Loading...
HomeMy WebLinkAboutItem 6.2 QuarryLaneSchool PD CITY CLERK File # D[B~[Q]-[1][3] AGENDA STATEMENT CITY COUNCIL MEETING DATE: November 21, 2000 SUBJECT: ATTACHMENTS: RECOMMENDATION: tl,J- ~ PUBLIC HEARING P A 99-064 Quarry Lane School, Planned Development (PD) Prezone and Annexation (Report Prepared by: Anne Kinney, Associate Planner) 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. City Council Resolution adopting a Mitigated Negative Declaration, Mitigation Monitoring Program and the Response to Comments City Council Ordinance adopting a Planned Development (PD) Prezone/Development Plan for the Quarry Lane School (with the Prezoning Exhibit attached as Exhibit A-I and the Development Plan attached as Exhibits A-2 and A-3) and Planned Development (PD) Prezone for the Kobold property with the Prezoning Exhibit attached as Exhibit A-I) City Council Resolution authorizing an application for reorganization to Alameda County Local Agency Formation, Commission (LAFCo) with annexation description and maps attached as Exhibits B-1, B-2, B-3 and B-4 and the Plan for Services attached as Exhibit B-5 City Council Resolution regarding Exchange of Property Tax Revenue City Council Resolution approving a Pre-Annexation Agreement between Quarry Lane School and the City of Dublin with the Pre- Annexation Agreement attached as Exhibit C Vicinity Map Aerial Initial Study/Mitigated Negative Declaration Response to Comments Mitigation Monitoring Program Applicant's letter addressing noise impacts Revised project noise assessment prepared by Wilson Ihrig & Associates, dated November 7, 2000 Noise assessment, Alternative 2, prepared by Wilson Ihrig & Associates, dated November 7,2000 1. 2. 4. 5. 6. Open Public Hearing and Hear Staff Presentation Take testimony from Applicant and the Public Question Staff, Applicant and the Public Close Public Hearing and Deliberate Adopt the following: --------------~---------------------------------------------------------------------------------------------- G:\pa99064\ccsrnov21.doc COPIES TO: The ApplicantlProperty Owners P A File ITEM NO. ---1,,1- '~~ . Attachment 1 City Council Resolution adopting a Mitigated Negative Declaration, Mitigation Monitoring Program and the Response to Comments . Attachment 3 City Council Resolution authorizing an application for reorganization to Alameda County Local Agency Formation Commission (LAFCo) with annexation description and maps attached as Exhibits B-1, B-2, B-3 and B-4 and the Plan for Services attached as Exhibit B-5 . Attachment 4 City Council Resolution regarding Exchange of Property Tax Revenue . Attachment 5 City Council Resolution approving a Pre-Annexation Agreement'between Quarry Lane School and the City of Dublin, and 7. Waive reading and introduce the Ordinance Attachment 2 amending the Dublin Zoning Ordinance to a Planned Development (PD) Prezone/Development Plan for the Quarry Lane School (with the Prezoning Exhibit attached as Exhibit A-I and the Development Plan attached as Exhibits A-2 and A-3) and Planned Development (PD) Prezone for the Kobold property with the Prezoning Exhibit attached as Exhibit A-I) 8. Schedule the second reading of the Ordinance for the December 5, 2000 City Council meeting. PROJECT DESCRIPTION: The project site is located north of the existing city limits, on the east side of Tassajara Road, approximately 2 miles north ofI-580 within unincorporated Alameda County. The site contains two properties, the Quarry Lane School and the Kobold property, located at 6363 and 6237 Tassajara Road respectively. The Kobold property is located adjacent to the city limits, south of the Quarry Lane School site. The total site includes approximately 13.7 acres of land. The Applicant, Dr. Arac of Quarry Lane School is requesting approval to allow the development of Phase 2 of the privately owned school at 6363 Tassajara Road. Phase 2 of Quarry Lane School would include the construction of 66, 685 square feet of classroom and administrative space to house 750 students and 55 staff and recreational play fields. Construction of Phase 2 would increase the need for public services and facilities beyond that available from existing private facilities. Therefore, annexation to the City of Dublin and Dublin San Ramon Services District is requested to obtain the necessary level and range of urban services to facilitate future expansion of the school. The State reorganization act (Knox-Cortese) requires that properties proposed for annexation be contiguous with the boundaries of the jurisdiction to which annexation is proposed. Therefore, the Kobold property is proposed to be included in the annexation action, since it is the intervening property between the city limits and the Quarry Lane School site. However, no development is proposed for the Kobold property at this time. The proposed 'Proiect includes the following entitlements: . Planned Development Prezoning and Stage 1 and 2 Development for Phase 2 of the Quarry Lane School . Planned Development Prezoning of the Kobold property to allow future residential and open space ' uses in accordance with the Eastern Dublin Specific Plan 2 . Annexation to the City of Dublin and Dublin San Ramon Services District. A model of the proposed Quarry Lane School development will be presented at the City Council meeting. BACKGROUND: Although, the project site lies within a portion of unincorporated Alameda County, it is within the City of Dublin's sphere of influence and within the Eastern Dublin Specific Plan area. The Specific Plan was adopted by the City of Dublin in January of 1994, for the purpose of guiding future growth in the eastern portions of the City and established land use designations for approximately 3,300 acres of land east of the Camp Parks Military Reserve. Due to the characteristics of the project site, under the Specific Plan it was given three separate land use designations of "Medium Density Residential", "Open Space" and "Rural Residential/Agriculture". The Quarry Lane School site was previously known as the "Villa Tassajara", with an existing building and parking lot used primarily for a variety of social gatherings, including weddings, training seminars and similar events. In April 1999, Alameda County approved a rezoning for the property to PD- Planned Development District to allow the Phase 1 development for Quarry Lane School, consisting of 15, 600 square feet of floor area for day care, preschool and elementary grades with a maximum of 200 students. The school would be served by private on-site well and septic facilities. Phase 1 of the school opened in mid- September for the 2000/01 school year. The County also certified an Environmental Impact Report for Quarry Lane School prior to the approval of the rezoning and development application. The EIR considered the full build-out of Quarry Lane School consisting of 62, 575 square feet of floor area for day care, preschool, elementary, middle and high school grades to accommodate a maximum of 950 students. ANALYSIS: Project Site and Surrounding Land Uses: The project site encompasses two parcels of land, the Quarry Lane School property and the Kobold property located east of Tassajara Road, north ofthe current City limits within the Eastern Dublin Specific Plan area. The subject site contains the existing Villa Tassajara building which has been incorporated into the Quarry Lane School as the administration building and the Phase 1 school building. A single-family residence, landscape contracting business and plant nursery exists on the Kobold property. The Quarry Lane School site contains moderate to steep topographic features, with natural (pre-graded) elevations ranging from approximately 435 feet above sea level adjacent to Tassajara Road to approximately 564 feet above sea level (the highest point) on the northeast comer ofthe site. The Villa Tassajara building and parking lot has been constructed on the level portion ofthe site adjacent to Tassajara Road. At the rear ofthe parking lot the pre-graded topography rose steeply to form a small hill towards the center ofthe property at the 500-foot contour. A tributary of Tassajara Creek exists along the southern boundary of the Kobold property. The Specific Plan designation of Rural Residential! Agriculture encompasses the northeastern portion of the Quarry Lane School site generally located above the 500-foot contour line. The southern portion of the Kobold site along the tributary of Tassajara Creek is designated for Open Space uses and the remainder ofthe west, northwest and central portions of the total site (Quarry Lane School and Kobold) are de~ignated for Medium Density Residential land uses. 3 To the northeast of the site, a single-family residence has been constructed on a la-acre lot. The property to the south of the creek is currently being constructed with single-family residences as part of the Dublin Ranch development. To the east, lands designated for a Community Park and Rural Residential Agriculture under the Eastern Dublin Specific Plan are undeveloped. Across Tassajara Road to the west, lie vacant lands designated for future residential uses under the Eastern Dublin Specific Plan. Planned Development Quarry Lane School: The Applicant is requesting a Planned Development Prezone and Stage 1 and 2 Development Plan to establish regulations for the use, development, improvement, and maintenance of the property as required by Chapter 8.32 of the Dublin Zoning Ordinance. The proposed land uses are shown on the Prezoning Exhibit, labeled Exhibit A-I of Attachment 2 to the staff report. A Stage 1 and 2 Development Plan has been prepared for the Quarry Lane School, depicting development concept and addressing the requirements of the Zoning Ordinance. The proposed Development Plan is attached and consists of: ExhibitA-2, the Planned Development Provisions (including permitted and conditional uses and development regulations) and Exhibit A-3, the applicants proposed site, architectural, landscape and other plans. Development Plan The Development Plan as proposed would allow the operation and construction of a private school including kindergarten through high school grades for a maximum of 950 students (phase 1 and 2) and approximately 55 faculty and staff. The second phase of construction would include 66, 685 square feet of floor area to accommodate new classrooms, a gymnasium, new recreational play fields, driveways and parking areas. The following table summarizes the amount of construction proposed for each phase of development: Table 1. Summary of Quarry Lane School Development Building Sq. Ft. Classrooms No. of Students Phase I (approved . by Alameda County 15,578 13 200 Phase II (proposed for construction in 66,685 37 750 Dublin) Total 82,263 , 50 950 The original site plan prepared by the Applicant for submittal to Alameda County in 1998 proposed the complete grading of the property to provide a flat area to construct the school. The Applicant worked closely with both the City and County to revise the site plan to minimize on-site grading and design structures to more closely fit the natural topography. In 1999, the County approved the Phase 1 school building only, located to the immediate rear of the existing parking lot area. This approval also permitted the creation of a flat play area at the 500-foot contour and prohibited any grading above the 520-foot contour line. In order to accommodate the phase 2 improvements including a second school building and recreational play fields; the applicant proposes to recontour the central portion of the property so that the small hill to 4 the rear of the phase 1 building is cut to accommodate the new school building. The new building has been carefully designed to fit the contours of the existing topography. The three-story structure appears to step up and into the hillside to reduce its mass and scale, thereby appearing as a two-story structure (Refer to Exhibit A-3, Sheet A4.0). To the rear of this structure, a combination of cut and fill is used to create a flat playfield site with a steep downslope to the southerly property line to meet natural grade. The area will be landscaped with appropriate vegetation to promote stability and create a soft landscaped edge. Several retaining walls are required as part of the development. The walls would range in size from less than one foot to a maximum of 14 feet. The northeastern portion of the property between the recontoured 490 and 520 foot contours would be regraded to resemble the existing landform and the area above the 520-foot contour would be left undisturbed. The Phase 2 architecture has been designed to match the Phase 1 architecture to create a uniform site design. The architecture can be described as industrial rural with craftsman elements to complement the rural setting and future residential land uses in the area. The building is characterized by use of stucco finish, metal roofing, wood brackets, aluminum windows and decorative metal trim. The building has been designed with varying roof elements, which effectively reduces the overall scale of the structure. In addition, the building would not obscure or extend above the ridgeline. The ground level would contain parking spaces and classrooms, with second and third floors accommodating the gymnasium and additional office and classroom areas. The Phase 1 school building is constructed in a similar manner to the proposed Phase 2 building and also utilizes the existing topography to step up the hillside. The general appearance of the overall project would be one of buildings walking up the natural landforms and stepping back from Tassajara Road. The Phase 1 building will partially screen the Phase 2 structure proposed. The applicant is using the natural landform rather than destroying it. Landscaping of the property consists of streetscape landscaping, landscaping around the perimeter of the buildings and playfield. The landscaping shall conform to the City of Dublin Master Streets cape Manual and incorporate the use of native plants and shrubs; vegetation shall be chosen to promote slope stabilization. The site has been designed with adequate access and on-site pedestrian and vehicular circulation. Parking has been provided in accordance with the City's Parking Ordinance. Proposal to Revise Development Plan: In response to comments from Mr. Nielsen, the property owner to the immediate north of the Quarry Lane School site, the applicant, Dr. Arac proposed to revise the rear portion ofthe school. The revision involved lowering the elevation ofthe play field and moving the play field approximately twenty feet to the south (Kobold property). It was anticipated that moving the play field would reduce the noise levels generated by outdoor school activities at the Nielsen residence. Relocating the play field required the addition of new retaining walls along the north side of the play field and the redesign of the access between the Phase 2 building and the play field. The changes to the site plan reduced, and in some cases eliminated, the 'run-off" area between the edge of the play field and the retaining wall, thereby creating a hazard for sports players. The revised site plan presents an awkward transition from the third floor of the building to the play field for student access. Relocating the play field closer to Kobold's property may result in additional noise and other impacts to that property. Also, the revised site plan would require additional cutting of the hillside and the removal of more earth off-site. 5 Wilson, Ihrig and Associates, noise consultants reviewed the revised site plan to determine if there would be any substantial change in noise levels as a result of lowering the elevation and moving the location of the play field. Refer to Attachment 13, noise assessment-alternative 2 letter, dated November 7,2000. The noise assessment determined that the revised site plan provides no additional noise reduction from the play field at the Nielsen residence and slightly increases the play field noise at the Kobold residence. After careful consideration of safety issues, noise, grading and visual impacts, it is staff s opinion that the original site plan provides the best design solution for the project. Therefore, staff is not recommending approval of the revised site plan. Consistency with General Plan and Eastern Dublin Specific Plan: The Eastern Dublin Specific Plan Specific / General Plan designates the property for Medium Density residential and Rural Residential! Agricultural uses. A school use within this designation is appropriate because the Eastern Dublin Specific Plan envisions this area (identified as subarea G: Foothill residential in the Specific Plan) to be developed with predominantly residential and open space uses, as well as uses including public schools and parks. It is appropriate for schools, both public and private to be located in residential neighborhoods in close proximity to the students they serve. The siting and design of on-site improvements has be carefully planned to accommodate the required buildings but also to complement the existing site topography; minimize grading; ensure that the development does not obscure or extend above the ridgeline; and recontour slopes to resemble natural land forms consistent with the policies of the Specific Plan. Kobold Property: A Planned Development (PD) Prezoning has been prepared for the Kobold property to establish regulations for future use. The proposed land uses are as shown on the Prezoning Exhibit, labeled Exhibit A-I of Attachment 2 to the staff report. The proposed land uses are consistent with the Eastern Dublin Specific Plan and General Plan land use designations of "Open Space" and "Medium Density Residential". The draft PD District provisions (Attachment 2) specify the intent, intensity of use, permitted and conditional uses ofthe Residential and Open Space land use designations in accordance with the Specific Plan. Any future residential development on this property shall conform to the policies and intent of the Eastern Dublin Specific Plan including the design guidelines. In accordance with the Specific Plan, the prezoning identifies open space uses along the southern property line to preserve the creek corridor and provide passive recreational areas. No development may occur until a Stage 1 and Stage 2 Development Plan is adopted by the City identifying regulations for the improvement and maintenance of the property in accordance with Dublin's Zoning Ordinance. The "Interim Agricultural" land use designation (Attachment 2) allows the existing residential and agricultural uses approved under the Alameda County's Zoning Ordinance to remain until such time as the property owner applies for a Development Plan to develop the property. The regulations and standards governing this land use designation shall be the Agricultural Districts (A Districts) provisions of the Alameda County Zoning Ordinance. Also, following annexation, all City of Dublin zoning provisions relating to legal non-conforming uses and buildings shall apply to this property. Annexation The project site is currently within unincorporated portion of Alameda County. In order for the project to come under the jurisdiction of the City of Dublin, annexation of the site to the City must be approved by the Alameda County Local Agency Formation Commission (LAFCo). The LAFCo prefers that a city prezone an area proposed for annexation, and that prezoning must be consistent with the approved General Plan and Specific Plan uses for the property. The PD Prezoning proposed for adoption would 6 address this requirement, and would establish the appropriate land uses to be in effect at the time the project site becomes a part of the city. The current action proposed for the City Council is to consider the draft resolution (Attachment 3) authorizing staffto file an application to LAFCo for a reorganization. The reorganization proposal includes the annexation of 15.07 acres (the Quarry Lane School site, Kobold property and a portion of Tassajara Road) to the City of Dublin and Dublin San Ramon Services District. LAFCo and State law also requires an agreement between the City and the other affected taxing entities regarding the exchange of property tax revenues following annexation. The City and Alameda County are parties to an agreement which provides that the City will receive 25.4% of the property tax revenues from the areaproposed to be annexed. The City has received a letter from Alameda County confirming that the proposed annexation is subject to the terms of this agreement including the transfer of property taxes to the City following annexation. Staff recommends the City Council adopt Resolution Attachment 4 agreeing formally to the transfer of these property taxes following annexation. The provision of public services is outlined in the "Plan for Municipal Services" (Exhibit B-5 of Attachment 3) document that describes the timing and availability of services for the proposed annexation area. Dublin San Ramon Services District will provide potable water and wastewater collection, treatment and disposal services. As stated in the Plan for Services, DSRSD has adequate water supplies and sewer capacity to provide service to the annexation area. However, water and sewer for this annexation may not be available immediately upon approval of annexation. Detailed engineering and construction plans for water and sewer infrastructure will be required to address service to the annexation area, and the project proponent will likely need to enter into an agreement with the District. Following annexation Fire and Police protection services will be provided by the City of Dublin. Utilities such as electricity and telephones will continue to be provided by P G & E. The proposed annexation is appropriate, as it is contiguous with the Dublin City limits and would provide for the logical and orderly extension of urban services within the Eastern Dublin Specific Plan Area. ENVIRONMENTAL REVIEW The project is within the Dublin General Plan's Eastern Extended Planning Area and the Eastern Dublin Specific Plan Area, which was the subject of an Environmental Impact Report, certified by the City of Dublin in 1993. The General Plan/Specific Plan ErR is a program EIR, which analyzed the ~nvironmental issues related to the land use locations, development plans and policies contained in the Eastern Dublin Specific Plan. The EIR also anticipated several subsequent actions related to future development in Eastern Dublin. The EIR did identify some impacts from implementation of the General Plan/Specific Plan that were not able to be mitigated. Upon certification of the EIR, the City adopted a Statement of Overriding Considerations for several impacts, some of which relate to this project. The City also adopted a mitigation monitoring program, which included measures intended to reduce impacts from the development of Eastern Dublin area. These mitigation measures apply to project approvals and actions at various stages in the development process, and will be applied to this project as applicable. The timing of these mitigation measures is indicated in the City's EIR mitigation monitoring matrix (City Council Resolution # 53-93) incorporated herein by reference. An Environmental Impact Report for Quarry Lane School was certified by Alameda County Board of Supervisors in 1999. The EIR analyzed environmental issues relating to the proposed school in the areas of land use, visual quality, geology, hydrology, traffic and circulation, air quality, noise, public services 7 and utilities. Upon certification of the EIR, the Board of Supervisors adopted a Statement of Overriding Considerations for impacts relating to high noise levels as a result of construction activity and adopted a mitigation' monitoring program. An Initial Study was prepared for the proposed project, involving an annexation and prezoning request for 6363 and 6237 Tassajara Road. The Initial Study utilized technical information and analysis in both the Eastern Dublin EIR and the County EIR to determine if additional impacts would occur as a result of this proposal. The Initial Study determined that with the implementation of Mitigation Measures previously adopted for the Eastern Dublin EIR and with site specific Mitigation Measures contained in the Initial Study, the potential site-specific impacts of the project would be reduced to a level of insignificance and the proposed project will not have a significant effect on the environment. The public review period of the Initial Study/Mitigated Negative Declaration was held from July 19,2000 through August 7,2000. A copy of the Initial Study/Mitigated Negative Declaration is included as Attachment 6. During the Public Comment period four comment letters were received from Mr. Kyle, Attorney representing Mr. Nielsen (the property owner to the immediate north of the project site), local and State agencies, including the Regional Water Quality Control Board, East Bay Regional Park District and Alameda County Flood Control and Water Conservation District, Zone 7. Staffhas prepared responses to each of these letters. The comment letters and responses are attached as Attachment 7 to this staff report. The letter received from Mr. Kyle focused on two issues, the potential grading and noise impacts that could result from the development of the proposed Phase 2 site plan for Quarry lane School. Mr. Kyle requests that a new ElR should be prepared to address the environmental impacts of this site plan. The agencies comments primarily related to issues of stormwater runoff and water quality. In addition, the East Bay Regional Park District comments related to impacts that may occur as a result of heavy use of the park by future students of the school. The District requests the opportunity to meet with the School to discuss these issues. The City's response to each of these comment letters is attached as Attachment 7 to this staffreport. The following is a brief discussion of the pertinent issues: Traffic issues: A traffic study was conducted for the Quarry Lane School by Abrams Associates, Transportation Consultants. Traffic impacts were not analyzed for the Kobold property as no development is proposed at this time. The study concluded that with the construction of a traffic signal at the school entrance, there would be no significant traffic impacts as a result ofthis project. The program EIRdetermined that the development of Eastern Dublin would result in several traffic impacts, however these impacts would be mitigated by transportation improvements funded through the payment of traffic fees by new development within the eastern Dublin area. The Applicant will be required to pay traffic fees as part of this. development. Visual and Grading: The project was evaluated to determine whether the project design complies with the mitigation measures of the Eastern Dublin EIR and the Eastern Dublin Scenic Corridor policies. A number of these policies have been reflected in the project design to minimize visual impacts, site grading, the number and height of retaining walls and to design the building to fit the existing topography. With the adherence to mitigation measures of the Eastern Dublin EIR and site-specific measures identified in the Initial Study, no significant impacts were identified for the project. Noise: The County EIR for the Quarry Lane School analyzed the potential noise impacts of the project and determined that minimal noise impacts would be caused by vehicular traffic or school activities. Noise related to school activities would primarily involve children using the recreational play fields towards the center and rear of the site. Surrounding uses would largely be shielded by the new buildings and topography and noise levels would only occur during the school day. An updated noise study has 8 been prepared by Wilson Ihrig and Associates (refer to Attachment A of Attachment 9, Response to Comments) to evaluate potential noise impacts as a result of the revised Phase 2 site plan. The noise study was further revised in response to comments from the City's Acoustical Consultant, refer to , Attachments 12 and 13. The study analyzed noise that would result from circulation of traffic to the parking lots on-site, noise from students at play at the recreational area and noise from the Phase 2 building and assessed the noise impact on adjacent properties. The study concluded that noise produced by the Quarry Lane School would not significantly impact noise levels at adjacent residences. The Quarry Lane School traffic and play area activities would only occur for relatively short periods of time and primarily during daytime hours, when school is in session. The adjacent residences would be largely shielded from the noise generated by children at the recreational playfield by both distance and topography of the site. OTHER AGENCY IDEP ARTMENT REVIEW The proposed project has been reviewed by the Building Department, the Public Works Department, Police Services and Alameda County Fire Department. The concerns raised are reflected in the design of the project and / or in the mitigation measures identified in the Initial Study/Mitigated Negative Declaration prepared for the project PRE-ANNEXATION AGREEMENT The goals and policies of the Eastern Dublin Specific Plan require annexation and new development to be revenue neutral. It is estimated that the cost of providing public services to the Eastern Dublin Area (including the annexation area) could exceed revenues over the next several years. If new development occurs within Eastern Dublin as anticipated, it is expected to generate revenues to the City which will exceed costs over the long-term as predicted in the Eastern Dublin Specific Plan. The City will require the developer ofthe Quarry Lane School to enter into an agreement (Refer to Exhibit C to Attachment 5) to pay, the school's proportionate share of the public services deficit and certain major road improvements. The agreement will assure that the financing goals and policies of the Specific Plan are met. DUBLIN UNIFIED SCHOOL DISTRICT The Dublin General Plan policies state that "schools located within the city should be operated by the Dublin Unified School District". It is the intent of the City that the boundaries ofthe Dublin School District should be coterminous with the City limits. The project site is currently located within the Livermore Valley Joint Unified School District. The detachment of the project site (Quarry Lane School and Kobold properties) from the Livermore School District and annexation to the Dublin School District is not subject to LAFCo approval. The Planned Development Prezone contains a provision which requires that the applicant cooperate and actively work with other property owners within the City of Dublin's sphere ofInfluence to initiate and complete the annexation process to the Dublin Unified School District. CONCLUSIONS The proposed Planned Development Prezone and Annexation request for the Quarry Lane School and Kobold properties is consistent with the Dublin General Plan, Eastern Dublin Specific Plan and Dublin Zoning Ordinance. The project will accommodate the logical extension of public services within Eastern Dublin and will provide for future land uses anticipated in the Eastern Dublin Specific Plan. 9 RECOMMENDATION: Staff recommends the City Council open the Public Hearing, deliberate and 1. Adopt the following resolutions: . Attachment 1 City Council Resolution adopting a Mitigated Negative Declaration, Mitigation Monitoring Program and the Response to Comments . Attachment 3 City Council Resolution authorizing an application for reorganization to Alameda County Local Agency Formation Commission (LAFCo) with annexation description and maps attached as Exhibits B-1, B-2, B-3 and B-4 and the Plan for Services attached as Exhibit B-5 . Attachment 4 City Council Resolution regarding Exchange of Property Tax Revenue . Attachment 5 City Council Resolution approving a Pre-Annexation Agreement between Quarry Lane School and the City of Dublin 2. Waive reading and introduce the Ordinance Attachment 2 amending the Dublin Zoning Ordinance to a Planned Development (PD) Prezone/Development Plan for the Quarry Lane School (with the Prezoning Exhibit attached as Exhibit A-I and the Development Plan attached as Exhibits A-2 and A-3) and Planned Development (PD) Prezone for the Kobold property with the Prezoning Exhibit attached as Exhibit A-I), and 3. Schedule the second reading of the Ordinance for the December 5, 2000 City Council meeting. 10 t 6b lG RESOLUTION NO. A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF DUBLIN ADOPTING A MITIGATED NEGATIVE DECLARATION, MITIGATION MONITORING PROGRAM AND RESPONSE TO COMMENTS FOR P A 99-064 WHEREAS, the applicant, Dr. Sabri Arac of Quarry Lane School has requested approval of a Planned Development (PD) Prezoning and Annexation of an area of approximately 15 acres generally located north ofthe City Limits at 6363 and 6237 Tassajara Road within the Eastern Dublin Specific Plan area (APN: 985-0002-006-01,985-0002-005-01 and 005-02.); and WHEREAS, the General Plan Amendment ("GP A") and Eastern Dublin Specific Plan ("EDSP") were adopted by the City in 1994; and WHEREAS, the EDSP. provides more specific and detailed goals, policies and action programs for approximately 3313 acres within the GP A area nearest to the City on its Eastern side; and WHEREAS, a Program Environmental Impact Report ("Program EIR") was prepared for the EDSP and GPA (SCH No. 91103604) and certified by the City Council on May 10, 1993, by Resolution No. 51-93, and two Addenda dated May 4, 1993, and August 22, 1994 ("Addenda") have been prepared and adopted by the City Council and are hereby incorporated by reference; and WHEREAS, on May 10, 1993, the City Council also adopted Resolution No. 53-93, adopting the GP A and EDSP, making findings and adopting overriding considerations as to the environmental impacts and mitigation measures relating to the EDSP and GP A, and adopting a Mitigation Monitoring Program ("Program MMP") for the GP A and EDSP which resolution is hereby incorporated by reference; and WHEREAS, an Initial Study has been prepared for the project to evaluate site-specific impacts of the project, to a greater level of detail than in the Program EIR, pursuant to CEQA guidelines Section 15168. Based on the Initial Study, a Mitigated Negative Declaration and Mitigation Monitoring Program has been prepared for the project with the finding that with the implementation of Mitigation Measures previously adopted for the Program EIR and with site specific Mitigation Measures contained in the Initial Study, the potential site-specific impacts of the project would be reduced to a level of insignificance. The Program EIR and Initial Study adequately describe the impacts of the project, and there have been no substantial changes or new information which would necessitate supplementing the Program EIR pursuant to Public Resources Code section 21166 and CEQA guidelines Section 15162; and WHEREAS, a complete application for the project is available and on file in the Planning Department; and WHEREAS, a 20 day public review period was held for the Mitigated Negative Declaration, from July 19,2000 through August 7, 2000; and . ATTACHMENT 1 ~ I L \\/~\ \00 1- ot \~~ WHEREAS, a total of four comment letters have been received during the public review period from the Attorney representing the adjacent property owner and local and State agencies; and WHEREAS, all pertinent comments have been responded to and have become part of the Response to Comments attached as Attachment 9 to the staff report for PA 99-064; and WHEREAS, the Planning Commission did hold a properly noticed public hearing on said application on August 8, 2000 and on August 22, 2000 did adopt a Resolution recommending that the City Council adopt a Mitigated negative Declaration, Mitigation Monitoring Program and the Response to Comments for PA 99-064; and WHEREAS, a properly noticed public hearing was held by the City Council on November 21, 2000; and WHEREAS, a Staff Report was submitted recommending .that the City Council adopt a Mitigated Negative Declaration, Mitigation Monitoring Program and the Response to Comments for P A 99-064; and WHEREAS, the City Council did hear and use their independent judgment and considered all said reports, recommendations and testimony hereinabove set forth. NOW, THEREFORE, BE IT RESOLVED THAT the Dublin City Council does hereby find that: 1. The project is within the scope ofthe Program Environmental Impact Report for the Eastern Dublin General Plan Amendment and Specific Plan (SCH 91103064). Site-specific environmental affects have been analyzed in the Initial Study prepared for the project and circulated for public review. The project will not have a significant effect on the environment with the application of Mitigation Measures identified in the Program EIR and in the Initial Study. 2. All pertinent comments received during the public comment period have been responded to and have become part of the Response to Comments document. 3. The Mitigated Negative Declaration, Mitigation Monitoring Program, and the Response to Comments have been prepared in accordance with State and local environmental laws and guidelines. 4. The Mitigated Negative Declaration, Mitigation Monitoring Program, and the Response to Comments are complete and adequate. BE IT FURTHER RESOLVED THAT THE Dublin City Council does hereby adopt a Mitigated Negative Declaration, Mitigation Monitoring Program and Response to Comments for PA 99- 064, the Mitigation Monitoring Program is attached as Attachment 10 to the Staff Report, the Initial Study/Mitigated Negative Declaration is attached as Attachment 8 to Staff Report and the Responses to Comments is attached as Attachment 9 to Staff Report are incorporated herein by reference. .. BE IT FURTHER RESOLVED THAT THE location and custodian of the documents or other materials which constitute the record of proceedings upon which the subject decision is based is: Community Development Director, Dublin City Hall, 100 Civic Plaza, Dublin. 2 ?> at ()~ Mayor ATTEST: City Clerk 3 g:\pa99-064\CCRESOmnd y ~ tS-3 ORDINANCE NO. - 00 AN ORDINANCE OF THE CITY OF DUBLIN AMENDING THE ZONING MAP TO PREZONE PROPERTY LOCATED ON THE EAST SIDE OF TASSAJARA ROAD, IN ALAMEDA COUNTY, ADJACENT TO DUBLIN'S NORTHERN CITY LIMITS (APN 986-0002-006-01, 005-01 AND 005-02) TO A PLANNED DEVELOPMENT ZONING DISTRICT AND ADOPTING A DEVELOPMENT PLAN FOR THE QUARRY LANE SCHOOL (P A-99-064) WHEREAS, the applicant, Dr. Sabri Arac of Quarry Lane School has requested approval of a Planned Development (PD) Prezoning and Annexation of an area of approximately 15 acres generally located north of the City Limits at 6363 and 6237 Tassajara Road within the Eastern Dublin Specific Plan area (APN: 985':0002-006-01,985-0002-005-01 and 005-02.); and WHEREAS, the applicant has requested approval of a Planned Development Prezone and Development Plan for the development of Phase 2 of Quarry Lane School involving 66,600 square feet of floor area to accommodate new classrooms, a gymnasium and new recreational play fields on approximately 10 acres of land located at 6363 Tassajara Road (APN: 985-0002-006-01) and a Planned Development Prezone for the Kobold property to allow future residential and open space uses on approximately 3.7 acres ofland located at 6237 Tassajara Road (APN: 985-0002-005-01 and 005-02.) within the Eastern Dublin Specific Plan area; WHEREAS, the Applicant has submitted a complete application for a Planned Development Prezone (Exhibit A-I), including a Development Plan for the Quarry Lane School (Exhibits A-2 & A-3) as required by Chapter 8.32 and 8.120 of Title 8 ofthe Dublin Municipal Code which meets the requirements of said Chapter; and WHEREAS, the site will be prezoned to "Planned Development"; and WHEREAS, the potential environmental effects of the proposed project have been previously addressed in the Eastern Dublin Specific Plan EIR (SCH No. 91-103064); and WHEREAS, an Initial Study has been prepared for the project to evaluate site-specific impacts of the project pursuant to CEQA guidelines Section 15168. Based on the Initial Study, a Mitigated Negative Declaration and Mitigated Monitoring Program has been prepared for the project with the finding that with the implementation of Mitigation Measures previously adopted for the Eastern Dublin Specific Plan EIR and with site specific Mitigation Measures contained in the Initial Study, the potential site-specific impacts of the project would be reduced to a level of insignificance. The Eastern Dublin Specific Plan EIR and Initial Study adequately describe the impacts ofthe project, and there have been no substantial changes or new information that would be outside the scope of the Eastern Dublin Specific Plan EIR; and WHEREAS, a total of four letters commenting on the Mitigated Negative Declaration were , received during the public comment period; and . WHEREAS, all pertinent comments have been responded to and have become part of the Response to Comments attached as Attachment 9 to the Staff Report for P A 99-064; and ATTACHMENT 2 s 6b \S?? WHEREAS, the Planning Commission did hold a properly noticed public hearing on said applications on August 8 and 22, 2000, and did adopt a Resolution recommending that the City Council approve a Planned Development Prezone and Development Plan for Quarry Lane School and a Planned- Development Prezone for the Kobold Property (PA 99-064); and WHEREAS, a properly noticed public hearing was held by the City Council on November 21, 2000; and December 5, 2000; and WHEREAS, a Staff Report was submitted recommending that the City Council approve the application; and WHEREAS, on November 21,2000 the City Council adopted a Mitigated Negative Declaration, Mitigation Monitoring Program and Response to Comments for P A 99~064; and WHEREAS, pursuant to Section.8.32.070 and 8.120.050 of the Dublin Municipal Code, the City Council makes the following findings regarding said proposed Planned Development Prezone/Development Plan for Quarry Lane School: 1. The proposed Planned Development Prezone meets the intent and purpose of Chapter 8.32 of the Zoning Ordinance because it provides a comprehensive Development Plan which will create a desirable use of land and an environment that will be sensitive to surrounding land uses by virtue of the layout and design of the site plan; and 2. The Planned Development Prezone will be appropriate for the subject property in terms of setting forth the purpose, applicable provisions of the Dublin Zoning Ordinance, range of permitted and conditionally permitted uses and Development Standards, which will be compatible with existing and proposed residential and open space uses in the immediate vicinity and will enhance the development of the Specific Plan Area; and 3. The Planned Development Prezone will provide for the development of future phases of the Quarry Lane School on land designated by the Eastern Dublin Specific Plan for Medium Density Residential and Rural Residentia1/ Agricultural land uses. The Eastern Dublin Specific Plan envisions this area denoted as subarea G: Foothill Residential in the Specific Plan to be developed with predominantly residential and open space uses as well as uses including public schools and parks; it is therefore appropriate for schools, both public and private to be located in residential neighborhoods in close proximity to the students they serve; the project is consistent with the general provisions, intent, and purpose of the Eastern Dublin Specific Plan and will contribute towards implementation of said Plan; and 4. The Planned Development Prezone is consistent with the general provisions, intent, and purpose of the PD Zoning District of the Zoning Ordinance in that it contains all information required by Section 8.32 ofthe Zoning Ordinance and accomplishes the objectives of Section 8.32.010, 'A through H, of the Zoning Ordinance; and 5. The Planned Development Prezone will provide efficient use of land and will preserve an area of open space and undisturbed hillside along the north and primarily the northeast comer of the property; and will be compatible with and enhance the general development of the area; and will create an attractive, efficient and safe environment and physically suitable for the type and intensity of the zoning and uses proposed; and 6. The Planned Development Prezone will not have a substantial adverse effect on health or 2 Co 6b (S'3 safety or be substantially detrimental to the public welfare or be injurious to property or public improvement, as all applicable regulations will be met; and 7. The Planned Development Prezone will not overburden public services or facilities as all agencies must commit to the availability of Public Services prior to the issuance of any building permits as required by the Eastern Dublin Specific Plan policies and Mitigation Measures; and 8. The Planned Development Prezone will be consistent with the policies ofthe Dublin General Plan and the Eastern Dublin Specific Plan; and 9. The Planned Development Prezone will benefit the public necessity, convenience and general welfare; and 10. The adopted Eastern Dublin Specific Plan Mitigation Monitoring Program and the additional site specific mitigation measures identified in the Initial Study (Attachment 6 to Staff Report) will apply to the Project, as the reporting and monitoring program required by Public Resources Code 21081.6 for the Project WHEREAS, pursuant to Section 8.32.070 and 8.120.050 and 8.120.110 of the Dublin Municipal Code, the City Council makes the following findings regarding said proposed Planned Development Prezone for the Kobold property: 1. The Planned Development Prezone will be appropriate for the subject property in terms of setting forth the purpose, applicable provisions of the Dublin Zoning Ordinance, rap.ge of permitted and conditionally permitted uses, which will be compatible with existing and proposed residential, private school and open space uses in the immediate vicinity and will enhance the development of the Specific Plan Area; and - 2. The Planned Development Prezone is consistent with the general provisions, intent, and purpose of the Eastern Dublin Specific Plan because the prezoning will establish land uses and densities allowed by the Specific Plan and will contribute towards' implementation of said Plan; and 3. The Planned Development Prezone will provide efficient use of land and will preserve an area designated for open space uses along the southern portion of the property to preserve the creek corridor and provide passive recreational areas; will be compatible with and enhance the general development of the area; and will create an attractive, efficient and safe environment; and 4. The Planned Development Prezone will not have a substantial adverse effect on health or safety or be substantially detrimental to the public welfare or be injurious to property or public improvement, as all applicable regulations will be met; and 5. The Planned Development Prezone will not overburden public services or facilities as all agencies must commit to the availability of Public Services prior to the issuance of any building permits as required by the Eastern Dublin Specific Plan policies and Mitigation Measures; and 6. The Planned Development Prezone will be consistent with the policies of the Dublin General Plan; and 7. The Planned Development Prezone will benefit the public necessity, convenience and general welfare; and 3 ( 61 IS'; Q 8. Final EIR. The Planned Development Prezone is within the scope of the Eastern Dublin Specific Plan WHEREAS, the City Council did hear and use their independent judgment and considered all said reports, recommendations and testimony hereinabove set forth. NOW, THEREFORE, the Dublin City Council does ordain as follows: Section 1: Pursuant to Chapter 8.32, Title 8 of the City of Dublin Municipal Code the City of Dublin Zoning Map is amended to prezone the following property ("the Property") to a Planned Development Zoning District: Approximately 13.7 acres of land generally located on the east side of Tassajara Road, in Alameda County, adjacent to Dublin's northern city limits at 6363 and 6237 Tassjara Road, more specifically described as Assessor's Parcel Numbers: 985-0002-006-01,985-0002-005-01 and 005-02. A map of the rezoning area is shown below: VICINITY MAP ~ N.T,S, ..