HomeMy WebLinkAboutItem 8.1 E Dublin Land Use Joint CC/PC Meeting (2) 4, -o-�
AGENDA STATEMENT
CITY COUNCIL MEETING DATE: February 26, 1989
SUBJECT: Schedule for Joint Planning Commission/City
Council Study Session on East Dublin Land Use.
Alternatives
REPORT PREPARED BY: A� Brenda Gillarde, Project Coordinator
EXHIBITS ATTACHED: Attachment 1 : September 25, 1989 Staff
report on West Dublin meeting dates .
( �v
RECOMMENDATIONS : Jar Select a meeting date in the second or third
d"[ week of April
FINANCIAL STATEMENT: Undetermined
DESCRIPTION
I . BACKGROUND
On September 25, 1989 , the City Council approved a set of special
meeting dates for the West Dublin project (see Attachment 1) . A
similar set of meetings will be held for East Dublin.
II . ISSUES
A date needs to be selected for the first in a series of joint
Planning Commission/City Council (PC/CC) study sessions on East
Dublin. Ordinarily, the meeting would be held on a regular Planning
Commission meeting day, however the two Planning Commission meetings
in April have been set aside for joint PC/CC meetings on West Dublin.
Based on the East Dublin time schedule, Staff suggests a meeting date
in the second or third week of April on a non-Planning Commission
meeting day.
The April meeting is intended as a study session on the three
land use alternatives for the East Dublin Study Area; it is not a
public hearing. The alternatives will be presented by the East Dublin
consultants - Wallace, Roberts and Todd. An Alternative Report
describing the alternatives, their relative impacts on the local
transportation network and the preliminary costs for infrastructure
will be available approximately two weeks before the meeting.
The meeting will be noticed in the same manner as all Council
and Commission meetings . In addition, written notice will be mailed
to all persons on the East Dublin mailing list. This list includes
property owners, agencies and interested citizens . The Mayor will
chair the meeting and coordinate input from both the Planning
Commission and City Council . All persons wishing to address the
Council/Commission on the alternatives will be allowed to speak.
No formal decisions or action on the project will be made by
either the Planning Commission or Council at this meeting. The
Planning Commission and City Council will hold public hearings before
making any formal decisions on land uses for East Dublin.
III . CONCLUSION
Select a meeting date in the second or third week of April for
the study session on the East Dublin land use alternatives .
---------_-------------------------------------------------------------
ITEM NO. s COPIES TO: File PA 87-031
[PLNG-08 :CC87031] General File
Planning Commission
i
a �V
AGENDA STATEMENT
CITY COUNCIL MEETING DATE: September 25, 1989
REPORT PREPARED BY: Brenda Gillarde, Project Coordinator
SUBJECT: PA 88-144 West Dublin Studies - Dates for Joint
Planning Commission/City Council meetings
EXHIBITS ATTACHED: Attachment 1: West Dublin Processing
Schedule
RECOMMENDATION: 1) Review dates for joint Planning
Commission/City Council meetings.
2) Approve or amend dates as necessary.
FINANCIAL STATEMENT: The meetings described below are included in
the contract with WPM Planning Team that was
approved by-the City Council on May 8, 1989.
DESCRIPTION:
As part of the West Dublin Studies, several Public Study Sessions are
scheduled jointly with the Planning Commission and City Council. The meetings
will be chaired by the Mayor, with both the Planning Commission and City
Council providing input, and the City Council providing the final directions
and decisions.
The dates and topics of these meetings are outlined below:
Date Topic
December 13, 1989 Presentation of Study Report #1: Opportunities and
Constraints. This report will describe the
environmental assets and liabilities associated with
development of the West Dublin Area. WPM Planning Team
will present the findings of their 5 month analysis of
the site. This meeting is for information only; no
decision is required of the Planning Commission or City
Council.
