HomeMy WebLinkAboutItem 7.09 Traffic Engineering Contract Review (2) ti
C)
CITY CITY OF DUBLIN
AGENDA STATEMENT
City Council Meeting Date: June 26, 1990
SUBJECT: Traffic Engineering Contract Review - TJKM
Report by Public Works Director Lee Thompson
EXHIBITS ATTACHED: 1) Memo from Chris Kinzel, TJKM
2) Current TJKM Agreement dated October 14, 1985,
with Amendments
3) Resolution and proposed TJKM agreement amendment
4) Comparison of proposed hourly increases by
personnel classification
RECOMMENDATION: ` LI 1) Review services of TJKM
2) Adopt resolution approving amendment to agreement
with TJKM and authorize Mayor to execute
FINANCIAL STATEMENT: See below.
DESCRIPTION:
Traffic Engineering services are provided by the firm of TJKM. Originally,
TJKM functioned as a subcontractor under the Santina and Thompson agreement.
In 1985, the City entered into a separate agreement with both Santina and
Thompson and TJKM.
Chris Kinzel has prepared a self-evaluation of his firm' s performance. The
staff report will highlight pertinent sections of the information. In
addition, the existing contract and an amendment covering the new rate
schedule is attached for review.
Outline of Services Provided
TJKM provides traffic engineering services generally in the areas of private
development review, Capital Improvement design and construction review. In
addition, they perform traffic engineering studies as a result of citizen or
City requests. These functions have been performed in a timely and
professional manner.
Approximately 50 studies have been made this year as a result of Staff or
resident requests. Some of the more notable ones were the stop sign study
for Brighton Drive at Callan Street, updating of the speed surveys for most
of the City streets that require such surveys, and the annual traffic
accident analysis and safety recommendations. More complicated traffic
studies have been performed on private developments such as the Hansen Ranch
and Blaylock/Gleason/Fletcher (Donlan Canyon) properties. Also, TJKM has
participated in studies regarding the proposed BART station locations and is
involved in many of the capital improvement projects. TJKM also reviews and
makes changes to signal timing as needed.
A representative of TJKM attends meetings of the Traffic Safety Committee and
performs necessary studies and makes recommendations. This Committee is made
up of the Public Works Director, Maintenance Superintendent, a member of
TJKM' s staff, and one or two representatives of Dublin Police .Services. The
Committee has been reasonably effective in responding to requests as well as
bringing traffic problems to light and solving them.
Cost Effectiveness
TJKM continues to charge the City at a reduced (80%) hourly rate for general
traffic studies. This reduced rate work amounted to 80% of TJKM's charges
for the 1989 calendar year. The remaining 20% was expended on capital
projects and private development review.
----------------------- -----------------------------------------------------
ITEM NO. 9 COPIES TO: Chris Kinzel, TJKM
A breakdown of TJKM's billings by fiscal year is as follows:
Estimated Budget
1986-87 1987-88 1988-89 1989-90 1990-91
General Traffic Engineering $42,986 $46,023 $32,490 $47,000 $49,000
Private Development Review 9,491 12,616 6,588 6,500 6,500
Capital Projects 43,377 39,364 12,882 10,500 10,500
Total $95,854 $98,003 $51,960 $64,000 $66,000
The total engineering fees vary, based mostly on the Capital Improvement
Program devoted to the design of traffic signals and related improvements and
on the private development review workload.
1990-91 General Engineering
TJKM will continue to staff the City's Traffic Safety Committee and provide
traffic safety studies on an as-directed basis, as well as prepare the annual
traffic safety report. This report includes analysis of high accident
locations, the accident map, and the updating of traffic volume counts at
selected intersections. TJKM also reviews private development projects to
analyze and make recommendations for traffic-related improvements.
Significant 1990-91 Capital Projects
Capital Improvement projects that TJKM will be working on in 1990-91 are:
1) San Ramon Road Phase IV.
2) Dublin Boulevard Improvements (Donlon Way to Village Parkway) .
3) Dublin Boulevard Extension - Dougherty Road to Tract 5900.
4) Pedestrian Signal Handicap Modifications.
The provision of these services impacts the proposed 1990-91 Capital
Improvement Budget.
Proposed Agreement
Mr. Kinzel has requested hourly rate increases which average 12.5%. The
attachment to Mr. Kinzel's letter identifies these proposed rate changes.
Staff has attached an additional comparison of these increases by
classification. Based on the actual hours spent by classification for the
first eleven months of 1989-90, the weighted average increase in fees would
be 13.3%.
While a 12.5% increase may seem significant, TJKM had requested very small
increases of 2.5% and 3% for the previous two years. The average increase
for the last three years is 6% per year. TJKM's charges for general
engineering and studies, which account for the major portion of their work,
are billed at 80% of the contract rate, as shown in the hourly rate schedule.