~ ". . .A.TTArRMli',NT;:. V...I...fftMlIn 4 9: 0"6 l'S~ SECTION 2. 1. Planned Development Prezone and Stage 1 and 2 Development Plan - Quarry Lane School. The regulations of the use, development, improvement, and maintenance of the Quarry Lane School Property shall be as depicted on the Prezoning Exhibit (Exhibit A-I , hereto) and as set forth in the Stage 1 and 2 Development Plan (Exhibits A-2 & A-3, hereto) which are hereby approved. Any amendments to the Stage 1 and 2 Development Plans shall be in accordance with Section 8.32.080 ofthe Dublin Municipal Code or its successors. 2. Planned Development Prezone - Kobold property The regulations of the use ofthe Kobold property shall be as depicted on the Prezoning Exhibit (Exhibit A-I, hereto). Regulations for the improvement, and maintenance of the Kobold property shall be established in a Stage 1 and 2 Development Plan which is required to be submitted in accordance with Section 8.32 of the Dublin Zoning Ordinance. No development shall occur on this property until a Stage 1 and 2 Development Plan has been adopted by the City. The Development Plan shall comply with the policies and requirements of the Eastern Dublin Specific Plan. 3. Planned Development Prezone - Land Use Designations - Kobold property: 1. PD - Medium Density Intent: Medium Density land use designations are established to: a) reserve appropriately located areas for family living in a variety of types of dwellings at a reasonable range of population densities consistent with sound standards of public health and safety; b) ensure adequate light, air, privacy and open space for each dwelling unit and c) accommodate single-family and multi-family housing, including a range of detached, zero-lot line, duplex, townhouse and garden apartment development. Intensity: 6.1 - 14.0 dwelling units per acre Permitted Uses: a. One-family dwellings b. Multi-family dwellings c. Combinations of attached or detached dwellings, zero-lot line units, duplexes, or townhouses d. Accessory structures and uses located on the same site as a permitted use. Conditional Uses: a. Bed and Breakfast Inn b. Boarding House c. Community facility d. Community Clubhouse e. Plant nursery or greenhouse used for the cultivation of plant materials (wholesale only) f. Community care facility large g. Day Care Center h. Large family day care home 5 q Cib 63 2. PD - Open Space Intent: Open Space land use designations are established to provide for the preservation of natural resources, outdoor recreational activities, and public health and safety. Permitted Uses: a. Public and private Open Space uses: including areas for open space preservation of natural resources; outdoor recreation-passive; stream corridor; trails. 3. Interim Agricultural Designation Intent: Interim agricultural designations shall be established for this property. This interim land use designation allows the existing residential and agricultural uses approved under Alameda County's Zoning Ordinance to remain until such time the landowner of this property applies for a Stage 1 and 2 Development Plan in accordance with Section 8.32 of the Dublin Zoning Ordinance Regulations and Standards Governing the Interim Agricultural Zoning Designation: a. As specifically provided by the Interim Agricultural Designations, all . applicable and general requirements of the Dublin Zoning Ordinance shall be applied to this land use designation. b. The Agricultural Districts (A Districts) provisions of the Alameda County Zoning Ordinance shall apply to properties within the Interim Agricultural land use designation. c. All properties with the Interim Agricultural land use designation shall conform to Section -8.140 of the Zoning Ordinance relating to legal non- conforming uses and buildings. 4. Dublin Zoning Ordinance - Applicable Requirements - Kobold property: Except as specifically modified by the provisions of the PD District, all applicable and general requirements of the Dublin Zoning Ordinance shall be applied to this PD District. 5. Dublin Unified School District - Quarry Lane School and Kobold properties: The General Plan Policy 4.1 states that" schools located within the city should be operated by the Dublin Unified School District". It is the intent of the City that the boundaries of the Dublin School District should be coterminous with the City limits. The property owners within this annexation area shall cooperate and actively work with other property owners within the City of Dublin's Sphere of Influence to initiate and complete the detachment process from the Livermore Valley Joint Unified School District and annexation process to the Dublin Unified School District. SECTION 3. Except as provided in SECTION 2. above, the use, development, improvement and maintenance of the Property shall b~ governed by the provisions of the Dublin Zoning Ordinance. SECTION 4. This Ordinance shall take effect and be enforced thirty (30) days from and after the date of its passage. The City Clerk of the City of Dublin shall cause this Ordinance to be posted in at least three (3) 6 ..., I D rJo (~, public places in the City of Dublin in accordance with Section 36933 ofthe Government Code of the State of California. PASSED AND ADOPTED BY the City Council ofthe City of Dublin, on this _th day of 2000, by the following votes: AYES: NOES: ABSENT: ABSTAIN: Mayor ATTEST: City Clerk g:\P A99-064\rezord.doc 7 " ." ~ i K ..., ~ C5 PREZONING EXHIBIT ~~ 991091 ~ ~~ ~~ II>I~~ 41 ~~ ... -. '" -. - '8 g ,. II> .~ .< E_ ~ C06 I~ iJ ~~ 2~! ggcN .., ~I <C Z II: o !!: -1-' oj 0> I!z C,)=> ...(/)8 ~w~ ~Z~ <(<C ~-I~ Z . :;l>-5 .:.a:!z lEa:~ <(<C~ -..wg -' -': ~lL~ U.W o~ >-. !:~ o~ ~ e EXHIBIT A-I ~ I "f,__ ! I , ' !J i L i i. ; 'hf';"~ 1-, 1 ~, ' ! ~ l",:~ i , I., if.. l' ,il jiil-- ~l" (... Jdi." ~~'< \ ' I " ,i~> ~<:i~1 ) + .~ .~ T' o!li, i \\j I I "'0.., ,_, ----fH:ir (41 '---~~~------~--.. r;~\ ..~ Rf,T-- -'\ ();; / 1 HI' T. ifrYl ., r'" \ i )/;;:;'/ / ,! ..,.' i,lilt' , d~ I)i 'r ,! (:-r//// ( ..j, 1/ ..: . \ / i L ,-" /'~<J. r-' I . ~ . : W ,'_' I'.{~" ',-__,;:::0/(( \, / ~"I/- .1' K '-'" JI :-:-.~7// 1 I, .<m, l~ .r ,. i ~ i\ ! 11/,~--#X/ \ \ 1 i:. I :~'';' if' ({:",Jrfjl/!(, , '\ ( \ ) (II ,or '';;"! , r. /! (I!I/j( ....... i ( ,J, j,' :'\i ,___,,_,~'<E i ,if ) (ii" l Ii/Il, ''\, " J \ I \ 11,'/ V.:.. """,,,,,, -,L",.L~"/+r'~! KOBDLD / ' PO OPEN SPACE ~?l f~/ :;/f/J)~ I / \ t '; Ii n-- -I~r ( ,h) '---7\ ..- DOS1UtG~~~l<<:OPtItSPAt;t \1 VI!r1!(( l." \ (' i i III iI. ,:~",,.c.,.c.C!J-i-,,) II, I / ------~------ ~ !!ill, \, \. : \ !! : \iI/' (, 'I ..' ~---- --"''''''''- .~ ,. . I ! I~)o J. I to -i; .~ , I!!/',' ,\ \ 0 ) .. "',I I I" 'I; ~" / / '-~"-"'-=~'-'= !\,\\\, \ ',I l I \, \ !! I~ / \',', \ \ '---,\ i .' -- \W) \ ' '1' \ t.! i i:; ;\i /i. 'r<;/ -l,/ / IIIi ! '\ (, I \" ' \ I[' '\. l .11 ~'\\\,l i \ "'I \ ,\ \, L,!'- .!~,'1t~.A"::~'I,!, / / ~\~\ . \ ,\ f \ I I II' '!-:.l.-__~~~.o..-.-1 Kif/' l ,\'))',,- \ ( \ \ I ,\, \. )o! \, r: ~~~ ,:-:,,,-- ~-\ i i ~1!g,,'O',......., !! ) \ ! '... ~ \I" 'J \ I ! .>:{\1Jr\"'"'~t I I..~ I ( (I i, \ \ \1 I ~r ,\\\ \-/y ~(ilt/,f!\ \ 1 \ \,. \ \ '1 :, ,~. '~'tL '41~ ~\ *<<1(((, \ '; , \ '\. \ ! \ !'- 'N''', ," ( '0..~,'~<';V, ~I'\~~'o.." \ 1,\, \, \, l' I!, ,,:I;'f"'C~", ,A,<:! ; \\\- \\ \ \ \ \ \. '-. \: \ \{.l~ ,/i.-j;r6~ /!(r : h~~ \) ) ( ',' \ ' \..,1\, k :"< t~.. ',.rt/..,<~J' I ! ~) "" \ .. ~: )k,\,\,.;: l! -\-_,"':-;p~_./f;;rr '"' 1 II I, Jili.,\ \, ......., \ \ .~ '.;t.)\1'.. :;' .,,;*>;lyr1if '..., , : i'\ \,.\ .... --.. ' ..... It.'.,. ",/,')<~'<'''/J( '--~! , l=' "-I' 1 \ ' ',., '1 ,"v,,"'}.,:,:, ! _ __,1______ \ '\~~.." ,., "-;.;{i//":" '" "- ~~ ~ \\ '- J}f:~;5;~il{ ''-'- _ ___, I" _"'-.~ ~I . '"PIt -...~, ost:~llDIIlTtl'lESlllEN1"'" ...""" I , I .. \'2 ~ \5~ DEVELOPMENT PLAN - QUARRY LANE SCHOOL (P A 99-064) This is a Development Plan pursuant to Chapter 8.32 of the Dublin Zoning Ordinance for the Quarry Lane School project, located at 6363 Tassajara Road (APN 985-0002-006-01). This Development Plan meets all of the requirements for Stage 1 and Stage 2 review of the project. This Development Plan is also represented by the, Site, Landscape and Architectural Plans, sheets dated June 14,2000 labeled Exhibit A-3 to the Ordinance approving this Development Plan (City Council Ordinance No. 00 -~, and on file in the Planning Department. The Planned Development District allows the flexibility needed to encourage innovative development while ensuring that the goals, policies, and action programs of the General Plan, Downtown Dublin Specific Plan, and provisions of Section 8.32 of the Zoning Ordinance are satisfied. 1. Zoning: This PD Planned Development Zoning District is to provide for and regulate the development of a private school. (General Plan land use designations: Medium Density Residential and Rural ResidentiaV Agriculture) 2. Permitted Uses: The following are uses permitted for this site: a. Private School: 1. Kindergarten through High School Grades 2. After school care 3. Recreational Play fields b. Similar and related uses as determined by the Director of Community Development Conditional Uses: All conditional uses in the Dublin Zoning Ordinance for the R-1 Residential Zoning District are conditional uses in this PD / R-1 District. Temporary Uses: The school shall comply with all temporary use requirements of Chapter 8.108 ofthe Dublin Zoning Ordinance. 3. Dublin Zoning Ordinance - Applicable Requirements: Except as specifically modified by the provisions of this PD District Rezone/Development Plan, all applicable general requirements and procedures of the Dublin Zoning Ordinance shall be applied to the land uses designated in this PD District Rezone. 4. Site Plan & Architecture: See attached site and elevation plans contained in Exhibit A- 3, Development Plan. This Development Plan applies to the la-acre site shown on this plan at 6363 Tassajara Road. Any modifications to the project shall be substantially EXHIBIT A-2 G:\pa99064\devplan \~ a'b \<53 consistent with these plans and of equal or superior materials and design quality. 5. Density: The maximum square footage of the proposed development and total number of proposed students under this Development Plan (as shown on the site plan) is as follows: 15, 578 square feet (currently under construction under the jurisdiction of Alameda County) and 66, 685. square feet (proposed); 950 students total (200 kindergarten students, 600 elementary and middle school students and 150 high school students) 6. Phasing Plan. The project will be constructed in one phase. 7. Landscaping Plan. Refer to attached landscaping plan included in Exhibit A-3 , Development Plan, Sheet 7. 8. Development Standards: Lot Size and Dimensions: N/ A / Front, Rear, and Side Yard Setbacks: Setback standards for this District shall be as shown on the Site Plan in Exhibit A-3, Development Plan. Building Height: 59' maximum, as shown on the elevation plan in Exhibit A-3, Development Plan Floor Area Ratio: The FAR within this district shall not exceed .21 Parking/Garages: Parking shall be provided in accordance with Section 8.76.080 C of the Dublin Zoning Ordinance, as shown on the site plan in Exhibit A-3, Development Plan. In the event that the proposed preliminary road alignment for Tassajara Road is altered, the Applicant shall demonstrate that the site is adequately parked in compliance with the Dublin Zoning Ordinance, prior to the issuance of a Site Development Review permit. 9. Development Agreement: The Applicant/Developer shall enter into a Development Agreement with the City of Dublin, prior to issuance of a building permit, which shall contain, but not be limited to, provisions for financing and timing of on and off-site infrastructure, payment of traffic, noise and public facilities impact fees and other provisions deemed necessary by the City to fmd the proj ect consistent with, the Eastern Dublin Specific Plan. 10. General Provisions: The developer shall be required to pay a Public Facilities Fee in the amounts and at the times set forth in City of Dublin Resolution No. 60-99, adopted by the City Council on April 6, 1999, or in the amounts and at the times set forth in any resolution revising the amount of the Public Facilities Fee, as implemented by the Administrative Guidelines adopted by Resolution 195-99. G:\pa99064\devplan 2 I NV'ld .LN3:WdO'l3A3:<I Q9 tc%'o.euwv;w~ 0 ~O'i."N'J.OJ. 9'fOOW.V'~'1.'. tMol::~ "': ~m: 0 ~ ~".JMol tw=-.... 'oHr.I ~~ --- J"IWm99at/Jl':KoI"ltlDJ, ::: _-= an~ _ .1IlOl;WliI..o;IHoI1'(.LOJ. ~... ___ ~.AI'II J.,ll:)gIl9'I..r5~""Jt1l. ~cw;: ~ ~TIfViW~"I't'iO.L ~~ c:::::=::J UE/S"",'",.,s'RtN;ug: ~~ {"~,:""":",,,,,':1 ClN:l9:!1 'f-V .LIHIHX3: ~ ~t:;UYQJmd o Tv' -- NV1d allS ;WVJ.S , I ;WVJ.S z: ~~!'N"'\f1d NI1Sna [.%1. V 1 Nor 03A1303l:f I II II 1\ I I I I II I I I II II I I I I I I I I I I I I I I Ii:! I I It] I I ItJ I I I?& I I Il>! II lOti I I fij II 19 II I I I I I I '", I I II I I I I I I I I II I I I I -LL__I I ++---:~]---- I I I I I I I I I I I I I I I I - I I I I I .. .! I I I I I I I I I I I I I I I I I I I I I lO:Xf",,",~I_$tl 1tI/J:!I'IIiItHIJOQ/_erwH",_:llrTM6l$'Oll!Ol1UrNr ~~~~~~~l~ ", ~..'. . .'. '", - "0. II .....; i 7.: -. ~ : '- ',; ~.L~a .L?:!rO~d l.It)S~LM -- ~~hIY oO-#P.oI:nr.l$ 'KM:Ag~ -- ... ~ = 'v'? 'N11ena avo.! ~%V~ "9,,9 :ss:lllaav~1'Ol:ld 100H?S 3NV1 ....~n<9 a'HJ. - II iaSVHd ""'''''''' lOOH?S :IN'il J.1S'l;lvn!9 :JH.L ;oono :.1H'tl.1nSNOO WOtl.Oll....:IC1..V@:::INI..nf x.....~ 09Ce...t.t-v-~::i2:& .l:.t017 _ t:."S>''t>' - S~6 DlOlO"'6 Y:l ':IItlClwtl::il^n :3nN:lIAY .LGv:3 aoz'&>- l.?Oilb ""- ~ L ~ 'n r:s \. '\ ,- - . !. (')1 ~ 1-4., .-' -' UN L.___ ........---- ----------- ------------ v'\ ....... j.l. ,QC. . 'J\ V PFlEUtMAAv GRACllMl PLAN QUARRY LANE SOHOOL GITY 0,. P&.U.'''NTON, "I.AMEDA COUNTY, CALPORHIA "" """CUAIlRYI.AHf:_ I __ __ _ ___-- __ __ _ _ _ _ _ _-=-= _ _____- _ _ __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ _ ___ --It -- - - - - - - - _1_ - -! - -- ---- ---------~--~------- I L I r.rtr:r.I.t]~ ~ @ ill 01:.t.ttttttill:t ~ ~1@1@1~lel~ D ..L. III 4..L. :12. ..L. ~ $, -L .,...------ ~ "" tSt .. ",4'j (Nou~mIlSNO~ , 3S'IHd) !lN1011ne v(OO~SSV10 .QIOlS-Z (3: '.:1" --------------------------------------------------------- ~ ,-.. 'i~~~ ;l>",'l1 ' ,.~~ e~~~ 5~~ 8:<:1"1'\..... ,,"'- ~~~~ g~~~ ~~~i!: ~~~ ~3i:~ z~a ~~ffi ::);t-:<: 5~~ ",~" ~~8 o~iS o~tB ..~~ - ~ ~ - V? 'NI"lena a'o'~ WYrVSS'tJ. G'X9 -""'""" 100H% 3NV1~"'" ilHi - lI,ilSVHcl """,,,1<, lOOH% 3N'fl ):~I~'v'(1l!) 3Hl. "",no - lJ.N'I'11nsNOO \'1 "" ......- NV1d i'll!$ t ;....J.$ f I ll9v'J.$ ~ ...- Lt'Oioio ~pt(o./dwy -- , aLYCl .I>-A ..t:;nw:l$ -- :A8 -..0 'WM:-'Q pqHIO I'IOO'CIiI.H)OIi9'lf'@.:INHlV X""'" 09EC>_"'".......,;;z:6 L LCtr - ,L.v't>' - see> O~""t<6"::J '..tlC :ilnN2^" ..LBY.iiIi dIi ~:a.J.YQJOld I ~ L '" <:;.s, \ Cj,," r- '0 --- -------- 530 , ;." ... , " " . -- --- ~--- ~~ .~ i <> I ~ !! JI r @ 8 )> h ~ ~ ~ ~ - . ~~ ~ kJ g Jl ~~ ~'OIlI!:.. ~i .:.lJN(N 5;11 ti~ig ~~ ~?{ ....01'1 g s: g~s~E ~~.~)o .. Z ~OtlCl< L III n"O~~ i~~g~_ I I .", .~' ~ :.:~~;::~:;, ~'i', ' , ::".., I' ',~ :.,' ., . " . j' .". .. ", ',.':, . ~ 01. . '... , .. ;',..,:.. ,~::' , (:, ....: '::',::::': . 480 -.J "I S61i 550 -1 [! 0'- V' t,' A4.0 PUJrOl.TE:2-MIr-OO '_T FQR CONS!&IC-.:riP~ i] --1 =~T. NOIt'Tll ~~~,# ~=IUO 0~ '- ~~IO 'iI"'''' ~""'" H!'TAL~-srNClII&!UH V~f'lUeI'L!AP_ I'Jr6CI.\-S/lTmt.PMd' ral.!rKUlZ.IIM-2~"12-l ftI:(,Q_,NIft mu:rKlClllt-IIQ.l ==~ ...--'....,. ~rllI'&-'AIlr J:lU.e\"Kl(;Ilf-IlM-' '!PIl'!le~'l-U....tIlH ~MXA!!'M2 1'CIOlJ1JW::!r!Nf!J:)'lIaK...... t:J!Uf'tWRl!!..,.." CI'IecIlM1IrI JlUL DrIwIIBy: I'\T. -- sciLe:...,.........,. DATIt:~ -- APfPlOlMt......~"J -- 6IJll.OlN6 El.EVATION& PROJect ADDRESS: 6S6S TA5SAJARA ROAD DUBl.IN,CA =- ;;;;;;;;;;;; tomALA:lCI!'IIIl>.~T~!iEAH VMUJnweN-LtA/'6QEI!M 'A5QA.6lII'Tml.-'WMl ~_'1IH-2HiO"Qol """,-,,", QJUY~_lIa-l ---- -=~ ~m.tS."""" 1al.lEl'~."M-2 ICIlXIBRNZTSNffDmtt.PAIllT 1:EUl1"~'6!1o>> ......,- mLEf~'Ma """',""' I:l!.l!lTH:li:IIt;.f11C-2 """"' THE GUARRY LANE SCHOOL PROJECT: PHASE II - THE GllJARR'l" I.ANE SCHooL COHSULTAHT: 4lZCC E....ST AVENUE LIVl':RMCRE, CA 94s'!SC 923 - 44"7 - 4017 921$_447_93&0 FAX AP"INC@ASSCC-PAO.CCM I 1'3 "'0 ':;':0 00 i _I .. ; K. aTt\CLASSROOMS (E)2-sTt111l'Cl1SSl!OOIlflllllOlltll {Pt4ooSE,-ll;(1HSIII,ICIDl '\t'::~'~~~::~:.;.',;',~~t~~','..:'.."~-"~~,; "' ,., ~ l"'fj!' '. ~'i!P!:' ,:.;:~rl: ~':~~~I V~~~~':"-: ',,,.f... '~ "~' . ,,--.' ..' :~.. ~"'O ~\.J'w >;;... ~"~N I '>: J. .. 'f', ~ . '.: .~, ~~~.~~~ I ! '-\" '" ." . ..., " ~ t .1....V:'I'l' ;l"i r- .'.., ... ~ .',":1...... .. 1_" ."L' ',11. _01 .11"'" I ;t,... . J ";::~' I~~J"~' ~~ ."..~ r"1.. ... '..-.. .J ". ~...L~. " ' r '\~, .,,"...i r-'''u ;1 i.!"'''"ii','!. I l' . ,:. r :;-:-..- -:-. .._~:..:.:."'::;- ':~H7'" -- --. ..~i: .1: , m mIl 0 :S z m en ~ ~ ~ (,If (n p il jp (1, II t ' .. l I ! If " J ~ ~ l' E ~ ~ c z Cl o 51 ~ i t ~ i i 1 ~ I 2 I . r i ~ [ I,ll I i it fJ Ii t i ~ ! ~ f ! il !I il = ~ h f II ~~ i It l '" i . ~ E ~ I > ~. ~l ~I?'i Y'I ;:;1.- bZ .. ~:bi~iI oP q, g ". a QUARRY LANE SCHOOL STAGE I" U 'CITY OF DUBLIN, ALAMaOA CDUNTY. CALlFOlUllA CONCEPTUAL \-ANDSCAPE PLAN ~ . !!l s:va Ii [~~ 1; !i1i: U)SJ s ii h ~i III 1 i .. ill g .;> t~ e f. ~~o~ en i p .. I ~ t ~ m ~ I ~ j ~ ~ . ; ~ i il' i J ~ . i . ~ i I ~ l II i f :~ i~ i I f i ,j l ( t g l ! ~ i i I fI '8' '" ~ ! A. S. DUTCHOVER & ASSOCIATES ~ Landscape Arch4,tecture C Planaing 40 California Ave 0 Suite M pleasanlon 0 CA '4566 .~ (9.51 462,3576 0 fax 1925) 46Z.5'" \f1, \. ',.5) "[]]I :co 0'" :.x:> {.~b \53 RESOLUTION NO. A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF DUBLIN AUTHORIZING INITIATION OF APPLICATION FOR REORGANIZATION FOR P A 99-064, ANNEXATION NO. 12 WHEREAS, the applicant, Dr. Sabri Arac of Quarry Lane School has submitted a request for annexing I5.07::!:: acres to the City of Dublin and annexing 15.07::!:: acres to Dublin San Ramon Services District; and WHEREAS, pursuant to the Cortese-Knox Government Reorganization Act of 1985 (the "Act") (Government Code Section 56000 et seq.) an affected city and affected district, as therein defined, may by resolution adopted by its legislative body make a proposal for a "reorganization", as defined in Section 56073 and request initiation of proceedings thereon; WHEREAS, the City of Dublin is an affected city, and the Dublin San Ramon Services District (DSRSD) is an affected district for a reorganization proposal which contains territory proposed to be annexed to said city and to DSRSD. WHEREAS, the City of Dublin is an affected local agency for this reorganIzation proposal. WHEREAS, the reorganization proposal is made pursuant to the Act. The proposal would annex 15.07::!:: acres to the City of Dublin and 15.07::!:: acres to the Dublin San Ramon Services District; and WHEREAS, the territory described in Exhibit B-1 and B-2 is uninhabited territory within the meaning of Government Code Section 56046. WHEREAS, the exterior boundaries of the territory described in Exhibit B-1 and B-2 are shown on Exhibits B-3 and B-4; and WHEREAS, this reorganization is proposed at the request of Dr. Arac, the landowner owning approximately 60% of the land within the territory to be annexed. The reorganization would implement the City of Dublin's Eastern Dublin Specific Plan; and WHEREAS, the 'Plan for Services' for the territory to be annexed is set forth in Exhibit B-5 WHEREAS, the potential environmental effects of development on the Quarry Lane School project site has been previously addressed in the Eastern Dublin Specific Plan EIR (SCH No. 91-103064); and WHEREAS, an Initial Study has been prepared for the Quarry Lane School project, including a Planned Development (PD) Prezoning, Annexation to the City and DSRSD and subsequent development ATTACHMENT 3 >\ ~ tS'?:> entitlements to evaluate site-specific impacts of the project pursuant to CEQA guidelines Section 15168. ' Based on the Initial Study, a Mitigated Negative Declaration and Mitigated Monitoring Program has been prepared for the project with the finding that with the implementation of Mitigation Measures previously adopted for the Eastern Dublin Specific Plan EIR and with site specific Mitigation Measures contained in the Initial Study, the potential site-specific impacts of the project would be reduced to a level of insignificance. The Eastern Dublin Specific Plan EIR and Initial Study adequately describe the impacts of the project, and there have been no substantial changes or new information that would be outside the scope of the Eastern Dublin Specific Plan EIR; and WHEREAS, a total of four letters commenting on the Mitigated Negative Declaration were received during the public comment period; and WHEREAS, all pertinent comments have been responded to and have become part of the Response to Comments attached as Attachment 9 to the Staff Report for P A 99-064; and WHEREAS, the proposed reorganization would be conditional upon agreement of Dublin San Ramon Services District for annexation of the territory to Dublin San Ramon Services District, and WHEREAS, this proposal is consistent with the City of Dublin and DSRSD's sphere of influence, and WHEREAS, if determined appropriate by the LAFCo, the City Council consents to act as the conducting authority for the proposed reorganization, and WHEREAS, a notice of the City Council public hearing to consider an application for reorganization to the Alameda County Local Agency Formation Commission (LAFCo) was distributed to all public service providers and interested individuals; and WHEREAS, the City and the applicant have been cooperatively planning for the provision of services to the project site and have notified the service providers of the proposed annexation; and WHEREAS, the City Council held a properly noticed public hearing on the Quarry Lane School project, Planned Development Prezoning, and Annexation on November 21,2000, and considered all written and oral testimony submitted at or prior to the public hearing; and NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF DUBLIN DOES HEREBY RESOLVE AS FOLLOWS: A. The foregoing recitals are true and correct. B. The City Council of the City of Dublin, as the legislative body for an affected local agency, does hereby adopt the foregoing recitals and makes a proposal for a reorganization, as described herein, pursuant to Section 56800 ofthe Cortese-Knox Act, and does hereby request that proceedings be taken pursuant to said Act. C. This proposal is consistent with the sphere of influence of the City of Dublin. :J ~ 66 IS3 D. The proposed annexation is appropriate because it is contiguous to the existing city limits and would provide a logical extension of development under the City's jurisdiction to provide a private school, residential, and open space land uses for the community. E. This proposal is made subject to the following terms and conditions: 1. The description and the maps in Exhibits B-1, B-2, B-3 and B-4 are preliminary and are subject to more detailed description(s) and map(s) to be prepared and ' submitted to the LAFCo. Adjustments to the descriptions and maps of the territory are to be made as deemed necessary by the County Surveyor. 2. The annexation to the City of Dublin is conditional upon agreement of Dublin San Ramon Services District (DSRSD) for annexation of the territory to DSRSD. The Community Development Director is hereby directed to acquire an agreement from DSRSD to participate in this reorganization. 3. An agreement for payment of service costs satisfactory to the City shall be executed by Dr. Sabri Arac of Quarry Lane School. F. The City Clerk is directed to file a certified copy of this resolution with the Executive Officer of the LAFCo. PASSED, APPROVED, AND ADOPTED this _ day of , 2000, by the following vote: AYES: NOES: ABSENT: ABSTAIN: Mayor ATTEST: City Clerk g:pa99-064 ccreso lafco nov 21.doc J ~ o:t 1S'3 Date: August 16, 2000 Page ~ of2 ExmBIT I . ANNEXATION NO~ 11. TO tHE CITY OF DUBLIN Parcel ~ocated in Alameda County, California ,~ Being all of the following: . 1) Deed to Michael H. Kobold, recorded in Series No. 91-128046, Alameda County Records 2) Deed to Sabri Arac, recorded in Series 99..31 GO lA, Alameda County Records 3) Portion of Tassajara Road (County Road 2568,66 feet wide) Commencing at a railroad spike at the centerline of Tassajara Rpad (County Road No. 2568, 66.00 feet wide) as shown on Tract Map 6925, filed in Book 241 of Maps at Page 39, Alameda Coun~; . thence S.86035'44"E., 33.00 feet to the easterly line of said Tassajara Road; thence along said easterly line S.030'24'16!1W., 801.02 feet.to the northwesterly comer of said par.cel (99-310014) and the Point of Beginning; thence along the northerly line of last said parcel (99-310014), N.82007'31 'IE., 781.19 feet to the general westerly line of Annexation No. 10 (Eastern Dublin), recorded in Series No. 9"5-214838 ~dBook 204 of Maps at Page 75, Alameda: CoUnty Records; . thence continuing along said general westerly line, S.Ol o18'31"W., 783.32feet; thence N.86035'44"W., 457.40 feet; thence S.55001'21"W'., 430.36'feet; thence N,86035'44"W., 66.0'0 feet to the weSterly line of said Tassajara Road~ thence leaving said general westerly li~e and continuing along the westerly line of said Tassajara Road, N.03024116"E.,. 890.63 :feet to the intersection with a line which is pe.rpendieular Vvith the centerline of said Tas~aJaraRoad, said perpendlcularline bears N.86035'44"W. 33.00 feet from the intersection of the southwesterly prolongation of the northerJy line of said parcel (99-310014) with said centerline, thence leaving last said westerly line and continuing along said perpendicular line, ) EX'H:)'B,IT B-J EXHIBIT 1 .ANNEXATION NO. J ~ TO TIm CITY OF DUBLIN Date: August 16, 2000 Page 2of2 S.86035144"E., 33.00 feet to the centerline of Tassajara Road; thence along said prolongation, , N.82007'31 liE; 33.65 feet to the Point of Beginning Containing: 15.07 Acres:l: 'd-l{ crt IS3 ~ ) References to the existing boundaries of the City of Dublin are primary calls. Any bearings or distances referred to herein are n6t,as a result ofa peld survey and should be only considered secondary. ' Boundary line of territory is shown on the map of the Annexation No, ~ to the City of Dublin by City Council Resolution No. on the _ day of ,2000. Said map was certified by the Deputy/County Surve~or on the day of ,2000. This description conforms to the requirements of me Alameda County Local Agency Fomiation Co~ssion.' . Donald J. LaBelle, Director of Public W.orks County of Alameda Ousama.H; Kawar. Goun1y Surveyor . R.C,E. # 18499, Expires 6/10/01 By: Russell Reid Penland, Jr. Deputy County Surveyor ,1. s.. #5726, Expires 12/31/03 T, "'l,fI 'I{'V'!I :' <U\I> .AJI ;,z '5 cs& l ~3 ,Date: August 16, 2000 'Page 1 of2 Ex.HJBIT I ANNEXATION NO.. , ;;:~., TO DUBLIN SAN RAlV[ON"SERVICES DISTRICT Parcel located in Alameda County, California Being all of the following: 1) Deed to Michael H: Kobold, recorded in Series No. 91-128046, Alameda County Records 2) Deed to Sabri Arac, recorded in Series 99-310'014, Alameda County Records '3) Portion of Tassajara Road (County Road 2568,66 feet wide) Commencing at a railroad spike at the centerline of Tassajara Road (County Road No. 2568; 66.00 feet wide) as shown on Tract Map 6925, filed in Book 241 of Maps at Page 39, Alameda County; thence S.86035'44"E., 33.00 feet to the easterly line of said Tassajara Road; ,thence, al ong said easterly line S. 03024' 16,"W., 801..02 feet to the, northwesterly comer of said parcel (99-310014) and the Point of Beginning; thence aleng the northerly line oflast said parcel (99-310014), N.82007'31 liE., 781.19 feet to the generatwesterlyline of Annexation No.1 0 (Eastern Dublin), recorded-in Series No. 95-214838 and Book 204 of Maps at Page 75, AlamedaCotmty' - Records; thence continuing along said general westerly line, S.Ol o18'31"W., 783.32 feet; thence N.86035'44"W., 457.40 feet; thence S.55001'21"W., 430.36 feet; thence N.86035'44"W., 66.00 feet to the westerly line of said TassajaraRoad; , thence leaving'said general westerly line and continuing along the westerly line of said T,assajara Road, , N .03 o24'16'~E" 89.0~~o3 feet to the intersection with a line which is perpendicular with the centerline of said Tassajara Road,'said perpendicular line bears N.86035144I1W. 33.00 feet from the intersection of the southwesterly prolongation of the northerly llne of said parcel (99-310014) with said centerline, thence leaving last said westerly line and continuing along said perpendicular line, / " EXHIBIT B-2 Date: August 16, 2000 'Page 2 of 2 EXHIBIT' I , ANNEx.A:TION N0. , TO DUBLIN SAN RAMON SERVICES DISTRICT S.86035t44'tE., 33.00 feet to the centerline ofTassajar~ Road; thence along said prolongation, N .82007'31 fiE. 33.65 feet to the Point of ;Beginning Containing: 15.07 Acres:l: References to the existing boundaries of the City of Dublin are primary calls: Any bearings or diStances referred to herein are not as a result of a field SUrvey and should be only considered secondary.. , , ~ an \~~ Boundary line',<ofterritory-is shown ,on the map of the Annexation No,_ to the City of Dublin by City Council Resolution No. on the day of ~ 2000. Said mapwas certified by the Deputy/Co@ty Surveyor on the day of ,2000. This description conforms to the requirements ,of the Alameda County Local Agency Formation Commission. Donald J. LaBelle, Director of Public Works County of Alameda Ousama H. KaWaI. COlintv''Surveyor R.C.E. # 18499, Expires 6/30/01 By: Russell Reid Penland, Jr. Deputy' County Surveyor L. s.. #5726, Expires 12/31/03 ";'P.! #""" "I., ~ .,<; "if"';' '" .fi^. . .!;' t.' ~. ) " EXHIBIT A CITY OF DUBLIN MAP DEUNEATlNG BOUNDARY OF TERRITORY ANNEXED TO THE CITY OF DUBUN. CAUFORNIA DUBLIN ___________ ANNEXATION NO. ----- BY RESOLUTION NO. _______ OF mE CITY OF DUBUN cITY COUNCIL ON ______________ ....-- YICINITY MAP NOT, 1'0 SCALE ....... 1- ..-. .-.- ANNEXATION NO. 10 (fAST DIIBUNl SERIES NO. 95-214838 204 II 75A UN 99-177972 APN, 985-0002-(103-6 r_1lfI T,../ 6925 ~11IJ9 . . ~\ -NJ . ~ SCALE: 1"'" 200' II/IS _ agr)//I/S 10 11€ RCWI/ClENIS OF 11€ LCCAt ACENf:Y -- C(MMSS1IH OF Al_ ClllMI'Y. DIJW1J J. lA8!lLC. QllfCIllR OF PIHX IO'lftS _ Ii Jt4~ ClllMT'I Sl.fMl'/lf! R.c.E. 1/1m. /l(t;I$TRA_ ~ 1JJ/JD/D1 1m DATE: - R(I) PfM,ANJ. TIO'IJT'I COJ1iIT'I 5l.filOO'l II/ISt~l~r/1f.~ BY A CCRWlCATE OF t:aII'I.I_1oM) CCR1ftO ctt'Y OF 11€ IIW1I/IARY TIEST1/IP- DflJlwm - AS RCOIlIllJ BY scc_ 5ntJJ OF 11€ GO'rf.1/NIENT ~ /MOl CCRWlCATE OF t:aII'I.I- 10M) IJOtM)NlY TIEST1/IP- IIIIC RCCORfJ€D III SCMS - OF omaAL IlCCOROS OF ....- ClllM1l; CNSCI1HIA 9JSIN s; -. DECUTM:_ LCCAt NICNt:Y -- -- OF Al_ ClllM1l; CAJ._ BY' U/(/- lFRWA. A/lIINS"rAlll€ ANALYST LN'" S1AFF fUT) AT 11€ RCQEST OF 11€ OIY OF _ AT ~ _TES PAST __ ON 1If: _ DAY OF 2Ol1O III 11€ aRC! OF 11€ /X1fJNT'I RCCCIl/1OlOF .<tAIEllA ClllMIY, CN.JI'aIN/A ' PAIJlIQ( o'QJlNEU ClllMT'I RCCCIl/1Ol ANNEXATION NO, 10 (fAST D118UNI SERIES NO, 95-214838 204 II 75A IlQltlj;. ,: .. 1. /HE IE/IIIXJ /JStD 10 CAJ.GlUIf II/IS IIIICA ...s BY TRAlf1!SC '2. I/UtIIDII%S 10 EJ/IS11NG OT'lIKXJll1}AllES IIIIC PRtMARY t:AlL5. ANY IIC_ 10M) 1I1S1ANCES _ _ON 9IIUD /IE CDI/SIFJCIIlD :;t_Y lN.Y. 3. AS A TJIW'- __ 11€ S1/N.I. SEPAl/AMlSIICTrEfN 11€ PORMIS OF /If( tHWllRf( _ 1If: f1(]UM)N/Y OF 1If: I'RlJ'OSl:l) NI1UA_ II€Rr PROlalI 10 AlLortllllL1IPtE TIEST1/IPIlONS IOI1C Pl.ACCO ON...T IIO!LD ol1011lSt IIC A 51NCLl UI/C. THESE LIIICS IIIIC TO IIC fXIII51DE1/fD COIIIOOENT Cl/CCPT II6lC HOlfll IIB6"J5'" 66.00' ANNEX.'TION NO, 2 BOOK 15\ MAPS PAGE 57 ~ I! i ~ BY:_ DCPI1IY COIMT'I R!C(1IIlER RUGGERl-JENSEN-AZAR &: ASSOCIATES ^, CM~ EIlGIMEERS. PWlMBRS. S!l1tYEYORS Yil eMI _ DRIVE. S!l1TE 1156 - PLEASAIITOM. CA. - MOVIIlBSR 2000 JOB NO, 1lIl109l SHEET I OF I SHEET ~ 8 - 3 ~_\nl~f\sm~~ 8ASlS OF BEARING$: tHE IICIJ11NG OF N01"24~6T 1IC1WEEN noo fDUND IIllM.*ENrs AlONG lASSU'RA /lOIID AS SHOI1N ON TRACT _ 692S. fUT) IN BOOK 24/ OF IIAPS. PACE J9,ALAIIfl)A COOI/IY REIXJ//IlS. IS tHE BASIS OF fIE-. EXHIBIT LEGEND ..0& P(JNT or etGINII1NG _ . . ___ .. . _ EXlSTlNG CIlY 8OlJNOARY lINE _ _ _ _ _ _ _ BOUNDARY UNE or ANNEXAnQN PARCEL, UNE 600 400 IDeb - 2QO n. 200 EXHIBIT A DUBUN SAN RAMON SERVICE DISTRICT YAP DEUNEATING BOUNDARY OF TERRITORY ANNEXED TO THE CITY OF DUDUN. CAUroRNIA DUBUN ----------- ANNEXATION NO. ----- BY RESOLUTION NO. _______ OF THE CITY OF nUDUN CITY COUNCIL ON ----------------- 1- -- ...... ... .l:I c.':' - -- YICINITV MAP MIl' 10 SCAli .~~~-' ~~~ BLlN ANNRlCA1TlOR SCALE: t"= 200' /115 _ CQIIOt/IIS. ID lIE I/EQUllEJlENIS(IF lIE t(JCN. A(it1C FrIIJI},1KlN (;QIIIIS5lUt OF AtAll!lIA ctJINTY. ' D!IHAlII .l tA8QU'.' /lfIEC1llR (IF I'lJfllJC IllllllS WSAJI1. II. KAw.I!I, ctJINTY SURlf1l1l RoCC. """ RCQ5JRA1KlN CI/I'IIIES.' CWJOlPl B~ DAlE: ___ _ FCNJ,NIJ, lIEPfITr ctJINTr ~ /ll5L;f;p5~J1P&NIICD BY A CC/l11fI(ATC OF ca.RE1KlN NtI CC/lIftD COPY OF lIE ~ tJCS&/IIP- /IElIIUTCD HC/ICON. AS IItI>>IIED Br $(C- 5120J (IF /IlC GtMJINIIEII.T COlIC. IHQI CC/l11fI(A TC (IF ca.RE1KlN NtlIJ(JII//JNl'f tJCS&/IIP- NI€ I/Ect1RfI(IJ IN S1lI6 - (IF rPraN. I1CIJQIifIS (IF IUIIIJ)A ctJINTY. /:N.f'(11IIIA. _$~CllEQJlWC~ t(JCN. A(it1C FrIIJI},1KlN (;QIIIIS5lUt (IF A/.MICDA ctJINTY. CAUU/NIA BY: /IN _ /cIIC&. AiilNSJRA/l1f' MlA/.YST Utt4 STAFF ' FUtJ AT /IlC RC~T (IF lIE alY (IF flIB)H AT ~ _rrs PAST __ (1# /IlC ____ /MY (IF 2110II IN /IlC omcr (IF lIE ctJINrt RC(#if)CIl (IF IUIIIJ)A ctJINTY. CMftIIHIA PAIJ/fCIC ot(rHU ctJINlY i/ccOIIDC1I UN 99-1179n APM, 9B5-OOO2-OO3-& AIINDl/ITION 110, 10 lEAST DU8U111 SEllIf5 110, 95-2141138 l!O4 M 7~ tIQD. .' 1. /IlC 11/:1/10O USCD ID c.v.CUtA1C /115 NICA IIIS,Br JRAl('IlSE. 2. fIUERC1ICES III CJlIS/WG art fI(IUNIIIJI/C$ NI€ -"<< CA/.tS. - ~ NtlI1ISTN<<%S SIIOfII /ICRCOH 9Il1UD fIC CO/ISIIlfllfO SCCf]IGNIY IJM, I': 3. AS A, IlW'TItC C(IIIfHllllH. /IlC SIlo'U $!'PARA1IllIS flCTJUH lIE I'llIlIllllS (IF /IlC t/NC'IIfJRK NIfMI/) /IlC 8/lIJ//DA/lY OF lIE ~ NIlEXA1KlN - fIIlf/lUD ID AU()It /II1.Tf'lE IJE5t;1lIPIIllIS III fIC IUalI (1# _T IIIlLlO o/lE1lfl5E fIC A S/NfilC /H. T/DC UIl'S NI€ ID fIC it;NstJE/ICJ> CO/HODfIIT CXCCl'T __ NOTff). Paroel M Tr.~ l"tI' ::25 Ni.....n 94-348420 p_..l Paro" Map 1193 84 PM 40 APII, 9115-0002-009 ,gg~'T JJ.0f)' MAC IH1l1014 APNt 88H002000H1 f6.0f)' _35'" _Of)' . ~ ~~ -r ~ ..,J i ~- . lIEPfITY ctJINTY 11iti:I<<R .;,.0 RUGGERHENSEII-#oZAR It ASSOCIATES CIVI~ IlIImllBBll8. PUlWIIERS. su)lVlYOllS 1101 0lIEJIS DJllV& sum 160 ~ pL&\BAllTOll. CA. 84088 IIOVSIlBIUl - .lOll NO. 8&1081 SIIBIT I OF I SHEJlT ->4- "'-,..,..,,~'" lEGENO BASIS Of' SEARlNGS: P.o.& POINT (IF BEGINNING H SCARING (IF ~~6" SC1V/fCN IllO _ . . _ . . _ ElClSllMG alY BOONDARY UNE r ~.,:tr::' ~ ':" _ _ _ _ _ _ _ BOUNDARY UIIE (IF MItIElCA110N f1()OK 211 (IF IIAPS. PACe ~ PAACEL LINE Cf)tJNT'll/ECOIIf)$. IS lIE BASIS OF <<~ 600 200 400 ~ ~ 1 IbOb . 200 JL o CI i !I \1 11 11 \1 \1 Ii I if9 ~ lJ?I PLAN FOR MUNICIPAL SERVICES QUARRY LANE SCHOOL REORGANIZATION SERVICES CURRENT AGENCY PROPOSED AGENCY Police Alameda County Sheriff City of Dublin Police Department Fire Alameda County Fire Department City of Dublin Division - Alameda County Fire Department Water Well Water Sewer Septic Garbage Alameda County Street Lighting Alameda County Road Maintenance Alameda County Flood Control Zone 7 Dublin San Ramon Services District Dublin San Ramon Services District City of Dublin City of Dublin Public Works Dept. City of Dublin Public Works Dept. Zone 7, City of Dublin Public Works Dept. Parks and Recreation East Bay Regional Parks District East Bay Regional Parks District, City of Dublin Library Services Alameda County Alameda County Electricity P.G. & E. P.G. & E. Transit LAVTA-Wheels BART LAVTA-Wheels BART EXHIBIT B-5 3(, Ot \~3 PLAN FOR MUNICIPAL SERVICES QUARRY LANE SCHOOL REORGANIZATION INTRODUCTION Since the incorporation of the City of Dublin in 1982, development in Eastern Dublin was envisioned as someday being a part of the City. It is identified as the Eastern Extended Planning Area in Dublin's original General Plan (1985). In 1994, the City adopted the Eastern Dublin Specific Plan, for the purpose of directing long-term land use, circulation, infrastructure and environmental protection for 3,302 acres of land within Eastern Dublin. At full build-out, the planning area would allow a range of residential, commercial office, employment and open space uses. At the time the Eastern Dublin Specific Plan was adopted approximately 20% of the land area was located within the City of Dublin. In 1995, Alameda County Local Agency Formation Commission (LAFCo) approved the annexation of 1,500 acres ofland within the Specific Plan to the City of Dublin and Dublin San Ramon Services District (DSRSD). To date, approximately 72% of the Specific Plan area is currently within the City of Dublin and approximately 63% of the plan area has been developed, is currently under construction or has been approved for future development or permanent open space. The proposed reorganization involves approximately 15.07 acres ofland located on the east side of Tassajara Road, approximately 2 miles north of Interstate 580 within unincorporated Alameda County. The annexation area is within the City of Dublin and Dublin San Ramon Service District's spheres of influence and within the Eastern Dublin Specific Plan area. The reorganization would include annexation of the site to the City of Dublin and annexation to Dublin San Ramon Services District. The annexation area contains a portion of Tassajara Road and two properties, the Quarry Lane School and the Kobold property located at 6363 and 6237 Tassajara Road. Description of Proposed Annexation: The annexation area is currently developed and consists of three parcels of record and a portion of Tassajara Road. Existing uses include Phase 1 ofthe Quarry Lane School which opened for the 2000/01 school year in mid-September. Phase 1 contains the existing Villa Tassajara building that has been incorporated into the school as the administrative building and 13 classrooms in a new 15, 600 structure to accommodate 200 pre-school through elementary grade students. A single-family residence, landscape contracting business and plant nursery exists on the Kobold property. A tributary of Tassajara Creek forms the southern boundary ofthe Kobold property. Phase 1 of Quarry Lane School and the Kobold property is currently served by private well and septic facilities. The proposed annexation has been requested by Quarry Lane School, which intends to construct Phase 2 of the school to include an additional 66, 685 square feet of classrooms, administrative space and a gymnasium to accommodate additional 750 middle through high school students and recreational play fields. At full build-out, the school would house 950 students and 55 faculty and staff. Construction of Phase 2 would increase the need for public services and facilities beyond that available from existing private facilities. Therefore annexation to the City of Dublin and Dublin San Ramon Services 2 ':j ( . ~ I s~ District has been requested to obtain the necessary level and range of urban services to facilitate future expansion of the school. Availability of Services: As shown in this Plan for Services the agencies responsible for providing services to the annexation area are know at this time. DSRSD would provide water, recycled water and wastewater services to the annexation area. Infrastructure would need to be extended from Tassajara Road (south of existing city limits) to service the project area. Capacity to provide all services to the annexation area either currently exists, is scheduled through contract to be provided in the future, or will be available as soon as funding from the developer is provided. Annexation Justification: The following reasons justify the size and configuration of this proposed annexation. Firstly, annexing just the Quarry Lane School property would result in the creation of an island or unincorporated corridor. Therefore, the Kobold property is proposed to be included in the annexation, since it is the intervening property between the city limits and the Quarry Lane School site. Secondly, the proposed annexation configuration follows existing property lines, and is a logical extension of the existing Dublin City limits. Thirdly, the annexation includes a portion of Tassajara Road providing proper access to the annexation area. Fourth, the proposed annexation to DSRSD is consistent with the Dublin General Plan and Eastern Dublin Specific Plan. Fifth, on completion, the Quarry Lane School would provide private educational opportunities for students living within Eastern Dublin. SERVICES The Eastern Dublin Specific Plan and program EIR (1994) were prepared with the knowledge that it would be used for the annexation to the City of Dublin and Dublin San Ramon Services District, and as a basis for the Plan for Municipal Services for the area. Special care was taken during the preparation of these documents to insure that the analysis of services provided therein would be thorough and thereby satisfy the requirements of the Alameda County Local Agency Formation Commission (LAFCo) for annexation actions. Both documents were referred to, reviewed by and commented upon by LAFCo staff and those comments were incorporated into final drafts of the Plan and EIR. DSRSD reviewed the documents to ensure that they would support the future discretionary action of the District to annex Eastern Dublin properties. The District determined that the draft EIR presented a through analysis ofthe impacts of the project on water and wastewater services keeping in mind the District's master plan models for water, wastewater and recycled water would need to be after adoption of the Specific Plan. This task is required by mitigation measures of the EIR and accomplished through completion of the report entitled "Eastern Dublin Facilities Plan Final Report" (G.S. Dodson and Associates, December, 1993) and more recently by the "Urban Water Management Plan", DSRSD, May, 2000 and the "Plan for Services for the Quarry Lane School annexation", DSRSD, October 2000. An Initial Study and Mitigated Negative Declaration was prepared for the proposed annexation to evaluate the site-specific impacts of the project to a greater level of detail than in the program EIR. The Eastern Dublin Specific Plan and program EIR in 3 3'2. ~ IS.?; conjunction with the Mitigated Negative Declaration represent, in effect, a "Plan for Services" for project site. WATER DSRSD has been actively planning to provide water service to Eastern Dublin for many years. The Eastern Dublin Specific Plan was prepared in conjunction with DSRSD and includes policies and programs for water supply, wastewater and storm drainage for Eastern Dublin. To update information contained in the Specific Plan and provide a basis for future infrastructure planning efforts throughout the Eastern Dublin area, DSRSD prepared the 'Eastern Dublin Facilities Plan, Final Report (G.S. Dodson and Associates, December, 1993). DSRSD has prepared an "Urban Water Management Plan" (UWMA), dated 1996 and updated May, 2000 to ensure that adequate water would be available to supply existing and future demand to the Dublin area, including the annexation area. More specifically, DSRSD has prepared a 'Plan for Providing Services, Potable Water, Wastewater Collection, Treatment and Disposal for the Quarry Lane SchoollKobold Annexation', dated October 2000 (refer to Attachment A). Infrastructure will be extended from Tassajara Road to the annexation area by Quarry Lane School and DSRSD will provide water services to the annexation area. WASTEWATER Wastewater services for the annexation area will be provided by DSRSD. The District has been actively planning to provide wastewater collection, treatment and disposal services to the east Dublin area since 1993. DSRSD has prepared a plan for providing wastewater services for the annexation area and is attached as Attachment A ('Plan for Providing Services, Potable Water, Wastewater Collection, Treatment and Disposal for the Quarry Lane SchoollKobold Annexation' , DSRSD, dated October 2000) STORM DRAINAGE Zone 7 of the Alameda County Flood Control and Water Conservation District is the responsible agency for major drainage and flood control channels within Eastern Dublin, including the tributary of Tassajara Creek which forms part ofthe southern boundary of the annexation area. Upon annexation, the City of Dublin will be responsible for local storm drains which connect to this Zone 7 channel. POLICE PROTECTION Currently police protection for the annexation area is provided by the Alameda County Sheriff s Department and the California Highway Patrol. Once the area is annexed, police responsibilities will be provided by the Dublin Police Department. The Dublin Police Department is a division of the Alameda County Sheriff s Department and is funded by the City through a contractual agreement with the County. Dublin owns the department's facilities and equipment but the personnel are employed by the County Sheriffs Department. The City's police department is a full service operation except for dispatch which is provided through the County Sheriff s dispatch office in San Leandro. The Dublin Police Department currently has 40 sworn officers and 6.5 civilian staff and operates out of a central facility in the Dublin Civic Center. 