Loading...
HomeMy WebLinkAboutItem 4.4 Accept Work 89-9 (2) CITY OF DUBLIN AGENDA STATEMENT City Council Meeting Date: February 26, 1990 SUBJECT: Acceptance of Work - Contract No. 89-9 Dougherty Road Street Lighting and Various Knockdown Replacements; Dougherty Road Underground Utilities (Report by Public Works Director Lee Thompson) EXHIBITS ATTACHED: None. RECOMMENDATION: ~l) 2) Accept improvements constructed by DJB Electric under Contract 89-9 and by Rafanelli and Nahas and PG&E under the Dougherty Road Underground Utilities Capital Improvement Project Authorize final payment and retention in the amount of $3,259.90 to DJB Electric FINANCIAL STATEMENT: Underground Utilities C.I.P. Actual Expenditure Design Inspection Misc. (Legal Notice, Printing) Construction P.G. & E. D.J.B. Dougherty Lights Concrete Repairs (Rafanelli & Nahas) Fence Construction (est.) Striping/Berm Removal (done by Rafanelli and Nahas) 1989-90 Budget 3,259.50 $ 7,000.00 2,357.70 5,000.00 466.25 0.00 176,181.57 180,680.57' 19,311.00 50,000.00 4,998.00 0.00 1,000.00 0.00 0.00 8,000.00 Total, Underground Utilities C.I.P. $ 207,574.02 Street Light Assessment District DJB Electric - Knockdown Replacements $ 5,633.00 $ 250,680.57 $ 5,668.00 Grand Total $ 213,207.02 $ 256,348.57 * The budget for this portion of the work was increased by a $50,680.57 contribution from Rafanelli and Nahas, as approved by the City Council on December 21, 1989. DESCRIPTION: In September of 1989, the City Council awarded Contract 89-9, Dougherty Road Street Lighting and Various Knockdown Replacements, to DJB Electric. This contract is a portion of the Capital Improvement Project to underground the utilities on Dougherty Road between the Southern Pacific Railroad Right-of-Way and Amador Valley Boulevard. Since the wood power poles with street lights were removed, the City needed to install metal poles along this section of Dougherty Road in order to maintain the street lighting. Rafanelli & Nahas Steve DeBacker, PG&E In addition to the Dougherty light poles, Contract 89-9 included replacement of four City-owned poles in various locations which had been knocked down in traffic accidents. During the course of construction, a fifth pole was knocked down on Dougherty Road, and a change order was processed to add replacement of this pole to the contract. The knockdown replacements are funded in the Operating Budget by the Street Light Assessment District. The substructures for undergrounding the utilities were installed by Rafanelli and Nahas as part of that developer's offsite improvement requirement for the Villages at Willow Creek Project. Pacific Gas and Electric Company then pulled the wires through the conduit at a total cost of $176,181.57, of which Rafanelli and Nahas paid $50,680.57. Some of the sidewalk and curb and gutter along the west side of Dougherty Road in front of Arroyo Vista had been badly damaged by various construction projects. Rather than wait for the sidewalk safety project in the spring, Staff elected to have Rafanelli and Nahas' contractor replace this sidewalk and curb and gutter at a cost of $4,998. The unit prices for this work were comparable to bid prices received in the past and the project was facilitated since the contractor was already working in that area. An additional item of work associated with this project is relocation of the fence at the D.S.R.S.D. pump station near the Southern Pacific right-of-way. This work was a commitment made to D.S.R.S.D. at the time that the District dedicated right-of-way to the City along the frontage of the pump station. The fence modification allows D.S.R.S.D. trucks to drive off the pavement instead of blocking traffic when entering the pump station. This fence work has not been completed; however, prices have been received from several contractors, and the low bid is approximately $1,000. The budget item related to striping and berm removal was accomplished by Rafanelli and Nahas as part of their project at no cost to the City. Staff has reviewed the work on the project and determined that it is complete and in accordance with the approved plans and specifications. Staff recommends that the City Council accept the improvements and authorize final payment and retention to D3B Electric in the amount of $3,259.90. - 2 -