The general trend has been to reduce the total number of hours required of
TJKM for general traffic engineering. This trend may indicate that the
proactive approach to traffic problems has been successful in reducing
citizen complaints and/or the traffic problems inherited upon incorporation
are being solved.
Based on the same percentage distribution of TJKM staff utilized in 1989-90,
the projected number of person hours is being decreased by 8% (52 hours) for
the 1990-91 budget.
This year, Michelle DeRobertis, who attended the Traffic Safety Committee
meetings for TJKM, was promoted to Office Manager at TJKM' s Walnut Creek
office. In the interim, Ty Tekawa has filled in. TJKM has agreed in the
upcoming year to replace Ty with a person at a lower classification. This
will be consistent with the staffing level used in the past.
Areas to Improve
In his memo, Chris Kinzel indicates that improvement could be made in that a
proactive approach should be taken in the areas of signal timing, operation,
and special maintenance. He suggests that improvement could be made in
Y
2 -
regard to the standards and procedures by which traffic signing, striping,
and marking are accomplished. Additionally, Mr. Kinzel notes that traffic
operations during street and utility construction and maintenance have
improved but still need attention.
Staff has discussed these items with Mr. Kinzel and proposes to implement
them as follows:
1) TJKM will supply a traffic engineer approximately once a month to
review signal timing in the field and look for defects and
enhancements that can be made.
2) Staff proposes to develop a standard policy for installing and
replacing signs and markings to update some of the existing devices
from older installations.
3) Staff has ordered extra copies of the "State of California Manual
of Traffic Controls" and "Work Area Traffic Control Handbook. " A
program is proposed to be implemented for encroachment permittees
to include the applicable sections of these standards as an
attachment for permits.
Mr. Kinzel states that the cost of this work will be minor and will fall
within the category of general engineering work that is already being done.
Recommendation
Staff recommends that the City Council review the written and oral reports,
provide input, and adopt the resolution approving the amendment to the
agreement.
N
3 -
RIC V E 0
PUBLIC WO.IZKS
MEMORANDUM
February 26, 1990
TO: Lee Thompson, City Engineer
FROM: Chris D. Kinzel
SUBJECT: City of Dublin Contract Review and Proposal
The purpose of this memorandum is to provide you information regarding the traffic
engineering services TJKM provides to the City of Dublin. As requested, the first
section of this memo deals with our self-assessment of TJKM performance for the
past year.
1. Contract Compliance
The administrative duties, development review duties and capital
projects for which TJKM has been involved range from the review of
routine citizen requests, requests from the City council for traffic control
changes, new traffic signal designs, traffic impact analyses for proposed
new development, review of site plans for proposed development, signal
timing studies, and investigation of school related traffic safety issues.
See attachment for a list of specific projects.
We believe we have provided these services in a "prompt, professional
and workmanlike manner in accordance with the standards of the
engineering profession".
During this past year, TJKM has continued to participate in the City
Traffic Committee which meets twice monthly and is attended by
representatives of the City Engineer's Office, maintenance, TJKM, and
the Police Department. The committee allows a high level of
coordination of traffic engineering and traffic safety issues among the
affected departments and in the coordination of the staff position of the
various City -departments for those items that appear on the agenda of
the City Council. At this meeting, many routine items are resolved and
other more complex issues are designated for further study with the
knowledge of all parties.
During the past year, staffing of TJKM work for the City of Dublin has
been fairly consistent. Senior Engineer Michelle DeRobertis attended
the City Traffic Committee meetings and handled and coordinated all
traffic investigations assigned by the committee, the City Engineer or the
4637 Chabot Drive,Suite 214,Pleasanton,California 94588•(41: 1 J
" d r ,
PLEASANTON•SACRAMENTO•FRESNO•CONCORD p
F' f k A.
:-Y ink aea.....+e.. r-.w--•--...+-.w..i
Lee Thompson -2- February 26 1990
City Manager. Michelle also conducted most of the traffic impact
evaluations for proposed development within the City of Dublin. She
was supervised by Principal Associate Ty Tekawa who attended
meetings in Michelle's absence and provided general review and also
coordinated all traffic engineering design functions including traffic
signals and signing and striping design or review. John Gildea
coordinates signal timing and operations. Chris Kinzel attends most
Council meetings, and provides overall direction to other TJKM staff
members. Michelle has recently been promoted to Office Manager of our
Concord office. Ty Tekawa will be replacing Michelle on a permanent
basis.
Other TJKM members are assigned as needed to assist these three,
particularly in the area of design and in'gathering of field data. Much of
the design work is accomplished at the Assistant Traffic Engineer or
Traffic Engineer level. The TJKM goal continues to be to provide traffic
engineering services to the City of Dublin at the lowest possible
classification level, while providing appropriate review and supervision.
