HomeMy WebLinkAboutItem 7.05 MCE Agreement (2) CITY OF DUBLIN
AGENDA STATEMENT
City Council Meeting Date: June 26, 1990
SUBJECT:
Public Works Maintenance Contract Review (MCE)
Report prepared by Public Works Director Lee Thompson
EXHIBITS ATTACHED:
1)
2)
3)
4)
5)
~)
7)
Comparison of Workload Measures
Service Request Form, Final Service Request Summary for
Fiscal Year 1988-89 and Street and Park Service Request
Su~mnaries for FY 1989-90 through May
Resolution Approving New Agreement
Proposed New Agreement
Comparison of Equipment Rental Rates
Current Maintenance Agreement with MCE
MCE Self-Evaluation
Discuss maintenance issues as part of evaluation process.
Adopt resolution approving new agreement and authorize
Mayor to execute.
FINANCIAL STATEMENT: See below.
DESCRIPTION:
MCE has provided maintenance services to the City of Dublin since July 1, 1984.
Those services which are provided by MCE are as follows:
Spill Cleanup
Street Repair
Drainage Maintenance
Storm Patrol/Cleanup
Curb, Gutter, and Sidewalk
(temporary or emergency repair)
Sign Installation, Repair, and Maintenance
Striping and Marking
Guardrail Repair
Weed Abatement
Bike Path Maintenance
Street Tree Maintenance
Street Landscaping Maintenance
Park Maintenance
Limited Building Maintenance
On July 1, 1987, the City entered into a one-year agreement with MCE Corporation,
which provided for extensions for two successive one-year terms, subject to the
satisfactory performance by the Contractor as determined by the City. This three-
year agreement will expire on June 30, 1990, and it is proposed to enter into a
similar revised agreement covering the next three fiscal years.
Shown below is a comparison of the contract costs authorized by the City for Fiscal
Year 1989-90 with the estimated costs which will be incurred for Fiscal Year 1989-
90 by activ'~ty.
Stan Smalley, MCE
TABLE I
Activity
Contract
1989-90
Spill Clean-up
Street Repair
Drainage Maintenance
Storm Patrol
Curb, Gutter, & Sidewalk
Sign Repair/Installation
Striping & Marking
Guardrail Repair
Weed Abatement
Bike Path Maintenance
Street Tree Maintenance
Landscape Maintenance
Neighborhood Watch
Park Maintenance
Maintenance Supervision
Stagecoach A.D. Trees
Stagecoach A.D. Ldscp.
Dougherty A.D. Trees
Dougherty A.D. Ldscp.
Additional Work
Building Management
$ 4 5OO
29 000
21 100
12 900
17 200
16 700
35 000
1 300
13 800
4 200
79 800
171 500
1 600
350.950
73 500
7,200
21,700
10,600
76,900
10,000
0
Total MCE Contract Cost' $ 959,450
Estimated
1989-90
$ 7 100
23 000
10 000
4 870
6 000
18 400
35 000
1 300
8 500
2 600
71.000
151 000
1600
317 450
73 500
5 000
23 900
6 000
35 000
80 400
0
Over/Under
1989-90 Contract
$ 2,600
(6,000)
(ll,100)
(8,o3o)
(ii,200)
1,700
0
0
(5,300)
(1,6oo)
(8,8oo)
(20,500)
o
(33,500)
o
(2,200)
2,200
(4,600)
(41,9oo)
70,400*
0
$ 881,620 $(77,830)
*The Additional Work category primarily includes work performed at the Civic
Center such as set-up of the Regional bleeting Room, maintenance and
installations, moving of furniture, and so forth, building maintenance items for
the Shannon Center and Senior Center, and pool maintenance). These items were
all budgeted within the City's existing budget accounts for Building Management,
Recreation, and Street and Park Maintenance but did not fit into other existing
MCE line items for the 1989-90 Fiscal Year.
As indicated above, it is anticipated that MCE will spend $77,830 less than they
were authorized to spend in Fiscal Year 1989-90. This is primarily attributable
to the following factors:
1) Low rainfall affecting drainage activities.
2) Dougherty Road Assessment District was not ready for City maintenance as
early as expected.
3) A new spraying subcontractor was utilized, which resulted in lower costs and
greater efficiency.
4) The Civic Center landscaping was not ready for City maintenance as soon as
anticipated.
The computerized reporting methods that MCE uses allows cost review and control
on a monthly basis so that the various maintenance activities to be monitored may
be easily revised when necessary.
Work Performed
MCE staff has developed a performance based budget in which a very detailed
inventory of improvements is monitored. Exhibit 1 lists a sample of the workload
measures which helps City Staff to keep up on changes in maintenance needs.
These workload measures include a full time maintenance supervisor who oversees
the budget categories of park maintenance, street tree maintenance, street
maintenance, and street landscape maintenance. The listed workload measures are
definable tasks which make up these budget categories. Labor is measured in
manhours; materials are quantified by weight, ~neasurement, or item.
puality of Service Provided
One means which the City uses to evaluate contract performance is the City's
Service Request Program. Attached are the Final Service Request Summaries for
street maintenance (including sweeping, landscaping, signs, and so forth) for
Fiscal Year 1988-89 and for the first 11 months of Fiscal Year 1989-90 (see
Exhibit 2). As indicated in the summary, the City handled a total of 36 street
maintenance service requests for the first 11 months of this fiscal year. Of
those service requests that were handled, the City received 21 responses (a 58%
response rate) to the Service Request questionnaire. The job evaluation score
increased from 4.54 in Fiscal Year 1988-89 to 4.80 in 1989-90 (the ratings being
defined as #4 "somewhat pleased" and #5 "very pleased). For the most part, those
residents that responded had very favorable comments regarding the quality of
service provided by MCE.
FY 1989-90 is the second year that MCE has handled park maintenance services for
the City. The Service Request Summary for park maintenance is computed
separately from the street maintenance report and is also attached. Through May
of 1990, a total of 60 requests for park maintenance were received, including
service to the Senior Center and Shannon Center buildings. The City received 1
response to the questionnaire, with an evaluation score of 5.0. (It should be
noted that approximately 77% of the park service requests were Staff-generated
and that the response rate from the 14 resident requests is about 7%.) The one
park service request card that was returned did not include any comments.
MCE's emergency response has been very good. In general, they have responded
within 20 to 30 minutes. Several of MCE's staff live in close proximity to the
City of Dublin, enabling a quick response time during non-working hours. Trucks
are equipped with phones so that MCE's staff is easily reachable.
In addition to the normal contract work, MCE has provided personnel and equipment
for special events such as the St. Patrick's Day parade and the Shamrock Festival
and for miscellaneous banner installations. The traffic control planning and
execution has been professional and timely for these events.
Contract Compliance
As was indicated in last year's report, MCE's performance has continued to
improve. MCE has attempted to find different ways to reduce costs to the City
and has exercised consistent initiative in identifying problem areas as well as
keeping the Public Works Director's office informed of the status of public works
maintenance activities. MCE has also gone to great lengths to document and
inventory all of the various public works items throughout the City in order to
more accurately project maintenance costs and identify service levels. This
information has been invaluable in preparing the Fiscal Year 1990-91 maintenance
budgets.
Additionally, the Maintenance Superintendent participates in both the Traffic
Safety Committee and regular Public Works staff meetings. These activities have
proven invaluable from the standpoint of communication within and among
departments and have hastened the resolution of real and potential problems that
come to light.
Cost Effectiveness
In past years, it has appeared that the only viable alternative to providing
public works maintenance services at this time would be to provide the service in
a combination of contract and City employees or with solely City employees. As
noted in prior reviews, the City's existing Corporation Yard facility would be
inadequate for the equipment and personnel that would be necessary if this
function was provided in-house. The cost of relocating and constructing a new
facility would far outweigh any difference between the contract and in-house
provision of public works services at this time.
Proposed Services for Fiscal Year 1990-91
The proposed schedule of work for Fiscal Year 1990-91 is shown in Attachment 1 of
the Addendum to Public Works Maintenance Agreement. As always, the scheduled
work is tentative and will not be finalized until the City Council approves the
Budget. As indicated in Exhibit 4, Schedule of Work, the estimated contract
costs for maintenance services provided by MCE for Fiscal Year 1990-91 total
$984,400. This exceeds the estimated maintenance costs of $881,620 for Fiscal
Year 1989-90 by $102,780. This increase is primarily attributable to the
following factors:
The assumption of the Villages landscape maintenance assessment district for
a full year.
The assumption of a building maintenance person for the four City buildings.
A full year of maintenance of the landscaping on the Civic Center grounds.
The reassumption of Shannon Park and Alamo Creek Park after reconstruction.
The assumption of Dublin High School field maintenance.
Proposed Contract
The proposed new agreement with MCE incorporates several revisions which have
come about to clarify legal requirements.
MCE is required to pay prevailing wages on specific types of work, as their work
falls under Public Works in the State Labor Code, Sec. 1770 et. seq. The current
agreement requires that they comply with all laws, and MCE has indicated that
prevailing wages have been paid when applicable. The existing general contract
requirements were changed to be more specific (Exhibit 4, Paragraph 19, Page 6 of
the new contract). Certified payroll reports may be requested by the City.
There is a new Paragraph 6 in the agreement which covers "work not subject to
this agreement." Certain types of work are allowed to be removed from MCE's
contract and bid as a public project. This conforms with requirements in State
Law to bid public projects which exceed $5,000. The new operating budget reduces
MCE's scope of work under street repair and striping. Primarily, MCE will be
involved with emergency repairs only. The street repair contract that is
normally bid with the street overlay work will now have two sections: one for
the massive, essentially single-area work that can be done with a large grinding
machine, and a second section which will involve smaller hand work and will be
spread City-wide. The hand work will be listed as a separate bid item. In order
for the City to have a contractor available to make repairs, the bids will be
obrtained early in the fiscal year. MCE's sidewalk repair will be limited to
asphalt ramping of sidewalk offsets, and all final repairs will be included in
the annual sidewalk program.
As part of the higher service level recommendation under the Building Management
Operating Budget, Staff has included provision for a Building Superintendent
position which would manage the City's five facilities (Civic Center, Shannon
Center, Senior Center, Swim Center, and Corporation Yard), perform minor
maintenance, and supervise building maintenance contracts.
The initial step in the Building Management process is proposed to be a complete
inventory of the buildings in order to identify and quantify such items as light
bulbs, windows, HVAC units, floor coverings, wall coverings, appliances, restroom
facilities, and so forth. Once this information is compiled and a Building
Management Plan is developed, the Building Superintendent would proceed to act on
the Plan's recommendations for regularly scheduled work and overseeing of
necessary outside contract work. Regular preventive maintenance procedures can
forestall major, expensive repairs in the future.
A budget figure of $69,600 is included in the proposed agreement's Schedule of
Work for Building Management. The position of Building Superintendent would be
filled by an MCE leadman (LL1). That personnel cost, along with the charges for
vehicles and materials, make up the proposed budget addition.
Exhibit 5 provides a table of proposed labor and equipment rental rate revisions.
