HomeMy WebLinkAboutItem 8.2 DB GPA ROW LineStudy (2)AGENDA STATEMENT
CITY COUNCIL MEETING DATE: April 9, 1990
SUBJECT:
Dublin Boulevard Extension General Plan Amendment
(PA 88-010)/Initiation of right-of-way line study for
the two lane access road parallel to Interstate 580
and connecting to Hacienda Interchange
REPORT PREPARED BY:
EXHIBITS ATTACHED:
Lee Thompson, Public Works Di~or
John Donahoe, Project Planner~
Exhibit A: Resolution initiating right-of-way line
study
Exhibit B: Proposed Plan Line
RECOMMENDATI ON~~
¥
1) Incorporate the General Plan Amendment for the
realignment of the Dublin Boulevard extension into the
East Dublin General Plan Amendment and Specific Plan
Study;
2) Adopt a resolution initiating the right-of-way line
study for the two-lane access road parallel to
Interstate 580 and connecting to Hacienda Interchange.
FINANCIAL STATEMENT:
The traffic study for the two lane facility by TJKM
would cost $4,700 and is within the Engineering
operating budget. The remainder of the work is City
Staff time, also budgeted under the operating budget.
DESCRIPTION:
Existing General Plan Designation of Dublin Boulevard Extension
In order to provide direction in the City of Dublin's orderly growth to the
east, the Dublin General Plan depicts the future location of Dublin Boulevard
from Dougherty Road east to Tassajara Road. The plan line of Dublin Boulevard
is shown conceptually as a major circulation arterial through the Camp
Parks/County property, uniting the eastern area with the City's existing
circulation system. The General Plan depicts the future extension of Dublin
Boulevard (ultimately a six lane arterial road) from Dougherty Road east to
Tassajara Road approximately 1,250 feet north of and parallel to Interstate
580 (Exhibit B).
Need to Realign the Dublin Boulevard Extension
Since the time when the Dublin General Plan was prepared, it has become
apparent that the extension as shown might be too close to Interstate 580. If
the extension of Dublin Boulevard was constructed along its existing
alignment, Staff was concerned that the resulting intersections of Dublin
Boulevard/ Hacienda Drive and Dublin Boulevard/Tassajara Road would be located
Copies to: PA File
ITEM NO. ~
too close to the freeway interchanges, creating inadequate room for lane
changes and vehicle stacking. By moving the Dublin Boulevard extension plan
line further to the north, the resulting intersections would be far enough
away from the interchange to allow adequate distance for lane changes and
vehicle stacking. Based on this concern, the City Staff requested that the
City Council initiate a General Plan Amendment (PA 88-010) to move the Dublin
Boulevard extension alignment further to the north to a point approximately
2,750 feet north of Interstate 580.
Although it would appear that changing the alignment of the extension of
Dublin Boulevard would have little or no adverse traffic impacts, the City of
Dublin authorized the City's Traffic Engineer, TJKM, to prepare a traffic
study analyzing the realignment as part of the environmental review required
for the project.
In order to calculate expected traffic levels within the project area, Staff
and TJKM made various land use assumptions for the East Dublin area, prior to
completion of more detailed land use assumptions that will be part of the East
Dublin General Plan Amendment/Specific Plan (GPA/SP) studies currently
underway. The resulting traffic study indicated that the potential traffic
impacts associated with the extension's close proximity to Interstate 580
would be mitigated by the realignment. However, the traffic report also
identified potentially significant adverse impacts to the Dublin
Boulevard/Dougherty Road intersection relating to the realignment to the
north. The traffic report indicated that the northern alignment would have
the potential to redistribute trips within the study area, causing more
traffic at the referenced intersection.
At the same time, the East Dublin GPA/SP process included the preparation of
more detailed land use studies, which identified alternative land uses for the
area. In addition, the East Dublin GPA/SP also indicated the potential for
multiple roads parallel to Interstate 580. These multiple roads may mitigate
the potential adverse traffic impacts of the realignment of the Dublin
Boulevard extension. Since the East Dublin GPA/SP is currently evaluating
land use alternatives and circulation alternatives, it would then be
appropriate and desirable to merge the Dublin Boulevard Extension General Plan
Amendment into the East Dublin GPA/SP so that the realignment can be made
based on all available land use information.