2. Availability
TJKM maintains its offices in northern Pleasanton, not far from Dublin
City Hall. Generally, we feel we have been available as needed to
provide traffic engineering services. Given the relatively large TJKM
office in Pleasanton, we generally are available as needed.
3. Responsiveness
Generally, traffic engineering matters do not require immediate
response. We feel our overall responsiveness has improved in the past
year.
4. Cost Effectiveness
During the 12 calendar months of 1989, TJKM expended a total of
952 hours on Dublin projects and invoiced a total of $57,034.99. Using
the total billings and the total hours, the average hourly rate was $59.91,
somewhat higher than the previous $51.89 rate for 1988. Of the total
amount $43,336.22 (76 percent) was for regular day to day traffic
services; $2,202.00 (4 percent) was for special City projects; $1,419.18
(2 percent) was for developer funded studies and $10,077.59 (18 percent)
was for design of capital projects.
5. Program Development and Implementation
This item deals with timeliness and accuracy and would best be
addressed by the City Engineer and the City staff.
1 1
Lee Thompson -3- February 26 1990
Proposal -
TJKM proposes to continue offering services to the City of Dublin. If appropriate,
the contract term would be from July 1, 1990, to June 30, 1991. The proposed
hourly rates for 1990-91 are included on the attachment. The attachment indicates
the current rates as well as the proposed rates for the City of Dublin along with the
reduced rates. The proposed rates would apply to any capital improvement project
or project funded by private developers. The reduced rates would apply to all other
traffic engineering services provided by TJKM. Reduced rates are a maximum of
80 percent of the proposed rates, rounded to the nearest dollar. The proposed
reduced rates average a 12.0 percent increase over current rates.
TJKM requires no insurance subsidy from the City of Dublin. Our errors and
omission insurance limits are $500,000.
As to ways that traffic engineering services can be improved in the City of Dublin,
we feel there are some areas that could receive more traffic engineering emphasis.
Traffic signal timing, operation and special maintenance appears to function on a
basis in which incidents are responded to, rather than anticipated. Traffic
operations during street and utility construction and maintenance appears to be
improving but in need of continuing attention.
We feel some improvements could be made with regard to the standards and
procedures by which traffic signing, striping and pavement markings are
accomplished. We would like to participate in a program which would establish,
formalize and maintain the highest standards in these areas.
We have appreciated the opportunity to conduct a brief traffic review of proposed
development within the City. We feel we have been able to contribute positive
comments on access, driveways, circulation, and parking within the development.
We hope to continue in this role.
We continue to be sensitive to the issue of conflict of interest or a perception of
conflict. TJKM has extensive involvement with many public and private entities in
the valley, hopefully to the advantage of the City of Dublin. We appreciate the
City's flexibility in this area.
TJKM is very pleased to be providing traffic engineering service to the City of
Dublin and hopes to continue providing such services as long as the City desires.
Among the possible offsetting advantages of consulting services provided by TJKM
are the availability of experienced senior personnel and a large group of traffic
engineers to handle peak loads.
Please contact me if there are questions on any of these matters.
rhm
Attachments
157-001.CON
rJKM HOURLY RATE SCHEDUL
Current- Reduced Proposedb Reduced,
89-90 89-90 90-91 90-91
Principal $120 $90 $130 $96
Principal Associate 90 72 110 88
Senior Associate 84 67 100 80
Associate 82 66 95 76
Senior Traffic Engineer 79 63 90 72
Senior Transportation Engineer/Planner 79 63 90 72
Traffic Engineer 75 60 85 68
Transportation Engineer/Planner 75 60 85 68
Assistant Traffic Engineer 65 52 73 58
Traffic Engineering Assistant 52 42 60 48
Technician N 45 36 50 40
Technician III 41 33 43 34
Technician 11 33 27 35 28
Technician 1 20 16 20 16
Graphics Designer 52 42 60 48
Designer 44 35 50 40
Drafter 40 32 ' 45 36
Project Coordinator 46 37 50 40
Word Processing Supervisor 43 35 46 37
Secretarial/Word Processing 41 33 44 35
Computer 30 30 30 30
Expert witness charges available on request.
Current TJKi1iI rates in the City of Dublin, effective July 1, 1990.
b These rates shall apply for capital improvement design work as indicated in the
master agreement.
These rates are 80 percent of TJKM standard rates, and shall apply to General
Traffic Engineering Services and Studies, excluding capital improvement design.