Note that while labor rates are generally increasing in the 1.5 to 6.5 percent
range, equipment charges remain the same or have decreased. The decreases are
possible because of the high hourly usage for much of the equipment. The labor
charges are in line with Staff's knowledge of the rise in labor market. It is to
MCE's credit that they are volunteering to reduce many of their equipment rates
based on their analysis of the usage of this equipment.
Recommendation
It is Staff's recommendation that the City Council adopt the resolution (see
Exhibit 3) approving the new Agreement for Fiscal Year 1990-91 as shown in
Attachment 1, Schedule of Work, including the revisions to the labor and
equipment rates.
COMPARISON OF WORKLOAD MEASURES
ACTIVITY
BUDGET
ACTUAL ACTUAL BUDGET 1989-90 PROPOSED
1987-88 1988-89 1989-90 (REVISED) 1990-91
SPILLS
TEMPORARY PATCHING
POTHOLE PATCHING
REMOVE AND REPLACE ASPHALT
DRAINAGE INSPECTION
CATCH BASINS CLEANED
DITCH CLEANING
STORM PATROL INSPECTION/
REMOVAL
REPLACE SIDEWALK
CURB & GUTTER REPLACEMENT
INSTALL NEW SIGNS
SIGNS REPAIRED
STRIPING-LANE LINES
STRIPING-LETTERS/SYMBOLS
STRIPING-CROSSWALKS
CURB PAINTING
INSTALL PAVEMENT MARKERS
ROADSIDE SPRAYING
BIKE PATH MAINTENANCE
TREE/BUSH CUTTING
TREE TRIMMING SUBCONTRACTOR
TREE REMOVAL
TREE WATERING
TREE REPLACEMENT
LITTER PICKUP
PRUNE/TRIM BEDDINGS
MOW MEDIAN TURF
EDGE MEDIAN TURF
IRRIGATION INSPECTION/
PROGRAM
IRRIGATION REPAIRS
REPAIR PAVER STONES
MAINTENANCE SUPERVISION
182 HRS 72 144 190 146
46 HRS 77 64 64 65
6 TONS 7 N/A N/A N/A
15,645 SF 4,361 6,390 3,500 0
718 EA 768 934 943 970
374 EA 169 374 50 194
3,030 LF 975 5,850 1,000 1,012
157 HRS 183 468 140 477
2,503 SF 1,136 1,590 217 0
221 LF 112 187 126 0
71 EA 81 91 91 92
271 EA 270 303 290 309
97,924 LF 63,710 85,240 87,000 0
1,549 EA 2,109 1,645 1,320 0
14,993 LF 22,434 12,186 17,177 0
6,337 LF 3,499 9,064 8,637 18,885
773 EA 257 607 300 558
15 AC 14 44 32 9
112 HRS 70 134 200 155
1,223 HRS 613 1,052 700 716
92 EA 238 250 250 250
0 EA 2 5 5 5
7,021 EA 7,434 7,120 3,500 1,290
66 EA 65 114 96 135
1,165 PM 1,061 1,409 850 871
8 AC 5 32 20 28
86 AC 68 117 92 131
211,614 LF 172,952 441,630 303,000 475,020
7,176 EA 6,081 17,848 9,243 11,800
291 HRS 315 967 950 1,006
242 HRS 35 160 160 160
1,908 HRS 1,894 1,856 1,856 1,856
Received from:
Dublin. CA 94568
Location: Same as above
1. Storm Drain
2, Street Sign
-- 3. Street Sweeping
-- 4 PotholelSIreet Repair __
6 Traffic Signal
-- 7 Sidewalk
Description of problem:
Acbon:
Employee:
Job Assignment:
CITY OF DUBLIN
Service Request No. _
Received
-- By Dale
Other
8. Curb/Gutler Repair
9 Striping/Marking
10. Landscaoe
fl. Tree Trimming
12, Roden(tlnsect
Problem
13. Zoning Complaint
2414
-- 14 Building & Safely
Corr~plaint
15. Information Request
16. Other
2414
CITY OF DUBLIN
P.O. Box 2340
Dublin, CA 94568
CITY OF DUBLIN
Service Request No.
Dublin, CA 94568
Daytime Received
Phone ~ __ __ By
Localion: Same as above _ Other
~ S~orm Dram __-- 8 Cucb/Gutter Repair
2. Street Sign ___ 9 SIriplngiMarKing
-- 3. Sheet Sweeping --. 10. Landscaoe
__ 4 PolholelStreet Repair -- fl. Tree Tbmmmg
_ . § Street Lighl -- 12, RodenPlnsec~
6 Traffic Signal Problem
-- 7. Sidewalk -- 13 Zoning Combiainl
Description ol pro01em:
Action
Date Time
-- 14. Building & Safely
Complaint
__ 15. Informalion Request
__ 16. OIher
Employee:
Date:
DETACH HERE
CITIZEN EVALUATION
1. How pleased are you with the City's response? (Circle one~
NO
6
NO
OPINION
6
SERVICE REQUEST SUMMARY
JUNE 30, 1989
TOTAL NO. OF SERVICE REQUESTS: 52
TOTAL NO. OF RESPONSES RECD.: 15
TOTAL NO. OF IN-HOUSE SERVICE REQUESTS: 4
TOTAL NO. NOT RESPONDING AFTER 2 MONTHS: 26
TOTAL NO. REMAINING OPEN:
RESPONSE BREAKDOWN:
Job Evaluation: 1 2
Total response 0 1
Average score 4,60
Previous average 4.54
City Evaluation: 1 2
Note:
3 4 5
1 1 12
Total response 0
Average score 4.58
Previous average 4.56
3 4 5
0 0 5 7
Three residents did not give a response in the City evaluation section; total
number of responses shown is 12 instead of 15.
BREAKDOWN BY TYPE OF PROBLEM:
Type: Ttl. SR's Ttl. Resp.
#1 Storm drain 3 2
#2 Sign 13 5
#3 Sweeping 10 t
#4 St. Repair 8 1
#5 St. Light 0 0
#7 Sidewalk 2 1
#8 Curb & Gutter 0 0
#9 Striping/Marking 1 1
#10 Landscape 5 3
#11 Tree Trim 5 0
#16 Other 5 1
Job Eval. City Eval.
(Avg.) (Avg,)
5.00 5 00
500 4 80
4 O0 4 O0
5 00 5 00
0 O0 0 00
2 O0 4 00
000 0 00
3 00 0 00
5 00 4 00
0 00 0 O0
500 0 00
SERVICE REQUEST SUMMARY
MAY 31, 1990
TOTAL NO. OF SERVICE REQUESTS:
36
TOTAL NO. OF RESPONSES RECD.:
21
TOTAL NO. OF IN-HOUSE SERVICE REQUESTS: 3
TOTAL NO. NOT RESPONDING AFTER 2 MONTHS: 9
TOTAL NO. REMAINING OPEN:
RESPONSE BREAKDOWN:
Job Evaluation: 1 2 3 4 5
Total response 1 1 0 1 18
Average score 4.6
Previous average 4.8
City Evaluation: 1 2 3 4 5
Total response 0 0 4 3 13
Average score 4.5
Previous average 4.5
One respondant did not give a rating under the City Evaluation portion of the
mailbaek card. Total response shown is 20 rather than 21.
BREAKDOWN BY TYPE OF PROBLEM:
Type:
Ttl. SR's Ttl. Resp.
#1 Storm drain 0 0
#2 Sign 10 6
#3 Sweeping 9 5
#4 St. Repair 2 2
#5 St. Light 4 1
#7 Sidewalk 7 6
#8 Curb & Gutter 0 0
#9 Striping/Marking 0 0
~10 Landscape 0 0
#11 Tree Trim 1 0
#12 Rodent 1 0
#16 Other 2 1
Job Eval. City Eval.
(Avg.) <Avg.)
4.5 4.7
5.0 3.8
5.O 5.0
4.0 5.0
4.3 4.6
5.0 4.0
CUMULATIVE
-SERVICE REQUEST SUMMARY
PARKS
MAY 31, 1990
TOTAL NO. OF SERVICE REQUESTS:
TOTAL NO. OF RESPONSES RECEIVED:
TOTAL NO. OF IN-HOUSE SERVICE REQUESTS:
TOTAL NO. NOT RESPONDING AFTER 2 MONTHS:
TOTAL NO. REMAINING OPEN:
~+One requested response card not be mailed
RESPONSE BREAKDOWN:
Job Evaluation: 0 1 2
6O
1
46
Total Response 0
Average Score 5.0
Previous Average 5.0
4
5
0 0 0 0 1
City EValuation 0
1 2 3 4 5
Total Response
Average Score
Previous Average
BREAKDOWN BY TYPE OF PROBLEM:
Type:
O
3.0
3.0
0 0 1 0 0
Ttl SR's Ttl Resp.
Job Eval
City Eval
(Avs.)
#1 Storm Drain
#2 Sign
#3 Sweeping
#4 St. Repair
#5 St. Light
#7 Sidewalk
#8 Curb & Gutter
#9 Striping/Marking
#10 Landscape
#11 Tree Trim
#16 Other
6O 1
5.0
3.0
RESOLUTION NO. -90
A RESOLUTION OF THE CITY COUNCIL
OF THE CITY OF DUBLIN
APPROVING AGREEMENT FOR MAINTENANCE SERVICES
WITH M.C.E. CORPORATION
WHEREAS, M.C.E. Corporation has submitted a proposal for
maintenance services which is reasonable and acceptable to the City of Dublin;
and
WHEREAS, the City of Dublin desires to contract with M.C.E.
Corporation for maintenance services as set forth in said proposal;
NOW, THEREFORE, BE IT RESOLVED that the City Council of the City
of Dublin does hereby approve the agreement with M.C.E. Corporation.
BE IT FURTHER RESOLVED that the Mayor is authorized to execute the
agreement.
PASSED, APPROVED, AND ADOPTED this 26th day of June, 1990.
AYES:
NOES:
ABSENT:
ATTEST:
Mayor
City Clerk
ANNUAL PUBLIC WORKS MAINTENANCE AGREEMENT
BETWEEN
CITY OF DUBLIN
AND
MCE CORPORATION
TITLE
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
TABLE OF CONTENTS
ANNUAL PUBLIC WORKS MAINTENANCE AGREEMENT
Scope of Work 1
Duration of Agreement and Date of Commencement 2
Adjustments to Contract Prices and Work Quantity 2
Scheduled Work 2
Additional Work 3
Work Not Subject to This Agreement 3
Emergency Work 3
Contract Amount and Prices 3
Maintenance Supervision 4
Work Scheduling Procedures 4
Work Reporting Procedures 4
Additional Contractor Responsibilities 5
Protection of Work and Public 5
Compensation and Billing 5
Public Works Headquarters 5
General Provisions 5
Maintenance of Records 6
Equal Employment Opportunity 6
Prevailing Wage 6
Attorney Fees 6
Miscellaneous 6
Notices 6
PAGE
AGREEMENT
ANNUAL PUBLIC WORKS MAINTENANCE
This Agreement is made this , 1990, between
THE CITY OF DUBLIN, a municipal corporation ("city"), and MCE
CORPORATION, a California corporation, ("Contractor").