April 2 & 16, 1990 Discussion of Study Reports 2/3: Sketch Plan
Alternatives. This report will describe up to three
alternatives to the proposed development plans for West
Dublin. The purpose of the meeting is to achieve
Planning Commission/City Council consensus on a
preferred alternative.
November 5, 1990 Discussion of Study Report #4: Administrative Draft
General Plan Amendment/Specific Plan. WPM Planning Team
will present the key features of the amendment and
specific plan. The Planning Commission and City Council
will have the opportunity to review and comment.
Once the Draft General Plan Amendment/Specific Plan/EIR are completed, the
Planning Commission and City Council will hold separate public hearings on
these documents (refer to Stage V of the attached processing schedule) .
------------------------------------------------------------------------------
j/ "Mvmf& OT
ITEM NO. � t,
I t
WRS1' 1) 1) 111. IN
P R O C E S S I N G S C if E 1) U 1. R
TASK
Starr is OiL)orlulsitirs/(.1WIlrn{Ilts enusplel.e
1.1 Staff/WI71 cundUCL Pro.ject. OrlenLOL'ion complete
] 1.2 SLnff/WPM conduct tech Session 1 (orirnLOLion) complete 9 weeks
[s 1.3 WPAI completes Initinl SLudy/Notice of I'repnraLion for I:LI1 8/31 1 week
1.4 Staff reviews Initial SLudy/Notice of Preparation 8/31 1 week
1.5 Status report/staff meeting 9/8 10 weeks
1.6 Eden Development completes model of existing site 9/8
1.7 Staff distributes Initial Study and letter regarding scoping session to key agencies/persons 10/20 5 weeks
1.S Staff receives Notice of Preparation responses 10/19
1.9 Staff/wrfl conduct Notice of PrepnroLion scoping session (Tech Session 2) 10/26 1 week
1.10 SLOf IM"I conduct Tech Session 3 on issues LhaL should be nddressed In Lhe CIA/SP/1`111 Studies 10/27 1 week
1.11 SLnLus reporL/atnff mocLine 11/3 7 weeks
1.12 WPH delivers Administrotive Draft SLudy Re purC 1 (OpporCUn.IC1.es and ConatrninL's) 11/17 2 weeks
1.13 Stnff reviews Study Report 1/submits coimnenL's Lo WPM 12/1 2 weeks
1.14 WPfI delivers/stnff distributes Study Report 1 12/13 2 weeks
A 1.15 Staff/WPM conduct Public Session 1 (public conmsenL on Study Iteporl 1) 12/22 1 week
1.16 Status report/staff meeting
Stnec li: Sl:elch Plans 1/26/9( G weeks
9 2.1 WPI•I submits AdminisLrnLive Draft of SLudy Reports 2/3 (Sketch Plan AlCCrnnC.l.ves)
•' 2 CtnfC/WI'1l conduct' Tech Sessions 4 and 5 (SLnff/Developer cunnnenL.v on SLudy Reports 2/3) 2/8. 2/22 4 weeks
_ 3/2 1 week
2.3 Stntus rvporl/stnff mcellnl; 3/16 3 weeks
2.4 W111 submit:/Staff dIsLrlbuLes Study Rapurls 2/:l 4/2. 4/16 4 weeks
66 2.5 WPPI/Staff conducts Public Sessions 2 and 3 (Joint PC/CC meeLings on SLudy Reports 2/3 - Sketch Plan Alternatives) 4/27 1 week
0 2.6 Stntus report/staff meeting
�ttCr III Prrlimnr� Draft CPA/SP 5/18 3 weeks
s7 3.1 ltr�l submits SLudy Report 4 (Pre].lint naiy General Plan Amendment) (,/1 2 weeks
3.2 Stnff reviews SLudy ReporL 4/submiLs conuucnLs to WPM 6/7 1 week