4 =)3 ~ \53 As development in Eastern Dublin is completed and occupied, additional officers and services are planned to serve the east Dublin residents. According to the City's police department, the level of existing and planned officers and services are adequate to serve the proposed annexation area. When Phase 2 of Quarry Lane School is operational, an additional Crime Prevention Officer providing drug awareness and other student classes may be required. If necessary this position will be funded by the City. FIRE PROTECTION At the present time, fire protection services to the annexation area are provided by the Alameda County Fire Department and the California Division of Forestry. Currently the City's fire protection services are provided by the Dublin Division of Alameda County Fire Department (ACFD) and funded by the City through a contractual agreement with the County. With annexation, the Dublin Division of Alameda County Fire Department would become responsible for fire services. Under the terms of the agreement, all Alameda County fire protection personnel and services would be available to respond in the event of an emergency within the City limits. There are two fire stations within the City of Dublin, fire station sixteen located at Donohue Drive and fire station fifteen located within the Santa Rita Jail complex north of Gleason Drive. ACFD operates under a standard of a 1.5 mile response zone for each station in order to maintain a response time within 5 minutes. Future :development within Eastern Dublin requires the construction'oftwo new stations in order to maintain these standard response times. The new stations would be located at Madigan Road, north of Gleason Drive and east of Fallon Road and would be operational by 2003 and 2004, respectively. According to ACFD, sufficient fire protection personnel, facilities and equipment currently exist to serve the proposed annexation area. SOLID WASTE Coordination of solid waste management activities in Alameda County is a joint responsibility of the County's Waste Management Authority and local jurisdictions. The City of Dublin presently contracts with a private company for residential and commercial garbage collection within the city limits. When annexation takes place, this private company will also provide waste collection services to the area. PARKS AND RECREATION The annexation area is currently ' under the jurisdiction of the East Bay Regional Park District (EBRPD). The annexation area which totals approximately 13 .6 acres (Quarry Lane School and Kobold property) lies within the Eastern Dublin Specific Plan area. The annexation site is under private ownership and no park facilities exist in the area. Once annexation takes place EBRPD will continue to provide regional park services to the area. Provision of local and community parks, park maintenance and organization of recreational services will be the responsibility of the City of Dublin. In 1994, the City of Dublin adopted a parks and recreation master plan to provide park facilities for future residents of Eastern Dublin, including the proposed annexation area. To date, the first phase of a 50-acre Community Park (Emerald Glen Park) was recently opened to the 5 ., II "'';'"'\. ;;..,'" ~, \$3 public. UTILITIES Electricity is currently supplied to the annexation area by P. G. & E. Maintenance of street lighting will be by the City of Dublin. Telephone service is currently provided to the annexation area by Pacific Bell. Both P. G. & E and Pacific Bell are able to expand service to accommodate any future development of the annexation area. STREET MAINTENANCE Street maintenance and sweeping services will be provided to the annexation area by the City of Dublin. These services are currently the responsibility of the County of Alameda. LIBRARY The annexation area is served by Alameda County Library system and will continue to be after annexation. While this service will initially be provided by the existing branch library located on Amador Valley Boulevard. The City of Dublin plans to begin construction of a new 37,000 square foot library to be located at the Civic Center in 2001. The Library is expected to open in January 2003. TRANSIT There are currently no transit lines which directly serve the annexation area. The Livermore / Amador Transit Authority (LA VTA) operates Wheels buses that provide local bus services throughout Dublin, including service to the Dublin/Pleasanton BART Station. The East Dublin BART train system provides convenient service to the City of Dublin and the Station is located approximately 3 miles southwest of the annexation area. FINANCING Any future development of the annexation area, including Phase 2 of the Quarry Lane School and residences on the Kobold property will require the extension of public improvements from Tassajara Road (south of the city limits) to the annexation area. The financing of capital improvements, including roadway improvements, water, sewer, drainage and flood control will be funded as part of the private project costs. Payment of these costs will be the responsibility ofthe landowner / developer. It is estimated that the cost of providing public services to the Eastern Dublin Area (including the annexation area) will exceed revenues over the next several years. This projection is consistent with the Eastern Dublin Specific Plan's analysis which shows costs exceeding revenues in the short-term. However, if new development occurs within Eastern Dublin as anticipated, it is expected to generate revenues to the City which will exceed costs over the long-term as predicted in the Specific Plan. The City will require the proponent of the Quarry Lane School to enter into an agreement to pay, the school's proportionate share of any public services deficit and certain major road improvements consistent with the goals and policies of the Specific Plan. 6 3~ CSt \53 PLAN FOR PROVIDING SERVICES POTABLE WATER WASTEWATER COLLECTION, TREATMENT AND DISPOSAL Quarry LanelKobold Annexation Annexation 00-1 to Dublin San Ramon Services District October 2000 Dublin San Ramon Services District ("DSRSD" or "District") will provide potable water and wastewater collection, treatment and disposal services to the annexation area. As a condition of annexation to the District, it will require each owner in the annexing territory to participate in providing all detailed phasing plans and design of on site water and wastewater facilities. Off- site water facilities will be designed and constructed by the District, in conformance with its Major Infrastructure Policy (Exhibit 1 attached). Offsite sewer facilities will be designed and constructed by the developer in conformance with District standards. It is the District's understanding that the Quarry Lane School will make thesewer extension at its expense, as they will need the extension to proceed with Phase 2 of the school project upon annexation. Preliminary data on water and wastewater facilities needed to serve the annexation territory are provided herein and in attachments hereto. Since no development approvals are sought by virtue of this annexation application. no final approval of water and wastewater facilities or equivalent connection estimates are granted bv virtue of this report. The final approval of the water and/or wastewater facilities and permits needed to ultimately serve the annexation territory may only be granted by the District. WATER Potable Water No water service is currently provided to the annexation territory by DSRSD. The residence and Phase 1 Quarry Lane School in the annexing area currently use well water. Upon annexation, and construction of Phase 2 of Quarry Lane School, the entire Quarry Lane site, and all new development in the annexing territory, will receive water service from DSRSD. In accordance with the District Code, existing homes can remain on wells unless a parcel is proposed for subdivision. All subdivision development shall be provided with public (DSRSD) water as provided by County Health regulations. The District has determined that the annexing territory will require a projected maximum of 14.5 acre feet of potable water per year (assuming maximum General Plan build-out of the Kobold parcel). The District has determined that its water supplies are adequate to meet this demand. The following discussion supports that conclusion. ATTACHMENT A TO EXHIBIT B-5 ~ ~ IS~~ DSRSD currently obtains all of its water supplies under the terms of an Agreement with Zone 7 of the Alameda County Flood Control and Water Conservation District ("Zone 7" or "Zone"), which wholesales treated local surface water, groundwater and imported water to various Livermore/Amador Valley retail water agencies. DSRSD renegotiated its Water Supply Contract with Zone 7 in 1994. The renewed contract will be for a term of 30 years and is renewable upon expiration. It obligates Zone 7 to supply all the water requested by DSRSD for use within the Zone 7 boundaries subject to its availability. It further provides that any area duly annexed to the District may be served with water obtained from Zone 7. The Agreement also provides DSRSD with the ability to seek and secure alternative sources of supply through mechanisms such as water transfers, to construct wells and pump from the groundwater basin which Zone 7 manages and to recycle water within its service area. The Water Supply Contract requires the District to submit to Zone 7 an annual water request profile, requesting supply requirements for the ensuing calendar year, and projecting requirements for the five (5) year period following the year in which the request is made. The 2001 supply year request made by DSRSD to Zone 7, includes adequate water supplies to accommodate the Quarry LaneIKobold annexation. The District has completed an Update to its Urban Water Management Plan (UWMP). The .UWMP was approved by the Board of Directors on May 16,2000. The UWMP includes demandprojections for all expected future development demands, including the annexing territory. The Zone 7 Board of Directors adopted the Year 2000 Update to its Urban Water Management Plan on October 18,2000. The Plan states that Zone 7 will manage and augment as necessary its supply sources so as to provide its retailers with 100% of the water they may request, even in critical drought years. It further states that Zone 7 will manage its local groundwater supplies to provide 75% of total system demands, even in critical drought years, so as to minimize reliance on State Water Project sources which could be curtailed during a catastrophic emergency or extended drought. Zone 7 has increased its wholesale water connection charge to provide the funding for the development of the necessary additional water resources and the construction of the needed infrastructure to meet its commitments made by its retail water ,supply agreements. The District has recently completed a Water Master Plan Update for its entire water service area, as well as its Sphere ofInfluence. The Master Plan shows a 14" supply main, which will be required in Tassajara Road to supply water to the annexing territory. The supply main is illustrated on Exhibit 2. Recycled Water Ordinance 280 of the DSRSD Board of Directors sets out policies and priorities for the required provision of recycled water. It provides that within the potable water service area of the District, all appropriate irrigation demands must connect to recycled water facilities as they may reasonably be available. Recycled water is a required addition to the potable source for those specified acceptable irrigation uses. ?:>l 6 153 Although the landscape irrigation represented by the school would be an acceptable recycled water use pursuant to Ordinance 280, it has been determined that the existing potable water well currently utilized for Phase 1 of the Quarry Lane School is adequate to be used for irrigation water when Phase 2 is constructed. Therefore, although the project's irrigation demands will not be required to connect to the District's recycled water system, neither will they become a demand upon the District's potable supplies. It is not expected that any recycled water will be used by . the Kobold property, as any development on that property would be low or medium density residential. WASTEWATER Wastewater services for the annexation territory will be provided by DSRSD. The District has been actively planning to provide wastewater collection, treatment and disposal services to the east Dublin service area since 1993. Wastewater flows for the annexation territory are estimated as follows: Quarry Lane School: . Approximately 4 gallons per day per student/staff . 1,005 Staff and students . 4,020 gallons per day (gpd) average flow (4 gal X 1005) . Approximately 18 equivalent single family connections (4,020 ~pd / 220 gal per ,equivalent connection) Kobold Property: . One existing single family dwelling . Potential for maximum of25 homes (terrain dictates highly unlikely more than 8 additional homes) . At 220 gpd per home, wastewater flow of 5,500 gpd Total maximum flow: 9,520 gpd Equivalent connections: 43 Wastewater Collection All development within the annexation territory will be connected to the DSRSD collection system. The Phase 1 of the Quarry Lane School currently uses a septic tank and leach field system as permitted by Alameda County and approved by the Zone 7 Flood Control and Water Conservation District. In accordance with the District Code, existing homes (the Kobold residence) will be required to connect to DSRSD mains when those mains are within 200 feet of the property line, or when any subdivision of land is approved, which conforms with the County Health Department regulations. Similarly, the Phase 1 and 2 Quarry Lane projects will be required to connect to the District's collection system upon .annexation and extension of jco o~ ! S~3 o collection system lines by Quarry Lane School. The District has completed an update to its Wastewater Collection System Master Plan, which calls for a sewer line in Tassajara Road adjacent to the annexing area to serve development in the area. The sewer extension will flow from north to south toward the existing Dublin Ranch development area, within the current District boundary. The sewer line is not designated as District Major Infrastructure, therefore it mu,st be constructed by development interests at their cost; the Quarry Lane School will be required to complete the sewer extension as a condition of the Phase 2 school construction. Currently, a 15" diameter sewer has been extended to within 120 feet of the annexing area. Extension of that 15" sewer is feasible to provide wastewater services to the annexing territory. Exhibit 3 (Figure 3-1 ofthe DSRSD Wastewater Collection System Master Plan Update) shows the sewer extension required to provide service to the annexing territory. Wastewater Treatment Treatment for sewage generated by development in the annexation territory will be provided by the DSRSD Wastewater Treatment Plant located south of Stoneridge Drive in Pleasanton. The plant is owned and operated by DSRSD and presently serves the cities of Dublin and Pleasanton and the southern portion of San Ramon. It currently has an average dry weather flow capacity of 11.5 mgd. Expansion of the plant is currently under construction and is scheduled for completion by the end of2003. The expansion will result in an average dry weather flow capacity of 17.0 mgd. Planning and development projections indicate that the current wastewater treatment capacity will be adequate beyond the planned completion of the expansion project. Wastewater Disposal Currently, disposal of all treated wastewater from the DSRSD plant is through export to San Francisco Bay via the Livermore Amador Valley Wastewater Management Authority (LA VWMA) and East Bay Dischargers Authority (EBDA) systems. DSRSD's current allotted capacity in the LA VWMA and EBDA systems is not sufficient for all planned and approved development within DSRSD's sphere of influence, however, DSRSD has obtained a lease of disposal capacity from the City of Livermore, and retains an option for an additional lease from the City of Pleasant on. There are currently a total of approximately 780 equivalent dwelling units of capacity remaining from the Livermore portion of this leased capacity. These capacity leases allow DSRSD to accept additional connections, while design and construction of major disposal capacity improvements is completed. The disposal capacity of DSRSD is therefore adequate to accommodate the annexing territory. DSRSD has approved and constructed the Clean Water Revival (CWR) wastewater disposal project, but has not placed the project into operation. DSRSD could provide up to 1.0 mgd of wastewater disposal capacity via this project (after the 5th year of full operation, capacity could be increased to a maximum of2.5 mgd upon approval of the Regional Board), to accommodate approved growth in DSRSD, including the proposed annexation. However, the District will not need to implement this disposal option unless the currently planned expansion of LA VWMA :)'1 06 IS.3 facilities is not constructed in accordance with its current schedule, as explained below. An expansion of the LA VWMA disposal system has been approved by its member agencies (Pleasanton and DSRSD; Livermore currently will participate only in repair of the LA VWMA facilities, and may participate in expansion in the future). Design ofthe expansion is complete, and construction of the repair/expansion awaits the member agencies' approval ofthe financing plan (expected by December, 2000). The LA VWMA expansion will allow the full utilization of wastewater treatment capacity of the current plant expansion to 17.0 mgd. H:\ENGDEPT\Dept Items\PLANNER\quarryln\PLANSVCS lO-25-00.DOC % ~ L~3 RESOLUTION NO. 55-97 RESOLUTION OF THE BOARD OF DIRECTORS OF THE DUBLIN SAN RAMON SERVICES DISTRICT ESTABLISHING POLICY REGARDING PLANNING, DESIGN, AND CONSTRUCTION OF INFRASTRUCTURE FOR UTILITY SERVICES; AND RESCINDING RESOLUTION NO. 29-94 WHEREAS, the mission of the Dublin San Ramon Services District (District) is to provide its customers with reasonably priced, high quality water and wastewater services; and WHEREAS, in support of this mission, the District is committed to planning, designing, constructing, and operating its facilities in an efficient, saf~, and effective manner, sensitive to community needs and protection of the environment; and WHEREAS, to meet these objectives, it is imperative that the infrastructure installed by the District meet the construction and service standards of the District; and WHEREAS, it is and will continue to be the District's policy to accept the dedication of "on- site infrastructure" constructed by others in accordance with the District's standards; and WHEREAS, the District anticipates receiving requests for major extensions of utility service into approved planning areas; and WHEREAS, the extension of utility service into these new areas will require infrastructure beyond the scale that is normally dedicated to the District within a given subdivision; and WHEREAS, this Board has adopted Resolution No. 38-92 (Policy Regarding Extension of Utility Services) for the purpose of advanced planning for utility services; and WHEREAS, after a commitment to provide service is made under Resolution No. 38-92, the responsibilities for implementing utility infrastructure mUst be determined; and WHEREAS, this Board has adopted Resolution No. 29-94 to establish responsibilities for implementing utility infrastructure; and WHEREAS, this Board intends to rescind Resolution No. 29-94 and to restate and revise the policy contained therein,. NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF DIRECTORS OF THE DUBLIN SAN RAMON SERVICE DISTRICT, A PUBLIC AGENCY IN THE COUNTIES OF ALAMEDA AND CONTRA COSTA, CALIFORNIA, that 1. It is the policy of the District to retain direct responsibility for the planning, design and construction of all major infrastructure directly through the District's organization. For the purposes of this policy: EXHIBIT 1 y l ~ t '53 Res. No. 55-97 (a) , In the water system, major infrastructure includes, but is not limited to, all turnouts, pwnp stations, reservoirs, chemical addition and other similar facilities as well as the primary interconnecting water main loop between facilities and all water mains with a diameter equal to or greater than 24 inches. (b) In the wastewater system, major infrastructure includes, but is not limited to, all wastewater pwnping, treatment, storage and disposal facilities, sludge and other residuals processing and disposal facilities and other similar facilities as well as aii pipes in the collection system witht;; diameter equal to or greater than 24 inches. (c) In the recycled water system, major infrastructure includes but is not limited to all treatment, pumping, storage, and other similar facilities as well as the primary interconnecting recycled water main between facilities and all transmission lines with a diameter equal to or greater than 24 inches in diameter. This policy applies to major infrastructure regardless of its location. However, the design - and construction responsibilities for such major infrastructure within a development project may, at the sole discretion of the District, be revised. The terms of such revisions shall be included in a written agreement between the District and the Developer (as used in this Resolution, "Developer" means the owner of property being developed, or his or her agent acting as the developer). 2. It is the policy of the District for the Developer to retain direct responsibility for the planning, design and construction of all minor infrastructure through compliance with the requirements of the District Code, District Specifications and Drawings and standard District practices, and such other pertinent requirements specified by the District; and for the Developer to dedicate minor infrastructure to the District upon acceptance by the District. 3. It is the policy of the District to require dedication of sufficient and necessary real property interests to the District for all infrastructure. For all items of major infrastructure, excluding pipelines, such real property interest generally shall be fee title. For pipeline major infrastructure and non-major infrastructure, such real property interests may be any easement interest (unless the District has acquired or has use of a sufficient property right, such as use of a public right of way) including the District's perpetual right to operate, maintain, repair and replace the facilities. 2 u-:; ,; I)) \ "-"f-.. ' FIGURE ES-2 DUBLIN SAN RAMON SERVICES DISTRICT September 2000 POTABlE WATER D1STRIlUTION SYSTEM IMPROVEMENTS SUMMARY , ~ r . ,.... >'600 l'" SCAlE If Fm LEGEND ,ill . STORACE TAN:: .. PUMP STA TlON ~ PRESSUlE REDl.IC:NC/SUST AJ\N; VALVE 11IIIII TURNOUT FACLlTES - . - DISTRICTS WATER SPH:RE OF INFLUENCE - PROJECTED DISTRICT INSTAUED Pfat - DEVELOPER DEDICATED PIPELl'JES EXHIBIT 1. CON~UITTNG F.NGtNF:F.RS W EST 4713 First Street. Suite 100 ...~ Pleasanton. California 94566 Phone: (925) 426-2580 Y 0 S T Fex: (925) 426-2585 .r.. J.!-~-' _ .--- .~: r~' CAMP ~m"" " ' ." ~ "--.. ----?"-<:, -_. ~ ~ ...- " ..,.-, . 'l:I.:.'-----~ .... ,.~1tll.ollOlCT >.-......, c~ %OHE:7t.o. ----=-. .,......-- fIl;IIIZOiIl:7 ,!fIJUI1lCDl;'\' ~, (EASmlN MUll ToO. ...""""" nOD ww. r' ! ! i i ....-. - I I ffi! __ ", ,0 TASSAJARA VALLEY ) 1 DOUGHERTY . VALLEY ~ J_ } \ \ GALE RANCH .' '\ '\ WESTERN DUBLIN - --.... / - ZOHt7'SCllOSSV.w..tTPlI - i ~ ~ l'; i ~ . ~ b t "i t i , t , , j ~ " t ~ g ~ o ~ -- V5, L\1. ~ Res. No. 55-97 4. It is the policy of the District to fund planning, design and construction costs of major infrastructure from those who receive benefit from the infrastructure through connection fees or other special financing arrangements. 5. It is the policy of the District that the planning, design and construction of all non- major infrastructure is the responsibility of the Developer and shall be done at the Developer's expense. For minor infrastructure installed outside of the Developer's project, the design and construction responsibilities may b~ revised, at the sole discretion of the District. The terms of such revision shall be included in a written agreement between the Disti"k~ Mdthe Developer. Such planning, design and construction requirements shall be in accordance with the requirements of the District Code, the District's Standard Procedures, Specifications and Drawings and standard District practices, and such other pertinent requirements specified by the District. 6. It is the policy of the District to detennine the size and location of all major and non- major infrastructure and to revise the requirements of the District Code, the District's Specifications - and Drawings and standard District practices, and such other pertinent requirements specified by the District, from tine to time, at the sole desertion of the District. 7. Resolution 29-94 entitled, "Resolution of the Board of Directors of the Dublin San Ramon Services District Regarding Its Policy for the Planning, Design, and Construction of Major Infrastructure for Utility Services," is hereby rescinded. Adopted by the Board of Directors of the Dublin San Ramon Services District at a regular meeting held on the 16th day of September, 1997, and p~sed by the following vote: AYES: 4 - Directors G. T. (Tom) McCormick, Georgean Vonheeder Leopold. James B. Kohnen, Jeffrey G. Hansen NOES: 0 ABSENT: 1 Attest: d7a'Y)C~a~ Nancy Gamble, lstrict Secretary 3 ------ c~ 66 o 1500 3000 . FEET q 1 \ . '-' -, -;-~-:,. I ~~_ " SANTA - i ." ,--- LEGEND: - SEWERS IN HYDRA NODEI ~X~iBi-'r 3 - SEWERS WITH FLOW lOADED TO t,lODEL lI..a\~U",~n DIAMETERS SHOWN FOR SEWERS >10' r DUBLIN SAN RAMON ~ERVICES DISTRICT TRUNK SEWER SYSTEM MODEL FIGURE 3- ." J~~~- ,/ ,/ '\..... ~ -_ 1- MONTGOMERY WATSON r f' \?~ ~ 8 ;:; ~ " ~ <1i z ~ g " ~ '" ~ '" <<ID . L.{r; 't 15, RESOLUTION NO. A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF DUBLIN RELATING TO EXCHANGE OF PROPERTY TAX REVENUE FOR P A 99-064 QUARRY LANE SCHOOL REORGANIZATION WHEREAS, Section 99 of the Revenue and Taxation code provides, among other things, that no local agency jurisdictional change can be completed without the agencies affected by such change first having agreed upon an exchange of property tax revenue between and among the affected agencies; and WHEREAS, there is presently pending an application for a reorganization by the City of Dublin entitled P A 99-064 Quarry Lane School Reorganization to annex territory to the City of Dublin and to the Dublin San Ramon Services District; and WHEREAS, the territory subject to the P A 99-062 Quarry Lane School Reorganization application is within "Eastern Dublin" as that area is defined in the ''Agreement Between County of Alameda, Surplus Property Authority and City of Dublin Regarding Transfer of Property Tax Revenues Upon Annexation, Provision of Services and Other Matters" ("Agreement"), dated May 3, 1993, and WHEREAS, paragraph 2 of the Agreement sets forth the agreement of the City Council of the City of Dublin and the Board of Supervisors of the County of Alameda on the method for distributing property tax revenue for annexations including the P A 99-064 Quarry Lane School Reorganization; and WHEREAS, paragraph 14 (e) of the Agreement provides that there will be no adjustment to the appropriations limit of either the City of Dublin or Alameda County by virtue of the Agreement. NOW, THEREFORE BE IT RESOLVED as follows: Section 1. That for the P A 99-064 Quarry Lane School Reorganization, the Auditor-Controller of the County of Alameda shall be directed to cause an exchange of property tax revenues pursuant to the provisions. of paragraph 2 of the Agreement, to wit: the City of Dublin shall receive 25.4% ofthe full one percent ad valorem property tax and/or possessory interest tax from the property annexed to the City of Dublin as part of the P A 99-064 Quarry Lane School Reorganization: PASSED, APPROVED, AND ADOPTED this 21st day of November, 2000 AYES: NOES: ABSENT: ABSTAIN: MAYOR ATTEST: CITY CLERK ATTACHMENT 4 9 :\pa99-064\ccrestax,doc ,y.-~ ~ lSj RESOLUTION NO. A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF DUBLIN APPROVING THE ANNEXATION AGREEMENT BETWEEN DR. SABRI ARAC AND THE CITY OF DUBLIN FOR P A 99-064 QUARRY LANE SCHOOL REORGANIZATION An agreement between Dr. Sanri Arac and the City of Dublin, entitled "Annexation Agreement Between City of Dublin and Dr. Sabri Arac for the Quarry Lane School Project", a copy of which is attached as Exhibit C. The City Manager has recommended the approval of said agreement. The applicant, Dr. Sabri Arac has signed said agreement. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Dublin that: Said agreement is hereby approved and execution thereof by the Mayor of Dublin is hereby authorized. PASSED, APPROVED, AND ADOPTED this 21st day of November, 2000. AYES: NOES: ABSENT: ABSTAIN: MAYOR ATTEST: CITY CLERK ATTACHMENT 5 g:\pa99-064\ccresagreementdoc '11 ~ lS' City of Dublin When Recorded Mail To: City Clerk City of Dublin 100 Civic Plaza Dublin, CA 94568 Space above this line for Recorder's Use ANNEXATION AGREEMENT BETWEEN CITY OF DUBLIN AND DR. SABRI ARAC FOR THE QUARRY LANE SCHOOL PROJECT THIS AGREEMENTdated for identification this 21st day of November, 2000, is entered into by and among the City of Dublin, a municipal corporation, (lithe City") and Dr. Sabri Arac ("Developer"). Recitals 1. In 1993, the City Council of the City adopted the Eastern Dublin General Plan Amendment and Eastern Dublin Specific Plan ("the Specific Plan").The Specific Plan provides a planning framework for the future growth and development of 'approximately 3,300 acres (collectively, "the Specific Plan Area"). 2. The General Plan and the Specific Plan include goals ~nd policies to prevent development within the Eastern Extended Planning Area and the Specific Plan Area (hereinafter collectively "Eastern Dublin") from drawing upon and diluting the fiscal base of the remainder of the City. 3. The Developer owns certain property (lithe Quarry Lane Property") within the Specific Plan Area described more particularly in Exhibit A, which is incorporated herein by reference. Developer received approval for a private school on the property for 200 students (Phase 1) from Alameda County. Developer has applied to City for annexation to the City of the Quarry Lane Property and Prezoning for construction of additional building and operation of Phase 2 of a private K-12 school for all additional 750 students, known as the Quarry Lane School (the "Project"). 4. On December 30, 1999, the Developer filed an application with the City to prezone and annex to the City the Quarry Lane Property and certain other land within the Specific Plan Area owed by Michael O. Kobold (collectively, "the Annexation Area"), all of which is shown on the map attached hereto as Exhibit B and incorporated herein by reference. The Developer did not submit any development plans with the application for the Kobold property. Annexation Agreement Between City of Dublin and Dr. Sabri Arac- Quarry Lane School EX H I BIT Govemb:~~;, ~~~~ y ~ D 16""3 5. It is estimated that the cost of providing public services to the Eastern Dublin Area at a level consistent with services provided within the City could exceed revenues generated to the City from property within the Eastern Dublin Area. 6. If new development occurs within the Eastern Dublin Area as anticipated, it is expected to generate revenues to the City which will reduce and, in the near future, eliminate the above-described potential deficit. However, even with development, deficits may occur in early years. Consistent with the goals and policies of the General Plan and SpE:lcific Plan, Developer will pay City Developer's proportionate share of any such deficits, as provided herein. Developer's proportionate share shall be .42% (.42 percent) which is the percentage which the Annexation Area (13.75 acres) is of the lands within the General Plan Amendment area which have not been annexed to the City as of the date hereof (1,929.84 acres) plus the Dublin Ranch Project (1,363.29 acres ). Because Developer proposes construction and operation of the Project on the Quarry Lane Property and City anticipates receiving revenues from such project, City will require payment by Developer of its proportionate share of any deficit only from the time a new fire station is opened to serve Eastern Dublin, which City anticipates will result in a deficit. 7. Certain improvements to the 1-580lTassajara Road Interchange ("Interchange Improvements") are required to be constructed in order to facilitate development on the Annexation Area. City has previously entered into agreement for funding for construction of the Interchange Improvements with developers of property within the City. Pursuant to these agreements, four developers (Alameda County Surplus Property Authority, Jennifer Un, Greenbriar Homes and Mission Peak) have agreed to advance at least $11,863,969 to City for the Interchange Improvements. Development ofthe Annexation Area will benefit from construction of the Interchange Improvements. 8. Development of the Project will result in additional traffic on Tassajara Road North of the Project. This agreement requires the Developer to prepare a precise alignment for Tassajara Road. 9. The purpose of this agreement is to: (a) assure the City that the Developer will contribute its proportionate share of any deficit between revenues and expenses for the Annexation Area; (b) provide for Developer contribution of its prorata share of the cost of design and construction of the Tassajara Interchange improvements; and (c) set forth the Developer's obligation for preparation of a precise alignment for Tassajara Road from the city limit line to the proposed intersection with the north boundary of the property to the north, all prior to the City initiating annexation of the Quarry Lane Property. Annexation Agreement Between City of Dublin and Dr. Sabri Arac - Quarry Lane School Page 2 of6 November 13, 2000 \.ol q '~6 lS3 AGREEMENT NOW THEREFORE, in consideration of the mutual promises and conditions contained herein, the Parties agree as follows: Section I. General Fund Shortfalls A. The Developer's Payment Obligations; Definitions. Developer shall pay the City .42% (.42 percent) of the deficit, if any, between Public Service Costs and General Revenues. "Public Service Costs" shall mean t~e general fund cost of providing public services to the Eastern Dublin Area at a level consistent with public services provided within the incorporated area of the City prior to the annexation. "General Revenues" shall mean those revenues deposited to the City's general fund from property and inhabitants within the Eastern Dublin Area. "Eastern Dublin Area" shall include all lands within the Eastern Dublin General Plan Amendment area which are within the City limits of Dublin. B. Duration of Payment Obligations. The Developer's obligation under this Section I shall begin when the new fire station to be constructed in Eastern Dublin (Fire Station 18) becomes operational and shall terminate when there is no deficit but in no event by June 30, 2010 ("Deficit Period"). c. Annual cFiscal Analyses. The City shall prepare a fiscal analysis each year during the Deficit Period to estimate the amount by which the Public Service Costs will exceed General Revenues. The fiscal analysis will be prepared on a fiscal year basis (July 1 to June 30) and will calculate the deficit for the preceding fiscal year. D. Payments to the City. No later than October 1 of each year during the Deficit Period, Developer shall pay to City .42% of the deficit between Public Services Costs and General Revenues for the preceding fiscal year, based on the fiscal analysis, plus .42% of the cost of the fiscal analysis described in Section I.C. E. Security for Payment. No later than approval of Site Development Review for Phase 2 of the Project, Developer will provide the City with security in an amount and form satisfactory to the City Manager, to become effective once the Annexation Area becomes part of the City, to secure the payments to the City described in Section 1.0 above. The security may consist of a letter of credit or similar instrument. F. Reimbursement From Other Property Owners. The City shall consider fair and appropriate ways of reimbursing the Developer some of the amounts Developer may be required to pay under this Section I from the owner of the Kobold property, which is the only other property included in the Annexation Area which is not owned by Developer. To the extent permitted by law, the Cityshall require owners of the Kobold property who seek City approval of development entitlements for such property to pay a fair and proportionate share of the amounts which Developer is required to pay pursuant to this Section I. Annexation Agreement Between City of Dublin and Dr. Sabri Arac - Quarry Lane School Page 3 of6 November 13, 2000 L1)b ~ ~53 Section II. Payment to City for Tassajara Road Interchange A. Advance of Monies by Developer. Prior to the Council, acting as the "conducting authority," adopting a resolution ordering the annexation (reorganization) and provided the ordinance prezonihg the Quarry Lane Property for the Project,has become effective, Developer will pay to City the sum of Four Hundred Nine Thousand Five Hundred Dollars ($409,500). B. Use of Monies by City. City will use the monies paid by Developer pursuant to this Agreement, together with any interest earned thereon, for construction of the Interchange Improvements. As used herein, "construction" shall include preliminary engineering, preparation of project study report, project report, plan specifications and estimates, engineering, environmental documentation and review, right-of-way acquisition (if necessary), permits, processing, utility relocation, construction, construction inspection, project management, and inspection. City shall be under no obligation to use the monies paid by Developer until such. time that City has adequate monies to construct the Interchange Improvements. C. Credit Against TIF. City will provide a credit to Developer in the amount of Developer's payment of monies hereunder, to be used by Developer against payment of the Eastern Dublin Traffic Impact Fee ("TIF"). This agreement shall be deemed to be the creditlreimbursementagreement required by Section V(A) of the TIF Guidelines (as adopted by Resolution 23-99). All aspects of the credits shall be as described in the TIF Guidelines, including the right to convert any unused credits to a right of reimbursement, subject to the following provisions: (a) the Developer shall pay an administrative fee of one-half of one percent or $1,000 whichever is greater; (b) the credit shall be granted at the time Developer makes payments of money pursuant to this agreement; (c) the credit shall be in the amount of $409,500 (d) the credit may be used only against the Category 1 TIF Fees; and (e) the credit may be used once it is granted. Section III. Preparation of Precise Alignment for Tassajara Road Prior to transmission by the City Clerk of a certified copy of any City Council resolution approving the reorganization, which includes annexation to the City of the Annexation Area, Developer shall submit to the City Engineer a precise alignment for T assajara Road from the existing northerly city limit line to the proposed intersection with the north boundary of the property immediately to the north of the Quarry Lane Property, currently owned by Robert Nielson, in a form acceptable to the City Engineer. The precise alignment shall be in a form which can be recorded, as required by Dublin Municipal Code Chapter 7.68. The precise alignment shall be consistent with the precise alignment for Tassajara Road south of the city limit line. The precise alignment shall be for the ultimate width of Tassajara Road (six lanes) but shall propose construction initially of only four lanes within the right-of-way for the ultimate road width. Annexation Agreement Between City of Dublin and Dr. Sabri Arac - Quarry Lane School Page 40f 6 November 13, 2000 &)1 ~ t53> Section IV. Approval of Annexation This Agreement shall take effect only if the City adopts a resolution of application to annex the Annexation Area, with or without conditions. Upon adoption of such resolution, the City shall take reasonable steps to facilitate annexation of the Annexation . Area in a timely manner. This Agreement shall become ineffectiVe, however, if the annexation is not approved by LAFCO or the voters or does not become effective for any other reason. Section VI. Additional Provisions A. Correctness of the Recitals. The Recitals set forth in this Agreement are true and correct and are a part hereof. B. Further Assurances. The Parties shall execute, acknowledge, and deliver such additional documents or instruments as may be necessary to carry out the intent of this Agreement, including but not limited to, those expressly referred to in this Agreement: C. Construction by California Law. This Agreement is entered into in the State of California and shall be construed, and interpreted in accordance with its raws.. D. Representation of Comprehension of Document. In entering into this Agreement, the Parties represent that they have relied upon the legal advice of their attorneys who are the attorneys of their choice. The Parties further represent that the terms of this Agreement have been completely read by and explained to them by their attorneys, and that they fully understand and voluntarily accept those terms. E. Authorship. Each Party and counsel for each Party has reviewed and revised this Agreement, and accordingly, the normal rule of construction to the effect that any ambiguities are to be resolved against the drafting Party shall not be employed in the interpretation of this Agreement or any amendment of it. F. Authority to Execute. Each of the Parties represents and warrants that each has full power to enter into this Agreement. G. Entire Agreement; Amendment. This Agreement contains the entire agreement between the Parties with regard to the matters set forth. There are no additional written or oral agreements or promises between the Parties concerning these matters which are not expressly set forth in this Agreement. This Agreement may be amended or modified only by an agreement in writing executed in the same manner as this Agreement. H. Attorneys Fees. In the event a Party to this Agreement is found in a court of law to have breached this Agreement, said Party shall pay the opposing Party's reasonable attorneys fees and costs incurred in litigating the breach of contract action. Annexation Agreement Between City of Dublin and Dr. Sabri Arac - Quarry Lane School Page 5 of 6 November 13, 2000 51- cst lS3 I. Approval of Project. By entering into this Agreement, City makes no commitment that it will approve the Project. J. Notices. All notices shall be by certified mail or hand delivered to the Parties as follows: To the City: City Clerk City of Dublin 100 Civic Plaza P. O. Box 2340 Dublin, CA 94568 To the Developer: Dr. Sabri Arac, President Quarry Lane School 3750 Boulder Street Pleasanton, CA 94566 K. Recordation. This Agreement shall be recorded against the Property described in Exhibit A (the Quarry Lane Property). IN WITNESS WHEREOF, the parties have executed this agreement the day and year first above written. CITY OF DUBLIN THE DEVELOPER Guy S. Houston, Mayor 5~Cr: A ~ Dr. Sabri Arac ' Approved as to form: City Attorney Attest: City Clerk [NOTARIZATIONS ATTACHED] / J:\wpd\mnrsw\114\163\agree\quarrLanexation_1113.doc Annexation Agreement Between City of Dublin and Dr. Sabri Arac - Quarry Lane School Page 6 of 6 November 13, 2000 STATE OF CALIFORNIA ) ) ss. COUNTY OF CONTRA COSTA ) 5~ ob 1S'3 On Nov. t&1 I '2()OO , before me, the undersigned, a Notary Public in and for said State, personally appeared Sabri Arac, personally known to me (or proved on the basis of satisfactory evidence) to be the person whose name is subscribed to the within instrument and ~cknowledged to me that he executed the same in his authorized capacity, and that by his signature on the instrument the person, or the entity upon behalf of which the person acted, executed the instrument. WITNESS my hand and official seal. ~.,l. ~ Notary P hc ' 54 fit lS3 Owner: Sabri Arac APN: 985-0002-006-01 EXHIBIT A (. PA'iE. 10''-) RECEMVED NOV 1 3 2000 DUBLIN PLANNiNG Legal Description Arac Property (Quarry Lane School Site) Real property situate in the unincorporated area of Alameda County, State of California, being all ofthat certain parcel described in the deed, recorded in Series No. 99-310014, Alameda County Records. Commencing at a railroad spike at the centerline of Tassajara Road (County Road No. 2568), (66.00 feet wide) as shown on Tract Map 6925, filed in Book 241 of Maps at Page 39, Alameda County Records; thence S.86035'44IlE., 33.00 feet to the easterly line of Tassajara Road; thence along said easterly line S.03024'16IlW., 801.02 feet to the northwesterly corner of said parcel and the Point of Beginning; thence along the northerly line of said parcel N.82007'31 "E., 781.19 feet to the northeasterly corner of said parcel; thence along the easterly line of said parcel S.Ol o18'31IlW., 557.80 feet to the southeasterly corner of said parcel; thence along the southerly line of said parcel S.82007'31IlW., 802.00 feet to the southwesterly corner of said parcel; thence along the westerly line of said parcel N.03024'16"E., 561.50 feet to the Point of Beginning. Containing: 10.01 Acres +/- P:\J obs-99\991 091 \SUR VEY\School.des November 8, 2000 ~~ Charles F. Sellman L.S. 5186 Licenc~s ~ires 6/30/2003 11/9; 00 Date . POC Found RR Spike Tract 6925 241 M 39 I I , J, ---, , 1 I I : I 1 I ~ : I ~ r I i I I a?!::. " ~ Ni~ (f) 1 I ~ I I - , Q: I <:( W -. I OJ W , 9::?t II · lL.. ~~: I~ O ~..... I I.....: tLl ~I (C) Chj--' I ;14) ...g: ll.. ;:: 1 o CS' J (f) Q:::tO ~, I' (f) to "- . , I <:(-<(cO~' I OJ Q::: to Qi, , t:' ~U"> ~I I "V <c C'\.I ir) I 1,- Wc ' I~ g)'c::( , ,~ po 1'1 ....... Q::: t; I I, : <t >-~I ~~l I 5~' I u <t' . - I I /1 ~ -N- " Nielsen 94-348420 Parcel 1 Parcel Map 1193 84 PM 40 APN: 985-0002-009 781.19' . ...