The city has elected to perform its public works maintenance
and related activities as set forth in Attachment 1 of this
document, using private contractors.
The Contractor has agreed to arrange for and supervise the
performance of the work and the City has agreed to retain the
Contractor for such purposes, in accordance with the terms and
provisions of this Agreement.
The city and the Contractor agree as follows:
1. Scope of Work: The city retains Contractor to arrange
for, supervise and manage the performance of the work described
in the Schedule of Work (Attachment 1) and as otherwise specified
in this Agreement; and for Additional Work, ("Additional Work")
as is called for in this Agreement. Contractor shall perform the
types of work listed in Section A of Attachment 1 at the unit
prices listed in Section B or at the time and material rates
listed in Section C, as appropriate. The Scope of Work set forth
in Section A of Attachment 1 includes the maximum amount the city
will pay to Contractor for each activity for fiscal year 1990-
1991. Notwithstanding the foregoing, the city may at any time
revise the schedule of work identified in Attachment 1 for
budgeting or other reasons as deemed necessary by the City and
the estimated annual expenditure for Fiscal Year 1990-91 shall be
revised accordingly.
The Contractor specifically agrees to: (a) undertake the
direct responsibility for the performance of the work in
accordance with this Agreement; (b) provide directly, or
through subcontractors or as otherwise permitted by this
Agreement all labor, materials and supervision necessary for the
proper performance of the work in accordance with this Agreement;
(c) furnish a Maintenance Superintendent to provide the
necessary liaison with the city staff and the required
coordination of workmen and materials in the performance of the
work; (d) comply with all laws, ordinances, rules, regulations,
and requirements of governmental authorities, pertaining to the
performance of the work; (e) perform the work, contract for its
performance and supervise its performance in a good and
workmanlike manner and in the most expeditious, cost effective
manner consistent with first class quality; (f) perform all
activities necessary and incidental to the orderly performance of
the work.
2. Duration of Agreement and Date of Commencement: The
term of the Agreement shall be one (1) year commencing July 1,
1990, with provision for an extension of term for two successive
one year terms, subject to satisfactory performance during the
prior year, as determined by and in the sole discretion of the-
city. The city has the option to renew the Agreement, subject to
the price modifications that may be agreed upon by city and
Contractor.
Notwithstanding the foregoing paragraph, the services of the
Contractor may be terminated by the city by giving ninety (90)
days written notice with or without cause. If the City
terminates the Agreement, the Contractor shall be compensated for
such services up to the point of termination. Compensation for
work in progress will be prorated as to the percentage of
progress completed at the date of termination.
Contractor may also terminate its services to the city, but
must first provide the City with written notice at least ninety
(90) days in advance of termination. In such event, City shall
compensate Contractor for services up to the point of
termination, as provided above. Compensation for work in
progress will be prorated as to the percentage of progress
completed at the date of termination.
3. Adjustments to Contract Prices and Work Quantity: In
the event of extension of the Agreement, no later than Marct, 1st,
the Contractor will submit to the City for the coming contract
year a proposed revised Schedule of Work which will set forth a
Work Plan in terms of types and quantities of work to be
performed as well as unit prices and/or estimated annual
expenditure amounts as appropriate. Upon written approval of
both parties, the Agreement shall be extended for one (1) year
effective July 1st as provided above.
4. Scheduled Work: Ail of the work set forth in
Attachment 1 is considered Scheduled Work, except as provided in
Section 1. Contractor shall perform no work in addition to
Scheduled Work, unless: (a) Additional Work is approved in
advance by the Public Works Director or; (b) an emergency
situation exists. An emergency situation is one which endangers
the public safety or public or private property and occurs under
circumstances making it either impossible or impractical to
obtain city approval before proceeding with the work. In such
cases, the Contractor will proceed with the work to the extent
necessary to relieve said danger and shall specifically inform
the Public Works Director of all Emergency Work accomplished.
All scheduled Work shall be provided according to a monthly
schedule prepared by the Maintenance Superintendent and approved
by the Public Works Director in advance.
5. Additional Work: City may require Contractor to
provide Additional Work not specifically described herein at
rates and quantities negotiated by the City and Contractor. No
Additional Work will be undertaken by the Contractor without the
prior written approval of the Public Works Director. The
Contractor will bill the city for Additional Work in the manner
as provided in Attachment 1.
6. Work Not Subiect to this Agreement: The Public Works
Director at his discretion may recommend that projects of a large
scope be approved by the city Council for competitive bid and
completed under a separate Agreement. This shall be the
recommendation on all "public projects" where State or other laws
require that it be contracted for and let to the lowest
responsible bidder after notice. Nothing in this Section shall
preclude the Contractor from participating in this bid process,
for said projects.
city, in accordance with local ordinances and State laws,
may directly purchase materials or supplies to be used by
Contractor. This shall not restrict Public Works Director from
requesting that Contractor, as part of other duties identified in
the Agreement, assist City with locating suppliers, obtaining
price quotations or bids, or other assistance provided that
Contractor will not be providing the materials and supplies.
7. Emerqenc¥ Work: Emergency call-out procedures will be
maintained to provide for emergency response on nights, weekends
and holidays. The procedure will be reviewed and updated
periodically to ensure its effectiveness. In the event Emergency
Work dictates that work be accomplished outside the normal
working hours, such as night time, weekends and holidays,
appropriate overtime rates shall be used as set forth in
Attachment 1.
8. Contract Amount and Prices: Except as provided in
Section 1, the total annual estimated budget shall be the sum of
the planned expenditure amounts listed in Attachment 1. The
actual amount paid to the Contractor shall be based on the amount
of work performed according to the costs outlined in Attachment 1
and any subsequent "Additional Work" approved by the City. Work
items listed in Attachment 1 shall be billed on a unit price
basis or otherwise as set forth in Attachment 1. Unit Pricing is
expressed in terms of Dollars per Work Measurement Unit for each
item of work.
For work listed as "Time and Materials" (T & M), Contractor
shall bill the city on the basis of actual costs to the
Contractor plus a percentage as stated in Attachment 1, Section
C, to cover overhead and management costs.
Contractor shall bill Additional Work on the basis mutually
agreed to by the Contractor and the City at the time the work is
incorporated into the annual maintenance program.
9. Maintenance Supervision: The Contractor shall furnish
a Maintenance Superintendent to assume full responsibility for
day-to-day maintenance operations, ensuring that resources
required to successfully complete the project are applied in a
timely manner. In addition to providing the necessary liaison
with the City, the Maintenance Superintendent is responsible for:
(a) making recommendations to the Public Works Director of work
that should be performed but which is not set forth in the
Schedule of Work; (b) identifying work programs; (c)
scheduling; (d) assisting and supervising work crews; (e)
responding to citizen calls; (f) assisting in contract
administration; (g) maintaining activity reports; and (h)
generally administering public works maintenance functions.
10. Work Scheduling Procedures: To the extent possible, it
is the intent of this Agreement that the Work be performed on a
scheduled, orderly basis. Prior to commencement of work,
Contractor shall prepare a schedule showing projected work to be
performed throughout the fiscal year, including information such
as frequency of weeding, watering, and other parks maintenance
and other similar projected schedules of the work to be
performed.
The Contractor will prepare monthly work schedules and
review them with the Public Works Director. These schedules will
represent specific work needs identified as the result of the
Contractor's recommendations and requests from the Public Works
Director or his designee. Emphasis will be placed on identifying
needs to ensure proper timing of work (for example, ditches
should be scheduled for cleaning before winter rains). The
Contractor will comply with reasonable requests of the Public
Works Director as to preferred locations for various types of
work.
The Contractor will use a service request form to ensure
that complete information is obtained on work needs and requests
for service.
11. Work Reporting Procedures: The Contractor shall submit
a Monthly Work Summary Report to the Public Works Director on or
before the 15th day of the month summarizing work completed in
the previous month. These reports shall include a listing of
work activities and work units completed, including any
Additional or Emergency work performed; status of current and
completed service requests; and, comparisons of annual work
quantities and expenditures planned versus actual.
4
12. Additional Contractor Responsibilities= MCE workers
will be alert for observable maintenance deficiencies in public
facilities as they travel within the city's boundaries in the
course of their maintenance activities performing Scheduled Work,
Additional Work, and Emergency WOrk. They will report observed
maintenance deficiencies to the appropriate MCE or city
representative, or other appropriate agency.
13. Protection of Work and Public: The Contractor shall
take all necessary measures to protect the work and prevent
accidents during any and all phases of work. Contractor shall
provide and maintain all necessary barriers, flagmen, and/or
signs during maintenance procedures.
The Contractor will provide at no additional cost, all the
advance signing and barricading and also signs, barricades,
flashers, and other necessary facilities for the protection of
the public within the limits of the maintenance area while
maintenance activities are proceeding.
14. Compensation and Billinq: For work performed and
services rendered, Contractor shall submit monthly bills to the
city by the 15th day of the month following the month in which
the work was performed. The Contractor shall be compensated by
the city as follows:
A monthly payment for time and materials or unit price
work will be provided, with payment to be made within
twenty (20) days of receipt of invoice by city.
For Additional Work for which no unit prices have been
agreed upon, compensation shall be agreed upon between
the Public Works Director and Contractor in writing
before work is performed. For Emergency Work when
prior approval is not possible and when unit prices
have not been agreed upon, the City and Contractor
shall agree as soon as possible after the work is
performed on the amount of compensation based on costs
for related jobs.
15. Public Works Headquarters: city shall provide an
office for the Maintenance Superintendent. city shall provide a
corporation yard facility from which routine maintenance may be
dispatched. Work days shall begin at such time of dispatch from
a Dublin corporation yard or as mutually agreed upon by city and
Contractor.
16. General Provisions: The general provisions set forth
in Attachment 2 are part of this Agreement. In the event of any
5
inconsistency between said general provisions and any other terms
or conditions of this Agreement, the other terms or conditions
shall control, insofar as it is inconsistent with the General
Provisions.
17. Maintenance of Records: Contractor shall maintain all
books, documents, papers, employee time sheets, accounting
records and such other evidence pertaining to costs incurred and
shall make these materials available at reasonable times during
the contract period and for one year from the date of final
payment under this Agreement for inspection by City.
18. Equal Employment Opportunity: Contractor is an equal
opportunity employer and agrees to comply with applicable
regulations governing equal employment opportunity.
19. Prevailinq Waqe: Contractor shall comply with the
provisions of Labor Code Section 1770 et seq., with respect to
payment of prevailing wages, maintenance of payroll records and
payment of penalties under Labor Code Section 1775.
20. Attorney Fees: If either party brings an action
against the other party arising out of or in connection with this
Agreement entered into between city and Contractor, the
prevailing party is entitled to have and recover from the losing
party reasonable attorney fees and costs of suit.
21.
A.
