Loading...
HomeMy WebLinkAboutItem 4.03 AdvertiseForBids 90-7 (2) CITY OF DUBLIN AGENDA STATEMENT City Council Meeting Date: April 23, 1990 SUBJECT: Authorization to Solicit Bids Contract 90-07 City Entrance Signs and Facilities Identification Signs Report by Public Works Director Lee Thompson EXHIBITS ATTACHED: Plans and specifications will be available at the City Council meeting. RECOMMENDATION: f\~luthorize Staff to advertise for bids. FINANCIAL STATEMENT: Budget for four of the City Entrance Signs: Design/Inspection: Construction: Utility Fees: $ 8,000 30,000 6~500 $ 44,500 The cost of the sign on Dougherty Road at the northerly City Limit will be reimbursed by developer contribution from J.L. Construction (Village V). Budget for Park and Pool (Facilities) Signs: Administrative: $ 5,000 Construction: 15~000 $ 20,000 DESCRIPTION: This project provides for installation of City Entrance Signs at five locations: Dougherty Road at Dublin Boulevard, Dougherty Road at the northerly City Limit, Village Parkway at Kimball Avenue, San Ramon Road at Dublin Boulevard, and San Ramon Road at Alcosta Boulevard. The City Council approved the design for the signs at the April 9th meeting. Initially, it was hoped to landscape around the sign at the 1-580/Dougherty Road location. As there is no nearby water connection, this landscaping will be postponed until the Dougherty Road widening project is constructed. Also included in this project are the signs for the Dublin Swim Center, Dublin Sports Grounds, and Mape Park. A project to construct these signs was bid in February; however, the bids received were considerably higher than the estimated cost for the work. Singer and Hodges has reduced the scale of these signs in an effort to obtain lower prices, and the landscaping improvements associated with the signs will not be included at this time. ITEM NO. ~ ~ COPIES TO: Singer & Hodges