-.-- . " ...-.. N82.0~ f - ...-. - - ...-. ...-.-- ..., ARAC 99-310014 APN: 985-0002-006-01 (Guarry Lane Schoon . . 'I~ r-...: 114) II.C) I '08 I, I LlN 99-177972 APN: 985-0002-003-6 ,?!::. I a . - I~ :-- 1'- I~ ...-.-- ~.. . .. ., '...-. _....-. - -...-. 802.00 - · ...-. si2rliJl:W KOBOLD 91-128046 APN: 985-0002-005-02 ALAMEDA COUN TY CALIFORNIA Duggeri - ~JN~~~soci~ 6601 OVtENS DRIVE. SUITE 155 . PLEASANTON, CA 94588 PHONE: (925) 227-9100. F'AX: (925) 227-9300 SCALE: DATE: JOB NO.: 1" - 200' Nov. 9, 2000 991091 PLA T TO ACCOMPANY LEGAL DESCRIPTION ARAC PROPERTY 0: \ iobsT999\ 99/091 \survey\onnex.dwg CITY OF DUBLIN MAP DEIJNEATlNG BOUNDARY OF TERRITORY ANNEXED TO THE CITY OF DUBIJN, ,CAIJFORNIA DUBUN ___________ ANNEXATION NO. _____ RESOLUTION NO, _____OF THE CITY OF DUBIJN CITY COUNCIL ON E'XHIBITB <,PAC.IS ~OF:t) SB6"J5'UY .lIDO' .~ !! -NJ . BY SCALE: 1"= 200' II.s /IN' ctKrifIJ/S III lIE RCfH/IEIIIE7Il'S tr lIE LOCAL '-'XNCY FfJRIIA/1QN_ tr ~ Cl1lMTY. OONN.O J. LAIULt Dl1!C1l1R tr PIJ8UC IItl'ilrS _ It KA~ CWNlY SIA'1If'Itl1 R.ec. I/U99, I/CCISIRATION CXPII!S: DJ/.JOA11 or., DATC: 1ItX1mlAM1. ,lIf1'f/lY Cl1lMlY 5LI/IVOI/ 1I.s~5:L~S~~AMEll BY A CER1I'1C.tTC tr CLlIfU'TION Nt) CERIFED ca>r tr lIE __ <<SCRIPTION _AIW-. AS I/EOlIIlW 8'1 secTION 5121>> tr lIE ~r Gllfl!: rHCH CER1I'1C.t1F tr CLlIfU'TION Nt) /1OUNONIY <<SCRIPTION _ _ Ii SO/lES _ tr omcw. IICCI1I1tIS tr ~ a;Um: tAurIINtA. _ s. -.....:9t; CJfCCllIIlI: Dtf1CtR LCCIL AInCYFfJRIIATION ~ tr ~ ClDrIY, CAL.IlrlI<M SY: _ LOl1_ 1LlnlA. _1RA1IIf' ANALYST LNC# STN'F fUOAr IlElIClUSrtr lIE arrtrDlBliAr _ _trSPAST __ rw lIE ..:....- DAY tr I/()(}() Ii lIE omcc OF' lIE t:rXMlY RCCa/DER tr .tLM04 CWVIY, ColLElRW.t ' PA/RIa( Otl7HU cwvrr_ J +-. t f r ;' ANNOOTlON NO, 10 lEAST DU8UNI SERIES NO. 95-214838 204 M754 UN 99-ln972 APN, 985-0002-003-6 I FOJndIlR. I I_I 692S , 2flll,J9 ~ I~ I , , ' -"'-II I. : J- '. 'I' :, j : I : t - I I ,. Ni ~ I :T~ '" 'I ~ : I IE I I <( " .... - m ~, 11165' lE P . - -:/5"'t .lIOO' l:lc>~ei.1 ARAe ~~:g~~ APN: 8~-ooe-01 ~i~::.1 ~l3;j~ ' ~~",:.! !i~:'1 ~il ~ Nielson 94-348420 Pur.e! 1 PlIt.e! Mup 1193 84 PM 40 APN, 985-0002-009 Pur.e! M Tr.2~IM: ::25 N/J6"J5'" /i6.DO' DUBUNl Hl1Wi;. .. I, lIE IIF:IHOO IJSl1) III CALc:ttATC II.s ARtA IllS 8'l1llA1Qll; 2. IIU'U/f.1iIXS III DtlSIlNG arr 8aHJARICS ARt iRIIIARr CALl$; ANY 8CAIItNGS AND OISrANCtS _ _ $HOW) lit CQVSlOOlIlI SFa:NlARr' ,.r. 3. AS A tIRAF_ CONlf:IIIION, lIE 5MAI.L SEPARJ.T/ONS fIC/IEN lIE 1'Cf/T/ONS tr lIE ~ MlUtIIIE __ tr lIE Ifla'OS8J AM'oDIITION rERC _Ill NJ.Ort MLI'PLE IJE$(;Rll'T/ONS III lit PLAaoON IlIAT IIIUD O/llCRflSt lit A 9NGLC LINC. lIESC uo ARt III lit CQVSlOOlIlI COINCI//EItr CllaPT wee ""1m ANNEXATION NO. 10 {fAsT SERIES NO. 95-214838 204 M 754, 5 ! Z' ,I +1 II j II :i i ~ \ \ (t ~ < ~ ~~ t:z z t--f U 1--1 I ::> f '"51 C:6 153 . ~ , " t..:I :z: ::;i 1 '1 I '1 '" io" aVOH OHHVH~ 1~ . .... ~ ~ ~ II!! f! = Co ~ Eo Eo ~ av OM N 0'1'IV l!I aVQH 'ern Q Q c::: <: ~ 0 E-o c::: ~ 5i ~ ::3 Z ~ Z >- Z 0 0 .~\ ~ E-o CIJ a:l ~Ula 0 t3 <: \ .~ t--I I:'=:l E-t ':?:' ~ ....::I Z .:.a ?':' CO ,~ ::3 Z ~ ~ c:c < S ~ ~ ~ Q 0 U ~ to) Q CO ~ ~ LD <: o ..0 ~ to) e. I (0 to ~ aYaH I-- ~ ~ aHY!dOH 0. '6 to) avOH AJ.H3:HDfiaa .. - II!'iI ~, '.::~ \' ,~' '0 " ,) ;::::~:<~ )), ';L\~~c;\'~::' , ",tl~.,;'5,:.~'i'- II WilD II . I . 1'-- Eo-< Z ~ U ~ Eo-< Eo-< -< iCW) ~I ~ it) i g: .~ )Q I~B I~ <US ~~ ~~a ~~ .~~ iOOH:)S )N'fl J,tlHVnO :~O.:l 'o'INl:lO.dI1'o'O 'AlNnOO '0'031'1I'0"'0' 'NOlN'o'S'o'3'd .dO AllO lOOHOS 3NVl ^HHVn~ 1181HX3 All:l3dOl:ld 01080>1 """"""''''''<''''''''..><'".~ a~.6 1~ '..:J,....$~J'., . ~~; .H'''; .,hl><J ~"Jrl.':> lli'i!~ S<ll1!POSSV 'i J1!ZV( - _U~:~n~ .'a 'C '" -< ATTACHMENT 8 S9 Ci6 )53 Initial Study Project Quarry Lane School Annexation and Prezoning File PA 99-064 Lead Agency: City of Dublin 100 Civic Plaza Dublin, CA 94568 July 2000 bO '1 IS~ Table of Contents INTR 0 DUCT I ON .......... ..... .................. ..... ............... ...... .......................................................................... ..................... .............. 2 APPLICANT.... ..........................;.................................................. ........... .............. ............. ........ ................. ......... ........................ 2 PROJECT LOCATION AND CONTEXT...... ........................... ......................................;.................... ..................................... 2 PROJECT HISTORY .......... .......... .................................... ....... .......;........................................................................................... 3 PR OJE CT DES CRIPTI ON............. ............;...... .................. .................... ........................ ........................... ................................ 3 ENVIRONMENTAL FACTORS POTENTIALLY AFFECTED..........................................................................................14 DETERMINATION (TO BE COMPLETED BY LEAD AGENCy):....................................................................................... 14 EVALUATION OF ENVIRONMENTAL IMPACTS ............................................................................................;............... 15 XVII. EARLIE R ANALySES........... ........................................... .................................................... ............... .......................... 25 A TT A CHMENT TO INITIAL STUDy...... ............................................................................................................................. 27 D ISCUSS ION OF CHE CKLIST........................ ............................ .................... ......................................... .............................. 27 I. AESTHETICS .... ..,.......... ........ ...................,.............., ......... ...... ................ .....; .... .......... ..,.............. .:. ...,. .......... ........ ,... .......,27 II. AGRICULTURAL RESOURCES .....,. .........,...,... ,............. ......,........................................... ...................................,... ........ 29 III. AIR QUALITy...................... .......,.... '....................,.,........... ....... ...........'..................... .......,........ ...... ..... ..................... "... 30 IV. BIOLOGICAL RESOURCES..... ..... '........., ...,........ ...........'...... ........ ......................... '................ ..... ............ ...... ........., ......31 V. CULTURAL RESOURCES...... ................................. ........................ .....................:..........,...................... ..................,........32 V. GEOLOGY AND SOILS ...........................,.....................................................................,...................................................33 VII. HAZARDS AND HAZARDOUS MATERIALS................................................................................................................36 VIII. HYDROLOGY AND WATER QUALITY ...................................................................................................................... 36 IX. LAND USE AND PLANNING ................. .........,................................................................................................................39 X. MINERAL RESOURCES .................. .......... .......,..... ....................... .....'..................... .... ............. ................ ........... ............39 XI. NOISE... ........ .......... ........ ..................................... ...., .............. ,....... ................ ..................... ........ ............... ....................... 39 XII. POPULATION AND HOUSING ...............,......,...........,..,...............................................,................................................41 XIII. PUBLIC SERVICES... ..................... ...... ..'...".......... ....'................................. ...................... ...........................,................41 XIV. RECREATION ......... ........ .....:......... ......,.,...................,..... .................... ............................... ........... ................ ...............43 XV. TRANSPORT A TIONrrRAFFIC ......,......................................................,. ........... ........ ........ ...... ......................................43 XVI. UTILITIES AND SERVICE SySTEMS.......,.................................................,............................,...................................46 XV. MANDATORY FINDINGS OF SIGNIFICANCE ....... ........................................................................................,.............48 , ' INITIAL STUDY PREP ARER ........ .................................................. ................................. .......... ..... ...... .............. ................... 49 A G EN CIES AND, 0 RG ANIZA TIONS CONS ULTED ........................................................................................................... 49 REFERENCES . ........ ............ ............. ...... ..................... ......... ............ ............................................................ ........... .................. 49 b\ ~ \53 City of Dublin Environmental Checklist/ Initial Study Introduction This Initial Study has been prepared in accord with the provisions of the California Environmental Quality Act (CEQA) and assesses the potential environmental impacts of implementing the proposed project described below. The Initial Study consists of a completed environmental checklist and a brief explanation of the environmental topics addressed in the checklist. Applicant Dr. Sabri Arac President Quarry Lane School 3750 Boulder Street Pleasanton,'CA 94566 925-846-9400 Project Location and Context The project site is located on the east side of Tassajara Road approximately three miles north ofI-580. The site addresses are 6363 Tassajara Road and 6237 Tassajara Road. Assessor's Parcel Numbers include 985-0002-0006-01,985-0002-005-01 and -02. The site encompasses two parcels of land, the Quarry Lane School property, and the Kobold property immediately south of the school. The total site includes approximately 13.6 acres of land. Existing site uses include the Phase I construction of the private Quarry Lane School and an existing building (Villa Tassajara) that has been incorporated into the Quarry Lane School as the administration building. A single family residence, landscape contracting business and plant nursery exists on the Kobold property south of the school site. The project site contains moderate to steep topographic features, with natural (pre-graded) elevations ranging from approximately 400 feet above sea level adjacent to Tassajara Road to approximately 564 feet above sea level on the northeast comer of the site. An unnamed tributary of Tassajara Creek forms the southerly boundary ofthe site. Exhibit 1 depicts the location of the project area in context of the larger City of Dublin and Exhibit 2 shows the detailed site location. Both properties comprising the project site lie within the unincorporated portion of Alameda County, although within the City of Dublin's sphere of influence. Annexation to the City of Dublin and Dublin San Ramon Services District (DSRSD) is proposed as part of the project. The project site is located within the Eastern Dublin Specific Plan/General Plan area. This Specific Plan/General Plan was adopted by the City of Dublin in 1994 for the purpose of directing long-tenn land use, circulation, infrastructure and environmental protection for 3,302 acres ofland located east of the central portion of Dublin and north of the 1-580 freeway. At full build-out, the Eastern Dublin planning area would allow a range of residential, commercial office, employment and open space uses. City of Dublin Initial Study/Quarry Lane School P A 99-064 Page 2 July 2000 b l crt \ S"'3 Property south of the project site has been recently developed with single family residential dwellings as part of Dublin Ranch. A custom single family dwelling on a large lot has been constructed northeast of the site. Other properties in the vicinity of the site remain vacant. Project History As noted above, both of the two parcels comprising the project site lie within the unincorporated portion of Alameda County. In April 1999, Alameda County approved a rezoning to the PD-Planned Development District to allow an initial phase of development for the Quarry Lane School, consisting of 15,600 square feet of floor area for day care, preschool and elementary grades with a maximum of200 students. The school is a private school; water and sewer utilities are also private (on-site well and septic facilities). Construction of these facilities are currently on-going with opening of Phase I planned for August 2000. An Environmental Impact Report (Quarry Lane School, Environmental Impact Report for the 2060th Zoning Unit, August 1998, SCH # 97122109) was certified by the County prior to approving the rezoning and development application. The EIR included the full buildout of the private school consisting of 62,575 square feet of floor area for day care, preschool, elementary, middle and high school grades with a maximum of 950 students. However, the site plan for the second phase of development for the Quarry Lane School has since changed as part of the development application to the City of Dublin. The owner of the school now requests approval to construct Phase II of the school which includes additional classrooms, a gymnasium, recreational facilities and other features which will increase the need for public services and facilities beyond that available from private facilities. .Annexationto the City of. Dublin and DSRSD is therefore required to obtain a higher level and range of services that is currently available. Since the Knox-Cortese Act requires properties proposed for annexation to be contiguous with boundaries of the jurisdiction to which annexation is proposed. In this instance, the Kobold property is proposed to be included in the annexation action, since it is an intervening property between existing City limits and the Quarry Lane School site. Project Description The proposed project includes a number of related land use applications to allow the development of additional phases of the Quarry Lane School, to include the construction of 66, 600 square feet of floor area to accommodate new classrooms, a gymnasium, new recreational play fields to house a maximum of 750 students. At full build-out, there would be 950 students and 55 faculty and staff on the site. Parking would be provided for 172 vehicles. Landscaping would also be provided on the site. The following table summarizes the amowlt of construction proposed for each phase of project development: City of Dublin Initial Study/Quarry Lane School P A 99-064 Page 3 July 2000 f;'b fS"~ IS,?> Table 1. Summary of Quarry Lane School Development Building Sq. Ft. Classrooms No. of Students Phase I (under construction in 15,578 13 200 Alameda County Phase II (proposed for construction in 66,685 37 750 Dublin) Total 82,263 50 950 Exhibit 3 shows the site plan for the proposed ultimate construction of the Quarry Lane School, including the existing, approved phase (Phase 1) and the proposed second phase. Exhibit 4 shows proposed building elevations. . . Construction of the second phase would require grading of the rear portion of the site to provide relatively flat areas for playing fields, parking and drive areas and new classroom space. A preliminary plan has been submitted to the City of Dublin showing the proposed grading for the school site. (see Exhibit 5). Briefly, the applicant proposes to recontour the rear portion of the site so that the existing small hill on the site is cut, a combination of cut and fill is used behilJ.d the new classroom building to create a flat playfield site and a steep downslope is created along the southerly property line to meet natural grade. Several retaining walls would be required as part of the grading plan. The walls would range in size from less than one foot to a maximum height of 14 feet. The estimated amount of material moved as part of the school development project would be 87,401 cubic yards. Construction of Phase II improvements would begin following approval by the City of Dublin and completion of the annexation process. Preliminarily, the school operator anticipates opening Phase II in September, 2002. At this time, no development is planned for the Kobold property. The following entitlement requests have also been filed by the applicant to allow phase two ofthe development of the private school to proceed. PD-Planned Development Prezoning and Stage 1 and 2 Development Plans The applicant has also proposed a PD-Planned Development prezoning for the project site. Existing zoning is Alameda PD (Planned Development) for the school site and "A" (agricultural) for the nursery site to the south. Proposed City of Dublin prezoning is PD-Planned Development (School) and would include a Stage land 2 Development Plan. The PD-Planned Development also establishes standards and regulations governing the future use, development, improvement and maintenance of the site, in accord with Chapter 8.32 ofthe Dublin Zoning Ordinance. Proposed prezoning for the Kobold site is PD-Planned Development (Residential and Open Space); however, no development is proposed at this time on this site. City of Dublin Initial Study/Quarry Lane School PA 99-064 Page 4 July 2000 b l4. rt.; \ 53 Since both sites lie outside of the City of Dublin corporate boundaries and annexation has been requested, proposed zoning actions are prezoning actions until the annexation can be finalized. The proposed zoning . would become effective at the time the annexation process is complete. Development Agreement Approval of a Development Agreement is also part of the entitlement process for the project as required by the Eastern Dublin Specific Plan. Items typically included in the Development Agreement include, but are not limited to, the financing and timing of infrastructure; payment of traffic, noise and public facilities impact fees; improvement of roads and general provisions. Proposed Reorganization (Annexation) To implement the proposed development project, the property owner of the Quarry Lane school has submitted a request to incorporate the entire site into the City of Dublin. Pursuant to the Knbx-Cortese Local Governmental Reorganization Act, a municipal reorganization would be required to annex the site to the City 'of Dublin 'and Dublin SanRamon Services District. Although the initial phase of school development has occurred in the unincorporated portion of Alameda County, a higher level of public services, including water and sewer service, is needed than is available from private water wells and on;.site septic systems. Annexation to both the City as DSRSD is therefore required. . Since the Knox-Cortese Act requires properties proposed for annexatIon to be contiguous with boundaries of the jurisdiction to which annexation is proposed. In this instance, the Kobold property is proposed to be included in the annexation action, since it is an intervening property between existing City limits and the Quarry Lane School site. The proposed reorganization can be initiated by either the City of Dublin or by the affected property owners and would then be approved by the Alameda County Local Agency Formation Commission (LAFCO). The action would be complete when accepted by the Secretary of State. Site Development Review Approval of a Site Development Review permit is also part ofjhe entitlement process for the project, pursuant to Chapter 8.104, of the Dublin Zoning Ordinance. The purpose of Site Development Review is to promote the orderly, attractive and harmonious development within the City and to ensure compliance with all applicable development regulations of the Zoning Ordinance. City of Dublin Initial Study/Quarry Lane School P A 99-064 Page 5 July 2000 I , ---I L"'~'i I : . , , . I (".'.:,: 'J Data:! j I '. . "'. - I \. ',' . I. \ . " I '..-- ':. . . ~. . llIi"'", ~ I I ~- , . "" I !" , " \ "', : '\ Cafifomi~ '-) I ~'-...,~., . : ~ I '-'" ',. ,. I "... c.._ I ~ ! .... caclilc ':)cean j o I @ 10 Miles I b~ 01, If3 ,. "., i 9 .... .".,....,... , ;''', "17 ; ".,._". ,~ \ \ ~L :- -.....- . c: . ',_~,....I "COR.9ECrJONAI. .1 . . ......."". ,_ .",In ""," ."; ", . ~. : INST/TU,TlQN ,. " "-:: 1 ~ .;. .:::1' ..ot.N....'!.:.IA~:c:!.m.y ..' ". h S- .1' :;,.I=~T.~.i:;:.\,..i,: :i--=-....:~.~ ~--~ ---=---~ -~----.:....-_~. .~.~.~rF. "!.~.~ ~ - - ~ - - , MAP 5 , .fi?'~$ ," , """ ~'~"'~:'~' "~""": ::::: ": ,',', \ ;,.: ~': W"J[JV~ :'~:":"~i~ ; "ii g';if.~It:'t{:;'". t;~l i~l I ':::'."1.".,',' ... = ::E:!:!:.....j~' . ~ i ~""" .":,'.), '.'~~l.~~~:~ :~l .. B-~ jj" ;- .: :,:'" /,~l;:'>';) -.', ... -;.. , o~, , '--~ ",' :f~KS OR, "' '!' ","^' OWENS .... . ~; "-~~,,,._'"'' ,--_. , \ \'A \ ~~V ;=, ~\S ~ll ~\ ....1.. EY ~~~U =' a~~? C"';Z ~\\ ~ ,:~'il . ::a\~ \'? ;D~_..,:.Q CT. DR. I ',' ',:.:,':' ': " '.': ':'-:," :',:' ~I!.~ :;',', r41l!$" ':'/ ',',': '.'c;,: 'i:' ,'\,: >,''',:':',: '," '::,: ',".: :'LU~ :~ :'..',. 'oO . "', ',~ 7),: ."",,,' ',,' ,'., "",.oO'" ,," ',; : . ,:,',,::: ":" : ::,: , ,",: ' ",': ;::,> ",::' ," ': ',::' "', , ,':', '" ,,' " :,': ' :, ,',': ,..,', ,,,' ',,,' ..- - - - - - -. .. - - - -;.. - - ~ . -. 1 , FcDEFi(,l. ,,',,'.','" ..,,:" ," ,:,'" .,,-. "" ,:.. ";~~:?: " ''''- . , .,'. u;;.._,;, ;.' ~'t'I...:.w '<- OR, i~j";l 1. CT. i CT. . ' s Ct ! .,~, CT. . I ~ ,- ' '" ~ 0- 0, . : :!i 1 ~ H ~ !ii STONERIDGE '<1 5 II U1I :,;;,' g ~ 00 Oij, \NGL'aWO ~ 6 '~"';': '::,':,:, :,.';,,,, '::",":,:,:, ",',:,:::, ;',/ ','::, ""':'."':', :':< ":::, ; "', :",,',: ~;:' ", :,:',,:,;, ::::,;';;' <: '? ~' :,' " ';' ::: ',': ':,: ,,', " ,: ,', '..,'.' ,., ",' "', , ,.. ,:iF,: ;/::~:":'::, ,',<';/i,:\ .".", .:,.:....!.'\:~',~ SANTA':~iTA &.~ j ,,:' 7 ill ...............\l?;~~~ ~~ i' (",'" !\~ :" :'~~~\ \1 ':: ;', " ~ J:. CREEK :1 / :'~i;:-:R:GI:~;: ~. "~~: I .... "'p'I.. r---o"'-==--O~C:-=- /);:,t ;.1 I: >.<,\1' 8 . <...." ' :::, ,:, '" :,:", ',,,-,,". ':: ":' ',' ,: ',,:>',:'" ': ~ " " 'T' Project Site -/jJ, .' -",'<' ''',-::. " " .., :;:.,.' ..; .:' ~~~/ ","~:!.'\ ~:l~/ 'I~ ...."_, ...." ". J, """"" ,",.._" ,,,', . "'. ~ .. "...' /, ,,'~- -t'/~"":'.:":~:"'-~ ~..~.~:::!~~y REH,~BltlTATION CEi'rr:,"1 -3:.;:::,');-;:.1 ;',," ~ fo~~oGo~~ft 2 1 WIN "" ~ ,.' .. .1.:-':";'. ..,...".", ~~:~-~ --~ - -;:;-~> g ~PARKING wr ....~ CT -. __ :t B.A.~ ''AR''''''' "',,' " ~ ~- . '.,..'1. ,.' ,- I~ ;J J~ ~ ~( ~a ~/ ! i "" '" \"~'~ "Ill ""'~,,,,, "t' " / ,::': .....:'~ - ';};/j;;~:~~;': { 1812 'l! 17 Il'? @: ~? 33 5 ~ 12 6 ol 7 13 281 2 1~ COURT. + 25 16 HOUSE 3 ~i " 20 '" Q i:5 C3 .., '" , 2 3 ~~. ~ . 7 ! LIt T, '''\ ii,' ~O.4k' DUB~ _ -----L _ ~ ~ 'rc~ ii --.....\ W:'" ' ~ :'\t'oCEY ;1 ~Ii ~ '! i! ~ 1 <~'\ <~.,.,,, ,/ , , _ _ _ _ _ _ _ _ ~ _ _ _ ~ _ '.;,i , ~l_ '.. I ~I:: .;:.~~~f ;,~ \:.:' ~.~ ..."",.), . AV, .. /' DR, <( a: ~ '" ;!i -" ~ ~ '" ,KW'I, Jr{ , , ,,:: .,.' I "':,~'"f. _". .' ,~"_. ALTAMIRANO h ..::~ a i ""0-91:$ ~ . '" 'JOe OR. 6 rWY. wy, !f "~ I,' UMIT OR')!; ~ ;; ,~-{(}, : , --, '.....: ~cc '\ ROS~~ % ~~ !I~gl DR. ~It ~1 1J...~: riA ~ :;'{ ~ ~~,.: ~ ~ 3i ~<.lo ~ ,.~,; . ~r C1<o, ~ :1" ~(o..... , 1'1' , q. '1.8.'10. ,..: .;- '" '~ . "~,,, , .' ,,' ,~" ,:'~ ~,."., .. .. '=, "I .:....' ,I, '. t .'.., :o....~ ' .. _ ".,', .' ".,,,, . ,:l, .:'",':" ,.' .... , ? ',: :::::;:::'>,":',:~" ';:' "~;',:,::<,,'~ i.,::: ";-'::::::::;,, : ":~,':~ ': ',' ,'r.:': . '" ,,_ ~ ",.. ~ 13 =gi~;'~~ cA<<. "':>- ~...cJ.'" 'O:'i\..;;O<:' ' ,:'-..11''' 73 - F.s.~ ~ /,") o\.~'\, ~ .-:v~ f.-! 01 ~ .13 Wl.~' .1 S\~~(l!,~. ~ ~"~ ~: ~ 13 4300 t;".z LAS vI) ~~f/J\.~ IV VW:1~ 12 ~i , = ~ "" ')>0 " '," ~ - ';, 'l u w.OC . . ~~ ~o AV. ~~ lt~~89 ~ % JI ;"&"0: - ~ ~Q 01'0: 2 164 18 9 ~~ ~ ~ ~, . t v"4I----wY:1~ I: ~Ol't.. ~tC'd 15 '-',,_~y. ~G ~ ~~~ I' -'" ~ ...........~5~\!:; J : ........-~~,q:i \'.~ ~\:~ TRENERV DR. ~ 9 .~ ~~:"::~STONE.RIOGa f.PJ\ffl( ~~ I !~ \" -> .,- 1'" ...1. __ 10;; IS~ , ' 191514 ~ " 15 " " " CT. 19 20 " 22 !~ 6J.. ~ is?> ] tE ( FEET 0 .. MIL.ES 0 I: KILOMETERS ~ I '- . \ . - ~ ."'''" " I " .' I I' r I " ~i I '~:.. 'I ]i' r - ~ CT. ~ ~ . ~ :] i .:.: "~J\"o ~ Exhibit 2: Site Location Quarry Lane School Project City of Dublin ~ ~ =- s: .... f"I'. tH ~ , .., ~ '0 .:= .... = (J'Cl ~f ~;' =- -.; .... 0" .... f"I'. "i . (1) 1:53 '",- '", , \ I \ 1\, I ~ : ~ II I i I~II!~: II ~~I II iiI: ~,: 1 i ! . I I (\ : ~ I II \ a~ :~ 01 ~ ! 01 llAW:. tIC !iIia_ "''" + I 1 I I ~I aa' ~~II! ii I · !ft! J n'lltl. , PRI-ZONINg mtlIrr QUARRY LANE SCMOC.L . "" CITY QP PLGA8AHrON. A\.AMIOl)A COUNTY. CALlPORNIA "" fORI ClIiARRY ~NE SCIlOOI. ~ 0~ ! II~~ II I PIIIIPII II i III PII II I ~ iI . . . . ~ ~ I 1111 ~ =- I .... & ~ ! ! ~ ~ ~ ~ 5 0" .... l' ': ; l' l' l' " I ..... I . 9 · ! ! l! & ~ 8 i i". · .. , i i i i I j ~ .., & I I ~ I I 0 :t ~ ~ "C 0 I rI.l ~ I Q.. ~ rJ1 .... " III I ..... ~ I f IS' ~ t lei J i: - )> '~ nI- t = - ~; ~i b ~ I ~ f J ... f DlSSifJ'fRA ROAIT "I r I I I I -l I --j I -8- I 6 g l"b l 53 ~ I ' , I J! ; ~ )o~ VJ!:411, ~ ~ "IH1<N I~ rn ~ zlJlUl~g ~ I ~~ ~t~~~ =~"~m U.. c 1O~' "'l II ~~ 8~ ~ ~ ' g)l ~i ?~~~~ i~ r 8."'=c: r ~ 3:X..tCIll I rn ~ "I 4200 EAST AVENUE LIVERMORE, CA 9045SC 925 - 44"7 - 4C1"7 Q2!5~447-~:a6C F"AX AP-INO@ABSaC.PRO.CCM CON9lR.TAHT: CUENT: THE GlUARRY LANE ". !SCHOOL. 0"14-2 tGaQ~MD1It4."" tal1!t~-.J4.S PROJECT: .......- ICII.L!'l;tCDle.~ PHASE II - '!'HE ,'IIil::t.O.PMlJ au.tl'M:lCIII!-MP402 C4J_ LANE SCHooL PROJECT ADDRESS: 6!l63 TAS5A.JAAA ROAD DI.el.1H. t;A """"" i """"""" ___ ~~-""'trJH ....-"" "" -"" ,,~, YllffAI'IU:ec.ltN'Oll!ItI ..--:- =~H-:_"Q.t l!ICAl..ew'.r... DAre ..- ~SMlGO.1'Mfr ~:::=- N'lPlII)KI:NarftblI': 4l:tt041 --- ....111. --- _~1JIIt5.'N/If( r;aJ.!l'tQlll!'HM-2 ---- ....tftlL..Al.-'llWH eulLJ:llN6 ELI!'v' A TlONS ~ :w~:,:::""PMlf I12U.rttlJOllZ.."" 8/1f1tHumbu; A4.0 PlOfM're2-MBr-OO Fvhihif ,. P...,......,..:..:ul U..HA:""..... 1i'J~WT~4-:~_~ qJ:.... ~ ~&..'" ,:~ SQUTH eLeVATION .....~ NOItTH I!l.!'IA~~w l/l:::...... ~ ~...... ~IO l/l....". "'1'\.OQlIl ~ rt' ~.J'l '-D b ~=""" ~ ~~to C/!:t- ~;:t...... ~k C/!~"'l ~:~ ~ :"'....... I'eST I!l.!'IATION -;;;;...... ~T eLeVATION .....w .rn D m fTl ~ ~ =- .... 0" .... ..... 0\ iod ""'l Q "C Q ('I.l n> Q.. ~ ""'l = Q.. .... = CI'Cl ~ - = = "", ..~ \ '", ! i I I I ~ ~ I I I '%& 1 b t:rf ,~ 1) JJ " .-' UN + " I, t' " . Ii ',,1:' 'f,,; ,. . I i I~ i : 'J : I' "'I'lI." "I' .. I' " ", I I I iI" I : , I \ I I I I I I I: r I" ! ," ." , ;",., I; I"' . I, /'" : ,. r .:'1 . I 'j" ' "' I . j' , 'at', M fIflEJ,.IMDWlY ~G PLAN , QUARflitY LAM! SCHOOL CI'fY OI!' PL,IA8AtA'ON, A~A COUNTY. CALlP'ORNIA I'CIIUl!,l~ UIIt __ _ t'!j ~ =- ..... 0'" ..... - '" ~ ""l o "C o C'I.l ~ Q. ~ = = c.. C'I.l ~ = "C ..... = ~ ~ - = = ,'0,....'~ c : - ; .... p 1l cst IS?? " ,i , "j" ?i:.; :;_ o:~:,:./. -------==--:--_ __,>. : ,II . .. .;.".. ..~" Ii ~ '~ . t " K ~ STH CLASSROOIIS n:l:~Cl.lSSl'IOOIoIBI.IIllK>lG (PIIoSEl~) . " "'u:''::~: .~: " '" I i :t, ',::~ '.. ',':.:. : 'i -:",,;;,'I;.:"j;". l':::" "i. .,:, ,'" .~'."" :.;'" ','" ~ .} -}:~. "'~~oIl,\\l i&~!>.I~'~~~::rl":"'r'..r l' :' ,.J.~~" . _", ~ . -( ""'~ ......./ ',\-I ~..~~;, ': ,~.:: .~" ~, . ,n, '. , .. --".,' , ~.:.f.r;~ f I' ,h'~-:J '''l Y' r; ,. . 'J-' ....,.... .... . .,,~-" '':\, . _I .(~";~ .~.l"~., i ,:;...._..:..~ __.l .:~~'. ~:,.::..~~":.",, ~ "\...~,, r 'K ~ ~., '" '__.~,~ "~~~_, :;: . ~'" .',:~.":~f .. i i . ii', ~~:~~, ~~ ~--~. , , ',~:- ~, "'.~ 1";", :,' r1~L' 'I "'",''''''' ,,' '", , ",\, ;~,,;;.~~~-~~'"'-":~h~":._-~~"~~-~'~r;,::~t~:~i:~1)~' ,:>f ' ~ . ".... .....~, ",,,.\..';'- -J:~i.''''':''I'''t",~)'.:'J:'''i''~ :A"""~ -'''. ~ ," .;r"I'r:' "r~"" ".:~~.".".":,. ,i'~lI":~' .....i.IJo" :ti~~,~ ~ _ ~,1~"':'~i/";~' "ifr! .~ .;, ,..,',............, ,,'lIo"~".: ;',i'..,~'j "[}'.... ,:' ,,:"~~":' :"I,:"~. 'c'C.,.f4;" ii -( ) ~ ," ~.1 .. ~of: - {' i, "...,.r,,;,~.::,/.: . ;""".' .- '''I'):,''C''''~'~ .... ..r;:,'i~-' ''11,'':,,;: ~ . /.'I:l:"'t'. ~ ....... ...~ .;.J ~ '-~T " ? .'\f'''. ;. ;y .. " :,~'I~~ J.' " "':,,', "" .,."..... "'" ',.,." /{" ..,~?ttt. ,~." I ~.." ,..i: ~ , ", "I}.,,,....,.~1;.:,/.. ~~. ,- IT".., "'4.. .'. ",,,, ;1 r.. ~;. ~ ,- """,.t .. ,""4;' I,''':' .: -:. ' '," ;""'j> "l"'~'?~ : :~~~l':::,'} l :\;?\. . ,",~ I ~, ,,',./1 ~~,::~>} ~.! "',=<R};~~:';; ';, :; . :o..c i I.'" '. . At ' i: ': '".} , .p< I 'I~~ti " ~", . fl' ::...~' ,:~ .':,j :>tr~ , ''''J '" l ':::.11 ~.Jf" a . ~;,. '~1':j \.i.~' .. ~. ..'!Io'"'''' ....:.."..:1.. .. _, . ....,./, .:,~';- ,;' : ~',: ". ) . ,. .~~:J:h;t!'\"'W,.;...,1 -, .....1 . ,~~'I~':':-r" :", ~,,, " ',~~':'~:"II:' ~>~.<.. : } U'. "-~ " F.,. :....~...,~... .. -- ..--. ~- ~~.:~ ...-... 'v-/ '.' [ij IjTI [r-~ s I ~i II> 0o~ ~ I -a z ~ ~~ ~ ::I: ~ ,,' g m .. ~ m z '" ~ lZ II> ... '3 f. i if if t:I .. ~ ~f "I I ~rii IOn I ~ f [ i ~, ~ ~ I E-ii ~ ~ '" 13... i if Ii Ii" f.. 1ifr ~ JH i Ii j i . f ~ [II' prll fp ~ ij! ;! ~ . m .. i ii!' i ill . ill It l~i i f i . i .. r. 'l! .;> .. 1 .[ r ;a.~ f l t {Ii . " ,f 3. m l! II Ii l ~i; ~ Ii, f ~ i ~ t .. r If ~!l' U ~ i i if if Ii . I r f r l it . .. ~~ [ I r: ,I~ f ] , Ii h I~ , f I 1& iJ .. 11 m I .. il ~ ~ i [ t ~ d ! ~ i . i il' 1 J !i f Q , i ~ , t t ~ i ~ > ~:i :! ~ . ~= t! ~I i~~' *. ?e ~I ~ QUARRY LANE SeliOOL 'Sr:AOE I Ii 11 CITY OF DUBUN, ALAM'EDA COUNTY, CALIFO,,"IA CONCEPTUAL ~ANDSCAPE PLAN A. S, DUTCH OVER & ASSOCIATES ~ Landscape At~hltectare C PlannIng 40 eaflfomia Ave 0 Suite M pleasanton c CA 94566 ~ (9!SI 462.3576 c I.. (925) 462.5300 Q, ~.~ 1. Project description: 2. Lead agency: 3. Contact person: 4. Project location: 5. Project sponsor: "11, 1153 Proposed development of Phase II of the privately owned Quarry Lane School to include 66, 685 square feet of classroom and administrative space to house 750 students (with a maximum school capacity of 950 students) and 55 staff on 10 acres of land. The school would also include recreational facilities, a parking lot- and on-site landscaping. Entitlements would include a prezoning and a Stage 1 and Stage 2 Development Plan for the school. A prezoning of approximately 3.6 acres of land (Kobold property) located to the south of the school site for future residential and open space uses. No development is proposed on the Kobold property at this time. The school site and adjacent Kobold site to the south have been proposed for annexation into the City of Dublin. City of Dublin 100 Civic Plaza Dublin CA 94588 Anne Kinney, Dublin Planning Department (925) 833 6610 East side of Tassajara Road approximately 3 miles north ofI-580 Dr. Sabri Arac President Quarry Lane School 3750 Boulder Street Pleasanton, CA 94566 925-846-9400 6. General Plan designation: 7. Zoning: Medium Density Residential Rural Residential! Agriculture Open Space PD-Planned Development 8. Other public agency required approvals: Site Development Review permits (City of Dublin) Grading and Building permits (City of Dublin) Sewer and water connections (DSRSD) Encroachment permits (City of Dublin and/or Alameda County) Notice ofIntent (State Water Resources Control Board) Reorganization (Alameda County Local Agency Formation Commission) CIty of Dublin Initial Study/Quarry Lane School PA 99-064 Page 13 July 2000 13 ~~ IS~ Environmental Factors Potentially Affected The environmental factors checked below would be potentially affected by this project, involving at least one impact that is a "potentially significant impact" as indicated by the checklist on the following pages. X Aesthetics - Agricultural X Air Quality Resources - Biological Resources X Cultural Resources X Geology/Soils Hazards and Hydrology/Water - Land U se/ Planning - Hazardous Materials X Quality - Mineral Resources X Noise - Population/Housing X Public Services - Recreation X Transportation! Circulation X Utilities/Service - Mandatory Findings Systems of Significance Determination (to be completed by Lead Agency): On the basis of this initial evaluation: _ I find that the proposed project could not have a significant effect on the environment and a Negative Declaration will be prepared. l I find that although the proposed project could have a significant effect on the environment, there will not be a significant effect in this case because the mitigation measures described on an attached sheet have been added to the project. A Negative Declaration will be prepared. _ I find that although the proposed project may have a significant effect on the environment, but at least one effect 1) has been adequately analyzed in an earlier document pursuant to applicable legal standards, and 2) has been addressed by mitigation measures based on earlier analysis as described on the attached sheets, if the effect is a "potentially significant impact" or "potentially significant unless mitigated." An Environmental Impact Report is required, but must only analyze the effects that remain to be addressed. _ I find that although the proposed project could have a significant effect on the environment, there will not be a significant effect in this case because all potentially significant effects (a) have been analyzed adequately in an earlier EIR pursuant to applicable standards, and (b) have been avoided or mitigated pursuant to that earlier EIR, including revisions or mitigation measures that are imposed on the propbsed project. Signature: II~ Date: '://;:'/00 Printed Name: 4NWC KIN"'ey. 1/..Is0Galre; iJl..I'tNNe;t#!. For: City of Dublin Initial Study/Quarry Lane School P A 99-064 Page 14 July 2000 .., \{ '1 \'53 Evaluation of Environmental Impacts 1) A brief explanation is required for all answers except "no impacttl answers that are adequately supported by the information sources a lead agency cites in the parenthesis following each question. A tlno impacttl answer is adequately supported if the referenced information sources show that the impact simply does not apply to projects lik~ the one involved (e.g. the project falls outside a fault rupture zone). A tlno impacttl answer should be explained where it is based on project-specific factors as well as general factors (e.g. the project will not expose sensitive receptors to pollutants, based on a project-specific screening analysis). 2) All answers must take account of the whole action, including off-site as well as on-site, cumulative as well as project-level, indirect as well as direct, and construction as well as operational impacts. 3) "Potentially Significant Impact" is appropriate if there is substantial evidence that an effect is significant. If there are one or more "potentially significant impact" entries when the determination is made, an EIR is required. 4) "Negative Declaration: Potentially Significant Unless Mitigation Incorporated" implies elsewhere the incorporation of mitigation measures has reduced an effect from tlpotentially significant effect" to a "less than significant impact.tI The lead agency must describe the mitigation measures and briefly explain how they reduce the effect to a less than significant level. City of Dublm Initial Study/Quarry Lane School P A 99-064 Page 15 July 2000 IS <1 l '53 Environmental Impacts (Note: Source of determination listed in parenthesis. See listing of sources used to determine each potential impact at the end of the checklist) Note: A full discussion of each item is found following the checklist. I. Aesthetics. Would the project: a) Have a substantial adverse impact on a scenic vista? (Source: 6,7, 9) b) Substantially damage scenic resources, including but not limited to trees, rock outcroppings, and historic buildings within a state scenic highway? (Source: 6,7, 9) c) Substantially degrade the existing visual character or quality of the' site and its surroundings? (Source: 6,7, 9) d) Create a new source of substantial light or glare which would adversely affect day or nighttime views in the area? (Source: 6,7,9) II. Agricultural Resources Would the project: a) Convert Prime Farmland, Unique Farmland or Farmland of Statewide Importance, as showing on the maps prepared pursuant to the Farmland Mapping and Monitoring Program of the California Resources Agency, to a non-agricultural use? (Source: 2) b) Conflict with existing zoning for agriculture use, or a Williamson Act contract? (Source: 2) c) Involve other changes in the existing environment which, due to their location or nature, could result in conversion of . farmland to a non-agricultural use? (Source: 2) III. Air Quality (Where available, the significance criteria established by the applicable air quality management district may be relied on to make the following determinations). 