Miscellaneous:
Contractor shall inform City of private clients within
the corporate boundaries or sphere of influence of the
city during the term of this Agreement. Contractor
agrees not to accept other employment which is or may
be in conflict with its duties under this Agreement or
which may adversely affect the interests of the city.
Contractor will endeavor to secure materials from the
lowest cost source reasonably available.
22. Notices. Any notice given under this Agreement shall
be served by depositing it in the mail, postage prepaid, to the
addresses set forth below:
A. Notices to the Contractor shall be addressed to:
MCE Corporation
2500 Old Crow Canyon Road, Suite 320
San Ramon, California 94583
6
Notices to the city shall be addressed to:
city of Dublin
P. O. Box 2340
Dublin, California
94568
IN WITNESS WHEREOF, the parties have executed this Agreement on
the day and year first above written.
CITY OF DUBLIN
Mayor
ATTEST:
MCE CORPORATION
By:
President
ATTEST:
7
ATTACHMENT 1 - SCHEDULE OF WORK
PRELIMINARY CITY BUDGET
FISCAL YEAR 1990-91
REVISED JUNE 18, 1990
A. SCOPE OF WORK
The following breakdown identifies tasks which are anticipated to be
conducted as part of the Annual Public Works Maintenance Agreement for
the Fiscal Year 1990-91. Annual estimated costs include management
fees as provided in Section C. Contractor shall schedule work to adhere
to these expenditure levels as provided for in this Agreement.
ACTIVITY/SUB-ACTIVITY
1990-91 ESTIMATED
ANNUAL EXPENDITURE
SPILL CLEAN UP
$ 5,800
STREET MAINTENANCE
· Street Repair 9,800
· Drainage Maintenance 12,000
· Storm Patrol/Clean Up 14,000
· Curb & Gutter/Sidewalks 6,500
· Sign Repair/Maintenance 21,000
· Striping/Marking 14,600
· Guardrail Repair 1,300
· Chemical Weed Abatement 4,500
· Bike Path Maintenance 3,200
Activity Total $
86,900
MAINTENANCE SUPERVISION
$ 78,000
STREET TREE MAINTENANCE
· In-House Tree Maintenance $ 43,100
· Contract Tree Pruning 5,600
· Contract Tree Trimming 12,500
· Contract Tree Removal 2,200
· Contract Tree Fungus Spraying 3,600
· Stagecoach Assessment District 4,800
· Dougherty Assessment District 8,700
Activity Total
$ 80,500
NEIGHBORHOOD WATCH SIGNS
$ 1,700
STREET LANDSCAPE MAINTENANCE (BEAUTIFICATION)
· Existing Streets Excluding San Ramon $ 157,600
Road Phase IV
· Stagecoach Assessment District 24,900
· Dougherty Assessment District 57,500
Activity Total $
240,000
PARKS MAINTENANCE
·
·
·
·
·
·
·
·
·
·
·
Stagecoach Park
Kolb Park
Dolan Park
Alamo Creek Park (Renovated)
Dougherty Hills
Mape Park
Shannon Park (Renovated) (8 Months)
Dublin Sports Ground
Valley Swim Center
civic Center
Senior Center
Dublin High School (10 Months)
Activity Total
BUILDING MANAGEMENT
Total 1990-91 Estimated Annual Expenditure
15,600
38,700
41,900
43,900
10,900
14,700
37,000
112,000
18,900
67,800
500
20,000
$ 421,900
$ 69,600
$ 984,400
UNIT PRICES
The following activities shall be completed at the Unit Prices
indicated. The unit prices are inclusive of all labor, materials,
equipment, overhead and management fees.
ACTIVITY 1990-91 UNIT PRICE
RIGHT OF WAY MAINTENANCE
· Chemical Weed Control
120.40 per Acre
TURF MAINTENANCE · Fertilize/Weed Control
· Aeration
110.25 per Acre
350.00 per Acre
BEDDING MAINTENANCE · Fertilization
· Chemical Weed Control
114.95 per Acre
116.65 per Acre
TREE MAINTENANCE
Street Trees
· Pruning city Median Trees
· Trim for Clearance Only (Under 30')
· Trim for Clearance & Balance
(Under 30')
· Trim for Clearance Only (Over 30')
· Trim for Clerance & Balance
(Over 30')
· Fungus Spraying
8.52 per Tree
20.95 per Tree
41.90 per Tree
38.50 per Tree
77.00 per Tree
4.25 per Tree
Park Trees
· Prune and Shape (Over 20')
· Fungus Spraying
54.40 per Tree
4.25 per Tree
TIME AND MATERIALS RATES
The following rates shall be applied to work performed by the Contractor
which is not specified in Section B (Unit Prices). At all times the
Contractor shall strive to utilize the most cost effective elements
possible to complete a project. Appropriate overhead and management
fees will be applied as indicated.
DESCRIPTION
OVERTIME HOLIDAY
HOURLY DAILY HOURLY HOURLY
RATES RATES RATES RATES
( 8 HOURS )
LABOR RATES
Dublin Crew
Maintenance Superintendent
Landscape Foreman
Landscape Laborer I
Landscape Laborer II
Landscape Laborer III
$30.00 $240.00 $45.00 $ 60.00
21.50 172.00 32.25 43.00
18.10 144.80 27.15 36.20
15.30 122.40 22.95. 30.60
12.10 96.80 18.15 24.20
MCE Crew
Superintendent
Loader/Backhoe Operator
Asphalt Paver
Roller Operator
Tractor Operator
Truck Driver 8-12 C.Y.
Truck Driver 4-6 C.Y.
Truck Driver 3 C.Y. Transit
Cement Finisher
Laborer Foreman
Laborer 1
Laborer 2
Laborer 3
$46.95 $375.60 $70.42 $ ~93.90
45.95 367.60 68.92 91.90
44.40 355.20 66.60 88.80
44.40 355.20 66.60 88.80
42.20 337.60 63.30 84.40
37.80 302.40 56.70 75.60
37.25 298.00 55.87 74.50
37.25 298.00 55.87 74.50
35.80 286.40 53.70 71.60
34.20 273.60 51.30 68.40
33.20 265.60 49.80 66.40
32.95 263.60 49.42 65.90
32.80 262.40 49.20 65.60
DESCRIPTION
EQUIP. WAGES TOTAL OPERATED
COST INCL. COST
HOURLY FRINGE PER PER
RATE BENEFITS HOUR DAY
EQUIPMENT RATES
Dublin Crew
* Flatbed Dump $ 6.50 $ 52.00
* Pickup 5.00 40.00
Mower (21") 2.50 20.00
Mower (36") 3.50 28.00
Mower (72") 9.00 72.00
chain Saw 4.00 32.00
Brush Cutter 3.00 24.00
DESCRIPTION
EQUIP. WAGES TOTAL OPERATED
COST INCL. COST
HOURLY FRINGE~ PER PER
RATE BENEFITS HOUR DAY
EQUIPMENT RATES (CONTINUED)
Power Blower
Power Edger
Power Hedge Trimmer
Power Vacuum (30")
Trailer - Large (18')
Trailer - Small (8')
MCE Crew
Asphalt Paver
Loader/Backhoe
Tractor
Roller-Vibratory 3-5 Tons
Roller-Vibratory 1-3 Tons
Dump Truck 8-12 Yd.
Dump Truck 4-6 Yd.
Transit Truck 3 Yd.
Pickup Crew Cab
Pickup
Concrete Saw-Self Propelled
Concrete Saw - Small
Compressor
Bitumal Pot
Vibra Plate
Wacker
Power Berm Machine
$ 2.00 $ 16.00
2.00 16.00
2.00 16.00
7.00 56.00
3.00 24.00
1.80 14.40
$37.50 $ 44.40 $81.90 $655.20
27.50 45.95 73.45 587.60
22.50 42.20 64.70 517.60
15.00 44.40 59.40 475.20
12.00 44.40 56.40 451.20
22.50 37.80 60.30 482.40
20.00 37.25 57.25 458.00
20.00 37.25 57.25 458.00
7.00 56.00
6.50 52.00
12.50 100.00
8.00 64.00
10.00 80.00
6.00 48.00
6.00 48.00
6.00 48.00
10.00 80.00
OVERHEAD AND MANAGEMENT FEES
Applied to MCE Operations
Applied to Subcontract Work
20 percent to Street Maintenance
15 percent to all Park Maintenance
10 percent
* NOTE:
Dublin Flatbed and Pickup rates include cost of two way radios
and hand tools.
ATTACHMENT 2
GENERAL PROVISIONS
1. INDEPENDENT CONTRACTOR. At all times during the term of
this Agreement, Contractor shall be an independent contractor and
shall not be an employee of City. City shall have the right to
control Contractor only insofar as the results of Contractor's
services rendered pursuant to this Agreement; however, City
shall not have the right to control the means by which Contractor
accomplishes services rendered pursuant to this Agreement.
2. LICENSES, PERMITS, ETC.. Contractor represents and warrants
to city that it has all licenses, permits, qualifications and
approvals of whatsoever nature which are legally required for
Contractor. Contractor represents and warrants to City that
Contractor shall, at its sole cost and expense, keep in effect at
all times during the term of this Agreement any licenses,
permits, and approvals which are legally required for Contractor.
3. TIME. Contractor shall devote such time to the performance
of services pursuant to this Agreement as may be reasonably
necessary for satisfactory performance of Contractor's
obligations pursuant to this Agreement.
4. INSURANCE REQUIREMENTS. Contractor shall procure and
maintain for the duration of this Agreement insurance against
claims for injuries to persons or damages to property which may
arise from or in connection with the performance of the work
hereunder by the Contractor, its agents, representatives,
employees or subcontractors. The cost of such insurance shall be
included in the Contractor's bid.
(a)
Minimum Scope of Insurance.
as broad as:
Coverage shall be at least
Insurance Services office Form Number GL 0002 (Ed.
1/73) covering Comprehensive General Liability and
Insurance Services office Form Number GL 0404
covering Broad Form Comprehensive General
Liability; or Insurance Services office
Commercial General Liability coverage
("Occurrence" Form CG 0001.)
Insurance Services office Form Number CA 0001 (Ed.
1/78) covering Automobile Liability, Code 1 "any
auto" and Endorsement CA 0025.
Workers' Compensation insurance as required by the
Labor Code of the State of california and
Employers Liability Insurance.
(b) Minimum Limits of Insurance.
(c)
limits no less than:
Contractor shall maintain
General Liability: $ 1,000,000 combined single
limit per occurrence for bodily injury, personal
injury and property damage. If Commercial General
Liability Insurance or other form with a general
aggregate limit is used, either the general
aggregate limit shall apply separately to this
project/location or the general aggregate limit
shall be twice the required occurrence limit.
Automobile Liability: $ 1,000,000 combined single
limit per accident for bodily injury and property
damage.
Workers' Compensation and Employers Liability:
Workers' compensation limits as required by the
Labor Code of the State of California and
Employers Liability limits of $ 1,000,000 per
accident.