0 3.3 Stntus report/staff marling 7/6 5 weeks
® 3.4 WP11 submits Preliminary Specif.lc flan ('Tech Memos 12-17) 7/19 2 weeks
❑ 3.5 Staff/WPIM conducts Tech .5'e&91011 6 (Developer/SLaTf cunnnenls un TO-Ch Manu''s) 7/27 1 week
0 3.6 Status report/staff meeting 8/10 5 weeks
0 3.7 WPM submits Preliminary Specific Plan (1'ecil Memos 18-22) 8/23 2 weeks
❑ 3.8 Staff/WPM conducts Tech Session 7 (Developer/Staff comments on Tech Memos) 8/31 1 week
0 3.9 Status report/staff meeting 9/21 4 weeks
0 3.10 WPM submits AdministrnLive Draft Cenernl Pion Amendmonl/SpeciEle Pl.nn IU/5 2 weeks
3.11 StnfC reviews AdminIsLrnLive Draft/sulnn.its eosmncnLa Lo Wl'M 10/12 1 week
0 3.12 SUILtis report/sLnfl' mrrt.lst). !0/l9 2 weeks
sly 3.13 l:Pfi delivers/SLnff disLribuLcs AdmintsLraLlve DrnfL Cenernl 1'.lnn Amendment/Specific I'.Inn)
0 3.14 Staff/W111 conduct Public Session 4 (Joine PC/CC meeting on AdminisLra Live DrsfL Ceneral Plan Amenchnent/Spoci[ic Plan 11/9 1 weeks
0 3.15 Status report/staff meeting
0 Stnff fleeting ❑ Tech Session A Public SLudy Session A Public Hearing QIDocument from WPM
e
l _
W E S T D U B L I N '
P R O C E S S I N G S C 11 I: D U L E
TASK
Stare IV: Drnft SP/EIR
4.1 WPM submits Administrntive Drnft IsIR, Draft CPA/SP 1/18/91 13/weeks
4.2 Staff reviews Administrative Draft EIR and Draft GPA/SP; submits comments to WI'M (check against NOP) 2/01 2 weeks
4.3 Status report/staff meeting 2/08 1 week
4.4 WPM delivers/Staff distributes Draft EIR, CPA/SP and Notice of Completion; 30-day EIR review period begins 2/22 3 weeks
Stacie V: Adopt EIR/GPA/SP
IL 5.1 Planning Commission public hearings on Draft EIR/GPA/SP (30-day EIR review period ends 4/12/91) 3/18 3 weeks
4/1 2 weeks
4/15 2 weeks
4/29 2 weeks
(opt.)
D 5.2 Status report/staff meeting 5/1 1 week
5.3 Staff/WPM conduct Tech Session 8 (discuss revisions to CPA/SP based on PC and public comments) 5/9 2 weeks
0 5.4 WPM submits Final EIR and Study Report 5 (recommended refinements to CPA/SP) 5/31 5 weeks
5.5 Staff reviews Final EIR and Study Report 5; submits comments to WPM 6/14 2 weeks
9 5.6 WPM submits/Staff distributes Final EIR rind Study Report 5 6/28 2 weeks
► 5.7 City Council public hearings on Flnnl EIR and Draft GPA/SP 7/8 2 weeks
7/22 2 weeks
8/12 2 weeks
5.8 SLnrf/LTM conduct Tech Session 9 (41HcUss revisions to CI'A/SI' based On CC and public comunents) 8/1 (opt.)
5.9 WPM submits Study Rcport 6 (CEQA Findings and Overriding ConsideraLions) 8/9 1 week
5.10 Staff reviews Study Report 6/submits comments 'to WPM 8/16 1 week
31 5.11 WPM submits/Staff distributes Study Report 6 8/23 1 week
4 5.12 City Council certifies and adopts CPA/SP 8/26 3 days
31 5.13 WPM submits/Staff distributes Notice of Determination 9/7 1 week
® 5.14 WPM submits final GPA/SP 9/27 5 weeks
Note: These dates care subject to change
Q Staff Meeting ❑Tech Session A Public Study Session A Public Clearing 9 Document from WPM 9/1/89