'Would the project: a) Conflict with or obstruct implementation of the applicable air quality plan? (Source: 8 ) b) Violate any air quality standard or contribute substantially to an existing or projected air quality violation? (Source: 8) City of Dublin Initial Study/Quarry Lane School P A 99-064 Potentially Less Than Less than No Significant Significant Significant Impact Impact With Impact Mitigation X X X X X X X X X Page 16 July 2000 c) Result in a cumulatively considerable net increase of any criteria pollutant for which the project region is non-attainment under an applicable federal or state ambient air quality standard (including releasing emissions which exceed quantitative thresholds for ozone precursors? (Source:8 ) d) Expose sensitive receptors to substantial pollutant concentrations? (8) e) Create objectionable odors? (Source:8) IV. Biological Resources. Would the project a) Have a substantial adverse effect, either directly through habitat modifications, on any species identified as a candidate, sensitive, or special status species in local or regional plans, policies or regulations, or by the California Department ofFish and Game or the U.S. Fish and Wildlife Service? (Source:2) b) Have a substantial adverse effect on any riparian habitat or other sensitive natural community identified in local or regional plans, policies or regulations or by the California Department of Fish and Game or the U.s. Fish and Wildlife Service? (Source: 2) c) Have a substantial adverse impact on federally protected wetlands as defined by Section 404 ofthe Clean Water Act (including but not limited to marsh, vernal pool, coastal, etc.) through direct removal, filling, hydrological interruption or other means? (Source:2) d) Interfere substantially with the movement of any native resident or migratory fish or wildlife species or with established native resident or migratory wildlife corridors, or impede the use of native wildlife nursery sites? (Source: 2) e) Conflict with any local policies or ordinances protecting biological resources, such as tree protection ordinances? (Source: 2) ., ~ 1 ('53 Potentially Less Than Less than No Significant Significant Significant Impact Impact With Impact Mitigation X - X X X X X - X X City of Dublin Initial Study/Quarry Lane School P A 99-064 Page 17 July 2000 f) Conflict with the provision of an adopted Habitat Conservation Plan, Natural Community Conservation Plan or other approved local, regional or state habitat conservation plan? (Source: 2) V. Cultural Resources. Would the project a) Cause a substantial adverse impact in the significance of a historical resource as defined in Sec. 15064.5? (Source:2) b) Cause a substantial adverse change in the significance of an archeological resource pursuant to Sec. 15064.5 (Source: 2) c) Directly or indirectly destroy a unique paleontological resource or unique geologic feature? (Source: 2) d) Disturb any human remains, including those interred outside of a formal cemetery? (Source: 2) VI. Geology and Soils. Would the project a) Expose people or structures to potential substantial adverse effects, including the risk ofloss, injury, or death involving: (Source:2, 3, 6, 8) i) Rupture of a known earthquake fault, as delineated on the most recent Alquist-Priolo Fault Zoning Map issued by the State Geologist or based on other known evidence of a known fault ii) Strong seismic ground shaking iii) Seismic-related ground failure, including liquefaction? iv) Landslides? b) Result in substantial soil erosion or the loss of topsoil? (Source 2,3,6,8) c) Be located on a geologic unit or soil that is unstable, or that would become unstable as a result of the project and potentially result in on- and off-site landslide, lateral spreading, subsidence, liquefaction or collapse (Source: 2,3) d) Be located on expansive soil, as defined in Table 13-1-B of the Uniform Building Code (1994), creating substantial risks to life or property? (Source: 3) City of Dublm Initial Study/Quarry Lane School PA 99-064 \1 61 IS':S potentially Less Than Less than No Significant Significant Significant Impact Impact With Impact Mitigation X X X X X X X X X X X X Page 18 July 2000 e) Have soils capable of adequately supporting the use of septic tanks or alternative wastewater disposal systems where sewers are not available for the disposal of waste? (Source: 2) VII. Hazards and Hazardous Materials. Would the project: a) Create a significant hazard to the public or the environment through the routine transport, use or disposal of hazardous materials (Source: 2; 7) b) Create a significant hazard to the public or the environment through reasonably foreseeable upset and accident conditions involving the release of hazardous into the environment? (Source:2, 7 ) c) Emit hazardous emissions or handle hazardous materials, substances, or waste within one-quarter mile of an existing or proposed school? (Source: 2, 7) d) Be located on a site which is included on a. list of hazardous materials sites complied pursuant to Government Code Sec. 65962.5 and, as a result, would it create a significant hazard to the public or the environment? (Source: 2, 7) e) For a project located within an airport land use plan or, where such plan has not been adopted, would the proj ect result in a safety hazard for people residing or working in the project area? (Source: 2, 7) f) For a project within the vicinity of private airstrip, would the project result in a safety hazard for people residing or working in the project area? (Source: 2, 7) g) Impair implementation of or physically interfere with the adopted emergency response plan or emergency evacuation plan? (Source: 2, 7) ,'7;> ~ lS3 Potentially Less Than Less than No Significant Significant Significant Impact Impact With Impact Mitigation X X X , ,X , X X X X City of Dublin Initial Study/Quarry Lane School P A 99-064 ' Page 19 July 2000 h) Expose people or structures to a significant risk of loss, injury or death involving wildland fires, including where wildlands are adjacent to urbanized areas or where residences are intermixed with wildlands? (Source: 2, 7) IX. Hydrology and Water Quality. Would the project: a) Violate any water quality standards or waste discharge requirements? (Source: 2, 8) b) Substantially deplete groundwater supplies or interfere substantially with groundwater recharge such that there would be a net deficit in aquifer volume or a lowering of the local groundwater table level (e.g. the production rate of existing nearby wells would drop to a level which would not support existing land uses or planned uses for which permits have been granted? (Source: 2, 8) c) Substantially alter the existing drainage pattern of the site or area, including through the aeration of the course of a stream or river, in a manner which would result in substantial erosion or siltation on- or off- site? (Source: 6, 8) d) Substantially alter the existing drainage pattern ofthe site or areas, including through the alteration of a course or stream or river, or substantially increase the rate or amount of surface runoff in a manner which would result in flooding on- or off-site? (Source: 2, 7,8) e) Create or contribute runoff water which would exceed the capacity of existing or planned stormwater drainage systems or provide substantial additional sources of polluted runoff? (Source: 2, 7, 8) f) Otherwise substantially degrade water quality? (2) g) Place housing within a lOa-year flood hazard area as mapped on a Flood Hazard Boundary or Flood Insurance Rate Map or other flood delineation map? (2) City of Dublm Initial Study/Quarry Lane School P A 99-064 l~ ~ IS--~ Potentially Less Than Less than No Significant Significant Significant Impact Impact With Impact Mitigation X X X X X X X X Page 20 July 2000 h) Place within a lOa-year flood hazard area structures which impede or redirect flood flows? (2) i) Expose people or structures to a significant risk ofloss, injury, and death involving flooding, including flooding as a result of the failure of a levee or dam? (2) j) Inundation by seiche, tsunami or mudflow? IX. Land Use and Planning. Would the project: a) Physically divide an established community? (Source: 1,2, 6) b) Conflict with any applicable land use plan, policy, or regulation of an agency with jurisdiction over the project (including but not limited to the general plan, specific plan, local coastal plan, or zoning ordinance) adopted for the purpose of avoiding or mitigating an environmental effect? (Source: 1,6) c) Conflict with any applicable habitat conservation plan or natural community conservation plan? (1, 2, 7) X. Mineral Resources. Would the project a) Result in the loss of availability of a known mineral resource that would be of value to the region and the residents of the state? (Source: 2) , b) Result in the loss of availability of a locally important mineral resource recovery site delineated on a local general Plan, specific plan or other land use plan? (Source: 2) XI. Noise. Would the proposal result in: a) Exposure of persons to or generation of noise levels in excess of standards established in the general plan or noise ordinance, or applicable standards or.other agencies? (Source: 2, 8) b) Exposure of persons or to generation of excessive groundborne vibration or ground borne noise levels? (Source: 2, 8) c) A substantial permanent increase in ambient noise levels in the project vicinity above existing levels without the project? (Source: 2; 8) City of Dublin Initial Study/Quarry Lane Schoof P A 99-064 ' '6'D 0"6 'S~ Potentially Less Than Less than No Significant Significant Significant Impact Impact With Impact Mitigation X , X X X X , X X X X X , X Page 21 July 2000 d) A substantial temporary or periodic increase in ambient noise levels in the project vicinity above levels without the project? (Source: 2) e) For a project located within an airport land use plan or, where such a plan has not been adopted, within two miles of a public airport or public use airport, would the project expose people residing or working n the project area to excessive noise levels? (Source: 2, 6) f) For a project within the vicinity of a private airstrip, would the project expose people residing or working in the project area to excessive noise levels? (Source: 2, 6) XII. Population and Housing. Would the project a) Induce substantial population growth in an area, either directly or indirectly (for example, through extension of roads or other infrastructure)? (Source: 2) b) Displace substantial numbers of existing housing, necessitating the construction of replacement housing elsewhere? (10) c) Displace substantial numbers of people, necessitating the replacement of housing elsewhere? (Source: 10) XIII. Public Services. Would the proposal: a) Would the project result in substantial adverse physical impacts associated with the provision of new or physically altered governmental facilities, the construction of which could cause significant environmental impacts, in order to maintain acceptable service rations, response times or other performance objectives for any of the public services? (2, 7) Fire protection? Police protection Schools Parks Other public facilities City of Dublm Initial Study/Quarry Lane School P A 99-064 91 ~ /)6 Potentially Less Than Less than No Significant Significant Significant Impact Impact With lrqpact Mitigation X X X X X X X X X X X X Page 22 July 2000 XIV. Recreation: a) Would the project increase the use of existing neighborhood or regional facilities such that substantial physical deterioration of the facility would occur or be accelerated (Source: 7) b) Does the project include recreational facilities or require the construction or expansion of recreational facilities which might have an adverse physical effect on the environment? (Source: 7) XV. Transportation and Traffic. Would the project: a) Cause an increase in traffic which is . substantial in relation to the existing traffic load and capacity of the street system (i.e. result in a substantial increase in either the number of vehicle trips, the volume to capacity ratio on roads or congestion at intersections)? (4) b) Exceed, either individually or cumulatively, a level of service standard established by the County Congestion Management Agency for designated roads or highways?( 4) c) Result in a change in air traffic patterns, including either. an increase in traffic levels or a change in location that results in substantial safety risks? (2, 4) d) Substantially increase hazards due to a design feature (e.g. sharp curves or dangerous intersections) or incompatible uses, such as farm equipment?( 4) e) Result in inadequate emergency access? (4) f) Result in inadequate parking capacity? (7) g) Conflict with adopted policies, plans or programs supporting alternative transportation (such as bus turnouts and bicycle facilities) (7) CIty of Dublin Initial Study/Quarry Lane School P A 99-064 ~1- "6 (5:' Potentially Less Than Less than No Significant Significant Significant Impact Impact With Impact , Mitigation X X X X , X X X X X Page 23 July 2000 XVI. Utilities and Service Systems. Would the project a) Exceed wastewater treatment requirements of the applicable Regional Water Quality Control Board? (2) b) Require or result in the construction of new water or wastewater treatment facilities or expansion of existing facilities, the construction of which could cause significant environmental effects? (2, 7) c) Require or result in the construction of new storm water drainage facilities or expansion of existing facilities, the construction of which could cause significant environmental effects? (7) d) Have sufficient water supplies available to serve the project from existing water entitlements and resources, or are new or expanded entitlements needed? (2) e) Result in a determination by the wastewater treatment provider which serves or may serve the project that it has adequate capacity to serve the project's projected demand in addition to the providers existing commitments? (2) f) Be served by a landfill with sufficient permitted capacity to accommodate the project's solid waste disposal needs? (2) g) Comply with federal, state and local statutes and regulations related to solid waste? (2) XVI. Mandatory Findings of Significance. a) Does the project have the potential to degrade the quality of the environment, substantially reduce the habitat of a fish or wildlife species, cause a fish or wildlife population to drop below self-sustaining levels, threaten to eliminate a plant or animal community, reduce the number of or restrict the range of a rare or endangered plant or animal or eliminate important examples of the major periods of California history or prehistory? City of Dublin Initial Study/Quarry Lane School P A 99-064 ~ "'~'b l5~ Potentially Less Than Less than No Significant Significant Significant Impact Impact With Impact Mitigation X X X X X X X X Page 24 July 2000 b) Does the project have impacts that are individually limited, but cumulatively considerable? ("Cumulatively considerable" means that the incremental effects of a project are considerable when viewed in connection with the effects of past projects, the effects of other current projects and the effects of probable future projects). c) Does the project have environmental effects which will cause substantial adverse effects on human beings, either directly or indirectly? '8'4 crt I; ~ Potentially Less Than Less than No Significant Significant Significant Impact Impact With Impact Mitigation X ( X Sources used to determine potential environmental impacts 1. Eastern Dublin Specific Plan/General Plan (1994) 2. Eastern Dublin Specific Plan/General Plan EIR (1994) 3 Geotechnical Investigation of the Quarry Lane School Property" Nicholas Engineering Consultants (June 1999 & June 2000) 4 Project Traffic Impact Analysis prepared by Abrams Associates (July 12,2000) 6. Site Visit 7. Discussion with City of Dublin staff or affected special districts 8. Quarry Lane School EIRSCH#97122109, (Alameda Co. Planning, 1999) 9. Other source XVII. Earlier Analyses Earlier analyses may be used where, pursuant to the tiering, program EIR, or other CEQA process, one or more effects have been adequately analyzed in an earlier EIR or negative declaration. Reference Section 15063 (c)(3)(d). a) Earlier analyses used. Identify earlier analyses and state where they are available for review. Portions of the environmental setting, project impacts and mitigation measures for this Initial Study refer to environmental information contained in the 1994 Eastern Dublin Specific Plan/General Plan Environmental Impact Report. (SCH 91103064). This document is referred to in this Initial Study as the "Eastern Dublin EIR." As part of the certification of the EIR, the Dublin City Council adopted a Statement of Overriding Considerations for the following impacts: cumulative traffic, extension of certain community facilities (natural gas, electric and telephone service), regional air quality, noise and visual. City of Dublm Initial Study/Quarry Lane School P A 99-064 Page 25 July 2000 ~~. ~ 15'-~ The certified ErR contains a large number of mitigation measures that will be applied to the proposed Quarry Lane School development. Specific mitigation measures are noted in the text of the following Initial Study. The Initial Study also relies on a previous EIR prepared for the site, the Quarry Lane School EIR, SCH#97122109, certified by Alameda County in 1999. Copies of these document are available for public review at the City of Dublin Planning Department, 100 Civic Plaza, Dublin CA, during normal business hours. City of Dublin Initial Study/Quarry Lane School PA 99-064 ' Page 26 July 2000 <?If, ot tS~ Attachment to Initial Study Discussion of Checklist Legend PS: Potentially Significant LS/M: Less Than Significant After Mitigation LS: Less Than Significant Impact NI: No Impact I. Aesthetics Environmental Setting The project site contains the initial phase ofthe Quarry Lane School, currently under construction. Construction has caused recontouring of the topography adjacent to Tassajara Road and conversion of the previously vacant site to an urban use. The property to the south contains a single family dwelling, landscaping contracting business, nursery and related outbuildings. Properties surrounding the project site are generally vacant, however, the City of Dublin has approved urban development on maj or portions of the Dublin Ranch to the east and south of the school site. A custom single-family dwelling on a large lot exists to the northeast of the site. The project site is located within the Tassajara Road scenic corridor, so designated by both the City of Dublin and Alameda County. The previous EIR certified by the County for the project identified a number of mitigation measures to ensure potential visual impacts of proj~ct construction are reduced to a level of less-than-significant, however, the overall visual impact of the project, including re-grading of the site and . construction of permanent buildings, could not be mitigated to a less-than-significant level. A number of mitigation measures have been included in the County EIR to deal with visual and aesthetic impacts. These are summarized below: · Reduce the amount of site grading; . · Incorporation of rounded features as part of exterior building design; · Development of a planting plan using native and adapted plants for the site; · Replanting the site as soon as possible after grading and construction; · Designing buildings and landscaping to be compatible with surrounding uses and rural character of East Dublin; · Developing a fencing and sign plan compatible with the rural character of the area; · On-site lighting to use full cutoff-shielded lights, use low-wattage lights, minimizing amount of illuminated areas and consider a "dark campus" concept. Proiect Impacts and Mitigation Measures a) Have a substantial adverse impact on a scenic vista? LS/M. Approval and construction of the proposed project would convert the rear portion of the site from a natural area to an urban use. The front portion of the site has recently been converted from rural to an urban use. To minimize the visual impacts of development in the Tassajara Corridor, the City of Dublin prepared Eastern Dublin Scenic Corridor Policies and Standards in 1996. A portion of the Guidelines focus on the Tassajara Creek Valley area, which-includes the project site. For this area, the Guidelines suggestthe following policies and standards: City of Dublin Initial Study/Quarry Lane School P A 99-064 Page 27 July 2000 cst l C ')" oJ '.# · Policy 6: Emphasize valley character by creating viewpoints and view corridors to knolls, foreground hills and to Tassajara Creek. Standard 6.1: Allow intermittent views from Tassajara Rd. to the hills, knolls and creek. Standard 6.2: Where Tassajara Creek intermittent branch crosses Tassajara Road, maintain views to the creek and riparian vegetation and to the open space to the east. · Policy 7: Emphasize the semi-rural character of the area Standard 7.1: Streetscapes should reinforce semi-rural ambience Standard 7.2: Site and articulate buildings to provide interest and reduce perceived density · Policy 8: Provide transition to Tassajara Village Standard 8.1: North of the creek crossing at Tassajara Road, reintroduce more formal village elements. This potential impact was addressed in the Eastern Dublin EIR (Impact 3.8C, Obscuring Natural Features and Impact 3.8F, Alteration of Visual Character of Flatlands) and it was determined that no mitigation measures would reduce this impact to a less-than-significant level. Therefore, the EIR ' concluded this impact would be a potentially significant irreversible change and a Statement of Overriding Considerations has been approved for this impact. The following measures are recommended to reduce impacts to a less-than-significant level: Mitigation Measure la: The project developer shall adhere to applicable Tassajara Creek Valley Scenic Corridor Policies and Standards for development phases proposed in the City of Dublin. In addition, mitigation measures included in the Alameda County Environmental Impact Report to reduce visual impacts, including but not limited to limiting site grading, replanting graded slopes and similar elements shall be complied with. Mitigation Measure Ib: The project developer shall adhere to the following methods, as approved by the City of Dublin Planning Department: a) On-site retaining walls shall be landscaped with fast-growing evergreen vines. b) The chain-link fencing around sports field and on top of retaining walls shall be of green vinyl cladding to reduce visibility and reflectiveness. c) Landscaping along the project frontage shall comply with the City of Dublin Streetscape Master Plans. Mitigation Measure 2: The appearance of the steep slope on the southeast comer of the site (approximately 2:1 slope) shall be reduced through the following methods, as approved by the City of Dublin Planning and Public Works Departments: a) The landscape plan for the project shall designate vegetation suitable for slope areas to ensure slope stability. b) The base of this slope shall be landscaped with dense, fast growing appropriately spaced vertical trees. Tree wells shall be provided to protect trees and encourage healthy growth. City of Dublin Initial Study/Quarry Lane School PA 99-064 Page 28 July 2000 ~? fli l5"3 b) Substantially damage scenic resources, including state scenic highway? LS/M. The project site is located adjacent to Tassajara Road, which is designated as a scenic corridor in the Eastern Dublin Specific Plan/General Plan Adherence to Mitigation Measures 1 and 2, above, will reduce potential impacts to a less-than-significant level. c) Substantially degrade existing visual character or the quality of the site? LS. This impact was addressed in a Statement of Overriding Considerations in the 1994 Eastern Dublin EIR. Therefore, this impact is less-than-significant and no further analysis is required. Adherence to Mitigation Measures 1 and 2 will also serve to reduce impacts to the existing visual character of the area. d) Create light or glare? LS/M. Construction of the proposed project would increase the amount of light and glare due to new street lighting, parking lot lighting, building security lighting and potentially lighting of the playfields. Although some level of new light sources have already been added to the site as part of Phase I construction, new lighting would result in negative aesthetic impacts through the "spill over" of unwanted lighting onto adjacent properties, streets and other areasthat are not intended to be lighted. Implementation of the mitigation measures contained in the Alameda County EIR for Phase I of the project is recommended to reduce spillover of lighting impacts for Phase II to a level of less-than-significant. Mitigation Measure 3: The following measures shall be incorporated into plans and school operations: a. Pole-mounted lights shall be equipped with cut-off lenses and oriented down toward interior streets to minimize unwanted light and glare spill over. b. Building security lighting and other lights shall be directed downward. c. Exterior lighting shall be dimmed or turned off during off-hours. d. All exterior glass panels shall be of non-glare manufacture. e. The project developer shall also work with the City of DublinPolice Services Department to investigate the concept of the "dark campus" concept, if such a concept is consistent with adopted City security ordinances. II. Agricultural Resources Environmental Setting: The Eastern Dublin EIR notes that the school site is located on soils that are classed as "locally important farmland." Although the school site may have been under agricultural production at one time, Phase I of the Quarry Lane School is now under construction. The parcel to the south has been developed as a nursery. The Eastern Dublin Specific Plan has determined that loss of farmland of local importance (Impact 3. liD) would be an insignificant impact should the Eastern Dublin Specific Plan/General Plan be approved and no mitigation measures would be needed. Proiect Impacts and Mitigation Measures a-c) Convert Prime Farmland, conflict with agricultural zoning or convert prime farmland to a non- agricultural use? LS. Although site soils are classed as locally important farmland, neither of the sites are in active agricultural production. The project site is also adjacent to future urbanized areas immediately to the east/south-east. Therefore, less-than-significant impacts with regard to agricultural resources are anticipated. . City of Dublin Initial Study/Quarry Lane School PA 99-064 Page 29 July 2000 ~s crt 15~ III. Air Quality Environmental Setting Dublin is located in the Tri- Valley Air Basin. Within the Basin, state and federal standards for nitrogen dioxide, sulfur dioxide and lead are met. State of California standards for other airborne pollutants, including ozone, carbon monoxide and suspended particulate matter (PM-10) are not met in at leasta portion of the Basin. The Quarry Lane School EIR, prepared by Alameda County Planning Department contains an air quality analysis for the full-build out of the school. The air quality section was prepared by Donald Ballanti, meteorologist and consulting air quality analyst. The air quality section concludes that development of the school wo.uld not result in any significant long-term operational air quality impact. There would be short- term air quality impacts associated with the project, primarily caused by grading of the site and release of airborne fugitive dust. Mitigation Measures included in the EIR to reduce short term air quality impacts to a less-than-significant level include frequent watering of the site during grading, use of dust palliative in place of water trucks where necessary, covering graded areas with buildings, landscaping or similar items. Mitigation measures have been included in the County EIR to deal with air quality impacts. These measures are summarized below: · Frequent watering of graded portions of the site, at least twice daily; · Use of dust palliative chemicals to stabilize graded areas; · Planting or paving of graded areas as soon as possible. Proiect Impacts and Mitigation Measures a) Would the project conflict or obstruct implementation of an air quality plan? LS. The proposed project would not conflict with the local Clean Air Plan adopted by the Bay Area Air Quality Management District, since the proposed amount of non-residential development have been included in Dublin's planned growth as part of Easterh Dublin Specific Plan/General Plan. Therefore, such impacts would, be less-than-significant. b) Would the project violate any air quality standards? LS. Short-term construction impacts related to implementation ofthe project, including grading and excavation, could result in exceedances of air quality standards established by the Bay Area Air Quality Management District (Eastern Dublin EIR, Impacts 3.11/A and B). Adherence to Mitigation Measure 3.11/1.0 and Mitigation Measure 3.11/2.0 contained in the Eastern Dublin EIR will reduce short-term air quality impacts to a less- than-significant level. These mitigation measures minimize the creation of fugitive dust during grading and construction activities and also mandate that construction equipment be kept in proper running order. The Eastern Dublin EIR concludes that potential air quality impacts related to construction equipment could not be mitigated to a less-than-significant impact and a Statement of Overriding Considerations was adopted for this impact. Similarly, potential air quality impacts related to mobile source emissions of Reactive Organic Gasses and Nitrogen Oxide, both precursor indicators of smog, and stationary source emissions were found to exceed regional air quality standards even with mitigation measures, and were included in the Statement of Overriding Considerations (Eastern Dublin EIR Impacts 3 .11/C and E). Since a Statement of Overriding Concerns was adopted for the previous EIR, such impacts would be considered less-than-significant for the purposes of this Initial Study. City of Dublm Initial Study/Quarry Lane School P A 99-064 Page 30 July 2000 qe 'i ls3 c) Would the project result in cumulatively considerable air pollutants? LS. The Eastern Dublin EIR identifies Mobile Source Emissions and Stationary Source Emissions as significant irreversible impacts. Generally such impacts are based on vehicular emission from future traffic within the sub- region as well as stationary sources. A Statement of Overriding Considerations was adopted for long-term impacts, therefore, no additional discussion or analysis is necessary. d,e) Expose sensitive receptors to significant pollutant concentrations or create objectionable odors? LS. Proposed land uses would include a private school with outside play and recreation areas. Although children are considered as sensitive receptors, existing air quality in the area meets state and local emission standards and implementation of mitigation measures for short term construction impacts would ensure that students would not be exposed to significant pollutants. Since the project site is proposed as a private school, there would be no release of objectionable odors, which are not considered as sensitive receptors. Therefore, less-than-significant impacts are anticipated with regard to potential impacts to sensitive recepto~s. IV. Biological Resources Environmental Setting The Eastern Dublin EIR indicates the biological character of the project site is "developed" and "non- native grasslands." Non-native grasslands are characterized as introduced annualweedy species which have replaced native grasses and herbs in a grassland habitat. Introduced grass species include slender wild oat, ripgut grass, soft chess, foxtail and rattail fescue. Native and non-native grasslands on the west side of the school property have been disturbed by grading and building activities associated with Phase One construction ofthe Quarry Lane School. The Kobold site is developed with a single family dwelling and outbuildings associated with the landscape contracting business on the property. A tributary of Tassajara Creek forms the southern boundary of the site. · The Eastern Dublin EIR identifies no known wetlands on the site nor the presence of rare, threatened or endangered animal plant or animal species (Figures 3. 7B and C). However, a Red tailed hawk or other raptor nest is identified in the Eastern Dublin EIR as being located adjacent to the eastern boundary of the site. Proiect Impacts and Mitigation Measures a) Have a substantial adverse impact on a candidate, sensitive, Or special-status species? LS. Based on information contained in the Eastern Dublin EIR, no candidate, sensitive or special-status species exist on the school site. However, based on information contained in the Eastern Dublin EIR, a raptor next may exist to the east of the Kobold site to the south. Although no development is proposed on the Kobold site at this time, prior to future development on this property a preconstruction survey for raptor nests is required by Mitigation Measure 3.7/20.0 to 22.0 of the Eastern Dublin EIR prior to grading activities, with appropriate actions taken at time to ensure that any raptors would be protected. b, c) Have a substantial adverse impact on riparian habitat or federally protected wetlands? LS/M. Based on information contained in the Eastern Dublin EIR, there are no wetlands or riparian features on the school site. There would therefore be no impacts to wetlands or riparian habitats on the school site. However, the southerly boundary of Kobold property is an unnamed tributary creek to Tassajara Creek to the west. A portion of the tributary creek is located on the Kobold site. Since City of Dublin Initial Study/Quarry Lane School PA 99-064 Page 31 July 2000 '41 ~b 153 no development is being proposed at this time on the Kobold property, there would be no impacts to this watercourse or biological resources. Proposals for future development on the Kobold property will be analyzed for impacts to the creek and mitigation measures would be imposed at that time to ensure that any impacts to riparian habitat would be reduced to less-than-significant levels. The provision of utility lines to the site (including but not limited to water, sewer, natural gas and others) may result in impacts to the unnamed Tassajara Creek tributary during the construction phase of utility extensions. The following mitigation shall apply to the extension of utilities to the Quarry Lane School property: Mitigation Measure 4: The following measures shall be incorporated into construction plans and operations related to service line extensions to the Quarry Lane School area: a. Service providers shall coordinate construction plans with appropriate biological regulatory agencies (including but not limited to Army Corps of Engineers, Fish and Wildlife Service, California Department ofFish and Game, Regional Water Quality Control Board) b. Requirements of each of the regulatory agencies shall be followed to reduce impacts to the. unnamed creek and Tassajara Creek. d) Interfere with movement of native fish or wildlife species? NI. The project site is substantially surrounded by a combination of vacant lands to the north and west with recently developed areas to the south as part of Dublin Ranch. Future park and rural residential lands lie to immediate east. There are no stream courses on the school site that could be used as a wildlife migration corridor. Although an unnamed tributary bisects the southerly portion of the Kobold property that could function as a wildlife corridor, no development is proposed for the Kobold site at this time. Future biological analyses will be conducted regarding potential wildlife corridors at the time development is proposed on the Kobold site. Therefore, no impacts are anticipated with regard to movement of fish or wildlife species. e, f) Conflict with local policies or ordinances protecting biological resources or any adopted Habitat Conservation Plans or Natural Community Conservation Plans? NI. No trees are present on the school site. Although trees and a portion of an unnamed creek exist on the Kobold site to the south, no development is proposed for this site at the present time. Therefore, there are no impacts with regard to local tree preservation ordinances or policies. The site is not located within the boundaries of any Habitat Conservation Plans. v. Cultural Resources Environmental Setting The Eastern Dublin area was surveyed in 1988 as part of the Eastern Dublin Specific Plan and associated ElR. Several potentially significant historic and archeological resources were identified in the eastern Dublin area. Proiect Impacts and Mitigation Measures a) Cause substantial adverse change to significant historic resources? NI. The site contains Phase I of the school (currently under construction), the Villa Tassajara and an older single family residence and outbuildings on the Kobold site. No known historically significant resources exist on the subject site. There would therefore be no impacts to historical resources. . City of Dublin Initial Study/Quarry Lane School. P A 99-064 Page 32 July 2000 41 i l'5'3 b, c) Cause a substantial adverse impact or destruction to archeological or paleontological resources? LS. The site is located near the former Santa Rita Rehabilitation Center site and the Chang Su-O-Lin properties on which archeological artifacts were found n the mid-1980's. Development of the school project could have an impact on subsurface archeological and/or palenotological resources. This would be a potentially significant impact. In the event that such resources are encountered. Mitigation Measure 3.9/5.0 and 6.0 contained in the Eastern Dublin Specific Plan EIR establishes procedures to be activated in the event archeological resources are encountered during grading for Phase Two of the school and future development on the project to the south. With adherence to these mitigation measures impacts to archeological or paleontological resources would be less-than- significant, should any be found. d) Disturb any human resources? LS. A remote possibility exists that human resources could be uncovered on the site during construction activities. With adherence to Mitigation Measures 3.9/5.0 and 6.0 any impacts would be less-than-significant. v. Geology and Soils Environmental Setting This section of the Initial Study addresses seismic safety issues, topography and landform, drainage and erosion and potential impacts to localized soil types. Seismic The project site is a part of the San Francisco Bay area, one of the most seismically active regions in nation. The Eastern Dublin EIR notes the presence of several nearby significant faults, including the Calaveras Fault, Greenville Fault, Hayward Fault, and San Andreas Fault. The likelihood of a major seismic event on one or more of these faults within the near future is believed to be high. The geotechnical report indicates that the project site is not part of a Special Studies Zone for faults as identified by the State of California, however, previous geotechnical investigations of the area show inferred faults north of the site (identified as the "Mocho Fault"). The Mocho Fault was mapped by the California Division of Mines and Geology in 1974 and was later evaluated as part of the Alquist-Priolo Special Studies Zone. As part of this evaluation it was concluded that the existence of the Mocho Fault was questionable and geomorphic features could be caused by differential erosion. A second thrust fault system has been inferred in the Coast Ranges of the Bay Area that may be seisimically active. A belt of faults and folds has been mapped in sedimentary rocks south of Mount Diablo, including one identified as the "leading edge-blind thrust, Mount Diablo Domain." Further investigation of this inferred faultby Berlogar Geologic Consultants has concluded that the risk of ground rupture from this inferred fault is low within the project area. Site Soils and Geology The site is within the Diablo Range, an elongare system of northwest trending mountains, hills, ridges and narrow intervening valleys formed within the Coast Ranges of Central California. The site is underlain by underlain by undifferentiated rocks belonging to the Contra Costa Group, Orinda Formation. The "Contra Costa Group consists of non-marine sedimentary rocks, which often have poor slope stability with landslides occurring in both soils and rocks on natural and man-made cut slopes. Page 33 . July 2000 City of DUblin . Initial Study/Quarry Lane School P A 99-064 '13 d"l \5", Soils on the site consist of moderately expansive clays and silts, The more level western area of the site, near the Villa Tassajara, contain alluvium and colluvium from nearby hillsides. The site includes two landslides that are shown on regional landslide maps. Portions of the site have been previously graded and a cut slope on the northern portion of the site appears to have experiences a small mudflow. Landform and Topography The Quarry Lane School site consists of a southwest facing hillside with a relatively flat topped hill in the center and a relatively level area along the western border, adjacent to Tassajara Road. The Kobold site is relatively flat with a gradual slope towards the unnamed tributary of Tassajara Creek to the south. Site elevations range from approximately 440 to 590 feet above mean sea level. Natural topographic conditions have recently been altered on the school property caused by construction of Phase 1 of the Quarry Lane School. Drainage Existing drainage on the site is generally sheet flow in a north to south direction. The County EIR includes a number of mitigation measures to deal with geologic impacts. These are summarized below: · Completion of a geotechnical report for the site, identifying appropriate construction methods and techniques consistent with generally recognized engineering principles; · Reduction in the amount of proposed site grading; · Review of the final grading plan by a geotechnical engineer; · Identification of specific methods to minimize risk of landslides and expansive soils as part of the geotechnical report. Project Impacts and Mitigation Measures a) Expose people or structures to potential substantial adverse impacts, including loss, injury or death related to ground rupture, seismic ground shaking, groundfailure, or landslides? LS/M. The site is subject to ground shaking caused by a number of regional faults identified above. Under moderate to severe seismic events which are probable in the Bay Area over the next 30 years, buildings, utilities and other improvements constructed on the site would be subject to damage caused by ground shaking. Since the site is not located within an Alquist-Priolo Earthquake Safety Zone, the potential for ground rupture is anticipated to be minimal. Adherence to Mitigation Measures MM 3.6/1.0 through 8.0 contained in the Eastern Dublin EIR will ensure that new structures built on the site will comply with generally recognized seismic safety standards so that ground shaking impacts would be reduced . to a level of less-than- significant. As part of the project, the site is proposed to be graded to recontourthe site, allowing for the development of future buildings, the playfield, parking areas and landscaping. Grading would also occur to improve and control site drainage. Mitigation Measures 3.6/17.0-26.0 have been adopted as part of the Eastern Dublin Specific Plan ErR to reduce potential impacts to slopes to a level of less- than-significant. These mitigation measures require the preparation of site-specific soils and geotechnical reports, minimizing grading on steep slopes and adherence to Uniform Building Code and other City requirements for grading. Nicholas Engineering Consultants have prepared City of Dublin Initial Study/Quarry Lane School P A 99-064 Page 34 July 2000 q t..\ ~t l S ') preliminary soils reports dated June 1, 1999 and June 12,2000, that contains specific recominendations regarding grading, soil compaction and construction methods to ensure that future buildings and improvements adhere to applicable safety standards. Based on discussions with the Dublin Public Works and Building Departments, a final soils report must be prepared to ensure that all construction details of the school comply with Uniform Building Code requirements and engineering standards. Mitigation Measure 5a: Prior to issuance of a grading permit by the City of Dublin, the project developer shall submit a final soils report for review and approval by the City of Dublin Public Works and Building Departments. The final report shall include specific construction techniques to ensure consistency with generally recognized engineering standards. Mitigation Measure 5b: Prior to issuance of grading permit by the City of Dublin, the project developer shall submit a Slope Stabilization Program addressing the steep slope on the southeast corner of the site (approximately 1.5:1 slope). The Slope Stabilization Program shall include but not be limited to planning plans, compaction plans and appropriate measures to ensure stability of this slope The Dublin Building and Public Works Departments will use the soils report to review detailed construction plans for the project. Adherence to this mitigation measure will reduce potential landslide and ground failure impacts to less-than-significant levels. b) Is the site subject to substantial erosion and/or the loss of topsoil? LS. The Eastern Dublin EIR notes that an impact of constructing all of the land uses identified in the Eastern Dublin Specific Plan/General Plan would be an increase of erosion and sedimentation caused by grading activities. Mitigation Measures 3.6/27.0 and 3.6/28.0 requires that specific project developers prepare and implement interim erosion plans as part of grading impacts. With adherence to these mitigation measures, potential erosion impacts will be less-than-significant. c-d) Is the site located on soil that is unstable or expansive or result in potential lateral spreading, liquefaction, landslide or collapse? LS. Based on the Nichols Engineering Consultants Report (June 12,2000), the site can support the type of project envisioned by the applicant. The report also contains several specific soils-related and construction techniques that must be followed to assure compliance with the Uniform Building Code and other safety requirements Adherence to Mitigation Measures 3.6/14.0 through 16.0 contained in the Eastern Dublin EIR will also serve to reduce potential lateral spreading and related soil hazards impacts to proposed structures. e) Have soils incapable of supporting on-site septic tanks if sewers are not available? NI. The project developer has indicated that school facilities constructed on the site would be connected to a sanitary sewer provided by Dublin San Ramon Services District. Therefore, no impact is anticipated with regard to septic tanks. City of Dublin Initial Study/Quarry Lane School PA 99-064 Page 35 July 2000 c, S- tJ"b I S .