Deductibles and Self-Insured Retentions. Any
(d)
deductibles or self-insured retentions must be declared
to and approved by the city. At the option of the
City, either the insurer shall reduce or eliminate such
deductibles or self-insured retentions as respects the
city, its officers, officials and employees; or the
Contractor shall procure a bond guaranteeing payment of
losses and related investigations, claim administration
and defense expenses.
Other Insurance Provisions. The policies are to
contain, or be endorsed to contain, the following
provisions:
General Liability and Automobile Liability
Coverages.
The city, its officers, officials, employees
and volunteers are to be covered as insureds
as respects: Liability arising out of
activities performed by or on behalf of the
Contractor; products and completed
operations of the Contractor, premises owned,
occupied or used by the Contractor, or
automobiles owned, leased, hired or borrowed
by the Contractor. The coverage shall
contain no special limitations on the scope
of the protection afforded to the city, its
be
de
officers, officials, empl=~'ees or volunteers.
The Contractor's insurance coverage shall be
primary insurance as respects the City, its
officers, officials, employees and
volunteers. Any insurance or self-insurance
maintained by the City, its officers,
officials, employees or volunteers shall be
in excess of the Contractor's insurance and
shall not contribute with it.
Any failure to comply with reporting
provisions of the policies shall not affect
coverage provided to the City, its officers,
officials, employees or volunteers.
The Contractor's insurance shall apply
separately to each insured against whom claim
is made or suit is brought, except with
respect to the limits of the insurer's
liability.
2. Ail Coverages.
Each insurance policy required by this clause
shall be endorsed to state that coverage shall not
be suspended, voided, cancelled by either party,
reduced in coverage or in limits except after
thirty (30) days prior written notice by certified
mail, return receipt requested, has been given to
the City.
Acceptability of Insurers. Insurance is to be placed
with insurers with a Bests' rating of no less than
A:VII.
Verification of Coveraqe. Contractor shall furnish
City with certificates of insurance and with original
endorsements effecting coverage required by this
clause. The certificates and endorsements for each
insurance policy are to be signed by a person
authorized by that insurer to bind coverage on its
behalf. The certificates and endorsements are to be
received and approved by the City before work
commences. The city reserves the right to require
complete, certified copies of all required insurance
policies, at any time.
Subcontractors. Contractor shall include all
subcontractors as insureds under its policies or shall
furnish separate certificates and endorsements for each
subcontractor. All coverages for subcontractors shall
be subject to all of the requirements stated herein.
The Ris~ Manager of city may approve a variation in
those insurance requirements upon a determination that
the coverages, scope, limits and forms of such
insurance are either not commercially available or that
the City's interests are otherwise fully protected.
5. CONTRACTOR NO AGENT. Except as City may specify in writing,
Contractor shall have no authority, express or implied, to act on
behalf of city in any capacity whatsoever as an agent.
Contractor shall have no authority, express or implied, pursuant
to this Agreement to bind City to any obligation whatsoever.
6. ASSIGNMENT PROHIBITED. No party to this Agreement may
assign any right or obligation pursuant to this Agreement. Any
attempted or purported assignment of any right or obligation
pursuant to this Agreement shall be void and of no effect.
7. PERSONNEL. Contractor shall assign only' competent personnel
to perform services pursuant to this Agreement. In the event
that City, in its sole discretion, at any time during the term of
this Agreement, desires the removal of any such persons,
Contractor shall, immediately upon receiving notice from City of
such desire of City, cause the removal of such person or persons.
8. STANDARD OF PERFORMANCE. Contractor shall perform all
services required pursuant to this Agreement in the manner and
according to the standards observed by a competent practitioner
of the work in which Contractor is engaged~ in the same
geographical area. All instruments of service of whatsoever
nature which Contractor delivers to city pursuant to this
Agreement shall be prepared in a substantial, first class and
workmanlike manner and conform to the standards of quality
normally observed by a person performing Contractor's work.
9. ~OLD ~IARMLESS AND RESPONSIBILITY OF CONTRACTOR: Contractor
shall take responsibility for Scheduled Work, Additional Work,
and Emergency Work as described in paragraphs 4, 5 and 6 of this
Agreement, as such work is performed by Contractor, its
employees, agents, and subcontractor in accordance with all
provisions of this Agreement. Contractor shall bear all losses
and damages resulting to it, to any subcontractor, to the city,
to City officers and employees, or to parties designated by the
city, on account of performance or character of the work stated
above, including unforeseen difficulties, accidents, occurrences
or other causes predicated on active or passive negligence of the
Contractor or any subcontractor.
Contractor shall indemnify, defend and hold harmless the
city, its officers, officials, employees and agents from and
against any or ail loss, liability, expe~se, claim, costs
(including costs of defense), suits, and damages of every kind,
nature and description arising from the performance of the work
described in the paragraph above. This paragraph shall not be
construed to ~xempt the City, its employees and officers from its
own fraud, willful injury or violation of law whether willful or
negligent. City shall indemnify, defend and hold the Contractor,
its employees, officers, directors and agents harmless from and
against any and all loss, liability, expense, claim, costs
(including costs of defense), suits and damages of every kind,
nature and description arising from the act or omission by the
City or any of its officers, officials, employees and agents. By
execution of this Agreement, the parties acknowledge and agree
that each has read and understand the provisions hereof and that
this section is a material element of consideration.
Approval of the insurance contracts does not relieve the
Contractor or subcontractors from liability under this paragraph.
10. GOVERNMENTAL REGULATIONS. To the extent that this Agreement
may be funded by fiscal assistance from another governmental
entity, Contractor shall comply with all applicable rules and
regulations to which City is bound by the terms of such fiscal
assistance program.
5
COMPARISON OF EQUIPMENT RENTAL RATES
1989-90 1990-91
RATES RATES
CHANGE
PERCENT
CHANGE
LABOR RATES
DUBLIN CREW
MAINTENANCE SUPERINTENDENT
LANDSCAPE FOREMAN
LANDSCAPE LABORER I
LANDSCAPE LABORER II
LANDSCAPE LABORER III
$ 28.00 HR
20.20 HR
17.00 HR
14.40 HR
11.40 HR
$ 30.00 HR
21.50 HR
18.10 HR
15.30 HR
12.10 HR
$ 2.00 HR
1.30 HR
1.10 HR
0.90 HR
0.70 HR
7.1%
6.4%
6.5%
6.2%
6.1%
MCE CREW
SUPERINTENDENT
LOADER/BACKHOE OPERATOR
ASPHALT PAVER OPERATOR
ROLLER OPERATOR
TRACTOR OPERATOR
TRUCK DRIVER 8-12 C.Y.
TRUCK DRIVER 4-5 C.Y.
TRUCK DRIVER 3 C.T. TRANSIT
CEMENT FINISHER
LABOR FOREMAN
LABORER I
LABORER II
LABORER III
$ 44.75 HR
43.75 HR
42.30 HR
42.30 HR
40.15 HR
36.75 HR
36.25 HR
36.25 HR
35.10 HR
33.65 HR
32.65 HR
32.45 HR
32.30 HR
$ 46.95 HR
45.95 HR
44.40 HR
44.40 HR
42.20 HR
37.80 HR
37.25 HR
37.25 HR
35.80 HR
34.20 HR
33.20 HR
32.95 HR
32.80 HR
$ 2.20 HR
2.20 HR
2.10 HR
2.10 HR
2.05 HR
1.05 HR
1.00 HR
1.00 HR
0.70 HR
0.55 HR
0.55 HR
0.50 HR
0.50 HR
4.9%
5.O%
5.O%
5.O%
51%
29%
28%
28%
20%
16%
17%
15%
15%
EQUIPMENT RATES
ASPHALT PAVER
LOADER/BACKHOE
TRACTOR
ROLLER-VIBRATORY 3-5 TON
ROLLER-VIBRATORY 1-3 TON
DUMP TRUCK 8-12 C.Y.
DUMP TRUCK 4-6 C.Y.
TRANSIT TRUCK 3 C.Y.
FLATBED DUMP W/R & HT
PICKUP CREW CAB
PICKUP W/R & HT
CONCRETE SAW-SELF PROP.
CONCRETE SAW-SMALL
AIR COMPRESSOR
$ 37.50 HR
27.50 HR
22.50 HR
15.00 HR
12.00 HR
22.50 HR
2O.O0 HR
20.00 HR
7.00 HR
7.0O HR
5.00 HR
12.50 HR
8.00 HR
10.00 HR
$ 37.50 HR
27.50 HR
22.50 HR
15.00 HR
12.00 HR
22.50 HR
20.00 HR
20.00 HR
6.50 HR
7.00 HR
5.00 HR
12.50 HR
8.00 HR
10.00 HR
N/C
N/C
N/C
N/C
N/C
N/C
N/C
N/C
$-0.50 HR
N/C
N/C
N/C
N/C
N/C
-7.1%
TABLE III (CONTINUED)
1989-90 1990-91
RATES RATES
CHANGE
PERCENT
CHANGE
EQUIPMENT RATES (CONTINUED)
BITUMAL POT
VIBRA PLATE
WACKER
POWER BERM MACHINE
MOWER (21")
MOWER (36")
MOWER (72")
CHAIN SAW
BRUSH CUTTER
POWER BLOWER
POWER EDGER
POWER HEDGE TRIMMER
POWER VACUUM (30")
TRAILER LARGE (18')
TRAILER SMALL (8')
6.00 HR
6.00 HR
6.00 HR
10.00 HR
3.00 HR
4 00 HR
10 00 HR
4 00 HR
3 00 HR
2 00 HR
2 O0 HR
2 O0 HR
7 00 HR
4 00 HR
2.00 HR
6.00 HR
6.00 HR
6.00 HR
10.00 HR
2.50 HR
3.50 HR
9.00 HR
4.00 HR
3.00 HR
2.00 HR
2.00 HR
2.00 HR
7.00 HR
3.00 HR
1.80 HR
N/C
N/C
N/C
N/C
$-0.50 HR
-0.50 HR
-1.00 HR
N/C
N/C
N/C
N/C
N/C
N/C
-1.00 HR
-0.20 HR
-16.7 %
-12.5 %
-10.0 %
-25.0 %
-10.0 %
UNIT PRICES
REMOVE/REPLACE ASPHALT
REMOVE/REPLACE ADD. DEPTH
ASPHALT LEVELING/OVERLAY
REPLACE SIDEWALK
REPLACE DRIVEWAY
REPLACE CURB & GUTTER
SAW CUTTING
FERTILIZE BEDDING
CHEMICAL WEED CONTROL MEDIANS
CHEMICAL WEED CONTROL R.O.W.
