by the bid opening on May 4, 2000 at 2:00 P.M. A comparison of the bid received and the engineer's estimate is attached (see Attachment 3). The sole bidder was Golden Bay Fence Plus Iron Works, Inc., with a bid of $72,000. Staft'rec0mmends including a 10%' contingency, .which brings the total funds needed to $79,200. The total budget for the project is $5t,975 which would result ina funding shortfall in the moUnt of $27,225 if the bid were awarded. The cost of the demolition and the new steel fence is more than double the cost projected in the budget. The existing fence is embedded in a concrete drainage swale that borders the High School athletic fields. At the time the budget 'was prepared it was thought :that the new fence COuld be installed just outside of the drainage swale. Since then the school installed a concrete walkway along the drainage swale. Therefore the new fence must be installed in the existing drainage swale. Minimizing damage to the r-q, minage swale requires saw cutting, which significantly increased the cost of demolition. Staff does not oelieve that substantial cost savings could be achieved by bidding the project again. COP1-ES TO: Golden Bay Fence Plus Iron Works, Inc. Jilt ITEM NO. H:kPCS~.c516fenceaward. doc Staff has reviewed the bidder's proposal and license stares. Staff also checked the contractor's references and received no negative comments. Therefore, Staff recommends' that the City Council adopt the resolution awarding Contract 00-05 to Golden Bay Fence Plus Iron Works, Inc. Further, it is recommended that the City Council approve the Budget Change Form in Attachment 2. The project is expected to take 30 working days to complete. Therefore, Staff anticipates the project will be finished by June 30, 2000. Page 2 RESOLUTION NO. - 2000 A RESOLUTION OF THE CITY COUNCIL OF THE CITY .OF DUBLIN AWARDING CONTRACT 00-05 DUBLIN SWIM CENTER FENCE REPLACEMENT PROJECT TO GOLDEN BAY FENCE PLUS IRON WORKS, INC. WHEREAS, the City of Dublin did, on May 4, 2000, publicly open, examine, and declare all sealed bids for doing the work described in the approved Specifications for Contract 00-05, which Specifications are hereby expressly referred to for a description of said work and for all particulars relative to the proceedings under the request for bids; and WHEREAS, said bids were submitted to the City Engineer, who has reviewed the bids to determine the lowest bid which was responsive to the requirements of the bid documents; and NOW, TI--IEREFORE, BE IT RESOLVED that the City Council of the City of Dublin does hereby award Contract No. 00-05 to the lowest responsible bidder therefor, to wit, Golden Bay Fence Plus Iron Works, Inc., at a base bid of Seventy Two Thousand Dollars and no cents ($72,000.00), the particulars of ;~-"vhich bid are on file in the office of the City Engineer. PASSED, APPROVED AND ADOPTED this 16th day of May, 2000. AYES: NOES: ABSENT: ABSTAIN: ATTEST: Mayor City Clerk ~-~IAPCS~fenceresoIutiomdoc Attachment I CITY OF DUBLIN BUDGET CHANGE FORM New Appropriations (City Council Approval Required): X From Unappropriated ReServes (If Other than General Fund, Fund No - From New Revenues CHANGE FORM # Budget Transfers: From Budgeted Contingent Reserve (1080-799.000) Within Same Department Activity Between Departments (City Council Approval Required) Other Name: Name: Swim Center Fence Replacement $27,225.00 Improvements Account#: Account#: 001.95911.750.050 Name: Name: Account ~. Account #: Name: Name: Account ~.~ Account #: Name: Name: Account #: Account #: . Name: Name: Account ~ Account #: City Manager:. Date: Signature ASD/Fin Mgr Date: Signature REASON FOR BUDGET CHANGE ENTRY: To award Contract 00-05 to Golden Bay Fence Plus Iron Works, Inc., for replacement of the fencing at the Swim Center. Contract amount exceeds available budget. Mayor: Date: Sig-nature Posted By: Date: Sig-nature. Attachment 2 BID RESULTS - DUBLIN SWIM CENTER FENCE REPLACEMENT PROJECT, CONTRACT 00-05 BID OPENING DATE - MAY 4, 2000 ITEM ITEM DESCRIPTION UNIT QTY. UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE 1 Demolition LS 1 $2,000.00 $2,000.00 $10,000.00 $10,000.00 2 ISteel Fence Work LF 195 $85.00 $16,575.00 $160.00 $31,200.00 3 12-Foot Chain Link Fence Work LF 245 $40.00 $9,800.00 $31.00 $7,595.00 4 8-Foot Chain Link Fence Work LF 600 $35.00 $21,000.00 $27.51 $16,506.00 5 Metal tSaint Work LS 1 $2,600.00 $2,600.00 $6,699.00 $6,699.00 TOTAL BID: $51,975.00 $72,000.00 ATTACHMENT 3