~ VII. Hazards and Hazardous Materials EnvirOrimental Setting The site is partially vacant and contains Phase One of the Quarry Lane School (currently under construction) and a single family residence and several nursery buildings on the Kobold property south of the school. The previous use of the site was likely for farming and/or grazing. Proiect Impacts and Mitigation Measures a-c) Create a significant hazard through transport of hazardous materials or release or emission of hazardous materials? NI. The proposed use of the site would include additional phases of the Quarry Lane School and continued use of the landscape contracting business to the south. Neither site would include use or transport of hazardous material so there would be no impact with regard to use or release of hazardous materials. d) Is the site listed as a hazardous materials site? NI. The project site is not listed as a hazardous materials site, so there would be no impacts in this regard. e,f) Is the site located within an airport land use plan of a public airport or private airstrip? NI. The site is located northwesterly of the Livermore Municipal Airport but outside of any safety or referral zone for this airport. No impacts are therefore anticipated regarding airport safety issues. g) Interference with an emergency evacuation plan? NI. Adequate emergency access will be provided via proposed driveways onto Tassajara Road. On-site access will be reviewed during the Site Development Reviewprocess. Due to the provision of existing and planned adequate access, there would be no impact with regard to emergency evacuation plans. h) Expose people and structures to a significant risk of loss, injury or death involving wildlandfires or where residences are intermixed with wildlands? LS. The project site lies adjacent to existing vacant grasslands which is subject to grassland fires during the dry portions of the year. However, the long- term plan for the area is for urbanization. Development of the project site and surrounding area would include adding new water lines for firefighting purposes as well as new fire stations and personnel in the nearby area. Less-than-significant impacts are therefore anticipated VIII. Hydrology and Water Quality Environmental Setting The project site is within the Alameda Creek watershed. Tassajara Creek, to which the project site and the uplands of the Amador Valley drains, is one of the major tributaries of Alameda Creek, draining approximately 27 square miles. Stormwater runoff for the project site drains directly into a small unnamed natural defined drainage, which then drains west into Tassajara Creek, then south to Alameda Creek in Sunol and finally to San Francisco Bay. The school property itself contains no wetlands or riparian features, although an unnamed tributary of Tassajara Creek is located in the southerly portion of the Kobold property immediately to the south of the school. No major storm drain lines serve the site and it is not located within a 100-year flood hazard area as defined by the Federal Emergency Management Agency. A number of mitigation measures have been included in the County EIR to deal hydrology and drainage impacts. These are summarized below: City of Dublin Initial Study/Quarry Lane School P A 99-064 Page 36 July 2000 ,\b ~b \53 · Reducing the amount of stormwater runoff from the site through appropriate grading techniques; · Constructing planned improvements during the dry season to minimize water borne erosion; · Replanting the site as soon as possible after grading and construction; · Limiting the amount of grading by appropriate staking; · Preparing a Stormwater Pollution Prevention Plan; · Verifying the size and location of existing storm drain features; · Property owner participation in County-funded programs to improve local drainage near the site. Project Impacts and Mitigation Measures a) Violate any water quality standards or waste discharge requirements? LS/M. Construction of improvements anticipated as part of the school project would necessitate additional grading and overcovering of the soil in order to construct building pads, recreational play fields, parking lots and driveways and similar features. The amount of grading is not known at this time, however, proposed grading is anticipated to increase the possibility of soil erosion into creeks and other bodies of water, on and off the project site. This could be a potentially significant impact. Mitigation Measure 6 will ensure that potential water quality impacts are reduced to a less-than-significant level. Mitigation Measure 6: The project developer shall prepare a Stormwater Pollution Prevention Plan (SWPPP), listing Best Management Practices to reduce construction and post-construction activities to a less than significant level. Measures may include, but shall not be limited to revegetation of graded areas, silt fencing and other measures. The SWPPP shall conform to standards adopted by the Regional Water Quality Control Board and City of Dublin and shall be approved by the City of Dublin Public Works Department prior to issuance of grading permits. Specific development projects containing five acres or more are also required to obtain a Notice ofIntent from the State Water Resources Control Board prior to commencement of grading. b) Substantially deplete groundwater recharge areas or lowering of water table? LS. Although the currently vacant site would be converted to an urban use, this impact has been addressed in the Eastern Dublin EIR (Impact 3.5/Z) and Mitigation Measures 3.5/49.0 and 50.0 adopted as part of the EIR, so groundwater impacts would be reduced to a less -than-significant level and no further analysis is required. c) Substantially alter drainage patterns, including streambed courses such that substantial siltation or erosion would occur? LS/M. The Eastern Dublin Specific Plan ErR acknowledges that implementation of the Eastern Dublin Specific Plan would change existing natural drainage patterns on individual sites. In this instance, proposed changes would include grading and re-contouring much of the site and filling surface drainage swales with underground pipes and culverts to accommodate storm water runoff. The overall direction of stormwater flow in a southwesterly direction and the direction is not anticipated to significantly change. The amount of increased stormwater runoff from the site is not known. To ensure that additional quantities and peak flows from the site would be consistent with storm drain master plans for East Dublin and that surrounding properties would not be affected by stormwater runoff from the site, the following mitigation measure shall be adhered to: City of Dublin Initial Study/Quarry Lane School P A 99-064 Page 37 July 2000 Ct1 Ot "5-" Mitigation Measure 7: Prior to issuance of a grading permit by the City of Dublin, the project developer's civil engineer shall submit written documentation to the Dublin Public Works Department that (a) anticipated stormwater runoff from the site will be consistent with master storm drain plans. If, in fact, anticipated stormwater flows exceed any master plan assumptions, the project developer shall make arrangements satisfactory to the Dublin Director of Public Works that storm water flows can be safely accommodated. (b) Stormwater runoff from the site will not adversely impact the property to the south. Adherence to Mitigation Measure 7 would reduce potential erosion and drainage impacts to a less- than-significant level. d) Substantially alter drainage patterns or result inflooding, either on or off the project site? LS. Approval of the proposed project and construction of additional phases of the school would not significantly change drainage patterns within the site area. Existing surface drainage flows would be slightly altered due to anticipated site grading. Drainage would likely be routed through newly constructed underground pipes, culverts and similar facilities. It is anticipated that on-site storm drain improvements would be constructed to connect with existing and planned drainage improvements within the Eastern Dublin area. This would be considered a less-than-significant impact. Similarly, the site lies above the 100-year flood elevation. e) Create storm water runoff that would exceed the capacity of drainage systems or add substantial amounts of polluted runoff? LS. Construction of on-site improvements is anticipated to lead to greater quantities of storm water runoff. Adherence to Mitigation Measure 7 would reduce this impactto a less-than-significant level. f) Substantially degrade water quality? LS/M. Refer to the analysis and mitigation measure under "a," above. g) Place housing within a I DO-year flood hazard area as mapped by a Flood Insurance Rate Map? NI. The proposed project does not include a housing component, so there would be no impacts with regard to placing housing within a 100-year flood plain: h, i) Place within a I DO-year flood hazard boundary structures that impeded or redirectfloodflow, including dam failures? LS. The proposed project would not place structures within a 100-year flood. hazard area, since the project includes proposed school construction. Since the project would be consistent with the Eastern Dublin Master Drainage Plan, there would be less-than-significant impacts regarding redirection of flood flows. j) Result in inundation by seiche, tsunami or mudflows? NT. The site isnot located near a major body of water that could result in a seiche. The risk of potential mudflow is considered low since no historic landslides or mudflows have been identified on the site (see Figure 3.6-c ofthe Eastern Dublin ErR). City of Dublin Initial Study/Quarry Lane School P A 99-064 Page 38 July 2000 L\~ u."b \5~ IX. Land Use and Planning Environmental Setting The project site is site is currently within the unincorporated portion of Alameda County and construction of Phase I improvements for the school are proceeding under County jurisdiction. No development is currently proposed for the Kobold property, although this property is proposed for annexation to the City of Dublin and DSRSD. The site also lies within the City of Dublin sphere of influence and is also within Eastern Dublin Specific Plan/General Plan area. The property owner of the school site has requested annexation to the City of Dublin and Dublin San Ramon Services District to receive a higher range and level of urban services than is presently available in the unincorporated County area. Refer to the Project Description for a discussion of both the project site setting, existing uses on the site and requested land use entitlements by the project proponent. Proiect Impacts and Mitigation Measures a) Physically divide an established community? NI. The project is located within the Eastern Dublin Specific Plan area and has been planned for urban uses since the original adoption of the Eastern Dublin Specific Plan/General Plan in 1994. Therefore there would be no disruption of any established community~ b) Conflict with any applicable land use plan, policy or regulation? NI. The proposed project would be consistent with goals and policies contained in the Eastern Dublin Specific Plan/ General Plan. No changes are being proposed to the Specific Plan or General Plan. Eastern Dublin Scenic Corridor Goals and Standards, which serve to implement the Eastern Dublin Specific Plan, would also be complied with. c) Conflict with a habitat conservation plan or natural community conservation plan? NI. No such plan has been adopted within the Eastern Dublin Specific Plan/General Plan area. There would therefore be no impact to a habitat conservation plan or natural community conservation plan for the proposed project. X. Mineral Resources Environmental Setting The site contains no known mineral resources. Proiect Impacts and Mitigation Measures a, b) Result in the loss of availability of regionally or locally significant mineral resources? NI. The Eastern Dublin EIR does not indicate that significant deposits of minerals exist on the site, so no impacts would occur. XI. Noise Environmental Setting Major sources of noise on and adjacent to the project site include distant noise generated by vehicles passing Eastern Dublin planning area on 1-580, traffic. sources on Tassajara Road and from aircraft flyovers. City of Dublin Initial Study/Quarry Lane School PA 99-064 Page 39 July 2000 ctl d 15~ () Based on Figure 3.10 B contained in the Eastern Dublin EIR, the western portion of the project site would be subject to significant long-term noise exposure, defined as 60 decibels CNEL for exterior noise for residential land uses. A number of rnitigation measures have been included in the County EIR to deal with noise impacts during construction. These include: · Include noise generation requirements and limitations in contractor specifications; · Placement of high noise generating equipment toward the southeast end of the school site and limit placement of noisy equipment near residences. Project Impacts and Mitigation Measures a) Would the project expose persons or generation of noise levels in excess of standards established by the General Plan or other applicable standard: LS. Construction of the proposed development project would result in incremental increases in long-term noise related to additional vehicular traffic related to the project, noise associated with playing children and short-term related to project construction. The Alameda County EIR has determined minimal and less-than significant impacts caused by vehicular traffic or schQol activities. Noise related to exterior school operations would primarily involve children using the recreational play fields towards the center and rear of the school site. Surrounded uses would be largely shielded by new buildings and noise levels would only occur during the middle of ,day, when school is in session. Mitigation Measures 3.10/4.0 and 5.0 contained in the Eastern Dublin EIRwill control short-term construction noise. These measures r~quire the project developer to prepare a Construction Noise Mitigation Plan and to comply with the City's Noise Management Ordinance. b) Exposure of people to excessive groundborne vibration or groundborne noise levels? LS. Approval of the projectwould not result in long-term increases in groundborne vibration, since a private school use would be constructed. Short-term vibration that may result from construction would be controlled through adherence to Eastern Dublin Specific Plan Mitigation Measures 3.10/4.0 and 5.0. Therefore, this impact would be considered less-than-significant. c) Substantial increases in permanent in ambient noise levels? LS. Refer to item "a;" above. d) Substantial temporary or periodic increase in ambient noise levels in the project vicinity above levels without the project? LS. Refer to item "a," above. e, f) For a project located within an airport land use plan, would the project expose people to excessive noise levels? NI. The project site would not be affected by Livermore Municipal Airport due to the fact that the airport is located approximately two miles southeasterly of the project. No impacts are therefore anticipated. City of Dublin Initial Study/Quarry Lane School P A 99-064 Page 40 July 2000 \ t>~ c-b (53 XII. Population and Housing Environmental Setting Recent information regarding population and housing in Dublin has been published in Projections '98, published by the Association of Bay Area Governments (ABAG). According to ABAG, Dublin's population (including the sphere of influence) was 26,300 in 1995 and is projected to be 33,300 in 2000. By way of cornparison, the State Department of Finance has determined that Dublin's population was 28,707 as of January 1,1999. The adopted Eastern Dublin Specific Plan/General Plan anticipates an ultimate population of 12,458 dwelling units in the Eastern Dublin planning area at full buildout of all land uses within the planning area. The Specific Plan/General Plan also calls for a maximum of9,737,000 square feet of commercial, office and industrial uses at full buildout of the Plan. Proiect Impacts and Mitigation Measures a) Induce substantial population growth in an area, either directly or indirectly? NI. Approval of the proposed project is consistent with the existing, approved Eastern Dublin Specific Plan/General Plan. Potential impacts related to growth inducement have been addressed in the Eastern Dublin Specific Plan EIR There would therefore be no impact associated with growth inducement. b,c) Would the project displace substantial numbers of existing housing units or people? NI. The site is occupied by Phase I of the Quarry Lane School, presently under construction. A single family has been constructed on the Kobold property immediately to the south, however, there is no plan to remove this house as part ofthe project. Implementation of the proposed project would therefore displace neither housing units or people. No impacts are therefore anticipated in regard to population displacement. XIII. Public Services Environmental Setting . Fire Protection. Fire protection services are handled by the Alameda County Fire Department. . Police Protection: Police and security protection is provided by Alameda County Sheriff Department. . Schools. The Dublin Unified School District (DUSD) provides educational services to the City of Dublin. . Maintenance. Maintenance of streets, roads and other governmental facilities are the responsibility of Alameda County Public Works Department. · Solid Waste Service: Private service. The Alameda County EIR identified the following mitigation measures with regard to public service impacts: · Appointment of on-site safety inspector specifically for flammable materials; City of Dublin Initial Study/Quarry Lane School PA99-064 Page 41 July 2000 1()1 ~b IS?> · Appropriate refueling and maintenance of construction equipment; · Construction of on-site water facilities, including building sprinklers, fire hydrants and other measures identified by the Fire Department; Environmental Impacts and Mitigation Measures a) Fire protection? LS. Construction of the proposed project would increase demand for fire and emergency services by increasing the amount of permanent daytime population on the site. This impact was previously addressed in the Eastern Dublin EIR. Features which would be incorporated into the project as part of existing City ordinances and development requirements ~nd to assist in reducing impacts would include installation of on-site fire protection measures such as fire sprinklers, installation of new fire hydrants and meeting minimum fire flow requirements contained in the Uniform Building Code and Uniform Fire Code. The project developer must also adhere to Mitigation Measures 3.4/6.0-13.0 contained in the Eastern Dublin EIR. These mitigation measures relate to funding new fire facilities in eastern Dublin, ensuring adequate water supplies and pressure for fire suppression, and minimizing wildland fire hazards. With adherence to previously adopted mitigation measures and normal City requirements, impacts related to fire protection would be reduced to a less-than-significant level. b) Police protection? LS. Incremental increases in the demand for police service could be expected should the project be approved and future developments constructed. Impacts would generally include increases in calls for service. This increase in calls for service would be offset through adherence to City of Dublin safety requirements from the Police Department, including the non- residential security ordinance. The project developer would also be required to adhere to Mitigation Measures 3.4/1.0-5.0 set forth in Eastern Dublin EIR. These measures deal with establishing funding mechanisms for additional police personnel and facilities and require the inclusion of security provisions into individual development projects. With adherence to previously adopted mitigation me~sures and normal City requirements, including preparation of a Master Security Plan, impacts related to police protection would be reduced to a less-than-significant level. c) Schools? NI. The proposed project involves the development of a private school. Since this is a non-residential land use and would provide for classroom space in addition to educational facilities maintained by the Dublin Unified School District, no impacts are anticipated with regard to impacts to local schools. d) Maintenance of public facilities, including roads? LS. Approval of the project and construction of additional phases of the private school would incrementally increase the long-term maintenance demand for roads and other public facilities. However, such additional maintenance demands will be offset by additional City fees and property tax revenues accruing to the City of Dublin. Less-than- significant impacts are anticipated and no mitigation measures are needed. e) Solid waste generation? LS. Approval of the project and construction of additional phases of the Quarry Lane School would incrementally increase generation of solid waste. The Eastern Dublin EIR requires adherence to Mitigation Measures 3.4/37.0-40.0. These measures require the preparation of a solid waste management plan and assurances that adequate solid waste landfill capacity exists prior to approval of individual development projects. City of Dublin Initial Study/Quarry Lane School P A 99-064 Page 42 July 2000 1 b 2.- tf6 61 XlV. Recreation Environmental Setting There are no parks or other recreational facilities on the project site. Proiect Impacts and Mitigation Measures a) Would the project increase the use of existing neighborhood or regional parks? NI. The proposed project would notresult in new residences being constructed within the Eastern Dublin area Therefore, no impact would result to neighborhood or regional park facilities. b) Does the project include recreational facilities or require the construction of recreational facilities? NI. The proposed project does not include residential development, so there would be no impact on recreational facilities or require the construction of new recreational facilities. xv. Transportation/Traffic [This section is based on a traffic analysis for Quarry Lane School prepared by Abrams Associates, Transportation Consultants, July, 2000. The full text of the traffic analysis is on file in the City of Dublin Public Works Department.] Environmental Setting Existing Transportation Network The project site is served by a number of regional freeways and sub-regional arterial and collector roadways, including: Tassajara Road is a two-lane rural road connecting Santa Rita Road at 1-580 to the south and continues north to the Town of Danville. North of Contra Costa County line, it is named Cameo Tassajara and is used primarily for local traffic in the Tassajara Valley, with some through traffic. The average daily traffic volume on Tassajara Road is approximately 16,800 vehicles south of Dublin Boulevard, 9,900 vehicles per day between Dublin Boulevard and Gleason Drive and 7,500 vehicles per day north of Gleason Drive. This road is currently being widened to four lanes from 1- 580 to North Dublin Ranch Boulevard. Dublin Boulevard is a major east-west arterial roadway in the City of Dublin. It contains four lanes largely fronted by retail and commercial uses west of Dougherty Road. Between Dougherty Road and Tassajara Road, Dublin Boulevard is a two-lane road with an exception between Hacienda Drive and Tassajara Creek, where it is a four-lane road. Average Daily Traffic varies from approximately 29,300 vehicles east of San Ramon Road to 5,300 vehicles west of Tassajara Road. Gleason Drive is an east-west two-lane road parallel to and north of Dublin Boulevard. It serves the Santa Rita Rehabilitation Center, Federal Correctional Institute and existing developments along Gleason Drive. Gleason Drive connects Tassajara Road with Arnold Road and carries between 5,100 vehicles per day (west of Tassajara Road) to approximately 1,000 vehicles per day (west of Hacienda Drive). Portions of Gleason Drive are being widened to four lanes. Pimlico Drive is a two-way, two-lane roadway providing access to commercial and residential areas east of Santa Rita Road and south ofI-580. City of Dublin Initial Study/Quarry Lane School P A 99-064 Page 43 July 2000 It".3 i lS?, Existing Intersection Operations The traffic analysis prepared by Abrams Associates found that existing intersections near the project site currently operate at acceptable levels of service, defined by the City of Dublin as Level of Service "C" or better. Intersections investigated include: · Santa Rita Road/I-580 EB Ramps/Pimlico Dr. · Tassajara Rd.lI-580 WB Ramps · Tassajara Rd./Dublin Blvd. · Tassajara Rd.lGleason Dr. · Tassajara Rd.lProject Driveway Previous Trip Generation on the School Site The school site has previously been used for the Villa Tassajara, a 9,500 square foot building used for weddings, social gatherings, training seminars and similar gatherings. Based on maximum use of the structure for weddings, the traffic report estimates that up to 600 vehicles per day traveled on Tassajara Road from this use. The Villa Tassajara building has since ceased being used for social functions and has been incorporated into the Quarry Lane School as an administration building. Public Transit WHEELS operates Route 5 along Santa Rita Road and Pimlico Drive south ofI-580. Future Baseline Conditions To implement the transportation and circulation aspects of the Eastern Dublin Specific Plan/General Plan, the City of Dublin has undertaken a comprehensive program of transportation improvements in the community. The purpose of this program is to accommodate anticipated traffic from the Eastern Dublin area. Overall, the program includes upgrades to 1-580 freeway intersections, construction of new roads and improvements to existing roads. The program is primarily funded by fees levied on new development in Eastern Dublin and it is anticipated that the project sponsor will pay their required fees to the City as well. . Future Baseline Intersection Operations The traffic impact analysis for this proposed project also analyzed the future baseline intersection operations with existing traffic, traffic from approved but not yet built or occupied development and traffic from other pending developments in the area. The traffic analysis included various mitigation measures which would be the responsibility of these other developments and which would be consistent with the City's Traffic Improvement Program, described above. With this future development in the Eastern Dublin area and appropriate traffic improvements, the traffic analysis found that the operation of the majority of study intersections could be maintained at LOS "D" or better. The Tassajara Road/Project Driveway intersection would operate at Level of Service F during the peak hour morning conditions. A number of mitigation measures have been included in the County EIR to deal with traffic and circulation impacts. These are summarized below: · Dedication of right-of-way along the Tassajara Road frontage; · Construction of a southbound left-turn lane into the site from Tassajara Road if widening of Tassajara Road is not completed prior to opening of Phase II of the school; · Payment of fees to fund traffic signals; · Participation in placing traffic safety signs along Tassajara Road to warn of a school zone; City of Dublin Initial Study/Quarry Lane School P A 99-064 Page 44 July 2000 \(:jL.\. e~ \5, 0 · Construction of a six-foot high fence along Tassajara Road to preclude site access except at approved . locations · Adoption of a Transportation Demand Management Program (TDM) to reduce number of single occupant vehicle trips generated by the school; · If Tassajara Road is not widened to at least four lanes prior to Phase III, the developer shall delay opening of Phase III until such improvements are made, or the project developer shall construct missing improvements · Preparation of a contingency parking program for special events at the school; Project Impacts and Mitigation Measures a) Cause an increase in traffic which is substantial to existing traffic load and street capacity? LS/M. The traffic analysis, which analyzed the impacts of full construction of the Quarry Lane School but not any future development on the Kobold site, concludes that implementation of the proposed project would have a potentially significant impact with regard to anticipated traffic at project entrance driveway and Tassajara Road. The proposed project entrance on Tassajara Road will require signalization to allow for safe left turn movements to and from the site. The traffic analysis included consideration of existing traffic on nearby roadways, traffic from projects that have been approved but not yet constructed and traffic from the proposed project. School trip generation rates from other private schools in the area were used for the analysis. Trips generated from the school were then distributed to nearby streets and roads. With the mitigation measure listed below, impacts to local streets and nearby intersections would be reduced to a less-than-significant level with regard to traffic and transportation. With the traffic improvements being installed in the Eastern Dublin area and mitigation measures associated with future approved and pending developments, all study intersections near the site, with the exception of Tassajara Road and the project driveway, would operate at satisfactory LOS "D" or better conditions. Mitigation .Measure 8: The project developer shall install a traffic signal at the intersection of the project driveway and Tassajara Road. The traffic signal shall be in place at the time Phase 2 of the school opens for operation. b) Exceed, either individually or cumulatively, a LOS standard established by the County CMAfor designated roads)? NI. Based on the information contained in the traffic analysis, all nearby intersections can be mitigated to Level of Service D or better, which exceeds the minimum Level of Service E established by the Alameda County Congestion Management Agency. Impacts to CMA- designated facilities would therefore be less-than-significant. c) Change in a change of air traffic patterns? NI. The proposed project would have no impact on air traffic patterns, since it involves a private school development. ~ d) Substantially increase hazards due to a designfeature or incompatible use? LS/M. The project traffic report notes that school project on the site could be expected to cause potentially significant traffic safety impacts, specifically, vehicular movements on site from parents dropping off children at the start of the morning classes and the possibility that parents could stop their vehicle in front of the school on Tassajara Road to drop off or pick up school children. The following mitigation measure is proposed to reduce this potential impact to a less-than-significant level: CIty of Dublin Initial Study/Quarry Lane School P A 99-064 Page 45 July 2000 t \) S" <r6 \ S", Mitigation Measure 9a: The Quarry Lane School shall stagger the opening and closing times of the school day for the various parts of the school. The proposed hours are: . Elementary School: Open at 8:30 a.m.; close at 3:30 p.m. . Middle School: Open at 8:00 a.m.; close at 3:00 p.m. . High School: Open at 7:30 a.m.; close at 2:30 p.m. These hours may be adjusted to optimize school traffic circulation. Mitigation Measure 9b: The Quarry Lane School project shall include a fence along the Tassajara Road frontage to preclude parents from dropping off students in other than approved on-site locations. Appropriate signs shall be installed in front of the school prohibiting parking or stopping in front of the school. e) Result in inadequate emergency access? LS. The current need for emergency access is low, since phase one of the school is under construction. Completion of phase one and construction of additional phases of the school would increase the need for emergency vehicle access to the site. Since the proposed site development plan indicates that the driveway on Tassajara Road currently meets or will meet minimum City design requirements potentialimpacts relating to inadequate emergency access would be less-than-significant . The site plan for the project is also being reviewed by the Alameda County Fire Department and Dublin Police Services to ensure that on-site circulation standards, including minimum turning radii and vehicle stacking, are met. f) Inadequate parking capacity? LS/M. Parking for the proposed school would comply with the minimum number of on-site parking spaces required by the City's parking ordinance. Based on the proposed Phase 1 and 2 program for Quarry Lane School, 165 parking spaces are required. The . proposed site plan indicates that 166 parking spaces would be provided to serve the school. The site plan as proposed assumes a new road alignment for TassajaraRoad. This proposed alignment enables the property to provide parking in accordance with the ordinance. In the event this alignment should be altered the following mitigation measure will ensure that any impacts to parking are reduced to a less-than-significant level. Mitigation Measure 10: In the event that the proposed road alignment for Tassajara Road is altered, the applicant shall demonstrate that the site is adequately parked in compliance with the City's parking regulations prior to the issuance of a site development review permit. g) Hazards or barriers for pedestrians or bicyclists? NI. The proposed school development would include on-site bicycle parking to accommodate students and staffwho choose to ride. The widening and improvement of Tassajara Road will provide for sidewalks on one or both sides of the road where none currently exist. No impacts to pedestrian or bicycle access is therefore anticipated. XVI. Utilities and Service Systems Environmental Setting The project site is served by the following service providers: . Sewage treatment and local water supply: Private well and septic system. City of Dublm Initial Study/Quarry Lane School P A 99-064 Page 46 July 2000 I t.\~ t}b fS3 · Regional water supply and distribution: Alameda County Flood Control and Water Conservation District, Zone 7 · Storm drainage: Sheet flow Environmental Impacts and Mitigation Measures a) Exceed wastewater treatment requirements of the RWQCB? LS. The regional wastewater treatment plant is currently operating in compliance with local, state and federal water quality standards. Approval of the project and annexation to the City of Dublin and DSRSD would increase wastewater flows to the plant, but would not cause the plant to exceed such standards. Mitigation Measures 3.5/1.0 through 22.0 contained in the Eastern Dublin EIR deal with wastewater treatment collection, treatment and disposal. Adherence to these mitigation measures will ensure that potential wastewater impacts ofthe project would be less-than-significance. b) Require new water or wastewater treatmentfacilities or expansion ofexistingfacilities? LS. Approval of the project and annexation to the City of Dublin and DSRSD would require the extension of waster and sewer lines to serve the school site. Such extensions have been planned as part of the East Dublin Specific Plan/General Plan and have been analyzed in the Eastern Dublin EIR. Less-than-significant impacts would therefore result. The project developer will also be required to conform with Mitigation Measures 2.5/24.0 through 43.0 contained in the Eastern Dublin EIR regarding water service c) Require new storm drainagefacilities? LS/M. Approval of the project and annexation to the City of Dublin would require additional on-site drainage facilities. The project developer has indicated that new on-site drainage facilities would be built as part of project construction. Since the amount of increased stormwater runoff is not known at this time, which could be significant, adherence to Mitigation Measure 7 would ensure that less-than-significant impacts would result. The project developer will also be required to adhere to Mitigation Measures 3.5/44.0 through 52.0 contained in the Eastern Dublin EIR regarding drainage. Also refer to Mitigation Measure 6 of this document. d) Are sufficient water supplies available? LS. Approval of the proposed project under the auspices of the Specific Plan/General Plan Amendment would result in an increased demand for water for domestic and irrigation purposes. This amount of increased water demand could be accommodated by DSRSD and Zone 7 facilities and long-term supplies. The project developer would be required to provide any local extensions and connections to nearby facilities. This conclusion is based on information contained in the Eastern Dublin ElK Less-than-significant impacts would therefore result. e) Adequate wastewater capacity to serve the proposed project? LS. Approval of the proposed and annexation to the City of Dublin and DSRSD would increase the demand for wastewater treatment over present conditions. Presently, the site is served by a private septic system and there is no demand for wastewater treatment service. Based on information contained in the Eastern Dublin EIR, DSRSD has indicated that the local wastewater treatment plant has adequate capacity to serve the proposed project. Less-than-significant impacts are therefore anticipated with regard to wastewater treatment. e, f) Solid waste disposal? LS. Construction of proposed school under the auspices of the Eastern Dublin Specific Plan and General Plan would incrementally increase generation of solid waste. Over the long term, the amount of solid waste reaching landfill would decrease as statewide regulations mandating increased recycling take effect. Information contained in the Eastern Dublin EIR City of Dublin Page 47 Initial Study/Quarry Lane School July 2000 PA 99-064 IGl cY~ 15~ indicates that the solid waste hauler can accommodate this project. Less-than-significant impacts are therefore anticipated with regard to solid waste disposal. The project developer must also adhere to Mitigation Measures 3.4/37.0 through 40.0 contained in the Eastern Dublin EIR regarding solid waste disposal. g) Comply with federal, state and local statutes and regulations related to solid waste? NI. The City of Dublin and the solid waste hauler would ensure that construction occurring on the project site would adhere to federal, state and local solid waste regulations. xv. Mandatory Findings of Significance a) Does the project have the potential to degrade the quality of the environment, substantially reduce the habitat of a fish or wildlife species, cause a fish or wildlife population to drop below self- sustaining levels, threaten to eliminate a plant or animal community, reduce the number of or restrict the range of a rare or endangered plant or animal or eliminate important examples of the major periods of California history or prehistory? No. The preceding analysis indicates that the proposed project will not have a significant adverse impact on overall environmental quality, including biological resources or cultural resources with the implementation of mitigation measures recommended in the Initial Study. b) Does the project have impacts that are individually limited, but cumulatively considerable? ("Cumulatively considerable" means that the incremental effects of a project are considerable when viewed in connection with the effects of past projects, the effects of other current projects and the effects of probable future projects). No, although incremental increases in certain areas can be expected as a result of constructing this project, including additional traffic, air emissions, light and glare, short term noise emissions, the project site lies within an approved specific plan whose cumulative effects were previously reviewed in the Eastern Dublin EIR. c) Does the project have environmental effects which will cause substantial adverse effects on human beings, either directly or indirectly? No. No such impacts have been discovered in the course of preparing this Initial Study. City of Dublin Initial Study/Quarry Lane School PA 99-064 Pt;:lge 48 July 2000 l~ % 15'3 Initial Study Preparer Jerry Haag, Urban Planner Agencies and Organizations Consulted The following agencies and organizations were contacted in the course of this Initial Study: City of Dublin Eddie Peabody Jr., AICP, Community Development Director Anne Kinney, Associate Planner Kevin Van Katwyk, Senior Civil Engineer Ray Kuzbari, Traffic Engineer Rose Macias, Dublin Police Department Ed Laudini. Alameda County Fire Department References Eastern Dublin Specific Plan/General Plan Environmental Impact Report, Wallace Roberts and Todd, 1994. Quarrv Lane School Final Environmental Impact Report for the 2060th Zoning Unit, Alameda County Planning Department, February 1999 Quarry Lane School Geotechnical Investigation, Nicholas Engineering Consultants, June 1, 1999 and June 12, 2000 Quarry Lane School, Updated Traffic and Circulation Study, Abrams Associates, July 12, 2000 City of Dublm Initial Study/Quarry Lane School PA 99-064 Page 49 July 2000 l D 1. ct 1'53 QUARRY LANE SCHOOL ANNEXATION AND PRE ZONING P A 99-064 Response to Mitigated Negative Declaration Comments August 2000 ATTACHMENT 9 II 6 ~b l S -:) Introduction This report compiles all letters received by the City of Dublin during the twenty-day Mitigated Negative Declaration public review period and includes responses to each of the comments. Summary of Comment Letters Comment letters were received by the City of Dublin from the following agencies and organizations. . Comment Letter 1: California Regional Water Quality Control Board, San Francisco Bay Region . Comment Letter 2: East Bay Regional Parks District . Comment Letter 3: Alameda County Flood Control District Zone 7 . Comment Letter 4: Michael E. Kyle, McNichols Randick O'Dea & Tooliatos, LLP Letter 1: Regional Water Quality Control Board Comment 1: Comment 1: Since the project would disturb more than 5 acres of land during construction, a Notice ofIntent must be filed with the State Water Resources Control Board Response: Page 37 of the Initial Study (second paragraph of Mitigation Measure 6) identifies the requirement to obtain a Notice ofIntent. Comment 2: The project could create runoff that could degrade water quality. Preparation of a Stormwater Pollution Prevention Plan for the project is therefore recommended. Response: Mitigation Measure 6 requires the project developer to prepare a Stormwater Pollution Prevention Plan (SWPPP) for construction and post-construction activities. The mitigation measure further requires the SWPPP to be prepared to Regional Water Board standards Comment 3 :The proposed development has the potential to impact wetlands and water quality on the site. Response: No wetlands have been identified on the Quarry Lane School site, the portion of the overall project site for which immediate development is being proposed. It appears wetlands exist on a portion ofthe Kobold property. There are existing uses on the site and no further development is being proposed at this time. A full analysis of wetlands will be completed if and when development is proposed on the Kobold site. Letter 2: East Bay Regional Parks District Comment I: Under XIV, Recreation (a) , "Would the project increase use of existing neighborhood or regional parks such that physical deterioration would occur or be accelerated?" The Initial Study determined that "no impacts" would occur. Cumulative impacts on recreation facilities in the area are increasing, including the Tassajara Creek Regional Park. The East Bay Regional Parks District anticipates heavy and increased use of this facility as a result of school development, including vandalism, increased litter and fire hazard from smoking. 2 \ \ \ tit \53 Response: Although some amount of use of the Tassajara Creek Regional Park could occur, the students using the proposed Quarry Lane School will be provided with extensive open space and recreation facilities on the school site, including a large play field. Given that nearly all students attending the school will arrive and depart by private vehicles, and that the school property will be fenced off to discourage pedestrian traffic, actual use of the Regional Park is anticipated to be minimal. The school is separated from the Regional Park by Tassajara Road, which is planned as a major, six-lane, high speed arterial road, which will also form a barrier to Park access. If the Regional Park is to be used by students during school hours, such visits will be organized by the school with the Park District in accordance with the regulations of the Park District and supervised to minimize excessive litter, vandalism and smoking. Comment 2: There is a risk of increased trespass of Quarry Lane students onto Camp Parks military facility. Response: Development ofthe Quarry Lane School will result in essentially a closed campus, since there are no services provided in the area for students. Also, students will typically arrive and depart the site via private vehicles. Since Camp Parks site is located west of a major Road (Tassajara Road) and Tassajara Creek, the potential incidence oftrespass onto Camp Parks property is considered low. Comme:l1t 3: Although no development is proposed for the Kobold site at this time, additional runoff and soil erosion may impact Tassajara Creek and Trail. Identify any new storm drain outfalls into Tassajara Creek tributaries proposed for Phases I or II. Response: No storm drain outlets are proposed into Tassajara Creek tributaries as part of either Phase I or Phase II. On-site storm drain facilities constructed as part of the Quarry Lane School are planned to be connected to the existing storm drain facilities in Tassajara Road. Project drainage and runoff impacts were addressed in both the Mitigated Negative Declaration and County EIR. The County EIR contains extensive discussion of the potential impact of future project runoff on Tassajara Creek under Impact D-3. The EIR states that there is a possibility that a future outfall may be needed. Ifultimately, a new outfall is required, then the permitting scheme set forth in the County EIR would be followed. As noted in the District's letter, no changes are anticipated regarding storm drain runoff or erosion from the Kobold site, since no development is proposed at this time. Comment 4: The Initial Study states that service providers shall coordinate construction plans with biological regulatory agencies to reduce potential impacts to Tassajara Creek and associated tributaries. Extensive development on the Dublin Ranch has occurred south of the site and . cumulative impacts to the tributary need to be assessed. The Comprehensive Stream Restoration Program was designed to cover this tributary, and requires the City to enhance theTassajara Creek Corridor and establish and maintain liaisons with appropriate regulatory agencies. This could provide educational opportunities for students. Response: Mitigation measure 4 included in the Initial Study requires mitigation for any impacts associated with extending utilities along the tributary. Further discussions with the project civil engineer indicate that there will be no impacts to local creeks with utility line extensions. The proposed water line extension to serve the school would be located adjacent to the existing alignment of Tassajara Road and would therefore be located above the creek. Extension of a sewer line would be completed below the creek tributary via a process of boring and jacking. 