TREE TRIMi~ING UNDER 30'
TREE TRIKMING OVER 30'
TREE WATERING
FERTILIZE TURF
AERATION TURF
PRUNE PARK TREES OVER 20'
FUNGUS SPRAYING-TREES
4" SKIP CENTERLINE
4" SOLID EDGELINE
4" SOLID CENTERLINE
6" SOLID BIKE LANE
8" SOLID TURN LANE
12" CONTINUOUS TURN LANE
(ONE SIDE)
3.90 SF
0.40 SF
95.00 T
6.90 SF
8.00 SF
18.90 LF
1.85 LF
109.50 AC
111.10 AC
114.70 AC
40.70 EA
74.80 EA
0.83 EA
105.00 AC
333.30 AC
52.80 EA
4.12 EA
0.039 LF
0.057 LF
0.064 LF
0.133 LF
0.165 LF
0.178 LF
4.05 SF
0.42 SF
99.00 T
7.20 SF
8.30 SF
19.60 LF
1.95 LF
114.95 AC
116.65 AC
120.40 AC
41.90 EA
77.00 EA
N/A
110.25 AC
350.00 AC
54.40 EA
4.25 EA
0.039 LF
0.057 LF
0.064 LF
0.133 LF
0.165 LF
0.178 LF
0.15 SF'
0.02 SF
4.00 T
0.30 SF
0.3O SF
0.70 LF
0.10 LF
5.45 AC
5.55 AC
5.70 AC
1.20 EA
2.20 EA
5.25 AC
16.70 AC
1.60 EA
0.13 EA
N/C
N/C
N/C
N/C
N/C
N/C
3.8%
5.O%
4.2%
43%
38%
37%
54%
5O%
50%
5O%
29%
29%
5.0%
5.O%
3.0%
3.2%
TABLE III (CONTINUED)
1989-90
RATES
1990-91
RATES
CHANGE
PERCENT
CHANGE
UNIT PRICES (CONTINUED)
12" DOUBLE CENTERLINE
8' LETTER
12" CROSSWALK
12" LIMIT BAR
8' DIRECTIONAL ARROW
24' DIRECTIONAL ARROW
20' DIAGONAL PARKING LINE
PARKING "T"
HANDICAP LEGEND
(W/BACKGROUND)
CURB PAINTING
BIKE LANE ARROW
BIKE LANE LEGEND 4'
PAINT REMOVAL
RAISED PAVEMENT MARKERS
(REFLECTIVE)
RAISED PAVEMENT MARKERS
(NON-REFLECTIVE)
$ 0.190 LF
4.125 EA
0.444.LF
0.508 LF
10.164 EA
23.441 EA
3.812 EA
2.541 EA
22.233 EA
0.508 LF
3.812 EA
2.541 EA
3.812 SF
4.446 EA
2.541 EA
$ 0.190 LF
4.125 EA
0.495 LF
0.508 LF
10.164 EA
23.441 EA
3.812 EA
2.541 EA
22.233 EA
0.508 LF
3.812 EA
2.541 EA
3.812 SF
4.446 EA
2.541 EA
N/C
N/C
$0.051 LF
N/C
N/C
N/C
N/C
N/C
N/C
N/C
N/C
N/C
N/C
N/C
N/C
11.5 %
AMENDMENT TO AGREEMENT BETWEEN
CITY OF DUBLIN AND MCE CORPORATION
FOR ANNUAL PUBLIC WORKS/MAINTENANCE SERVICES
WHEREAS, on September 14, 1987 the City of Dublin (hereinafter referred
to as "CITY") , MCE Corporation (hereinafter referred to as
,,CONTRACTOR") , entered into an Agreement to provide Public
Works/Maintenance Services to the city of Dublin; and
WHEREAS, that Agreement provided for the extension of the term of the
Agreement for two consecutive one-year terms subject to the
satisfactory performance, by the CONTRACTOR as determined by the CITY;
and
WHEREAS, the CITY has reviewed the performance of the CONTRACTOR and
has determined that the CONTRACTOR has performed satisfactorily; and
WHEREAS, an adjustment of fees for services is desired by both the CITY
and the CONTRACTOR.
NOW, THEREFORE, the parties hereto agree as follows:
Section 1: Extension of Contract The City of Dublin extends the
Annual Public Works/Maintenance Contract with CONTRACTOR for a period
of one year commencing on July 1, 1989 and ending on June 30, 1990.
Section 2: Schedule of Work and Adjustment of Rates The CONTRACTOR
will perform the Schedule of Work as identified in Attachment 1 and as
modified by the CITY for Fiscal Year 1989-90. The CITY also authorizes
a change in the rates charged by CONTRACTOR to the CITY as indicated in
Attachment 1.
CT~ OF DUBLIN
city 'C
.t - · President
ecre~tary
r~-~ ~ ~-- , ,.~ ,..,.
ATTACHMENT I - SCHEDULE OF WORK
PRELIMINARY CITY BUDGET
FISCAL YEAR 1989-90
A. SCOPE OF WORK
The following breakdown identifies tasks which are anticipated to be
conducted as part of the Annual Public Works Maintenance Agreement for
the Fiscal Year 1989-90. Annual estimated costs include management fees
as provided in Section C. Contractor shall schedule work to adhere to
these expenditure levels as provided for in this Agreement.
1989-90 ESTIMATED
ACTIVITY/SUB-ACTIVITY ANNUAL EXPENDITURE
SPILL CLEAN UP $ 4~500
STREET MAINTENANCE
o Street Repair
o Drainage Maintenance
o Storm Patrol/Clean Up
o Curb & Gutter/Sidewalks
o Sign Repair Maintenance
o Striping/Marking
o Guardrail Repair
o Chemical Weed Abatement
o Bike Path Maintenance
29,000
21,100
12,900
17,200
16,700
35,000
1,300
13,800
4,200
Activity Total
151,200
MAINTENANCE SUPERVISION
STREET TREE MAINTENANCE
o In-House Tree Maintenance
o Contract Tree Watering
o Contract Tree Trimming
o Contract Tree Removal
o Stagecoach Assessment District
o Dougherty Assessment District
73,500
$56,700
5,300
15,600
2,200
7,200
10,600
Activity Total
NEIGHBORHOOD WATCH SIGNS
STREET LANDSCAPE MAINTENANCE (BEAUTIFICATION)
o Existing Streets Including San Ramon
Road Phase III
o Stagecoach Assessment District
o Dougherty Assessment District
$
$
97,600
1,600
171,500
21,700
76,900
Activity Total
270,100
MISCELLANEOUS WORK $ 10,000
PARKS MAINTENANCE -'
O Stagecoach Park $ 14,800
o Kolb Park 38,500
o Dolan Park 41,900
o Alamo Creek Park 39,300
o Dougherty Hills 10,600
o Mape Park 15,600
o Shannon Park (6 Months) 26,700
o Dublin Sports Ground 106,400
o Valley Swim Center 20,150
o civic Center (9 Months) 37,000
Activity Total
$ 350,950
Total 1989-90 Estimated Annual Expenditure
$ 960,550
B. UNIT PRICES
The following activities shall be completed at the Unit Prices
indicated. The unit prices are inclusive of all labor, materials,
equipment, overhead and management fees.
ACTIVITY
STREET REPAIR
o Remove/Replace Asphalt (4" Depth)
0 - 30 S.F. per patch
30 - 150 S.F. per patch
150 - 300 S.F. per patch
Over 300 S.F. per patch
o Remove/Replace Additional Depths
o Asphalt Leveling/Overlay
CURBt GUTTER AND SIDEWALK
O Replace Sidewalk
o Replace Driveway
o Replace Curb & Gutter
o Saw Cutting
1989-90 UNIT PRICE
$ 6.10 per S.F.
5.00 per S.F.
3.90 per S.F.
2.80 per S.F.
.40 per S.F.
per inch
95.00 per ton
$ 6.90 per S.F.
8.00 per S.F.
18.90 per S.F.
1.85 per L.F.
RESTRIPING AND REMARKING
o
o
o
o
O
o
o
o
o
o
o
o
o
o
o
o
O
o
o
o
o
4" Skip Centerline
4" Solid Edgeline
4" Solid Centerline
6" Solid Bike Lane
8" Solid Turn Lane
12" Continuous Turn Lane (One Side)
12" Double Centerline
8' Letter
12" Crosswalk
12" Limit Bar
8' Directional Arrow
24' Directional Arrow
20' Diagonal Parking Line
Parking "T"
Handicap Legend (w/Background)
Curb Paining
Bike Lane Arrow
Bike Lane Legend 4'
Paint Removal
Note:
.039 pe~L.F.
.057 per L.F.
.064 per L.F.
.133 per L.F.
.165 per L.F.
.178 per L.F.
.190 per L.F.
4.125 Each
.444 per L.F.
.508 per L.F.
10.164 Each
23.441 Each
3.812 Each
2.541 Each
22.233 Each
.508 per L.F.
3.812 Each
2.541 Each
3.812 per S.F.
Raised Pavement Markers (Reflective) 4.446 Each
Raised Pavement Markers (Non-Reflective) 2.541 Each
(1) Restriping unit prices require a minimum of $ 1,000 of
work. Less than the above will require a $ 250.00
move-in charge.
(2) For small jobs, priority striping or new striping, unit
prices may be determined by local subcontractor rates.
RIGHT OF WAY MAINTENANCE
o Chemical Weed Control
114.70 per Acre
TURF MAINTENANCE
o Fertilize/Weed Control
o Aeration
105.00 per Acre
333.30 per Acre
BEDDING MAINTENANCE
o Fertilization
O Chemical Weed Control
109.50 per Acre
111.10 per Acre
TREE MAINTENANCE
Street Trees
o Trim for Clearance Only (Under 30')
o Trim for Clearance & Balance
(Under 30')
o Trim for Clearance Only (Over 30')
o Trim for Clearance & Balance
(Over 30')
o Fungus Spraying
o Tree Watering
20.35 per Tree
40.70 per Tree
37.40 per Tree
74.80 per Tree
4.12 per Tree
0.83 per Tree
Park Trees
o Prune and Shape (Over 20')
o Fungus Spraying
52.80 per Tree
4.12 per Tree
TIME AND MATERIAL RATES
The following rates shall be applied to work performed by the
Contractor which is--not specified in Section B (Unit Prices). At
all times the Contractor shall strive to utilize the most cost
effective elements possible to complete a project. Appropriate
overhead and management fees will be applied as indicated.
DESCRIPTION
(8 HOURS) OVERTIME HOLIDAY
HOURLY HOURLY HOURLY HOURLY
RATES RATES RATES RATES
LABOR RATES
Dublin Crew
Maintenance Superintendent
Landscape Foreman
Landscape Laborer I
Landscape Laborer II
Landscape Laborer III
28.00 224.00 42.00 56.00
20.20 161.60 30.30 40.40
17.00 136.00 25.50 34.00
14.40 115.20 21.60 28.80
11.40 91.20 17.10 22.80
MCE Crew
Superintendent 44.75
Loader/Backhoe Operator 43.75
Asphalt Paver Operator 42.30
Roller Operator 42.30
Tractor Operator 40.15
Truck Driver 8-12 C.Y. 36.75
Truck Driver 4-6 C.Y. 36.25
Truck Driver 3 C.Y. Transit 36.25
Cement Finisher 35.10
Laborer Foreman 33.65
Laborer 1 32.65
Laborer 2 32.45
Laborer 3 32.30
358.00 67.12 89.50
350.00 65.62 87.50
338.40 63.45 84.60
338.40 63.45 84.60
321.20 60.22 80.30
294.00 55.12 73.50
290.00 54.38 72.50
290.00 54.38 72.50
280.80 52.65 70.20
269.20 50.48 67.30
261.20 48.98 65.30
259.60 48.68 64.90
258.40 48.45 64.60
DESCRIPTION
EQUIP.
