Loading...
HomeMy WebLinkAboutItem 4.08 Accept Work 90-4 (2) GITY OF DUBLIN AGENDA STATEMENT City Council Meeting Date: August 13, 1990 SUBJECT: Acceptance of Work - Contract No. 90-04 90-4 Annual Street Overlay and Repair (Report by Public Works Director Lee Thompson) EXHIBITS ATTACHED: Dublin Sports Grounds Renovation Final Cost Report RECOMMENDATION: Accept improvements constructed under Contract 90-04 ~//~and authorize Staff to pay final payment and t(_~'r~etention in the amount of $46,681.32 to Granite Construction. FINANCIAL STATEMENT: Capital Improvement Budgets 1) Overlay (Construction) Design/Inspection Subtotal: * 2) Dublin Sports Grounds Parking Lot Repair **3) Shannon Parking Lot Repair TOTAL CIP: Operating Budget 1) Pavement Failure Repair 2) Pavement Striping TOTAL OPERATING BUDGET: GRAND TOTAL: Budget Actual $ 156,000.00 30,000.00 $ 130,385.92 17,350.33 $ 186,000.00 $ 147,736.25 $ 12,000.00 $ 11,638.26 $ 11,760.00 $ 7,879.69 $ 209,760.00 $ 167,254.19 $ 250,000.00 721000.00 $ 322,000.00 $ 531,760.00 $ 262,720.21 541189.17 $ 316.909.38 $ 484,163.57 * See attached memo regarding Dublin Sports Grounds project completion. ** $11,760 was deleted from the Shannon Park Renovation contract for eliminating slurry sealing of the lot. The Overlay and Dublin Sports Grounds Repair are budgeted in the Capital Improvement Program and are both under budget. Repair and striping expenditures are budgeted in the Street Maintenance Operating Budget, and the total of these two costs is under budget. DESCRIPTION: At the March 26, 1990, City Council meeting, Contract 90-04, the Annual Street Overlay and Repair was awarded to Granite Construction. This project consisted of removal and replacement of failed areas in those City streets which were then overlaid as part of this project or slurry sealed under a separate project. Streets that were overlaid in this year's project were the York/Penn Drive loop, Silvergate Drive between Castilian ITEM NO. ~ COPIES TO: Granite Construction and San Ramon Road, and Hansen Drive between Silvergate and Dublin Boulevard. The streets repaired in preparation for the slurry seal were located primarily in the residential area south of Amador Valley Boulevard and in the western hills just north of Dublin Boulevard. Repair of the failed areas in the Dublin Sports Grounds parking lot was accomplished under this contract as a part of the Dublin Sports Grounds Renovation Capital Improvement Project. Pavement failures were also removed from the Shannon Center parking lot. Additionally, this contract included placement of thermoplastic pavement markings on Amador Valley Boulevard and Village Parkway. City Staff has begun to replace the painted striping on major arterials with thermoplastic as a long-range cost-saving measure. Work on this project has been completed in accordance with the approved ~lans and specifications. Staff recommends that the City Council accept the improvements subject to the contractor's one year guarantee period amd authorize payment of final progress payment and retention in the amount of $46,681.32 to Granite Construction. CITY OF DUBLIN MEMORANDUM DATE: TO: FROM: SUBJECT: August 7, 1990 Richard C. Ambrose, City Manager Lee S. Thompson, Public Works Director Completion of Dublin Sports Grounds Renovation for 1989-90 CIP Budget This Project has been completed. The construction is being accepted under the contracts with Granite Construction for the Pavement Repair and Graham Construction for the Slurry Seal. The cost report for the Capital Improvement Project is as follows: Budget Administration $ 1,500 Study 15,000 Pavement Repairs 13,500 TOTAL $30,000. Singer a Hodges Study Santina & Thompson Aerial Topo subtotal Replace AC Slurry Subtotal Actual $ 7,685.00 $ 7,434.15 11,638.26 2,865.19 $15,119.15 $14,503.45 $29,622.60 LST/mb