TJKM CITY OF DUBLIN TRAFFIC ENGINEERING PROJECTS
1989
Traffic Accident Map
High Accident Location Investigations
Speed Survey: San Ramon Road and Other Locations
Dublin Boulevard Extension
San Ramon Road Construction Assistance and Phase 4
Hansen Ranch Studies
Blalock Gleason Traffic Study
Dublin Boulevard Signals and Timing
Various School Studies - Fallon
Opticom Analysis
Traffic and Intersection Studies
Traffic Mitigation Fee
Traffic Committee
Dublin Square
Hucke Property
Crown Chevrolet
T.I. Calculations-Dougherty Road
General Signal Timing
Dublin BART EIR
Dougherty Road Review
Donlon Commons
Amador Valley,Road/York Drive Striping
Heritage Commons
Amador Valley Road/Stagecoach Drive
Dublin Boulevard/Silvergate Drive
Silvergate Drive
East Dublin General Plan Amendment
Brighton Drive/Callan
Sierra Court-No Parking
Alameda County Transportation Study
Cronin Ranch Development
Street Light Equipment Review
Signal System Map
Rainbow Parking
No Right on Red- Amador Valley Boulevard
Dougherty Road/Sierra Lane
Alcosta Mall EIR Review
Dublin/San Ramon/Chevron
Dougherty Road/Scarlett Court
Village Parkway Signal Warrants
Capital Improvements
New Dublin Interchange
Level of Service D Policy
Page 2--
TJKM CITY OF DUBLIN TRAFFIC ENGINEERING PROJECTS
1989 w
U-Haul/Scarlett Court
Dougherty Road/Amador Valley Boulevard
Striping Review, Resurfacing, Restriping
Via Zapata/Juarez Lane
Civic Center
Dublin Boulevard/Village Parkway
ENEA Plaza
Golden Gate Parking
Regional Striping
Parade
Dougherty Road HMPS
Shadow Drive Barrier
Amarillo Road/Silvergate Drive
Beck's Mailbox
San Ramon/Dublin RTOR
Council Meetings
TJKM 1988 CITY OF DUBLIN INVOICES
A. Capital Projects Amount Hours Average
San.Ramon Road $ 2,326.00 29.5
Two Signals 7,168.59 138.0
Pre-emption 583.00 7.0
$10,077.59 174.5 $57.75
B. Developer Projects
Blalock Gleason $1,419.18 14.5 $97.87
C. Special City Projects
Parallel Street still open $ -0- 0
Dublin Planline 176.00 2.0
Dublin Boulevard Extension 2,026.00 41.5
$2,202.00 43.5 $50.62
D. Regular City Contract
Traffic Consulting $43,336.22 719.5 $60.23
A+ B + C + D $57,034.99 952.0 $59.91
A G R E E M E N T
This Agreement is made and entered into this day of 1.P , 1985 ►
by and between the City of Dublin (hereinafter referred to as "City" ) , and
TJKM Transportation Consultants , (hereinafter referred to as "Consultant" ) .
WHEREAS, City is desirous of the services of a City Traffic Engineer and
related engineering; and
WHEREAS, Consultant is qualified to render said necessary services and
desires to serve as City Traffic Engineer to City.
NOW, THEREFORE, the parties hereto agree as follows:
I , DUTIES OF CONSULTANT
Consultant agrees to provide those engineering services that may
be required by the City of Dublin during the term of this agreement in a
prompt, professional and workmanlike manner in accordance with the
standards of the engineering profession. All work shall be completed to
the satisfaction of the City Manager. The City may, at its discretion,
request performance by consultant of any of the following duties:
A. Administrative Duties
1. Perform the statutory responsibilities of City Traffic
Engineer.
2. Analyze the City' s traffic engineering needs and
recommend programs to the City Manager consistent with the economic
capabilities of the City.
3 . Attend meetings with City Staff, public officials,
community leaders , developers , contractors , and the general public, as
required by the City.
4. At the discretion of the City, review and comment on
planning programs and land development projects which are not only located
within the City, but also located outside the City and which may have a
traffic impact on the City.
5. Advise the City Manager as to engineering and
construction financing available from other governmental agencies and when
so directed, prepare and initiate application for such fundings.
6. Recommend ordinances and regulations pertaining to
traffic engineering matters .
7. Establish working relationships and coordination with
other public agencies and private utilities involving traffic engineering
matters affecting the City.
8. Provide special engineering reports as to such related
traffic studies .
9. Give direction to and assist City Staff -in performing
traffic studies as necessary and/or required.
`J 10. At the request of the City, recommend solutions to
street design problems.
11. Provide general engineering consultation in connection
with traffic circulation, street signs, noise impact, etc.
Page
C. Development Review Duties
1. Review proposed developments and make recommendations
pertaining to traffic engineering considerations.
2. Review traffic engineering aspects of planning
applications .
D. Capital Projects
1. Assist City Manager in development of a capital
improvement program that relates to traffic matters.