3 l\'2... tb 1'53 The school's storm drain system would be connected to the existing storm drain system located within Tassajara Road. Analysis of cumulative impacts to local creeks would therefore not be warranted. Letter 3: Alameda County Flood Control District Zone 7 Comment 1: Stormwater impacts from the site should also be evaluated as to whether it will adversely impact the flood control facility, Tassajara Creek. The project developer shall make satisfactory arrangements to the Dublin Director of Public Works and Zone 7 to ensure storm water flows can be safely accommodated. Response: Mitigation Measure 7, contained in the Initial Study, requires the project developer's civil engineer to furnish a letter to the Dublin Public Works Department that stormwater flows can be safely accommodated. This Mitigation Measure will ensure that stormwater impacts can be safely accommodated in local and regional drainage facilities. The project developer will be required by the City to provide necessary system upgrades. Comment 2: When the facility is connected to the District's sewer, the existing septic tank should be removed or decommissioned in such a manner that surface contaminants cannot reach the groundwater table. Response: This comment will be made a condition of project approval. Comment 3: If the on-site well becomes obsolete, the well must be properly sealed or destroyed per Alameda County Ordinance 73-68. Response: This comment will be made a condition of project approval. Letter 4: Michael E. Kyle, McNichols Randick O'Dea & Tooliatos, LLP Comment 1 :The Commentor believes that an Environmental Impact Report should be prepared to analyze grading and noise impacts of the Quarry Lane School Phase 2 project, as the site plan has changed to that originally considered by Alameda County in the Quarry Lane School EIR. Response: The Quarry Lane School (Phase 1 and 2) project was the subject of an EIR which was certified by Alameda County Board of Supervisors in 1999. The EIR analyzed all potential impacts of the development of a private school with up to 1,200 students in 68 classrooms, located in one existing building (9,600 square feet) and three new buildings totaling 78,000 square feet. The EIR analyzed the impacts of the full buildout of the school (Phase 1 and 2). However, Alameda County only rezoned the property to allow the development of Phase 1. Because environmental review must be conducted at the earliest stage possible and for the entire project as contemplated, a conceptual layout for Phase 2 was prepared, but was not approved by the County. The original site plan for Quarry Lane School considered in the EIR placed the school buildings at the center of the site with a series of parking lots along the northern property line. The recreational facilities were located to the rear of the buildings adjacent to the site's eastern 4 \\~ IJ~ ,s3 boundary. The City participated actively in the County's CEQA review. The certified EIR considered two alternatives to the proposed project, the 'reduced grading alternative' and the 'reduced scale alternative'. The 'reduced grading alternative' is similar to the current project in that it proposed buildings of a similar size (approximately 86, 000 square feet) and location on the site. The buildings were located on the western section of the property at the lower to mid portion of the hillside, the northeastern hillside was left undisturbed. The EIR also addressed potential impacts of the 'reduced grading alternative' including grading and noise. This EIR analysis has been supplemented with the Initial Study and Mitigated Negative Declaration prepared by the City for the current project. In addition, the project site is within the Dublin General Plan's Eastern Extended Planning Area and the Eastern Dublin Specific Plan Area, which was the subject of an Environmental Impact Report, certified by the City of Dublin in 1993. The General Plan/Specific Plan EIR is a program EIR, which analyzed the environmental issues related to the land use locations, development plans and policies contained in the Eastern Dublin Specific Plan. The EIR also anticipated subsequent project applications related to future development in Eastern Dublin. Mitigation measures adopted for the Specific Plan continue to apply to implementing projects such as the current project. A Mitigated Negative Declaration has been prepared based on the analysis contained in both the County EIR and EDSP EIR. The City is satisfied that the EIR supplemented by an Initial Study and Mitigated Negative Declaration prepared for the project (Kobold property and Quarry Lane School Phase 2 prezoning and annexation) adequately addresses and mitigates any potential impacts of the project. Once an EIR has been prepared for a project, a supplemental or subsequent EIR is only required to be prepared if I) substantial changes are proposed in the project that will require major revisions in the EIR, 2) substantial changes occur with respect to the circumstances under which the project is being undertaken that will require major revisions in the EIR, or 3) new information of substantial importance to the project, which was not known and could not have been known at the time the EIR was certified as complete, becomes available. The certified EIR considered the 'reduced grading alternative' which is similar to the current site plan regarding the placement and size of the proposed buildings. No new information or substantial changes have been identified that would necessitate the preparation of a new EIR. Comment 2: The Commentor references an agreement that was entered into between Mr. Nielsen and Dr. Arac. The agreement was provided to the City. Response: The City has received and reviewed this agreement. This is a private agreement between two adjacent property owners. The City is not a party to this agreement and the agreement does not preclude the City from approving a different site plan for the Phase 2 development of Quarry Lane School. Comment 3: The reconfiguration of the site plan, results in both the playground and the Phase 2 building being located closer to Mr. Nielsen's house. The site plan proposes a large cement/asphalt playfield at the 480 to 500-foot contour line Response: The original Phase 2 site plan presented to Alameda County was conceptual in nature. This site plan placed the building along the southern property line and recreational play fields towards the center of the site at the 500-foot contour line. After further refinement of the site plan, it was realized that to accommodate the original location of the Phase 2 building and 5 HI{ ~lS;> play area, three ten-foot high retaining walls would be required. The retaining walls would have been located along the entire hillside from the northwestern property line to the southeastern property line. The highest retaining wall would have been sited at the 520- foot contour. The construction of three tiers often-foot high retaining walls ranging from the 490-520-foot contours would have created significant visual impacts. In addition, the visual impacts of a three- story building located at the southern property line would be significant. The provision of adequate on-site parking was constrained by the presence of steep inclines and retaining walls. The site plan for the current project was designed to avoid these impacts. The proposed Phase 2 site plan locates the building (including classrooms and gymnasium) to the rear of the Phase 1 building to minimize the use of retaining walls, reduce grading and visual impacts and provide adequate on-site parking. The relocation of the Phase 2 building and play field eliminated the need for extensive retaining walls along the northern portion of the site. The building was designed to more closely fit the natural topography by stepping the building up the hillside, the northern wall of the building itself acts as a retaining wall. The relocation of the building from the southern property line and the removal of the three-tier retaining wall system reduces visual impacts from both Tassajara Road and Mr. Nielsen's property. The relocation of the Phase 2 building also allowed for the creation of a flat playfield area at the southeastern portion of the site. Thereby, allowing the play field to be moved from the 500-foot contour line at the center of the site (per Phase 1 and 2 site plan) to the 484-foot contour at the southeastern portion of the site. This in effect moves theplayfield area and associated activities further from Mr. Nielsen's home. The playfield material will not consist of cement/asphalt but rather grass. The tennis court located to the immediate east of the playfield would be asphalt. The siting of the Phase 2 building will be closer to Mr. Nielsen's home, however the City believes that this is not an adverse change and will be of benefit to Mr. Nielsen over the previous Phase 2 concept. Instead of viewing the long face of a building, Mr. Nielsen will be viewing the north-end ofthe building partially buried into the hill and the roof of the new building, foreshortened. The roof has been designed to break-up the mass of the building and to screen the HV AC units. Comment 4: The movement of the Phase 2 building and the playground area would produce significant off-site noise impacts. Response: The County EIR for the Quarry Lane School analyzed the potential noise impacts of the project and concluded that school activities (which includes activities in the classroom and in the playfield) will not be significant. The EIR determined that surrounding uses would be largely shielded by the new buildings and topography. The EIR states that the effects of the 'reduced grading alternative' on noise would generally be the similar to those for the original project. An updated noise study has been prepared by Wilson Ihrig and Associates to evaluate the potential noise impacts as a result of the revised Phase 2 site plan. A copy of this noise study is attached as Attachment A. The City of Dublin General Plan identifies a Community Noise Environment Level (CNEL) of 60dB to be considered 'normally acceptable' for residential development The noise study evaluated the future noise environment compared to a CNEL of 60dB but also estimated potential noise levels generated by future activities on the site. The study determined that the average noise levels produced by approximately 100 children at play would be in the range of 65-70 dBA at approximately 100 feet from the center of the play area. Noise levels would be increased by approximately 5-6 dBA if 300-400 children were at play. Mr. Nielsen's home is 6 ll5 ~ \53 located approximately 560 feet from the center of the playfield and will be partially shielded by the topography of the site. The study determined that average noise levels at the Nielsen residence produced by the playfield are projected to be approximately 57-63 dBA accounting for distance and ignoring shielding. In the event 300-400 students were located on the playfield at the same time, maximum noise levels could reach 73 dBA. According to the Applicant, Dr. Arac due to the segregated recess schedules for the elementary, middle and high school students and the limited recreational space on the site, it is unlikely that 300-400 students would be on playfield at anyone time. According to Table 2 of the Noise Study there is no projected increase above the CNEL of 60dB and therefore there is no significant impact. The study concludes that play area activities are not expected to significantly affect the average noise levels since these activities will occur for rehitively short periods of time and primarily during daytime hours. The noise study also analyzed potential noise levels produced by activities within the Phase 2 building. The building will contain classrooms and a gymnasium and would be site of various school assemblies and sporting events. The gymnasium is located within the center of the building and is separated by a perimeter lobby and additional classrooms to the exterior wall to the east and north respectively. The building shell itself provides a barrier to noise travelling to the outside. Based on the worst case scenario, that is all students and faculty are located within the gymnasium and the gymnasium doors and exterior windows are open, it is anticipated that the maximum noise level at the Nielsen residence would be between 48-58 dBA. According to Table 3 of the Noise Study there is no projected increase above the CNEL of 60dB and therefore there is no significant impact. Comment 5: The quantity of earth movement in the current proposal is greater than envisioned when the project was proposed to the County. The planners at the County of Alameda were sensitive to the natural configuration of the property and urged the applicant to redraw its plans to move site development generally westward and southward to avoid disturbing any more of the natural hillside than necessary. Response: The EIR prepared for the Quarry Lane School analyzed potential impacts of the original Phase 2 site plan and the 'reduced grading alternative'. However, the EIR did not include details regarding the quantity of earth movement required to accommodate the Quarry Lane School buildings and play fields. After, the applicant's design team further refined the Phase 2 site plan, it was realized that to accommodate the original location of the Phase 2 buildings and play fields, grading of the northern hillside and an extensive retaining wall system would be required. The original Phase 2 site plan contained in the EIR, indicated the placement of the buildings, but did not show final grading contours. (See also next response) Comment 6: The proposed site plan would result in a far greater cut and fill operations. Response: Under the original project plans, the applicant's engineer estimates that in order to accommodate the Phase 2 buildings along the southern property line and central recreational fields, approximately 165,000 cubic yards of dirt would have been needed to be cut. The current Phase 2 site plan before the City proposes a cut of approximately 63,294 cubic yards, a fill of approximately 24,107 cubic yards. The Initial Study incorrectly stated that 87, 401 cubic yards of dirt would be moved. The actual amount of earth to be moved is 63, 294 cubic yards which is equal to the amount of material to be cut, not the sum of the cut and fill as indicated by the 87,401 number. 7 \l6 ~ (5""3 The City is satisfied that the cut and fill operations currently proposed to accommodate the Phase 2 building and play fields will retain a larger portion of the natural hillside without the need for an extensive retaining wall system. Comment 7: The Commentor objects to the conclusion that a Mitigated Negative Declaration is appropriate as the movement of 87, 401 cubic yards of earth on site will be a significant impact. Response: The grading impacts of the 'reduced grading alternative', a similar site plan in both the location and size of buildings to the current project was analyzed in the County EIR. To supplement this analysis, an Initial Study/Mitigated Negative Declaration was prepared to analyze potential site-specific impacts of the current project. As referenced above the Initial Study incorrectly stated that 87, 401 cubic yards of dirt would be moved. The actual amount of earth to be moved is 63, 294 cubic yards which is equal to the amount of material to be cut. Therefore, the quantity of cubic yards to be moved as a result of the current Phase 2 site plan is not considered a significant impact. Refer to Comment 1 and 6 above for additional responses. 8 >~ wm.~ It., Secretary for Environmental Protection California Regional Water Quality Control Board I'li San Francisco Bay Region Internet Address: http://www.swrcb.ca.gov 1515 Clay Street, Suite 1400, Oakland, California 94612 Phone (510) 622-2300 .. FAX (510) 622-2460 Gray Davis Governor Letter 1 Date: July 26, 2000 File No. 2198.09 (MYM) ~.e-C I/ur; ~/"4S'O Otllli.IIi 1 2000 Pi A. . ~IlItIttQ Mr. Eddie Peabody, Jr. Director of Community Development City of Dublin P.O. Box 2340 Dublin, CA 94568 Re: Quarry Lane School, Annexation and Prezone, Mitigated Negative Declaration Dear Mr. Peabody: We have received the above referenced mitigated negative declaration and offer the following comments with which the Regional Board is concerned. The purpose of this project is to annex and prezone 13.6 acres ofland located within the Eastern Dublin Specific Plan Area. The application also includes a Planned Development Prezone/ Development Plan for Phase 2 development of Quarry Lane School. The project site is located at 6363 and 6237 Tassajara Road. The proposed project includes construction of 66,600 square feet of floor area to accommodate new classrooms, a gymnasium, new recreational play fields, landscaping, and parking for 172 vehicles. 1. The proposed development would disturb more than five acres of land during construction. It must be covered under the State NPDES General Permit for Discharges of Storm Water Associated with Construction Activity (General Permit). This can be accomplished by filing a Notice ofIntent with the State Water Resources Control Board, Division of Water Quality. The project sponsor must propose and implement control measures that are consistent with the General Permit and with the recommendations and policies of the local agency and the R WQCB. 2. This project may create runoff water that would exceed the capacity of existing or planned stormwater drainage systems or provided additional sources of polluted runoff. In addition, substantial alterations to the drainage pattern of the site may result. in substantial erosion or siltation. Therefore, proj ect impacts should be minimized by developing and implementing a Storm Water Pollution Prevention Plan (SWPPP). A SWPPP is required by the General Permit. The SWPPP should be consistent with the terms of the General Permit, the Manual of Standards for Erosion & Sedimentation Control Measures by the Association of Bay Area Governments (ABAG), policies and recommendations of the local urban runoff program (city and/or county), and the Staff Recommendations of the RWQCB. Preparation of a SWPPP should be a condition of development. Implementation of the SWPPP should be enforced during the construction California Environmental Protection Agency 6 Recycled Paper I\~ tJ l5~ o -2- period via appropriate options such as citations, stop work orders, or withholding occupancy permits. The Regional Board has prepared "Directions for preparing a SWPPP," which is. available from the Board at (510) 622-2304. 3 The proposed development has the potential to adversely impact wetlands and water quality on . the site. Section 404 ofthe Clean Water Act (covering, dredging, or filling of waters ofthe . United States, including wetlands) sequences the order in which proposals should be approached. First, impacts to wetlands or waters of the State must be avoided to the maximum extent practicable. Second, the remaining impacts must be minimized. Finally, the remaining unavoidable adverse impacts to wetlands or waters of the State must be mitigated. Mitigation will be preferably in-kind and on-site, with no net destruction of habitat value. Impacts to wetlands or waters of the State must be avoided to the maximum extent practicable. lfthe project will disturb any jurisdictional wetlands or waters of the State, SeGtion 401 Water Quality Certification will be necessary. The Regional Board is unable to offer more spec~fic comment at this time. However, r have attached a copy of our General Comments, which discuss the Regional Board's area of responsibility, and which should help guide in the preparation of further CEQA documentation. Regional Board staff also encourage the lead agency to obtain a copy of "Start at the Source," a design guidance manual for stormwater quality protection from the Bay Area Stormwater Management Agencies Association. This mm;mal may be obtained at most city planning offices. If you have any questions, please call Emily Guglielmo at (510) 622-2344 or e-mail at stu26@rb2.swrcb.ca.gov. ~~vn~ Martin Musonge Associate W.R.C.E. cc: w/o Attach.: State Clearinghouse Enclosure California Environmental Protection Agency o Recycled Paper j. e California Regional Water Quality Control Boardutt San Francisco Bay Region Winston H. Hickox Secretaryl for Environmental Protection Internet Address: http://www.swrcb.ca.gov 1515 CIay.Street, Suite 1400, Oakland, California 94612 Phone (510) 622-2300. FAX (510) 622-2460 Gray Davis Governor General Comments The San Francisco Regional Water Quality Control Board (Regional Board or RWQCB) is charged with the protection of the Waters of the State of California in the San Francisco Bay Region, including wetlands and stormwater quality. The Regional Board is responsible for administering the regulations established by the Federal Clean Water Act. Additionally, the California Water Code estabiishes broad state authority for regulation of water quality. The San Francisco Bay Basin Water Quality Control Plan (Basin Plan) explains the Regional Board'sstrategy for regulating water quality. The Basin Plan also describes the range of responses available to the Regional Board with regard to actions and proposed actions that degrade or potentially degrade the beneficial uses of the Waters of the State of California. NPDES Water quality degradation is regulated by the Federal National Pollutant Discharge Elimination System (NPDES) Program, established by the Clean Water Act, which controls and reduces pollutants to water bodies from point and nonpoint discharges. In California, the program is administered by the California Regional Water Quality Control Boards. The Regional Board issues NPDES permits for discharges to water bodies in the San Francisco Bay Area, including Municipal (area- or county-wide) Stormwater Discharge Permits. Projects disturbing more than five acres of land during construction must be covered under the State NPDES General Permit for Discharges of Storm Water Associated with Construction Activity (General Permit). This can be accomplished by filing a Notice ofIntent with the State Water Resources Control Board, Division of Water Quality. An NOI and the General Permit can be obtained from the Board at (510) 266-2300. The project sponsor must propose and implement control measures that are consistent with the General Permit and with the recommendations and policies of the local agency and the RWQCB. Projects that include facilities with discharges of Storm Water Associated with Industrial Activity must be covered under the State NPDES General Permit for Discharges of Storm Water Associated with Industrial Activity. This may be accomplished by filing a Notice ofIntent. The project sponsor must propose control measures that are consistent with this, and with recommendations and policies of the local agency and the RWQCB. In a few cases, the project sponsor \TI~y apply for (or the RWQCB may require) issuance of an individual (industry- or facility-specific) permit. The RWQCB's Urban Runoff Management Program requires Bay Area municipalities to develop and implement storm water management plans (SWMPs). The SWMPs must include a program for implementing new development and construction site storm water quality controls.. The objective of this component is to ensure that appropriate measures to control pollutants from new development are: considered during the planning phase, ,before construction begins; implemented during the construction phase; and maintained after construction, throughout the life of the project. California Environmental Protection Agency o Recycled Paper l~ db \S~~ In general, if a proposed project impacts wetlands or Waters of the State and the project applicant is unable to demonstrate that the project was unable to avoid adverse impacts to wetlands or Waters of the State, water quality certification will be denied. 401 Certification may also be denied based on significant adverse impacts to wetlands or other Waters of the State. Storm Water Quality Control Stonn water is the major source of fresh water to creeks and waterways. Storm water quality is affected by a variety of land uses and the pollutants generated by these activities. Development and construction activities cause both site-specific and cumulative water quality impacts. Water quality degradation may occur during construction due to discharges of sediment, chemicals, and wastes to nearby stonn drains or creeks. Water quality degradation may occur after construction is complete, due to discharges of petroleum hydrocarbons, oil, grease, and metals from vehicles, pesticides and fertilizers from landscaping, and bacteria from pets and people. Runoff may be concentrated and storm water flow increased by newly develop'ed impervious surfaces, whi.ch will mobilize and' transport .ppllutants deposited on these surfaces to stonn drains and creeks. Changes in runoff quantity or velocity may cause erosion or siltation in streams. Cumulatively, these discharges will increase pollutant loads in creeks and wetlands within the local w.atershed, and ultimately in San Francisco Bay. To assist municipalities in the Bay Area with complying with an area-wide NPDES Municipal Stonn Water Pennit or to develop a Baseline Urban Runoff Program (if they are not yet a co-permittee with a Municipal Stonn Water Pennit), the Regional Board distributed the Staff Recommendations for New and Redevelopment Control for Storm Water Programs (Recommendations) in April 1994. The Recommendations describe the Regional Board's expectations of municipalities in protecting stonn water quality from impacts due to new and redevelopment projects, including establishing policies and requirements to apply to development areas. and projects; initiating appropriate planning, review, approval, and inspection procedures; and using best management practices (BMPs) during construction and post-construction. . Project impacts should be minimized by developing and implementing a Storm Water Pollution Prevention Plan (SWPPP). A SWPPP is required by the State Construction Storm Water General Pennit (General Permit). The SWPPP should be consistent with the terms of the General Pennit, the Manual of Standards for Erosion & Sedimentation Control Measures by the Association of Bay Area Governments (ABAG), policies and recommendations of the local urban runoff program (city and/or county), and the Recommendations of the RWQCB. SWPPPs should also be required for projects that may have impacts, but which are not required to obtain an NPDES permit. Preparation of a SWPPP should be a condition of development. Implementation of the SWPPPshould be enforced during the construction period via appropriate options such as citations, stop work orders, or withholding occupancy pennits. Impacts identified should be avoided and minimized by developing and implementing the types of controls listed below. Explanations of the controls are available in the Regional Board's construction Field Manual, available from Friends of the .San Francisco Estuary at (510) 286-0924, in BASMAA's Start at the Source, and in the California Storm Water Best Management Practice Handbooks. ... 3 )2.\ ($& \'5'3 Chemical and Waste Management The project should minimize impacts from chemicals and wastes used or generated during construction. This should be done by developing and implementing a plan or set of control measures. The plan or control measures should be included in the SWPPP: The plan should specify all control measures that will be used or which are anticipated to be used, including, but not limited to, the following: · Designate specific areas of the site, away from streams or storm drain inlets, for storage, preparation, and disposal of building materials, chemical products, and wastes. . Store stockpiled materials and wastes under a roof or plastic sheeting. . Store containers of paint, chemicals, solvents, and other hazardous materials stored in containers .under cover during rainy periods. · Berm around storage areas to prevent contact with runoff. · Cover open Dumpsters securely with plastic sheeting; a tarp, or other cover during rainy periods. · Designate specific areas of the site, away from streams or storm drain inlets, for auto and equipment parking and for routine vehicle and equipment maintenance. . . . Routinely maintain all vehicles and heavy equipment to avoid leaks. · Perform major maintenance, repair, and vehicle and equipment washing off-site, or in designated and controlled areas on-site. · Collect used motor oil, radiator coolant or other fluids with drip pans or drop cloths. · Store and label spent fluids carefully prior to recycling or proper disposal. · Sweep up spilled dry materials (cement, mortar, fertilizers, etc.) immediately--do not use water to wash them away. · Clean up liquid spills on paved or impermeable surfaces using "dry" cleanup methods (e.g., absorbent materials, cat litter, rags) and dispose of cleanup materials properly. · Clean up spills on dirt areas by digging up and properly disposing of the soil. · Keep paint removal wastes, fresh concrete, cement mortars, cleared vegetation, and demolition wastes out of gutters, streams, and storm drains by using proper containment and disposal. Post-Construction The project should mlmmlze impacts from pollutants that may be generated by the project following construction, when the project is complete and occupied or in operation. These pollutants may include: sediment, bacteria, metals, solvents, oil, grease, and pesticides, all of which are typically generated during the life of a residential, commercial, or industrial project after construction has ceased. This should be done by developing and implementing a plan and set of control measures. The plan or control measures should be included in the SWPPP. The plan should specify all control measures that will be used or which are anticipated to be used, including, but not limited to, the source controls and treatment controls listed in the Recommendations. Appropriate control measures are discussed in the Recommendations, in: · Table 2: Summary of residential post-construction BMP selection . Table 3: Summary of industrial post-construction BMP selection · Table 4: Summary of commercial post-construction BMP selection Additional sources of information that should be consulted for BMP selection include the California Storm Water Best Management Practice Handbooks; the Bay Area Preamble to the California Storm 5 AUG-07-2000 MON 03:24 PM FAX NO. 4 P. 02 \)..1.-- 06 ( s:; l~ AS'. BAY. REG ION A L PARK DISTR1CT ---~--=>---~-~ Letter 2 tlOAR(l OF DInT-CJlOllS Carol Scvarin 1'I<l>.i<l(,nl Wmd5 John $(llI1U V,"Q PrcolClOil1 W'lrcl2 Ayn WWlikamp 1",~::!.t!rllrt'r W:ordS T~'d (Iadlr.' S(~~"'l..lry W~rcJ7 S!:lvEilly LMf. Wllld(j DO/Jg Sidefl W~rii ~ Jean S,O w.lId I August 7, 2000 Anne Kinney Community Development Department City of Dublin tOO Civic Plaza D~lb1in) CA 94568 via fax (925) 833-6628, original to fonow by mail RE: Tassajara Creek Regional Park and Trail- PA 99-064 Quarry Lane School AnneXatria)ft.l'BrlOn d P (,:,/lnlll.11 M'\nCl90r an . rezone H(1st Bay Regiona.l Park District ("tho District") has received the Initial Study and Mitigated Negative Declaration for the proposed Quarry Lane School annexation and prczoning and would like to make the following comments. The District owns and manages the Tass~ara Creek Rcgional Park and segment of Regional Trail within Tassajara Creek Regional Park (approximately 23 acres) across Tassajara Road from the Quarry Lanc School. In t 998, the District commented on the Dr'cift EIR for Phase 1, HIe initial phase of development for the QuaD)' Lane School. The EIR planned for 62,575 buihling sq. ft. as the planned full buildout ofthe private school. The District understands that this projectis seeking approval for tho proposed development of two additional parcels (13.6 acres) cUITcntly It)cated will1in unincorporated Alameda County and tho annexation of those parcels to the City of Dublin. This project proposes to increase development of classroom and admiliistralive space to 66,685 sq. fi. for a total of 82,263 sq. ft vs. the original 62, 575 sq. fi stated in the ElR. The project also proposes to add parking for 172 vehicles, recreational facilities, and landscaping to accomlllodate 950 students and S5 staff. The 3.6 acre Kobold property, located to the south of the school site for futuro development is proposed to be irlcludcd in the am1exation action, since it is the intervening property between existing City limits and the Quarry Lane School Site. A tributary of Tassajara Creek forms the sOllthem boundary of tho sHe. A PD Opon Space designation for a narrow buffer adjacent to the trihutaryon 1. 6 acres is indicated with the remaining 2.0 acres to he zoned residential. 1. Under XIV. Recreation (a), "Would the Projoct increase the use of existing neighborhood und regional parks or other re.creational facilities such that substantial physical deteriorution ofthc facility would occur or be accelerated?" and in the discussion of checklist item XIV. Recreation (a), "Would the project increase the use of cXlsfing neighborhood or regional pnrks?" The City has determined No Impact to neighborhood or regional park facilities. The cumulativeimp<icts on recreation demand in the area, including Tassajara Creck Regional Park. arc increasing and will be extremely high in consideration of1he development of thousands o[homcs proposed and under construction in the area. Clln-ently~ 1l1e Park's user profile consists of a small percentage of hikers and equestrians engaging in low impact R .. ?,9,?~:~C~.f~~.onl~s COLlrt p.o. Box 5381 Oal<land. CA 94605-0381 ~ ~ " ,; ~ l! Z .~ .~ ~ !J AUG-07-2000 MON 03:24 PM FAX NO. 4 P. 03 \ /...~ ~. l'5:> 2. activities such as nature study and recreational exercise. The Distdctallticipates heavy and increased use by students which may utllize the facility during and after school hours for associated uses which hav9 the potenlial for increased litter, vandalism, and fire hazard fi'om smoking, In addition, there is increased mil italY use at Carnp Parks adjacent to Tassajara Creek Park, which may result in trespass onto military propeIty from students. The Djstrict would like the opportunity to meet with the Project Applicant and discllss these issues so that m[lnagcmont approaches call be put in place in advance of the school's commencement. Concllrrol"\Uy, the District would like to discuss opportunities for enhancing the School's curriculum by utilizing the Park for nature study by tIle students. 3. . AlIhollgh t.here is no development proposed at this time 011 the Kohold propelty, the provision of utility lines to the site and drainage improvements, as identified in the lnitial St.udy, may result inhnpacts to tho Tassajara Creek tributary during the consfl1lctioll phase of utility extensions or drainage. Due to the downstream confluence with TassajfJra Creek at the District's Tassajara Creck Trail and Bddge. additional ru.noff and erosion may impact the Park and Trail. Please identify ifany stoml drain outfan into the tributary of Tassajarfi Creek is proposed for Phase n. lfnot, please indicate if consttuction of an outfa.ll was approv<.'d for Phase I. The Initial Study slates that the service providers shall coordinate COl1stnlction plans with appropriate biological regulatory agencies and that requirements of each, shall be followed to reduce impacts to the unnamed tributary and Tassajara Creek. Extensive tlevelopl11ent at Dublin Ranch has occurred 011 the southern side of the crecl,. therefore cumulative deyclopmcr'lt impacts to the tribut.ary ncodto be assessed. The Eastern Dublin General Plan Amendment and Specific Plal1's Comprehensive Stream Restoration Program was designed to cover the tributary and mainstem Tassajara Creek. A comprehensive document, the Program calls for the City to enhance the corridor and establish and maintain a liaison with the regulatory agencies (CDFG and USFWS) for the purpose of monitoring complianco with .specific plan policies (Program 6k). Opportunities for enhancing the creek corridor Hdjacent to the site could provide for additional wildlife value and education opportunities fot students as well. 4. The District flpprcciates the opportunity to comment and requests copies of future referrals, stnlTreports ~md public hearing 110tices on the Kobold property. tfyou have any questions. please contact me at (510) 544-2602 or Jamie Perkins at (510) 544-2611. Sincc1"cly, ~~ jt2~-.,-4.~-,.;) ~ ~~1evc Fiala Trails Specialist I 'l '-\ l"t lS- 3 ALAMEDA COUNTY FLOOD CONTROL AND WATER CONSERVATION DISTRICT 5997 PARKSIDE DRIVE ; PLEASANTON, CALIFORNIA 94588-5127 . PHONE (925) 484-2600 FAX (925) 462-3914 August 4,2000 Ms. Anne Kinney City of Dublin Planning Department 100 Civic Plaza Dublin, CA 94588 Letter 3 RECEIVED AUG 7 2000 DUBLIN PLANNING Re: Quarry Lane School, Mitigated Negative Declaration Dear Ms. Kinney: Zone 7 has reviewed the above-referenced CEQA document submitted to our office. Zone 7 is hereby submitting comments to the mitigated negative declaration in the areas of Water Resources and Flood Control as follows. Flood Control: Under Project Impacts and MitigatiQn Measures, Mitigation Measure 7a, 1. stormwater runoff from the site should also be evaluated as to whether it will adversely impact the flood control facility, Tassajara Creek, southwest of the proposed project site. The project developer shall make arrangements satisfactory to the Dublin Director of Public Works and Zone 7 that storm water flows can be safely accommodated. Water Resources: 2. When the facility is connected to the District's sewer, the existing septic tank should be removed or decommissioned in such a way that it is no longer a potential conduit for surface contaminants to reach the groundwater table. If the on-site well becomes obsolete subsequent to a municipal water 3. connection, then the well must be properly sealed or destroyed per Alameda County Ordinance 73-68, which has also been adopted by the City of Dublin. \.~I~ eft r53 Ms. Anne Kinney City of Dublin Page 2 of2 Thank you for the opportunity to comment on your environmental document. If you have any questions regarding our response, please call me at ext. 231. Sincerely, ,Ad /' <J~/ Sal Segura .. Environmental Document Coordinator Water Supply Advance Planning SS:ss cc: John Koltz, Zone 7 Diana Gaines Matt Katen \~ db L53 MeN I C H O.L S RAN 0 I C K O'DEA & TOOLIATOS LLP August 7,2000 Letter 4 lil:cell/~,.. AUr; II.,,~ 6. OlJSI..J. IIJ(Jlj 10i Pi.. 4J'fitlliV~ City of Dublin Attn: Planning Department Mr. Eddie Peabody, Jr. Director of Community Development 100 Civic Plaza Dublin, CA 94568 Be: Initial Study Project: Quarry Lane School Annexation and Prezoning File No. PA99-064 Nielsen Land Use/N0179.001 Dear Mr. Peabody: I am writing on behalf of my client, Mr. Robert Nielsen. Mr. Nielsen lives at 6407 Tassajara Road, Pleasanton, CA 94588. His property shares a common boundary with the project's northern boundary line. His home is situated on the hillside closely adjacent to the shared property line. 1. Unfortunately, I have had the opportunity to read through the Initial Study dated July, 2000, only once. However, I am advised that today, August 7,2000, is the deadline for public comment. To avoid missing that deadline, I therefore take up the pen without the opportunity to fully review the Study and to cross reference it with the earlier studies produced in conjunction with the applicant's processing through the County of Alameda for Phase I of the project. In general, my comments fall in two areas: (i) grading impacts, and (ii) noise impacts. Let me say generally that due to the changes in the project as it was originally proposed to my client, I believe that a full EIR should be done. The County's certification of the original EIR was based upon a much different project configuration. than what is currently proposed. At that time, an agreement was entered into and recorded against the project parcel. The agreement addressed various use, aesthetic, . and noise concerns raised by the Nielsens. It is my understanding that Mr. Nielsen has provided the Dublin Planning Department with a copy of this agreement. The very first configuration of the property upon which the original noise evaluation was based had the playground area at the southern edge of the parcel down below the school buildings. Then, at the urging of the County, the plan was reconfigured to put the Phase II building on the southern edge and to elevate the play field area more toward the center of the parcel. The agreement reached 2. between my Client and the applicant provided that when Phase II was implemented, the play field apparatus and cement/asphalt playground material would be removed. Unfortunately, the plan now before the City of Dublin leaves a rather large cement/asphalt playground at the 480 to 500 ft. . elevation and moves the classroom building from the southern edge of the parcel to a more central 3. location. In short, as opposed to the plan approved by the County of Alameda, the Api!i~~4ill1*:l~"'.j;;;,",wi". client, he now has BOTH the playground and the Phase II building nearer to his hgme!" .,'... . . 5000 Hopyard Road, Suite 400 Pieasanton, California 94588-3341 Telephone 925-460-3700 Fax 925-460-0969 www.mcnicholslaw.com p:In0179.00 1\7000.doc City of Dublin Attn: Planning Department Mr. Eddie Peabody, Jr. Director of Community Development August 7,2000 Page 2 I?-~> Cb ls3 The original -and so far as I am aware only noise study ever conducted in conjunction with this 4. project - was based on the original configuration first submitted to the County. This is referenced in the Draft EIR, August 1998. The movement of the classroom building as well as the playground area to the locations proposed to the City of Dubliri will inevitably produce off-site noise impacts that must be considered significant. Further, it appears upon quick analysis that the quantity of earth movement in the current proposal is greater than envisioned when the project was proposed to the County. The planners at the County 5. ,of Alameda were sensitive to the natural configuration of the property and urged the applicant to re- draw its plans to move site development generally westward and southward to avoid disturbing any me.re of the natural hillsides than necessary. This concern was heeded by the applicant at the County and was incorporated into the plan which was finally approved. For reference, the County approved the EIR for the full project, but only approved Phase I of the project for build out. Phase I involved remodeling the existing structure and construction of a new, approximately 15,000 square foot classroom building. Both buildings border Tassajara Road and are situated on the western end of the parcel. . My quick review suggests that with the relocation of the Phase n classroom building from the 6. southern edge of the parcel to the center ofthe parcel will of necessity result in a far greater amount . of cut and fill operations. On behalfofmy client, let me state that we strenuously object to the Initial Study conclusion that a Mitigated Negative Declaration is appropriate. The mere quantity of dirt 7. proposed to be moved (87,401 cubic yards) makes the conclusion that the site will be significantly impacted inescapable. Thank you for your time and consideration. My clients have attempted to be "good neighbors" to the Quarry Lane School. However, with the project's scope and layout being so significantly changed, my client feels compelled to comment as the proposal to adopt a mitigated negative declaration is simply not justifiable in his eyes. Thank you for your consideration of our comments. If you have any questions, please feel free to contact the undersigned. Vety truly yours, cc: Guy Houston, Mayor Anne Kinney Robert Nielsen : Reoeived: 8/14/2000 5:30PM; ->City o~ Dub~in PW/Fire; #121; Page 2 08/14/00 MON 16:44 FAX 510 652 4441. Wilson,Ihrig & Assoc. \}.~ .~\S, 141 00 WILSON, IHRIG & ASSOCIATES, INC. ACOUSTICAL 'CONSU L TANTS 577& BROADWAY OAKLAND, CA USA. 94618-1531 Tr.}: (51 0) 658-6719 .ax: (51 0) 652-4441 E-mail: info@WiaLcom w~b: www.wiaLcom August 14. 