COST
HOURLY
RATE
WAGES TOTAL OPERATED
INC. COST
FRINGE PER PER
BENEFITS HOUR DAY
EQUIPMENT RATES
Dublin Crew
* Flatbed Dump
* Pickup
Mower (21")
Mower (36")
Mower (72")
chain Saw
Brush Cutter
7.00
5.00
3.00
4.00
10.00
4.00
3.00
56.00
40.00
24.00
32.00
80.00
32.00
24.00
Power Blower
Power Edger
Spray Tank w/Trailer
Power Hedge Trimmer
Power Vacuum (30")
Trailer - Large (18')
Trailer - Small (8')
Hand Tools (per truck)
Two Way Radio
2.00
2.00
2.50
2.00
7.00
4.00
2.00
.50
.50
16.00
16.00
20tO0
16.00
56.00
32.00
16.00
4.00
4.00
MCE Crew
Asphalt Paver 37.50
Loader/Backhoe 27.50
Tractor 22.50
Roller - vibratory 3-5 Tons 15.00
Roller - Vibratory 1-3 Tons 12.00
Dump Truck 8-12 Yd. 22.50
Dump 4-6 Yd.
Transit Truck 3 Yd.
Flatbed Dump
Pickup Crew Cab
20.00
20.00
8.50
7.00
Pickup 6.50
Concrete Saw-Self Propelled 12.50
Concrete Saw - Small 8.00
Compressor
Bitumal Pot
vibra Plate
Wacker
Power Berm Machine
Hand Tools (per Truck)
Two Way Radio
10.00
6.00
6.00
6.00
10.00
.50
.50
42.34 79.80
43.75 71.25
40.15 62.65
42.30 57.30
42.30 54.30
36.75 59.25
36.25 56.25
36.25 56.25
638.40
570.00
501.20
458.40
434.40
474.00
450.00
450.00
68.00
56.O0
52.00
100.00
64.00
80.00
48.00
48.00
48.00
80.00
4.00
4.00
OVERHEAD AND MAI~AGEMENT FEES
Applied to MCE Operations
Applied to Subcontract Work
20 percent to Street Maintenance
15 percent to all Park Maintenance
10 percent
* NOTE:
Dublin Flatbed
and hand tools.
and Pickup rates include cost of two way
radios
ANNUAL PUBLIC WORKS MAINTENANCE AGREEMENT
Between
CITY OF DUBLIN
and
~CE CORPORATION
T~TLE
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
TABLE OF CONTENTS
ANNUAL PUBLIC WORKS HAINTENANCE AGREEMENT
Scope of Work
Duration of Contract and Date of Commencement
Adjustments to Contract Prices and Work Quantity
Scheduled Work
Additional Work
Emergency Work
Contract Amount and Prices
Maintenance Supervision
Work Scheduling Procedures
Work Reporting Procedures
Additional Contractor Responsibilities
Protection of Work and Public
Compensation and Billing
Public Works Headquarters
Insurance and Indemnify
Independent Contractor
Licenses and Permits
Assignment
Maintenance of Records
Equal Employment Opportunity
Attorney Fees
Miscellaneous
Notices
PAGE
1
1
2
2
2
2
3
3
3
3
4
4
4
4
4-6
6
6
6
6
6
6
7
7
AGREEMENT
ANNUAL PUBLIC WORKS MAINTENANCE
This Agreement is made this L~-YPT~._~'~-xm~./~, 1987 between THE CITY OF
DUBLIN, a municipal corporation- ("City")~ and MCE CORPORATION, a
California corporation, ("Contractor").
The City has elected to perform its public works maintenance and
related activities as set forth in Attachment 1 of this document, using
private contractors.
The Contractor has agreed to arrange for and supervise the performance
of the work and the City has agreed to retain the Contractor for such
purposes, in accordance with the terms and provisions of this Agreement.
The City and the Contractor agree as follows:
1. Scop.e of Work: The City retains Contractor to arrange for,
supervise and manage the performance of the work described in the Schedule
for Work (Attachment 1) (q,nd as otherwise specified in this Agreement; and
for additional work, Additional Work") as is called for in this
Agreement. Notwithstanding the foregoing, the City may at any time revise
the schedule of work identified in Attachment I for budgeting or other
reasons as deemed necessary by the City and the estimated annual
expenditure for Fiscal Year 1987-88 shall be revised accordingly.
The Contractor specifically agrees to (a) undertake the direct
responsibility for the performance of the work in accordance with this
Agreement; (b) provide directly, or through subcontractors or as otherwise
permitted by this Agreement all labor, materials and supervision necessary
for the proper performance of the work in accordance with this Agreement;
(c) furnish a Maintenance Superintendent to provide the necessary liaison
with the City staff and the required coordination of workmen and materials
in the performance of the Work; (d) comply with all laws, ordinances,
rules, regulations, and requirements of governmental authorities,
pertaining to the performance of the work; (e) perform the work, contract
for its performance and supervise its performance in a good and
workmanlike manner and in the most expeditious cost effective manner
consistent with first-class quality; (f) perform all activities necessary
and incidental to the orderly performance of the work.
2. Duration of Contract and Date of Commencement: The term of the
Agreement ~'l be one (1) year commencing July 1, 1~87, with provision
for an extension of term for two successive one-year terms, subject to
satisfactory performance during the prior year, as determined by and in
the sole discretion of the City. The City has the option to renew the
Agreement, subject to the price modifications that may be agreed upon by
City and Contractor.
Notwithstanding the foregoing paragraph, the services of the
Contractor may be terminated bx the City by giving ninety (90) days
written notice with or without cause. If the City terminates the
Agreement the Contractor shall be compensated for such services up to the
point of termination. Compensation for work in progress will be prorated
as to the percentage of progress completed at the date of termination.
Contractor may also terminate its services to the City, but must
first provide the City with written notice at least ninety (90) days in
advance of termination.
3. ~djustments to Contract Prices and Work Quanti~)~.' No later than
Harch 1st, the Contractor will submit to the City for the coming contract
year a proposed revised Schedule of Work which will set forth a Work Plan
in terms of types and quantities of work to be performed as well as unit
prices and/or estimated annual expenditure amounts as appropriate. Upon
written approval of both parties, the Contract shall be extended for one
(1) year effective July I as provided above.
4. Scheduled Work: All of the work set forth in Attachment i is
considered scheduled work, except as provided in Section 1. Contractor
shall perform no work in addition to scheduled work, unless (a) additional
work is approved in advance by the City Hanager or (b) an emergency
situation exists. An emergency situation is one which endangers the
public safety or public or private property and occurs under circumstances
making it either impossible or impractical to obtain City approval before
proceeding with the work. In such cases, the Contractor will proceed with
the work to the extent necessary to relieve said danger and shall
specifically inform the City Manager of all emergency work accomplished.
All scheduled work shall be provided according to a monthly schedule
prepared by the Maintenance Superintendent and approved by the City
Manager.
5. Additional Work: City may require Contractor to provide
additional wo~ n6t-spec~fi~ally described herein at rates and quantities
negotiated by the City and Contractor. The City Hanager at his discretion
may recommend that projects of a large scope be approved by the City
Council for competitive bid. Contractor shall be entitled to participate
in the bid process.
No additional work will be undertaken by the Contractor without the
approval of the City Hanager. The Contractor will bill the City for
additional work in the manner as provided in Attachment 1.
6. £merg~ncy Work: Emergency call-out procedures will be maintained
to provide for emergency response on nights, weekends and holidays. The
procedure will be reviewed and updated periodically to ensure its
effectiveness. In the event emergency work dictates that work be
accomplished outside the normal working hours, such as night time, week-
ends, and holidays, appropriate overtime rates shall be used as set forth
in Attachment 1.
7. Contract Amount and Prices: Except as provided in Section 1,
the total annual es't-~mate'd budg~-t shall be the sum of the planned
expenditure amounts listed in Attachment 1. The actual amount paid to the
Contractor shall be based on the amount of work performed according to the
costs outlined in ..Attachment 1 and an~-'subsequent "Additional Work"
approved by the City. Work items listed in Attachment i shall be billed
on a unit price basis or otherwise as set forth in the schedule. Unit
Pricing is expressed in terms of Dollars per Work Measurement Unit for
each item of work.
For work listed as "Time and Materials" (T&M), Contractor shall bill
the City on the basis of actual costs to the Contractor plus a percentage
as stated on Attachment 1, Section C, to cover management costs.
Contractor shall bill Additional Work on the basis mutually agreed to
by the Contractor and the City at the time the work is incorporated into
the annual maintenance program.
8. M~in~en~n~e Supervision: The Contractor shall furnish a
Maintenance Superintendent to assume full responsibility for day-to-day
maintenance operations, insuring that resources required to successfully
complete the project are applied in a timely manner. In addition to
providing the necessary liaison with the City, the Maintenance
Superintendent is responsible for: (a) making recommendations to the City
Manager of work that should be performed but which is not set forth on the
Schedule of Work, (b) identifying work programs, (c) scheduling (d)
assisting and supervising work crews, (e) responding to citizen calls, (f)
assisting in contract administration, (g) maintaining activity reports, and
(h) generally administering public works maintenance functions.
9. Work Schedu!i_n_g Pro_cedures_:_ To the extent possible, it is the
intent of ~h-i-s Agreement that the Work be performed on a scheduled, orderly
basis. The Contractor will prepare monthly work schedules and review them
with the City Manager. These schedules will represent specific work needs
identified as the result of the Contractor's recommendations and requests
from the City Manager or his designee. Emphasis will be placed on
identifying needs to insure proper timing of work (for example, ditches
should be scheduled for cleaning before winter rains). The Contractor will
comply with reasonable requests of the City Manager as to preferred
locations for various types of work.
The Contractor will use, a service request form to insure that
complete information is obtained on work needs and requests for service.
10. Work £epo[ting Procedures: The Contractor shall submit a
Monthly Work Summary Report to the City Manager on or before the lOth day
of the month summarizing work completed in the previous month. These
reports shall include a listing of work activities and work units
completed, including any additional or emergency work performed; status of
current and completed service requests; and, comparisons of annual work
quantities and expenditures planned versus actual.
11. Additional £ontractor Responsibilities: MCE workers will be
alert for observable maintenance deficiencies in public facilities as they
travel within the City's boundaries in the course of their maintenance
_~activities. They will report maintenance deficiencies to designated MCE,
City staff members,~,or appropriate agency.
12. Protection of Work and Public: The Contractor shall take all
necessary measures to protect the work and prevent accidents during any and
all phases of work. He shall provide and maintain all necessary barriers,
flagmen, and/or signs during maintenance procedures.
The Contractor will provide at his own expense, all the advance
signing and barricading and also signs, barricades, flashers, and other
necessary facilities for the protection of the public within the limits of
the maintenance area while maintenance activities are proceeding.