2. Upon specific and separate authorization by the City,
prepare plans and specifications for traffic related capital improvement
projects. It is understood that Consultant will provide design services
for most traffic related capital improvement projects. However, the City
reserves the right to bid any project or bring in specialists when deemed
necessary by the City or the Consultant.
A capital improvement is defined as any project in
which the construction is performed by someone other than the City forces
or the City' s designated street maintenance contractor.
II . DESIGNATION AS CITY TRAFFIC ENGINEER
For the term of this agreement, the following employee of
consultant is to be designated as City Traffic Engineer:
Chris Kinzel Registered Traffic Engineer
III. COMPENSATION
Consultant shall be compensated for work as follows :
A. The following work shall be charged at 80 percent of the
rates shown in Exhibit A:
1. General Traffic Engineering services and studies
excluding capital improvement project design.
B. The following work shall be charged at the rates shown in
Exhibit A:
1. Capital improvement design work, which is billed on a
time and material basis. Prior to proceeding with the work, a maximum
estimated budget shall be established by City and shall not be exceeded
without approval of the City Manager.
C. The City shall not pay for the cost of commuting from the
Consultant ' s office to Dublin City Office.
Page 2
IV. COLLECTION OF FEES
All fees to be collected from any private developer, engineer, or
architect in connection with the carrying out of the functions set forth
above, if collected by engineer shall be collected in the name of the City.
Engineer shall employ record keeping measures acceptable to the City. If
fees are collected by the City, engineer shall review the appropriate
ordinances and fee schedules in effect by City and shall provide to the
persons designated by the City for collection of fees, the amount of such
fees to be collected.
V. INDEPENDENT CONTRACTOR STATUS
In the performance of the work undertaken pursuant to this
agreement, consultant is deemed to be an independent contractor.
Consultant ' s employees are not to be considered employees of the City of
Dublin for any purpose.
VI. ASSIGNABILITY
This agreement shall not be assignable or transferable by the
Consultant without the expressed written consent of the City Manager.
VII. OWNERSHIP OF WORK
All documents, data studies, surveys, drawings , maps and reports
furnished to the Consultant by the City, as well as reports and supportive
data prepared by the Consultant under this contract shall be considered the
property of the City of Dublin and upon request at the completion of the
services to be performed, they will be turned over to the City of Dublin.
VIII. PERFORMANCE OF WORK
Consultant agrees to perform work as stated in this agreement to
the satisfaction of the City.
IX. LIABILITY COVERAGE
A. City shall not be called upon to assume any liability for
the direct payment of any salary, wage or other compensation to any person
employed by the Consultant performing services for the City.
B. Consultant firm shall hold harmless the City from damages,
costs or expenses that may arise because of damage to property or injury to
persons received or suffered by reason of the operation of engineering firm
which may be occasioned by any negligent act or omission to act which
amounts to negligence on the part of the Consultant or any of its agents,
officers and employees and subcontractors.
C. Consultant agrees to provide at its own expense general
liability insurance in an amount not less than $1, 000, 000 and further name
the City as an additional insured.
Page 3
D. Consultant shall provide the City with evidence that it has
Worker ' s Compensation Insurance covering all its employees and professional
liability insurance in the amount of $500,000.
E. Consultant shall assume liability for the wrongful or
negligent acts , errors and omissions of its officers, agents and employees
and subcontractors in regard to any functions or activity carried out by
them on behalf of the City.
X. TERM OF AGREEMENT
The term of this agreement shall be from the date first written
above until terminated. The City may terminate the services of the
engineering firm by providing the firm 30 days written notice. In the
event of such termination, the engineering firm shall be compensated for
such services up to the point of termination. Such compensation for work- -
in progress would be prorated as to the percentage of progress completed at
the date of termination.
If the engineering firm terminates its services to the City, it
must provide the City with written notice at least 90 days in advance of
such termination. All notices to the City shall be addressed to:
City Manager
City of Dublin
6500 Dublin Boulevard, Suite 101
Dublin, CA 94568
All notices to Consultant shall be addressed to:
TJKM
4637 Chabot Drive, Suite 214
Pleasanton, CA 94568
Notices , as referred to above, shall be sent via stered Mail.
CITY OF D LI
By
Mayo
AT
City Cle
TJKM
By
�.
Chris Kinzel
APPROYED AS ,TO FORM:
City Attorney
Page 4
EXHIBIT A
TJKM
PROPOSED HOURLY CHARGE RATES
*
1984 Rates Proposed Rates Difference
Principal $ 90 $ 98 + $ 8
Principal Associate 78 82 + $ 4
Senior Associate 74 76 + $ 2
Associate 69 72 + $ 3
Senior Traffic Engineer 65 68 + $ 3
Senior Transportation Engr 65 68 + $ 3
Traffic Engineer 55 60 + $ 5
Transportation Engineer NP 60 NC
Assistant Traffic Engineer 44 49 + $ 5
Traffic Engineering Assistant39 42 + $ 3
Technician II 34 34 0
Technician I 22 22 0
Graphics Supervisor NP 42 NC
Draftsman 29 34 + $ 5
Secretarial 32 35 + $ 3
Computer 30 30 0
Above rates include standard overhead items. Travel costs are
billed at 30 cents/mile. Outside services are billed at cost
plus 10 percent for handling.