2000 Dr. Sabri Arac. President The Quarry Lane School 3750 Boulder Street Pleasanton, CA 94566 Subject: Quarry Lane School- Phase IT Re-Assessment Dear Dr. Arac: This Jetter addresses noise issues for operation of the revised configuration of The Quarry Lane Scboolat its future site on Tassajara Road in Dublin, Califomia. This assessment provides a.dditional information with regard to the Phase n constrllction; the site plan has been revised and thejurisdiction now falls with the City of Dublin. (Ref. Letters dated 9 December 1997 and 3 April 1998 [mis-dated 3 April 1.997]) This letter addresses three operational noise issues: the noise from. the circulation of traffic to the parking lots, the noise from student~ at play at the baseballlsoftbalVsoccer field or the tennis court, and the noise from the Phase J1 building. Existing Conditions The Quarry Lane School (QLS) site is located on Tassajara Road. and the school buildings will be located at a distance of approximately 140 to 300 ft from the road. To the north of the site, a single family residence (Nielson) lies approx.imately 90 ft from the property line. The Nielson residence is situated on a hill overlooking Tassajara Road and haS a direct line of si.ght with the roadway to the south. On the south side of the site is the Kobold Nursery, and residen.ce located in close proximity to Tass8:.iara Road. The Nursery utilizes several heavy trucks and equipment in their operations during the day. The Kobold residence is shielded from the parking lot by the Villa Tassajara structure and is located approximately 40 ft from southern property lin.e. Undeveloped privately owned land exists to the east of the school site. The terrain is hilly and some facilities of the school will be at a higher elevation than the land to the south, and at a lower elevation than the Nielson residence. As indicated in our 9 December ] 997 letter, sources of noise include heavy trucks, flyovers by aircraft utilizing the nearby Livermore Municipal Airport, and heavy vehicle operation at the KoboJd ATTACHMENT A: Rece:lved: 8/14/2000 5:31PM; ->C:lty of Dub~:ln PW/F:lre; #121; Page 3 08/14/00 MON 16:44 FAX 510 652 4441 Wilson,Ihrig & Assoc. r'iq t5t ,<; 3 @ Ol WILSON, IHRIG & ASSOCIATES, INC. 2 Quarry Lane School Noise Assessment Nursery. The dominant noise source in the vicinity of the QLS site is the traffic on Tassajara Road. In1997, the average daily traffic volume was 6400 vehicles with peak hour volumes of approximately 550 vehicles. Assessment of Future Conditions We understand that the City of Dublin has approved plans for additional residential and commercial developments along Tassajara Road, some of which will extend to the vicinity of the QLS. In addition, widening of Tassajara Road to six lanes is currently underway south ofllie QLS site. Traffic Noise Traffic on Tassajara Road will be the primary contributor to the future noise cnvrronm.ent at the QLS -and adjacellt areas. The estimated ADT on Tassajara Road in the vicinity of the QLS is 23,000 vehicles with 1432 vehicles during the peak hour (year 2005), which will result in an estimated noise level increase of 5 to 6 dBA (CNEL) over the ] 997 noise levels. The traffic noise increa.se will primarily affect the Nielson and Kobold residences which are directly exposed to the roadway. This increase is considered to be a significant impact independent of the operation of the QLS. Based on the traffic projections provided by Abrams Associates, Phase IT of the QLS will require 2577 daily trips, with 675 trips (in/out) OCCUlTIng during the AM peak hour. It is estimated that traffic associated with the QLS will cause, at most, a noise level increase of 1 dBA ill the local area which is not con~jdered significant. Furlhermore, traffic flow in and out of the school will be concelltrated only during the morning peak hour (7:30 to 8:30 AM). Table 1 presents a summary of th.e projected traffic noise levels during the morning peak hour. TABLE.l SUMMARY OF PROJECTED PEAK HOUR (AM) TRAFFIC NOISE LEVELS (L dBA) -e'" Tass~ara Road Location 1997 Noise Levels 2005 Noise Levels QLS Parking N Property Line 52 to 63 56 to 67 50 S Property Line 52 to 63 56 to 67 48 Nielson Residence (N) 52 to 56 56 to 60 45 Kobold Residence (S) 63 to 67 67 to 71 49 Sports and Play Area. In additi on to traffic, noise associated with play areas will t?e produced by operation of the QLS. The QLS will ultimately enroll approximately 950 students although not all students will be at play .in ,Rece:i..ved: 6/14/2000 5:31PM; ->C:i..ty o~ Dub~:i..n PW/F:i..re; #121; 08/14/00 MON 16:44 FAX 510 652 4441 Wl1son.lh~lg & Assoc. Petge 4 ." \~U ti6 I~~ ~OO WILSON, IHRIG & ASSOCIATES, INC. 3 Quarry Lane School Noise Assessment the exterior areas simultaneously_ The site plan for the school indicates that play activities of the students will be concentrated in on the play field (soccer, tennis, possibly softbal1/baseball)at the east end of the site. Ambient noisc lcvels at this location will bc lowcr than othcr arcas since thc tcrrain and school buildings will provide shielding from Tass~lara Road. BaScd on noise measurements WIA has taken at playgrounds, average noise levels produced by approximately 100 children at play may be in the r.ange of 65 to 70 dBA at approximately 1.00 ft from the center of the play area. Note that this range applies to the equivalent noise level (L<!(() averaged over the measurement period (e.g., 15 minutes). and that the noise level flucnlates over time and m.ay vary by approximately +/- 10 dBA. Maximum noi~e level~ occurring for ~hort time durations (i.e., le~s than 1 second) within the measurement period may therefore exceed the Lcq by approximately 10 dBA. As a worst case, the QLS play area may contain up to 300 to 400 students at any specified recess period which will result in 5 to 6 dBA higher noise levels relative to the 100 student leveL Maximum noise levels may approach 80 to 85 dBA at the east property line due to activities on the play field, however no receptors exist at that location. At the north property line, the average noise level from the play field (approximately 430 ft from the center of thefie.l.d) is projected to be approximate.ly 57 to 63dBA (LeQ) accounting for distance and ignoring shielding, and maximum levels may reach 73 dBA. The Nielson residence is approximately 560 ft away from the play field and will be partially shielded by the topography of the Project site. The average noise levels at tbe Nielson residence produced at the play field are projected to be approximately 57 to 63 dBA (L~'l) accounting for distance and ignoring shielding, and maximlllll levels may reach 73 dBA. At the south property line, the average noise level from the play field (130 ft from the center of the field) is projected to. be approximately 68 to 74 dBA (Lcq) accounting for. distance and ignoling shielding, and maximum levcls may reach 84 dBA. The Kobold rcsidcncc is approximately 520 ft away from the play field and will he partially shielded by the topography of the Pr.oject. site. The average noise levels at the Kobold residence produced at the play field arc prqjectcd to be a.pproximately 56 to 62 dBA (Leq) accounting for distance and ignoring shielding, and maximum levcls may reach 72 dBA. To e!\timate the average noise levels for atypical school day, we have assumed that there will be four recess periods (15 minutes duration, 2 for elementary@400 students at play and 2 for high school@100 students in animated discussion). 2 lunch periods (45 minutes duration, 1 for elementary@400 students and 1 for high school@IOO students), 5 gym class periods (50 minute duration, 100 students each), and 1 after-school team sport (90 minutes ~uration, 50 students). Table 2 summarizes the projected range of noil>e levels for each of these events and the estimatcd. increase in the CNEL is indicated. With these projected levels. tbe playground noise will be audible to a person located outdoors at the north and south property lines and at the Kobold andNieJson residences, however the ambient CNEL will not be significantly increased since the projected levels are not high enough to affect the daily a.verage, and the playground activities will occur for relatively short peliods of tillleduring the daytime hours. . Recej.ved: 8/14/2000 5:32PM; ->Cj.ty of Dub~j.n PW/Fj.re; #121; Page 5 \?' esb i*5) I4JO( 08/14/00 MON 16:45 FAX. 510 6524441 Wilson,Ihrig & Assoc. WILSON, IHRIG & ASSOCIATES, INC. 4 Quarry Lane School Noi.se Assessment TABLE 2 . SUMMARY OF PROJECTED NOISE LEVELS FROM PLAY AREA Maximum Projected Distance1 Average Noise Level Noise Level Increase in Location (ft) (dBA LelJ) (dBA) CNEL2 N Property Line 430 49 to 63 59 to 73 0 S Property Line 130 60 to 74 70 to 84 2 Nielson Residence (N) . 560 49 to 62 59 to 72 0 Kobold Residence (8) 520 48 to 62 58 to 72 0 l: Approximate distance from the center of the play field 2: Assuming 60 CNEL existing condition (From 1992 Eastern Dublin EIR) Gyn:masium The Phase IT building will house the gymnasium, which will be the site of various school assemblies and sporting events. At worst case, a capacity event in the gymnasium would contain the enlire student population and school faculty. While the Phase II building does have windows on the east an.d west facades, the gymnasium is separated from the exterior walls by a perimeter Jobby- At worst case, the gymnasium doors would be open into the hallway and the windows would be open, allowing cheering and other noises from the gymnasi urn t.o travel to the exterior of the building. We have assumed that all such events would occur before 7 PM, with a duration np to 90 minutes, and that the shielding provided by the building shell provides 10 to 20 dB noise reduction as compared to an assembly outdoors. Table 3 summarizes the projected and average noise levels from gymnasium events. TABLE 3 SUMMARY OF PROJECTED NOISE LEVELS FROM GYMNASIUM Maximum Projected Distancel Average Noise Level Noise Level Increase in Location (ft) (dBA L~ (dB A) CNEL2 N Property Line :/ 260~'\l 42 to 52 52 to 62 0 '. .. / S Property Line toO 46 to 56 56 to 66 0 Nielson Residence (N) 400 38 to 48 48 to 58 0 Kobold Residence (S) 280 41 to 51 5] to 61 0 1: ApproxiIl1ate distance from Phase IT facade nearest gymnasium 2: Assuming 60 CNEL existing condition (From 1992 Eastern Dublin ElR) Rece~ved: 8/14/2000 5:32PM; ->C~ty o~ Dub~in PW/Fire; #121; Page 6 \ 31, tr't t5 ~ 00 08/14/00 MON 16:45 FAX 510 652 4441 Wilson,Ihrig & Assoc. WILSON, IHRIC & ASSOCIATES, INC. 5 Quarry Lane School Noise Assessment Conclusion Based on this discussion, our analysis still indi.cates that the noise produced at the Quarry Lane School is not cxpected to have an adverse effect on the existing or future noise environment at the nearest receptors, and the tr.affic volume increase on Tassa.jara Road wiU be a considerably grcatcr contributor to the environment. Traffic and play area acti vities are not expected to affcct the ambient noise levels significantly, particularly since these activities will occur for relativcly short periods of time and primarily during thc daytime hours. Please let me know if you have any questions on this information. Very truly yours, WILSON, lliRIG & ASSOCTA TES7 lNC. ~~ Senior Consultant E:\WPDAT A\WT<FIT..E!\\qllnrry lnne SChool.wpd Quarry Lane School (PA 99-064) Mitigation Monitoring and Reporting Program August 2000 Verification Monitoring Schedule Monitoring Responsibility Dublm Plannmg Department Mitigation Measure Mitigation Measure 1a: TIle project aeveIoper shall adhere to applicable Tassajara Creek Valley Scenic Corridor Policies and Standards for development phases proposed in the City of Dublin. In addition, mitigation measures included in the Alameda County Environmental Impact Report to reduce visual impacts, including but not limited to limiting site grading, replanting graded slopes and similar elements shall be complied with. - '<r ~ ~ - V1 W 10 As part ofSDR submittal ATTACHMENT Dublin Planning Department Project Developer Mitigation Measure 1b: The project developer shall adhere to the following methods, as approved by the City of Dublin Planning Department: a) On-site retaining walls shall be landscaped with fast-growing evergreen vmes. b) The chain-link fencing around sports field and on top of retaining walls shall be of green vinyl cladding to reduce visibility and reflectiveness. c) Landscaping along the project frontage shall comply with the City of Dublin Streetscape Master Plans. Verification Monitoring Schedule Monitoring Responsibility Implementing Responsibility Mitigation Measure As part of SDR submittal Dublin Planning Department Project Developer Mitigation Measure 2: The appearance of the steep slope on the southeast corner of the site (approximately 2: 1 slope) shall be reduced through some or all of the following methods, as approved by the City of Dublin Planning and Public Works Departments r- .$) ~ ~ \/', vJ Page 2 a) The landscape plan for the project shall designate vegetation suitable for slope areas to ensure slope stability. b) The base of this slope shall be landscaped with dense, fast growing appropriately spaced vertical trees. Tree wells shall be provided to protect trees and encourage healthy growth. Quarry Lane School Mitigation Monitoring and Reporting Program City of Dublin Verification Monitoring Schedule Monitoring Responsibility Implementing Responsibility Mitigation Measure -- v' 0\ As part of final building plans Dublin Planning Department Project Developer Mitigation Measure 3: The following measures shall be incorporated into plans and school operations: a. Pole-mounted lights shall be equipped with cut-off lenses and oriented down toward interior streets to minimize unwanted light and glare spill over. b. Building security lighting and other lights shall be directed downward. c. Exterior lighting shall be dimmed or turned off during off-hours. d. All exterior glass panels shall be of non-glare manufacture. e. . The project developer shall also work with the City of Dublin Police Services Department to investigate the concept ofthe "dark campus" concept, if such a concept is consistent with adopted City security ordinances. dl - lJ1 \;J Page 3 Quarry Lane School Mitigation Monitoring and Reporting Program City of Dublin Verification Monitoring Schedule Monitoring Responsibility Implementing Responsibility Mitigation Measure ~ ~ ()) c1?t .- >J~ . _ 1 Page 4 Prior to approval of street improvement plans Dublin Planning Department; Dublin Public Works Departm ~nt Project developer Mitigation Measure 4: The following measures shall be incorporated into construction plans and operations related to service line extensions to the Quarry School Lane area: a. Service providers shall coordinate construction plans with appropriate biological regulatory agencies (including but not limited to Army Corps of Engineers, Fish and Wildlife Service, California Department of Fish and Game, Regional Water Quality Control . Board) b. Requirements of each of the regulatory agencies shall be followed to reduce impacts to the unnamed creek and Tassajara Creek. Quarry Lane School Mitigation Monitoring and Reporting Program City of Dublin Verification Monitoring Schedule Monitoring Responsibility Implementing Responsibility Mitigation Measure Prior to issuance of grading permits Dublin Public Works Department Project Developer Mitigation Measure Sa: Prior to issuance of a grading permit by the City of Dublin for, the project developer shall submit a final soils report for review and approval by the City of Dublin Public Works and Building Departments. The final report shall include specific construction techniques to ensure consistency with generally recognized engineering standards. .-- ,y ,...::l .-.P' ~< ..,:> -- <J'f uj Page 5 Prior to issuance of grading permits Dublin Public Works Department Project developer Mitigation Measure Sb: Prior to issuance of grading permit by the City of Dublin, the project developer shall submit a Slope Stabilization Program addressing the steep slope on the southeast corner of the site (approximately 1.5:1 slope). The Slope Stabilization Program shall include but not be limited to planning plans, compaction plans and appropriate measures to ensure stability of this slope Quarry Lane School Mitigation Monitoring and Reporting Program City of Dublin Verification Monitoring Schedule Monitoring Responsibility Implementing Responsibility Mitigation Measure ::;J Li ~ -- U\ V Page 6 Prior to occupancy of grading permit Dublin Public Works Department Project developer Mitigation Measure 6: The project developer shall prepare a Stormwater Pollution Prevention Plan (SWPPP), listing Best Management Practices to reduce construction and post-construction activities to a less than significant level. Measures may include, but shall not be limited to revegetation of graded areas, silt fencing and other measures. The SWPPP shall conform to standards adopted by the Regional Water Quality Control Board and City of Dublin and shall be approved by the City of Dublin Public Works Department prior to issuance of grading permits. Quarry Lane School Mitigation Monitoring and Reporting Program City of Dublin Verification Monitoring Schedule Monitoring Responsibility Implementing Responsibility Mitigation Measure Prior to issuance of a grading permit Dublin Public Works and Planning Departments Project developer Mitigation Measure 7: Prior to issuance grading permit by the City of Dublin, the project developer's civil engineer shall submit written documentation to the Dublin Public Works Department that ofa Anticipated stormwater runoff from the site will be consistent with master storm drain plans. If, in fact, anticipated stormwater flows exceed any master plan assumptions, the project developer shall make arrangements satisfactory to the Dublin Director of Public Works that storrn water flows can be safely accommodated. Stormwater runoff from the site will not adversely impact the property to the south. (a) (b) - .y ~ ~ - u, w Page 7 Prior to issuance of a Certificate of Occupancy Dublin Public Works Department Project developer Mitigation Measure 8: The project developer shall install a traffic signal at the intersection of the project driveway and Tassajara Road. The traffic signal shall be in place at the time Phase 2 of the school opens for operation. Quarry Lane School Mitigation Monitoring and Reporting Program City of Dublin Verification Monitoring Schedule Monitoring Responsibility Implementing Responsibility Mitigation Measure Ongoing Dublin Planning Department Project developer Mitigation Measure 9a: The Quarry Lane School shall stagger the opening and closing times of the school day for the various parts of the school. The proposed hours are: · Elementary School: Open at 8:30 a.m.; close at 3:30 p.m. · Middle School: Open at 8:00 a.m.; close at 3 :00 p.m. · High School: Open at 7:30 a.m.; close at 2:30 p.m. These hours may be adjusted to optimize school traffic circulation. As part of SDR submittal Dublin Planning Department Project developer Mitigation Measure 9b: The Quarry Lane School project shall include a fence along the Tassajara Road frontage to preclude parents from dropping off students in other than approved on-site locations. Appropriate signs shall be installed in front of the school prohibiting parking or stopping in front of the school. .- ...t d cA - V' vJ Page 8 Quarry Lane School Mitigation Monitoring and Reporting Program City of Dublin .,...--.. - .--- ._~-- \ b{ (~ \5>~ Wll.l.lAIol 1:, OAOItN, ...,A. Q~ll:c)CRV 1.. MCCO.,. PATJOIICf\ .I, MOM~HON M........ 10, AI'lMS'TRONG L.tNN K. C:OOMtJD S'I'E:.PHICN W. 'I'I'lQ"'Al:S C tof"'RL.i:S ,.. KQS$ M.QHAIl:L. oJ. M....""eWITZ': ""ClHARCl e. f1tAINIr;$ VICTOR ..I. ~,9~'I'1 .' IBAIlIIII"NA l:I\'\vili.l.o .,iEWEL.\. AOIU:..n M'yr(".,..,~.~~.1 AJ.l..AN c, fott><:f....;. . ".... rl'lrl(;l.... ~. C;....I'lTIH STS:PMI:N '\'. I$UCfoo!t. ,it,M...NClA .,.lJOGE ....\.nAN"CI'l L.,. ,!PC:,I1""IQ ... .. I""ANQIGC'" j{"M-;:.ifMauWmR' "'Kl;I~~w li'.~~;flj,t+!":~\'& MARTIN LYSONS'; I.AW Ofl'FICE:$ 01'" GAGEN. MCCOY, HCHA.B:ON & AnKSTRONO ;.. .fllOP't.S510NAL. eO",",OlllATION tlAN'III.l.C Q~frl(:1: 1110 !t~q""Tfi,'r".IC~, p, a~ ...,O~ II. . O"NVII,,~ 11:; ~Al,;.l,Fb ilifilfA:'A":"*o~ol!le TEl.l:lII'HoNJ:;1 1'lil.I!SI 1Il:S',OB8rt . piAl'Il t...sJ'"e'i...~il.~'" "'fIIltA VAI.I.I:Y Clli'''Ic:l~.. 'THE: O""le~l!I A't ilOUTHIIlR'COI; 1C).Q~~I~.iIl'riltli::Fr. ~Jil:~t~, .,~ liT, li.~l.,~,l""" ~,AI..II"()~NI.A .""1:f7.... 'I'i1Z"'"o.N~)" 'l'io'if.._iioiOlio<:Oe I"~l .t11:)"1.. ~:a~."e," ~.' September 12. 2000 . ISI"CASt. REI"L.'l' 'I'QI DlIDv\n. Sent Via 'aaimile: 9251833-6628 Amie'KibneY, Assistant Planner City. of Dublin 100 Civic Plaza DUbHn, CA'.94'56,S.. Re: .1)1" E8tatty Lab.e~S~ De M.a. .Kinrl6jt: My client and I have had the fUtther6ppoi'tUnity to discuss additional ways to address the noise that m~ be genera~d by P_ IT of The Quarry Lane School.. The updated noise study prepared by Wilson, Ihrig &;~~~; Inc. (dated August 14J 2000), City Staff through the Staffhport. andtnePlanuing Oomnussion by way ofits recommendation to the City Councill have already concludt.d t:hat the Sohool will not create significant noise .impacts. However, in response tOith.~'coneemlii$ed by Mr. Nielsen (the neighbor who lives to the north of the School) regarding the potential for noise, we would like to offer the 'following additional m~. ";~/ "';- 1. The Phase n plans locate the play tield further away from Mr. Nielsen's residence then the plans for Phase I. According to the noise study, the play field is now located approximately 560 ft. away from Mr. Nielsen's residenoe. The field has been designed smaller 1hen Ii standard school play field. This substandard size preCludes the use of this field for most organized athletic events and activities. 2. The School can min.imi2.e the use Of the play field by coordinating as many llthlctic ovcnb and other school activities as pouible in the indoor gym. The nuise geuetalw by the activities 'that occur in the gym will not be heard by Mr. Nielsen nor other indi:viduals near the School. 3. The arrival and departure of the students. will be staggered in order to minimize the noise levels that may occur. In addition, the, Sohool willstaggertb.e recess periods. As ATTACHMENT It ~O.d 6tO'ON ~~:~t OO.~t d3S S86S8~8S~6:QI ~~ NOH~W)W AO))W N39~9 ~.L6=~ ~:3~d NIlSnO ~O Al!~CaI S86S~CI3.L WclSe : 0Ia b:::l~e"c.k-d3S \ U ()- t:i I ~ 3> tV I.. /- "' ~i \?' . i Anne'~~. AsslstantJillanner .. ~~~bet'j~, 2000 P4,je 2 suc~,f,tle..S,ehQol d.oes not expect m0t4_ tban.2~ ~4~ to be on the play field fJ~.,IA'1Y one. . ~.:~g aJ(~S period. It is expected that only.a Small percentage of these students will utifm, :tb.eplay field during recess. ' .. . . , .. 4. The School will provide an eating area behind the existing Villa Tusajara banding which is located on the south portion of the site (furthest away ftoin the NielSen property). The students will be encouraged to eat in this area which will minimize their time on the play field. 5. Most of the sohool activities that willoOCUt' on tb.~.pl~Y ~elfi ~Ub; ,9.0qdpQWd during thr; week days when most people are at work. 6. The landscape plans that will be prepared for Phase IT will inQl~iapd$~~ping that can provide additional noise buffering for Mr. Nielsen. These specific plans will be prepared in cooperation with belty dwing design review of~s P,P#iQll. o(1;be $ohoel.' We hope these suggestions are satisfactory. We would be happy to d~.any:othC>>' measures that may be appropriate. IfYQU have any questions, please do nofhesitate to call. Very truly.y~, <y~. Lc~ P~ci. E. Curtin PEClng co: Dr. Arae Sabri, President of The Quarry Lane School; via fax ~O.d 6~O.QN ~~:vl OO,~l d3S S86SS~8S~6:aI ~~ NOHeW)W ADJJW N39~9 11/13/00 ION 09:32 FAX 510 652 4441 Wilson,Ihrig & Assoc. H~ "6 \~~02f WILSON, IHRIG & ASSOCIATES, INC. ACOUSTICAL CONSULTANTS 5776 BROADWAY OAKLAND, CA U.5A 94618-1531 Td: (510) 658-6719 F~x:(510) 652-4441 E-<llail: info@Wiai.com web: www.wiaLcom 7 November 2000 Dr. Sabri Arac~ President The Quarry Lane School. 3750 Boulder Street Pleasanton. CA 94566 Subject: Quarry Lane School - Phase 11 Re- Assessment, Revised Dear Dr. Arac; This letter addresses noise issues for operation of the revised configuration of The Quarry Lane School at its future site on Tassajara Road in Dublin,. California. This assessment provides additional information with regard to the Phase II construction; the site plan has been revised and the jurisdiction now falls with the City of Dublin. (Ref. Letters dated 9 December 1997 and 3 April 1998 [mis-dated 3 April 1997]) This letter addresses three operational noise issues: the noise from the circulation of. traffic to the parking .10ts, the noise from students at play at the basebalVsoftballlsoc~et field. or the tennis court, and the noise from the Phase n building. This revised report incorporates the results of recent noise measurements of the existing noise environment and clarification of applicable impact criteria. Noise Impact Criteda The City of Dublin Noise Element, Table 4 present~ a chart of Land Use Compatibility which the City uses to evaluate new projects. An exterior noise environment of 60 CNEL is generally acceptable. while an exterior noise environment of 60 to 70 CNEL is considered conditionally acceptable and may required noise mitigation for new residential projects. For new residential projects and new projects which are adjacent to residential areas, the City assesses a noise limit of 65 CNEL at the property line. The CNEL is a 24-hour average of the noise environment. weighting noise generated during the evening (7 to 10 PM) and during the nighttime (10 PM to 7 AM) to account for the increased sensitivity of residents during those hours. The City's Noise Ordinance addresses "unreasonable" noise, with guidelines for assessing the impact of noise based on the time, duration and character. While the noise from the Quarry Lane School ATTACHMENT /2. NOV-13-20la0 10:34AM TEL)510 652 4441 ID)CITY OF DUBLIN PAGE:002 R=99" 11/13/00 lIlON 09: 33 FAX 510 652 4441 Wilson, Ihrig & Assoc. \L-\-q Gb \ S-'314l 003 WILSON. IHRIC &. ASSOCIATES, INC. 2 Quarry Lane School Noise Assessment ~ may be considered different in character from the existing noise environment. it is not expected to be considered "unreasonable". Existing Conditions The Quarry Lane School (QLS) site is located on Tassajara Road. and the school buildings will be located at a distance of approximately 140 to 300ft from the road. To the north of the site. a single family residence (Nielson) lies approximately 90 ft from the property line. The Nielson residence is situated on a hill overlooking Tassajara Road and has a direct line of sight with the roadway to the south. On the south side of the site is the Kobold Nursery, and residence located in close proximity to Tassajara Road. The Nursery utilizes several heavy trucks and equipment in their operations during the day. The Kobold residence is shielded from the parking lot by the Villa Tassajara structure and is located approximately 40 ft from southern property line. Undeveloped privately owned land e;x:ists to the east of the school site. The terrain is hilly and some facilities of the school will be at a higher elevation than the land to the south~ and at a lower elevation than the Nielson residence. As indicated in our 9 December 1997 letter. sources of noise include heavy trucks. flyovers by aircraft utilizing the nearby Livermore Municipal Airport. and heavy vehicle operation at the Kobold Nursery. The dominant noise source in the vicinity of the QLS site is the traffic on Tassajara Road. In1997, the average daily traffic volume was 6400 vehicles with peak hour volumes of approximately 550 vehicles. Figure 1 indicates the site plan and location of noise measurements. These measurements were pecrOTXlled from November 1 to November 3. 2000. Location 1 was located in the parking lot of ,the Quarry Lane School, Location 2 was placed on a tree to the south of the auditorium, close to the Kobold residence, and Location 3 was placed at the north property line, close to the Nielson residence. Figures 2 through 4 indicate a summary of the hourly 40ise levels obtained at the measurement locations. CNEL ranges from 62 to 63 near Tassajara Road (Location 1) to 63. to 64 at the south property line near the Kobold residence (Location 2) to 51 to 54 at the north property line near the Nielson residence (Location 3). Locations 2 and 3 were located near the property line, but we believe they are comparable to the noise environmenlcurrently experienced at the nearby residences: The elernentary school is currently in session. and these measurements include the typical daily noise n"Om operation of the elementary school. including recess and after-school play. Note that the business operations at the Kobold property and construction at the Dublin Ranch also contribute to the total noise environment, particularly the environment along the south property line. near Location 2. We expect that the noise environment along .the southern property line (west side) are similarly affected by the Kobold business. and we expect that the existing noise levels along the south property line, closest to the Kobold business yard. just meet or exceed the 65 CNEL limit. School starts at 8:15 AM. with a recess around 10 AM, lunch shifts between 11 AM and 12:35 PM and school ends at 3 PM. These activities are generally identifiable in Figures 2 through 4. We expect that the existing school activities has caused the CNEL at Location 3 to increase by less than NOV-13-2000 10:35AM TEL)510 652 4441 ID)CITY OF DUBLIN PAGE:003 R=99% 11/13/00 MON 09:33 FAX 510 652 4441 Wl1~on,Ihrlg & Assoc. \~? tJt \S~ 141004 WILSON, IHRIG &. ASSOCIATES, INC, 3 Quarry Lane School Noise Assessment 1 dB. Thus, the noise measurements indicate that the existing noise environment near all residential locations falls within the acceptable range for the City of Dublin. Assessment of Future Conditions We understand that the City of Dublin has approved plans for additional residential and commercial developments along Tassajara Road, some of which will extend to the vicinity of the QLS (i.e., Dublin Ranch). In addition, widening of Tassajara Road to six lanes is cmrently underway south of the QLS site. Traffic Noise Traffic on Tassajara Road will be the priIffi1I'Y contributor to the future noise environment at the QLS and adjacent areas. The estimated ADT on Tassajara Road in the vicinity of the QLS is 23,000 vehicles with 1432 vehicles during the peak hour (year 2005), which will result in an estimated noise level increase of 5 to 6 dBA. (CNEL) over the 1997 noise levels. The traffic noise increase will primarily affect the Nielson and Kobold residences which are directly exposed to the roadway. Tbls increase is considered to be a significant impact independent of the operation of the QLS. Based on the traffic projections provided by Abrams Associates, Phase n of the QLS will require 2577 daily trips, with 675 trips (inlont) occurring duri:ng the AM peak hour. It is estimated that traffic associated with the QLS will cause, at most. a noise level increase of I dBA in the local area which is not considered significant. Furthermore, traffic flow in and out of the school will be concentrated only during the morning peak: hour (7:30 to 8:30 AM). Table 1 presents a summary of the projected tJ:affic noise levels during the morning peak hour. TABLE 1 SUMMARY OF PROJECTED PEAK HOUR (AM) TRAFFIC NOISE LEVELS (L dBA) '~n Tassajara Road QLS Parking Lot Noise Location 1997 Noise Levels 2005 Noise Levels Levels N Properry Line 52 to 63 56 to 67 50 S Property Line 52 to 63 S6 to 67 48 Nielson Residence (N) S2 to 56 56 to 60 45 Kobold Residence (8) 63 to 67 67 to 71 49 Sports and Play Area In addition to traffic, noise associated with play areas will be produced by operation of the QLS. The QLS will ultimately enroll approximately 950 students although not all students will be a,t play in the exterior areas simultaneously. The site plan for the school indicates that play activities ()f the students will be concentrated in on the play Held (soccer, tennis, possibly softballlbaseball)at the east NOV-13-2000 10:35AM TEL)510 652 4441 ID)CITY OF DUBLIN PAGE:004 R=99" 11/13/00 ]ION 09: 34 FAX 510 652 4441 Wilson, Ihrig & Assoc. ) l\..\~ U'b \S~005 WILSON, IHRIG & ASSOCIATES, INC. 4 Quarry Lane School Noise Assessment end of the site. Ambient noise levels at this location will be lower than other areas since the terrain and school buildillgs will provide shielding from Tassajara Road. Based on noise measurements WIA has taken at playgrounds, average noise levels produced by approximately 100 children atplay may be in the range of 65 to 70 dBA at approximately 100 ft from the center of the play area. Note that this range applies to the equivalent noise level (~) averaged over me measurement period (e.g.t 15 minutes), and that the noise level fluctuates over time and may vary by approximately +/- 10 dBA. Maximum noise levels occuning for short time durations (Le.. less than I second) within the measurement period may therefore ex.ceed the Leq by approximately 10 dBA. As a worst case. the QLS play area may contain up to 300 to 400 students at any specified recess period which will result in 5 to 6 dBA higher noise levels relative to the 100 smdent level. Maximum noise levels may approach 80 to 85dBA at the east property line due to activities on the play field. however no receptors exist at that location. At the north property line, the average noise level from the play field (approximately 430 ft from the center of the field) is projected to be apprmdmately 57 to 63 dBA (Leq) accounting for distance and ignoring shielding, and maxlmumlevels may reach 73 dBA. The Nielson residence is approximately 560 ft away from the play field and.will be partially shielded by the [opography of the Project site. The average uQise levels at the Nielson residence produced at the play field are projected to be approximately 57 to 63 dBA (Leq) accounting for distance and ignoring shielding. and maximum levels may ;reach 73 dBA. At the southproperty line, the average noise level from the play field (130 ft from the center of the field) is projected to be approximately. 68 to 74 dBA (Lcq) accounting for distance and ignoring shielding. and maximum levels may reach 84 dBA~ The Kobold residence is approximately 520 ft away from the play field and will be partially shielded by the topography of the Project site. The average noise levels at the Kobold residence produced at the play field are projected to be approximately 56 to 62.dBA (Lcq) accounting for distance and ignoring shielding, andmaximum levels may reach 72 dBA. TABLE 2 SUl\1MARY OF PROJECTED NOISE LEVELS FROM PLAY AREA Average Noise Maximum Noise Location Distance' Cft) Level (dBA Leq) Level (dBA) N Property Line 430 49 to 63 59 to 73 S Property Line 130 60 to 74 70 to 84 Nielson Residence.(N) 560 49 to 62 59 to 72 Kobold Residence (S) 520 48 to 62 58 to 72 1: Approximate distance from the center of the play field We have assumed that there will be fom recess periods (15 minutes duration, 2 for elementary@400 students at play and 2 for high school@100 students in animated discussion), 21unch periods (45 NOV-13-2000' 10: 36AM TEL)510 652 4441 ID)CITY OF DUBLIN PAGE:005 R=99% 11/13/00 MON 09:34 FAX 510 652 4441 Wilson. Ihrig & Assoc. \ '-t\7 o-{\~06 WILSON, IHRIG & ASSOClATES, INC. 5 Quarry Lane School Noise Assessment minutes duration, 1 for elementary@400 students and 1 for high school@ 100 students), 5 gym class periods (50 minute duration, 100 students each), and 1 after~school team sport (90 nrinutes duration, 50 students). Table 2 summarizes the projected range of noise levels for each of these events. With these projected levels, the playground noise will be audible to a person located outdoors at the north and south property lines and at the Kobold and Nielson residences, however the ambient CNEL will not be significantly increased since the projected levels are not high enough to affect the daily average, and the playground activities will occur for relatively short periods. of time during the daytime hours. (See below) Gymnasium The Phase llbuilding will house the gymnasium, which will be the site of various school assemblies and sporting events. At worst case. a capacity event in the gymnasium would contain the entire student population and school faculty. While the Phase n building does have windows on the east and west facades.. the gymnasium is separated from the exterior walls by a perimeter lobby. At wot$t case, the gymnasium doors would be open into the hallway and the windows would be open, allowing cheering and other noises from the gymnasium to travel to the exterior of the building. We have assumed that all su.ch events would occur before 7 PM, with a duration up to 90 minutes, and that the shielding provided by the building shell provides 10 to 20 dB noise reduction as compared to an assembly outdoors. Table 3 summarizes the projected and average noise levels.. from gymnasium events. TABLE 3 SUMMARY OF PROJECTED NOISE LEVELS FROM GYMNASIUM Average Noise Maximum Noise Location Distancel (ft) Level (dBA Lcq) Level (dBA) N Property Line 260 42 to 52 52 La 62 S Property Line 160 46 to 56 56 to 66 Nielson Residence(N) 400 38 to 48 48 to 58 Kobold Residence (8) 280 41 to 51 51 to 61 l: Approximate distance from Phase IT facade nearest gymnasium Projected Total CNEL To estimate the average noise levels for a typical school day) we have time-averaged the school activities discussed above (traffic, play field use, gymnasium use) etc~). Using the estimated time and duration of each event discussed above, the daily sound levels from Quany Lane School (Phase II) have been tabulated to calculate me CNEL. Table 4 summarizes the existing and projected noise levels with the school in full session. NOV-13-2000 10:36AM TEL)510 652 4441 ID)cITY OF DUBLIN PAGE:006 R=99" 11/13/00 MON 09:34 FAX 510 652 4441 Wilson, Ihrig & Assoc. \ ~~ 't \~:; I4J 007 WILSON. IHRIG 8< ASSOCIATES. INC. 6 Quarry Lane School Noise Assessment TABLE 4 Su:MMARY OF PROJECTED NOISE LEVELS (CNEL) AND NOISE IMPACT FROM QLS PHASE II Projected Dublin P.rojected T amI Existing Noise Level Impact Noise Level3 Location Noise Level QLS only Criteria (Existing + QLS) N Property Line 51-541 52 65 55-'56 S Property Line 63-642 . 624 65 66 . Nieison Residence (N) 51-541 49 65 53-55 Kobold Residence (S) 63.64 51 . 65 63~64 I: pre-QLS school noise levels may be 1 dB less at: Location 3 & Nielson property 2: Location 2 data; existing noise level at the South property line may be greater than Location 2 due to the proxim.ity to Kobold business operations. and may currently exceed 65 CNEL 3: This total noise level does not include the projected noise increase from higher traffic on Tassajara Road . 4: This noise level is dominated by activities at the play field Conclll$ion Based on this discussion, our analysis indicates that at the nearest residences, the noise produced by the Quarry Lane School will generate a total noise environment less than 65 CNEL (in combination with the existing noise environment) and is not expected to have an adverse effect on the existing or future noise environment at these residences. Similarly, the noise levels at the northern property line will also remain below 65 CNEL. but at the southem property line closest to the proposed play field, the CNEL will exceed 65. In this affected area, we'beHeve that there is no noise impact because 1) there are no residences in this area and 2) the noise environment is expected to be 65 CNEL or slightly greater from the business activities generated on the Kobold property. QLS traffic . and play area activities are not expected to affect the ambient noise level,; significantly, particularly since these activities will occur for relatively short periods of time and primarily during the daytime hours. The traffic volume increase on Tassajara Road due to other projects will be a considerably greater contributor to the environment than the QLS project. Please let me know if you have any questions on this infonnation. Very truly yours, WILSON, llIRIO & ASSOCIATES, INC. ~~ Deborah A. Jue Senior Consultant E:\WPOAT A\WKflL8S\ql$\quatty bile schoolrc....wpd NOV-13-2000 10:37AM TEL)510 652 4441 ID )CITY OF DUBLIN PAGE:007 R=99" 11/13/00 MON 09:35 FAX 510 652 4441 Wilson, Ihr18 & Assoc, WILSON, IHR'C & ASSOcIATES, INC. \ u. Cjf j@.008 ~ t5, 7 Quany Lane School. Phase U ---- - ---- - --......-..- r' '. : Ii I .; " .~"" ! "-~~~'-.I" .. -.......... '''- "'WlIl__ I 1 I i f i 1 ! i- f i i i I i j I r ! , i 'i'f I . ~i" ) . I , / . . ~-~- /'.- /'.. FlGUREl NOV-13-2000 10:37AM SITE PLAN AND NOISE MEAsl1REM1i:Nr LOCATIONS QUAMY LANE SCHOOL_ NOVEl\1BER 2000 TEL)510 652 4441 ID)CITY OF DUBLIN .------ PAGE:008 R::::100~ -~ 11/13/00 MON 09:36 F~t 510 652 4441 Wilson,Ihrig & Assoc. 141009 lSJ, WILSON, IHRIG &. ASSOCIATES, INC. 8 \;50 Cb Quarry Lane School- Phase n 70 < m "0 60 ..J W > W ...J 0 50 Z :J 0 en 40 90 80 ....... :::l 30 20 ~ 12 3 6 3 9 6 9 noon . Leq Nov1 --------- Leq Nov2 -------..,---- Leq Nov3 FIGURE 2 SUMMARY OF 15-MINUTE EaUIVALENT NOISE LEVELS - LOCATION 1 QUARRY LANE SCHOOL PARKING LOT. CNEL 62-63 NOVEMBER 1 TO 3, 2000 NOV-13-2000 10:38AM TEL)510 652 4441 ID)CITY OF DUBLIN PAGE:009 R=9g% 11/13/00 MON 09:36 FAX 510 652 4441 Wilson,Ihrig & Assoc. WILSON. IHRIG & ASSOCIATES. INC- 9 .:( CO -c ..J ~ W -I o :z ::l o r.D "\ IJ \ fill . ^ XA ~ /,"-~-.[.~ t\ I \, L I' I \, I...' 'I,i~ I ,/\,1' , \ I {I V,....II>"":.J \ I \ ,''''_.../ " f I l Joy I~ l,\..J I'" \/ 1\ IY ' ,\. . I /I'~ . ..~ \\ I'\., j'v i i ! ,If, ,... " /. I \I . .\j, {I ; \' · V \/ '" ~ . " r 90 80 70 so 50 .J I4J 010 \ c;,~ 1J \s3 Quarry Lane School - Phase II L_ 6 9 12 40 30 20 3 6 9 noon 3 FIGURE 3 SUMMARY OF 1S-MINUTE eQUIVALENT NOISE LEVELS - LOCATION 2 NEAR SOUTH PROPERTY LINE AND KOBOLD RESIDENCE - CNEL 63-64 NOVEMBER 1 TO 3, 2000 Lsq Nov1 -------- Leq Nov2 -------.---.- Leq NovS NOV-13-2000 10:38AM TEL)510 652 4441 IO)CITY OF DU8LIN PAGE:010 R=99% 11/13/00 MON 09:36 FAX 510 652 4441 Wilson. Ihrig . Assoc. . 141011 tS3 WII.SON, IHRIG & ASSOCIATES, INC. 10 \6~ 1 Quany Lane School - Phase II 90 80 <( aJ "C I I ..J W > W ....J C Z ::l o 00 eo 50 --r 40 .30 20 Il/\l\ 1(\ .....; 1\ I ....1 f~\ '\;J" I \ ,\ i' " t t\ ,.l J i\ \ I , l .II i ~ i \ 'r \, ,\ {'... r ....... i' i ,.~\ .., \-~/ \ I i"'~1 / ....../ '. ....... I . I \ I ./_ \.,.1 l ..i" ........ ~' " ,,/ l I . I J \ I V ( \ A I, ,i ''-~.\.'' "" \ A;., f y '-..,: V \ ; v'...... LLJ3 9 12 I ... I..... 3 9 noon 3 6 6 Leg Nov1 ------------- Leq ~ov2 -----.-.----- Leq Nov3 ' FIGURE 4 SUMMARY OF 15-MINUTE EQUIVALENT NOiSe LEVELS - LOCATION 3 NORTH PROPERTY LINE NEAR NIELSON RESIDENCE - CNEL 51-54 NOVEMBER 1 TO 3, 2000 NOV-13-2000 10:38AM TEL)510 652 4441 ID)CITY OF DUBLIN PAGE: 011 R=99% 11/13/00 MON 09:36 FA: 510 652 4441 Wilson,Ihrig & Assoc. I4J 012 t5J at \S= 5776 BROADWAY OAKLAND, CA U.S.A. 94618-1531 Tel: (510) 658-6719 Fax: (510) 652-4441 E-mail: djue@wiai.c;om www.wiai.com WILSON, IHRIG & ASSOCIATES, INC. ACOUSTICAL CONSULTANTS 7 November 2000 Dr. Sabri Arnc, President The Quany Lane School 3750 Boulder Street Pleasanton, CA 94566 Subject: Quarry Lane School- Phase n Re-Assessment, Alternative 2 (Revised) Dear Dr. A:rac: As requested, this letter addresses the projected relative change in noise levels for Alternative 2, which places the new playfield approximately 25 ft to the southeast, at an elevation 10ft lower than Alternative 1. This assessment has been revised to incorporate the results of the revised noise assessment, also dated"7 November 2000. We have reviewed the plan drawings (Cl) prepared by Ruggeri-Jensen"Azar & Associates, dated September 28,2000 for Alt.2 and June 7, 2000 for Alt. 1, to determine if there will be any substantial change in the noise effected by the proposed change in field location and elevation. For Alternativel, we project that there will be some shielding of playfield noise at the Nielson residence provided by the 520 ft contour line. For Alternative 2, the new 520 ft contour line will also provide some shielding of noise. As the 520ft contour line for Alternative 2 is withinlO ft of the same contour in Alternative 1. there is no difference in noise attenuation provided. No other shielding is anticipated from the proposed topography. The playfield location in Alternative 2 is projected to cau~e an increase in noise leveUess than 0.5 dBA at the Kobold residence. as compared to Alternative 1. Based on this data, compared to Alternative 1, Alternative 2 provides no additional noise reduction from theplayfield at the Nielson residence and increases slightly the playfield noise at the Kobold residence. However, the CNEL noise levels are unchanged at both residences. Please let me know if you have any questions on this information. Very truly yours. WlLS~~CIATES.INC. Deborah A. Jue Senior Consultant ATTACHMfN'T /3. 1:'::\WPDATA\WKl'lt.ES\siIs\q11l1l1y lane ticoot>ll;.l,'11:v.wpd NOV-13-2000 10:38AM TEL)510 652 4441 ID)CITY OF DUBLIN PAGE:012 R=99~