Need for a Two-lane Access Road Parallel to Interstate 580 and Connecting to
Hacienda Interchange
In order to still facilitate the opening of the Hacienda Road interchange and
to expedite additional access to Tassajara Road, a two lane access road should
be constructed from Dougherty Road east to Tassajara Road. This two lane
access road will satisfy Federal and CalTrans requirements to open the
Hacienda interchange by constructing a street parallel to and north of
Interstate 580.
In a cooperative effort between the Cities of Pleasanton and Dublin, and
Alameda County, the following outline of events has been discussed in order to
facilitate construction of the parallel road.
I. Alameda County would provide the right-of-way necessary for the access
road to the Hacienda interchange and the parallel roadway connection through
their property from Tassajara Road to the Camp Parks eastern boundary (Arnold
Road).
II. Through a land trade, Dublin will acquire the roadway right-of-way
through Camp Parks on behalf of the County. This right-of-way was authorized
to be dedicated in the National Defense Authorization Act, Fiscal Year 1989-
90, to Dublin.
III. The City of Dublin will be responsible for obtaining the necessary
rights-of-way from the Camp Parks western boundary to Dougherty Road.
IV. The North Pleasanton Improvement District No. 3 (City of Pleasanton) is
proposing a loan against future assessments or fees to prepare construction
documents and construct a two lane access road to parallel Interstate 580 from
Tassajara Road to the western boundary of Camp Parks and connecting to the
Hacienda Interchange.
V. The City of Dublin will prepare all necessary traffic analysis and
environmental documents for this work. The City of Dublin will also prepare
the construction documents for the parallel connection from the Camp Parks
western boundary to Dougherty Road.
In order to insure that the City of Dublin proceeds with the establishment of
the right-of-way in an orderly fashion, as well as ensuring that all CEQA
guidelines are followed, the Staff recommends that the City follow the
following process, as established in Ordinance 44-87:
TWO LANE ACCESS ROAD TIME LINE
A. TJKM to prepare a traffic study reviewing a two-lane access road from
Dublin Boulevard to Tassajara Road.
B. Staff to review traffic study, prepare necessary revisions, prepare
environmental documents and Planning Commission staff report.
Co Planning Commission public hearing on right-of-way line. Tentative
meeting date: April 16, 1990.
D. City Council to adopt resolution of intent to establish right-of-way
line. Tentative date: April 23, 1990
City Council public hearing to consider objections to establishing
right-of-way line, environmental document, and introduce ordinance
establishing right-of-way line (lst reading). Tentative date: May 14,
1990. (Ordinance 44-87 states that this public hearing cannot occur
sooner than 14 days from Council adoption of the resolution of intent to
establish the right-of-way line).
F. City Council public hearing to consider adoption of ordinance
establishing right-of-way (2nd reading). Tentative date: May 28, 1990.
Staff recommends that the City Council:
1) Incorporate the GPA for the realignment of the Dublin Boulevard
extension into the East Dublin GPA and Specific Plan Study; and
2) Adopt a resolution initiating a right-of-way line study for the two
lane access road parallel to Interstate 580 and connecting to Hacienda
Interchange.
-3-
RESOLUTION NO. 90
A RESOLUTION OF THE CITY COUNCIL
OF THE CITY OF DUBLIN
INITIATING A RIGHT-OF-WAY LINE STUDY FOR A TWO LANE ACCESS ROAD PARALLEL TO
INTERSTATE 580 AND CONNECTING TO THE HACIENDA INTERCHANGE
WHEREAS, in order to provide orderly growth to the eastern areas of the
City of Dublin, adequate circulation facilities need to be provided; and
WHEREAS, the establishment of a road from Dougherty Road to Tassajara
Road would aid in the orderly development of the East Dublin area; and
WHEREAS, the establishment of a road from Dougherty Road to Tassajara
Road would also facilitate the opening of the Hacienda Interchange; and
WHEREAS, Ordinance No. 44-87 of the City of Dublin provides that the City
Council of Dublin may initiate the process to establish a right-of-way line by
adopting a resolution.
NOW, THEREFORE, BE IT RESOLVED THAT THE Dublin City Council initiates a
right-of-way line study to establish a two lane access road parallel to
Interstate 580 and connecting to the Hacienda Interchange.
PASSED, APPROVED AND ADOPTED this 9th day of April, 1990.
AYES:
NOES:
ABSENT:
Mayor
City Clerk