Invoices are due and payable within 30 days. Invoices paid after
30 days will be subject to separate billings of 1 1/2 percent per
month of unpaid balance. Late charges are not included in any
agreement for maximum charges.
Expert witness charges available on request.
* Fees are reduced by 20% for General Traffic Engineering
services and studies excluding capital improvement project
design.
Effective March 1, 1985
AMENDMENT TO AGREEMENT
BETWEEN CITY OF DUBLIN AND TJKM
FOR TRAFFIC ENGINEERING SERVICES
WHEREAS, the City of Dublin (hereinafter referred to as "CITY" ) ,
and TJKM Transportation Consultants (hereinafter referred to as
"CONSULTANT" ) , entered into an agreement on October 14 , 1985 to
provide Traffic Engineering Services to the City of Dublin; and
WHEREAS, the fees established in Exhibit A of that agreement have
been in effect continuously since October 14, 1985; and
WHEREAS, the City wishes to continue contracting for services
from Consultant; and
WHEREAS, an adjustment of fees for services rendered is desired
by both the City and the Consultant .
NOW, THEREFORE the parties hereto agree as follows :
Section 1 : Adjustment of Rates
The TJKM hourly rate schedule (Exhibit A) , shall replace the rate
schedule which was adopted by the City Council on October 14 ,
1985.
The change in rates shall be effective July 1, 1987 and shall
continue in effect until June 30, 1988, or until rescinded or
amended by the City Council, according to the provisions of the
agreement .
CITY OF DUBLIN
yor
Ci y Clerk
TJKM
Chris Kinzel
Date of Adoption
E X H I B I T A
TJK1 HOURLY RATE SCHEDULL
Proposed c Reduced d
85-86a 86-87b,- 87-88 87-88
Principal $98 $100 $105 $84
Principal Associate 82 86 90 72
Senior Associate 76 80 84 67
Associate 72 76 80 64
Senior Traffic Engineer 68 72 77 62
Senior Transportation Engineer 68 72 77 62
Traffic Engineer 60 66 69 55
Transportation Engineer 60 66 69 55
Transportation Planner -- 60 63 50
Assistant Traffic Engineer 49 . 55 58 46
Traffic Engineering Assistant 42 45 47 38
Technician II 34. 37 41 33
Technician I 22 23 26 21
Graphics Supervisor 42 45 50 40
Draftsman 34 37 40 32
Project Coordinator -- 42 44 35
Secretarial 35 37 40 32
Computer 30 30 30 30
The above rates include standard overhead items. _Travel costs are billed at thirty
cents per mile. Each project may be subject to initial set up and coordination fees.
All outside services are billed at cost, plus ten percent for handling.
Invoices are due and payable within thirty days. Invoices paid after thirty days
will be subject to separate billings of one and one-half percent per month of
unpaid balance. Late charges are not included in any agreement for maximum
charges.
Expert witness charges available on request.
a Current TJKM rates in the City of Dublin, established March 1, 1985.
b Current TJKM rates, not in use in Dublin, established March 1, 1986.
C . These rates shall provide for capital improvement design
work and shall be applied as indicated in Paragraph III . B.1.
of the master agreement dated October 14, 1985.
d. These rates are 80% of TJKM standard rates, and shall apply
to General Traffic Engineering Services and Studies,
excluding capital improvement design.
i� t� ucv � L
AMENDMENT TO AGREEMENT �JUL 19 1988
BETWEEN CITY OF DUBLIN AND TJKM
FOR TRAFFIC ENGINEERING SERVICES T ..11` M
WHEREAS, the City of Dublin (hereinafter referred to as "City") , and TJKM
Transportation Consultants (hereinafter referred to 'as "Consultant") , entered
into an agreement on October 14, 1985, to provide Traffic Engineering
Services to the City of Dublin; and
WHEREAS, the fees established in Exhibit A of that agreement have been in
adjusted by amendment for Fiscal Year 1987-88; and
WHEREAS, City wishes to continue contracting for services from Consultant;
and;
WHEREAS, an adjustment of fees for services rendered for Fiscal Year 1988-89
is desired by both City and Consultant;
NOW, THEREFORE, the parties hereto agree as follows:
Section 1. Adjustment of Rates
The TJKM hourly rate schedule (Exhibit A) shall replace the rate schedule
which was adopted by the City Council for Fiscal Year 1987-88.