13. Compensation and Billing: For work performed and services
rendered, Contractor shall submit monthly bills to the City by the loth day
of the month following the month in which the work was performed. The
Contractor shall be compensated by the City as follows:
A. A monthly payment for time and materials or unit price work
will be provided, with payment to be made within twenty (20)
days of receipt of invoice by City.
B. For additional work for which no unit prices have been agreed
upon, compensation shall be agreed upon between the City
Manager and Contractor in writing before work is performed.
For emergency work when prior approval is not possible and when
unit prices have not been agreed upon, the City and Contractor
shall agree as soon as possible after the work is performed on
the amount of compensation based on costs for related jobs.
14. Public Works Headquarters: City shall provide an office for
the Maintenance Superintendent. City shall provide a corporation yard
facility from which routine maintenance may be dispatched. Work days
shall begin at such time of dispatch from a Dublin corporation yard or as
mutually agreed upon by City and Contractor.
15. Insurance and Indemnity:
a. MCE warrants that Scheduled Work, Additional Work and Emergency
Work as defined in paragraphs 4, 5 and 6 will be performed and completed in
a safe manner without causing personal injury or property damage. MCE will
indemnify, hold City harmless and defend City from claims involving HCE
Scheduled, Additional and Emergency Work. City will indemnify and hold MCE
harmless and defend HCE from claims other than Scheduled, Additional and
Emergency Work.
b. Insurance. Contractor shall obtain and maintain insurance and
shall require each subcontractor to obtain and maintain insurance as
provided in this paragraph.
(1) Compensation Insurance. Contractor shall maintain during
the life of this Agreement, workers' compensation insurance for all
Contractor's employees employed at the site of the work, and in case any
work is sublet, Contractor shall require any subcontractor similarly to
provide workers' compensation insurance for all subcontractor's employees,
unless such employees are covered by the protection afforded by Contractor.
In case a class of employees engaged in work under this Agreement is not
protected under the workers' compensation law, Contractor shall provide and
shall cause each subcontractor to provide adequate insurance for the
protection of employees not otherwise protected. Contractor indemnifies
City for any damage resulting to it from failure of either Contractor or
any subcontractor to take out or maintain such insurance.
(2) Public Liability and Property Damage Insurance.
Contractor shall take out and maintain during the life of this Agreement
such public liability and property damage insurance as shall insure City,
its elective and appointive officers, agents and employees, Contractor and
any subcontractor performing work covered by this Agreement from claims
for damages for personal injury, including death, as well as from claims
for property damage which may arise from Contractor's or any
subcontractor's operations hereunder, whether such operations by
Contractors operations hereunder, whether such operations by Contractor or
a subcontractor or be anyone directly or indirectly employed by either
Contractor or subcontractor. The amounts of insurance sha.ll be as
follows:
a. Automobile Insurance. Vehicular public liability insurance with
minimum coverages of $500,000.00 for property damage
$1,000,000.00 for injury to one person/any one occurrence and
$1,000,000.00 for injury to more than one person/any one
occurrence.
b. Public Liability Insurance. In an amount not less than
$1,000,000.00 for injuries, including, but not limited to death,
to any one person and, subject to the same limits for each
person, in an amount not less than $1,000,000 on account of any
one occurrence.
C. Property Damage Insurance, In an amount of not less than
$500,000.00 for damage to the property of each person on account
of any one occurrence.
(3) Contractual Liability Insurance. Contractor shall take out and
maintain during the life of this Agreement, a policy of Contractual
Liability Insurance in the amount of at least $500,000.00 each occurrence,
$500,000.00 aggregate insuring City, its elective and appointive officers,
agents and employees, Contractor and any subcontractor performing work
covered by this Agreement against damages sustained by reason of any
action or demand by reason of breach or alleged breach of any contract, or
by reason of any contractual liability or alleged contractual liability on
any contract for the performance of work covered by this Agreement entered
into by Contractor or a subcontractor, agent or employee.
(4) Evidence of Insurance. Contractor shall furnish City with
satisfactory evidence of the insurance required and evidence that each
carrier is required to give City at least 3 days prior notice of the
cancellation or reduction in coverage of the policy during the effective
period of this Agreement. All Certificates of Insurance which are a part
of this Agreement shall be approved by the City Manager and City Attorney
as to form and content.
16. I_ndependent Contractor: Contractor is an independent Contractor
and shall not be considered an employee of the City. It is understood
that in the performance of services under this Agreement, Contractor is
operating independent of the control of the City (other than normal
contract monitoring) and possesses no authority to act as an agent or
representative of the City. As such, Contractor is not a public official
as defined in the California Fair Political Practices Act and is not
subject to the city's local conflict of interest code.
17. Licenses and Permits: Contractor represents and warrants to
City that it shall maintain in effect all licenses, permits,
qualifications and approvals that are legally required for Contractor to
perform under this Agreement.
18. Assignment: This Agreement may not be assigned or subcontracted
unless City con~ents in advance in writing. An assignment or
subcontracting in violation of this provision is void.
19. ~aintenance of Records Contractor shall maintain all books,
documents, papers, employee time,beets, accounting records and such other
evidence pertaining to costs incurred and shall make these materials
available at reasonable times during the contract period and for one year
from the date of final payment under this Agreement for inspection by
City.
20 Equal Employment Opportunity: Contractor is an equal
opportunity employer and agrees to comply with applicable regulations
governing equal employment opportunity.
21. Attorne~t Fees: If either party brings an action against the
other party arising out of or in connection with this Agreement entered
into between City and Contractor, the prevailing party is entitled to have
and recover from the losing party reasonable attorneys fees and costs of
suit.
22. Hiscellaneous:
Contractor shall inform City of private clients within the
corporate boundaries or sphere of influence of the City
during the term of this Agreement. Contractor agrees not
to accept other employment which is or may be in conflict
with its duties under this Agreement or which may adversely
affect the interests of the City.
Contractor will endeavor to secure materials from the
lowest cost source reasonably available.
23. Notices: Any notice given under this Agreement shall be served
by depositing it in the mail, postage prepaid, to the addresses set forth
below:
A. Notices to the Contractor shall be addressed to:
HCE Corporation
7 Crow Canyon Court, Suite 200
San Ramon, California 94583
Notices to the City shall be addressed to:
City of Dublin
P.O. Box 2340
Dublin, California
94568
IN WITNESS WHEREOF, the parties have executed this Agreement on
the day and year first above written.
CITY OF DUBLIN
ATTE ST:
- - City Clerk
HCE C~RPO~AT. I OI~'~.~ ~' /
' President-
ATTEST:
[ SecreCy-
8
!1 MCE CORPORATION
Maintenance -- Construction -- Engineering
MCE CORPORATION SELF-EVALUATION
QUALITY OF SERVICES
MCE believes it has provided a high level of service to the City
of Dublin and in a responsive manner. The attached
Service Request Summary Four Year Statistics shows that total
service requests per year have dropped from 181 in fiscal year
1985-86 to 52 in fiscal year 1988-89. At the same time the
evaluation of how the service requests are handled has risen from
4.20 to 4.60 over the same time frame. It is also interesting to
note that the responders' evaluation of the City itself has risen
from 3.78 to 4.58 over the same period.
EXPENDITURES
MCE has consistently underspent the approved budget over the last
two years. In 1987-88, MCE underexpended the approved budget by
25% and in 1988-89, the amount of underexpenditure was 15%. We
are constantly looking for ways to reduce the cost of maintenance
to the City of Dublin. We are subcontracting out work when we
can obtain unit price commitments that can perform work at a
lower unit cost than in-house work forces.
PERFORMANCE-BASED WORK PROGRAM AND BUDGET
MCE's continued use of the performance-based work program and
budget with the resulting management reports allows us the
capability to track costs and compare unit costs as discussed in
the previous paragraph. The system is used to update prior
year's planning values in order to more accurately budget for the
following year. Inventory items are updated to reflect
construction changes to the street and park systems.
As additional parks, streets, assessment districts and renovation
projects are proposed for the city, annual maintenance costs can
be projected based on the types and quantity of physical features
that are being proposed for the facility.
2500 Old Crow Canyon Road, Suite 320, San Rm
MCE CORPORATION SELF-EVALUATION
CONTINUED
SHIFT WORK
MCE continues to provide staff to administer the Work Alternative
Program using inmates supplied by the Alameda County Sheriff's
office. These inmates are used for roadside litter pickup and
weeding in city street medians and parks and in assessment
districts.
MCE has also provided a late shift worker that performs certain
preplanned maintenance work as well as assisting in meeting room
preparation at the civic Center and Shannon Center. This late
shift worker also secures city buildings at night after the
meetings conclude.
February 16, 1990
CITY OF DUBLIN
MEMORANDUM
Date:
To:
From:
Subject:
July 24, 1989
City Manager
Public Works Department
Service Request Sunnnary
Four Year Statistics
Attached is the final service request report for ~Y 1988-89. Following is a
summary of the number of requests by category and evaluation percentages for
the past four fiscal years: ~.
1988-89 1987i88 1986-87 1985-86
#1 Storm Drain 3 11 13 26
#2 Street Sign 13 6 21 24
#3 Sweeping 10 24 12 25
#a Street Repair 8 2 8 15
#5 Street Light 0 5 6 27
#7 Sidewalk 2 4 8 9
#8 Curb & Gutter 0 0 1 1
#9 Striping 1 0 2 3
#10 Landscape 5 4 5 3
#11 Tree Trimming 5 7 9 29
#12 Rodent/Insect 0 0 0 2*
#13 Zoning 0 0 0 3*
#14 Building 0 0 0 1'
#16 Other 5 5 6 13
TOTALS' 52 68 91 181
(*These items have been referred to outside agencies or other departments for
the past three years.)
Mailback Responses Rec'd 15
% Responding 28.8%
37 23 64
54.4% 25.3% 35.4%
EvalUation Ratings (based on a scale of 1 to 5, with 5 being the highest).
Job 4.60 4.51 4.43 4.20
City 4.58 4.03 3.63 3.78
~7hile the total number of service requests has decreased since FY87-88,
notably in the categories of storm drain service and street sweeping,
increases were noted in the following categories:
Service Request Summary
Four Year Statistics
July 24, 1989
Page 2 _
Sign maintenance: The number of requests for sign maintenance increased from
6 to 13. This category also includes Neighborhood Watch Sign installations,
of which there were 5. At least two of the signs repaired were obviously
vandalized.
Street repair: These requests were primarily for pothole repair. The number
of pothole requests in FY1987-88 was very low (2), probably because of the
lack of rain. Since FY1988-89 had a more normal rainfall, the number of
potholes increased again. It should also be noted that one pothole turned
out to be in San Ramon, and two were a result of DSRSD leaks.
Striping: This item increased from zero'to one request, which involved
vandalism to a crosswalk.
Landscaping: This item also increased only by one request over the last
fiscal year. Three of the five requests pertained to vandalized irrigation
systems in the Stagecoach Road assessment district.