The change in rates shall be effective July 1, 1988, and shall continue in
effect until June 30, 1989, or until rescinded or amended by the City
Council, according to the provisions of the agreement.
CITY OF DUBLIN
Mayor
ATTEST:
l y 1 k
TJKM
Chris Kinzel
DATE OF ADOPTION
ae,& //,
TJKM HOURLY RATE SCHEDU
Current' Reduced Proposed Reduced`
87-88 87-88— H-89 88-89
Principal $105 $84 $110 $88
Principal Associate 90 72 90 72
Senior Associate 84 67 84 67
Associate 80 64 82• 66
Senior Traffic Engineer/Planner 77 62 79 63
Senior Transportation Engineer 77 62 79 63
Traffic Engineer 69 55 73 58
Transportation Engineer 69 55 73 58
Transportation Planner 63 50 63 50
Assistant Traffic Engineer 58 46 60 48
Traffic Engineering Assistant 47 38 52 42
Technician 11 41 33 41 33
Technician 1 26 21 26 21
Graphics Supervisor 50 40 52 42
Draftsman 40 .32 41 33
Project Coordinator 44 35 44 35
Secretarial 40 32 40 32
Computer 30 30 30 30
Expert witness charges available on request.
e Current TJKM rates in the City of Dublin, established January 1, 1987.
b These rates shall provide for capital improvement design work and shall be
applied as indicated in Paragraph III.B1 of the master agreement dated
October 14, 1985.
` These rates are 80 percent of TJKM standard rates, and shall apply to General
Traffic Engineering Services and Studies, excluding capital improvement design.
REC; EiVED
y
AMENDMENT TO AGREEMENT .lU�_ 1 7 1989
BETWEEN CITY OF DUBLIN AND TJKM T KM
FOR TRAFFIC ENGINEERING SERVICES
WHEREAS, the City of Dublin (hereinafter referred to as "CITY")
and TJKM Transportation Consultants (hereinafter referred to as "CONSULTANT")
first entered into an agreement on October 14, 1985, to provide traffic
engineering services to the City of Dublin; and
WHEREAS, the fees established in Exhibit "A" of the most recent
amendment to the agreement were effective from July 1, 1988 to June 30, 1989;
and
WHEREAS, CITY wishes to continue contracting for services from
CONSULTANT; and
WHEREAS, an adjustment of fees for services rendered is desirable
by both CITY and CONSULTANT;
NOW, THEREFORE, the parties hereto agree as follows:
Section 1: Adjustment of Rates
The TJKM hourly rate schedule (Exhibit "A") shall replace the rate schedule
which was adopted by the City Council on July 11, 1988.
The change in rates shall be effective from. July 1, 1989 and shall continue
in effect until June 30, 1990, or until rescinded or amended by the City
Council according to the provisions of the agreement.
I DUBLIN
Mayor �
ATTEST:
C't Cler
TJKM TRANSPORTATION CONSULTANTS
ro, �-4
Chris Kinzel
6/,z 7169
Date of Adoption
EXHIBIT "A"
TJKM HOURLY RATE SCHEDULE
Current" Reduced Proposed Reduced`
88-89 88-89 89-90 89-90
Principal $110 $84 $120 $90
Principal Associate 90 72 90 72
Senior Associate 84 67 84 67
Associate 82 66 82 66
Senior Traffic Engineer 79 63 79 63
Senior Transportation Engineer/Planner 79 63 79 63
Traffic Engineer 73 58 75 60
Transportation Engineer/Planner 73 58 75 60
Assistant Traffic Engineer 60 48 65 52
Traffic Engineering Assistant 52 42 52 42
Technician IV 41 33 45 36
Technician III - - 41 33
Technician II 26 21 33 27
Technician I - - 20 16
Graphics Designer 52 42 52 42
Designer - - 44 35
Drafter 41 33 40 32
Project Coordinator 44 35 46 37
111ord Processing Superi,isor - - 43 35
SecretarialliFord Processing 40 32 41 33
Computer 30 30 30 30
Expert witness charges available on request.
a Current TJKM rates in the City of Dublin, effective July 1, 1988.
b These rates shall apply for capital improvement design work as indicated in the
master agreement.
These rates are 80 percent of TJKM standard rates, and shall apply to General
Traffic Engineering Services and Studies, excluding capital improvement design.
RESOLUTION NO. -90
A RESOLUTION OF THE CITY COUNCIL
OF THE CITY OF DUBLIN
-----------------------
APPROVING AMENDMENT TO AGREEMENT FOR TRAFFIC ENGINEERING SERVICES
WITH TJKM TRANSPORTATION CONSULTANTS
WHEREAS, the City Council of the City of Dublin approved an
agreement for engineering services with TJKM Transportation Consultants, on
October 14, 1985; and
WHEREAS, the City of Dublin and TJKM Transportation Consultants
have agreed to amend the agreement as regards hourly rates;
NOW, THEREFORE, BE IT RESOLVED that the City Council of the City-
of Dublin does hereby approve the amendment to the agreement which is attached
hereto as Exhibit "A" .
BE IT FURTHER RESOLVED that the Mayor is authorized to execute the
amendment to the agreement.
PASSED, APPROVED, AND ADOPTED this 26th day of June, 1990.
AYES:
NOES:
ABSENT:
Mayor
ATTEST:
City Clerk
; 2
EXHIBIT "A"
AMENDMENT TO AGREEMENT
BETWEEN CITY OF DUBLIN AND TJKM
FOR TRAFFIC ENGINEERING SERVICES
WHEREAS, the City of Dublin (hereinafter referred to as "CITY")
and TJKM Transportation Consultants (hereinafter referred to as "CONSULTANT")
first entered into an agreement on October 14, 1985, to provide traffic
engineering services to the City of Dublin; and
WHEREAS, the fees established in Exhibit "A" of the most recent
amendment to the agreement were effective from July 1, 1989 to June 30, 1990;
and
WHEREAS, CITY wishes to continue contracting for services from
CONSULTANT; and
WHEREAS , an adjustment of fees for services rendered is desirable
by both CITY and CONSULTANT;
NOW, THEREFORE, the parties hereto agree as follows:
Section 1: Adjustment of Rates
The TJKM hourly rate schedule (Exhibit "A") shall replace the rate schedule
which was adopted by the City Council on June 27, 1989 .
The change in rates shall be effective from July 1, 1990 and shall continue
in effect until June 30, 1991, or until rescinded or amended by the City
Council according to the provisions of the agreement.
CITY OF DUBLIN
Mayor
ATTEST:
City Clerk
TJKM TRANSPORTATION CONSULTANTS
Chris Kinzel
Date of Adoption
EXHIBIT "A" OF AMENDP
TJKM HOURLY RATE SCHEDULE
Currents Reduced Proposedb Reduced,
89-90 89-90 90-91 90-91
Principal $120 $90 $130 $96
Principal Associate 90 72 110 88
Senior Associate 84 67 100 80
Associate 82 66 95 76
Senior Traffic Engineer 79 63 90 72
Senior Transportation Engineer/Planner 79 63 90 72
Traffic Engineer 75 60 85 68
Transportation Engineer/Planner 75 60 85 68
Assistant Traffic Engineer 65 52 73 58
Traffic Engineering Assistant 52 42 60 48
Technician IV 45 36 50 40
Technician III 41 33 43 34
Technician II 33 27 35 28
Technician I 20 16 20 16
Graphics Designer 52 42 60 48
Designer 44 35 50 40
Drafter 40 32 ' 45 36
Project Coordinator 46 37 50 40
Word Processing Supervisor 43 35 46 37
Secretarial/Word Processing 41 33 44 35
Computer 30 30 30 30
Expert witness charges available on request.
Current TJKM rates in the City of Dublin, effective July 1, 1990.
b These rates shall apply for capital improvement design work as indicated in the
master agreement.
These rates are 80 percent of TJKM standard rates, and shall apply to General
Traffic Engineering Services and Studies, excluding capital improvement design.
TJKM TRAFFIC CONSULTANTS
COMPARISON OF EXISTING HOURLY RATES TO PROPOSED RATES
1989-90 1990-91 % Increase
Principal $120.00 $130.00 8.3%
Principal Associate 90.00 110.00 22.2%
Senior Associate 84.00 100.00 19.0%
Associate 82.00 95.00 15.9%
Senior Traffic Engineer 79.00 90.00 13.9%
Senior Transportation Engr./Planner 79.00 90.00 13.9%
Traffic Engineer 75.00 85.00 13.3%
Transportation Engineer/Planner 75.00 85.00 13.3%
Assistant Traffic Engineer 65.00 73.00 12.3%
Traffic Engineering Asst. 52.00 60.00 15.4%
Technician IV 45.00 50.00 11.1%
Technician III 41.00 43.00 4.9%
Technician II 33.00 35.00 6.1%
Technician I 20.00 20.00 0.0%
Graphics Designer 52.00 60.00 15.4%
Designer 44.00 50.00 13.6%
Drafter 40.00 45.00 12.5%
Project Coordinator 46.00 50.00 8.7%
Word Processing Supervisor 43.00 46.00 7.0%
Secretary/Word Processing 41.00• 44.00 7.3%
Computer 30.00 30.00 0.0%
Total 1,236.00 1,391.00 12.5% (Avg. )
E