HomeMy WebLinkAboutItem 5.1 BaseballFieldMurraySchl (2)
CITY OF DUBLIN
AGENDA STATEMENT
CITY COUNCIL MEETING DATE: March 11, 1991
SUBJECT
: Request from Dublin Little League for city
assistance with construction of a 90-foot
baseball field (Report by Diane Lowart,
Recreation Director)
EXHIBITS ATTACHED
5 Correspondence from David Distad, President
RECOMMENDATION ~:. Defer request pending further information from
',)\~ . (\/ A ~he Dublin Unified School District and the
\)\ ','f--' '" the Dublin San Ramon Services District
FINANCIAL STATEMENT: Estimated cost to City: $12,676 - 16,579
Funds are not available in the FY90-91 Budget
DESCRIPTION : Correspondence has been received from Dublin
Little League requesting assistance from the City with the
construction of a 90-foot baseball field at Murray School. Currently
there are three 90-foot baseball fields in Dublin; one at the Dublin
Sports Grounds and two at Dublin High School. The City's planned
renovation of the two high school fields, scheduled to begin in late
May, impacts Dublin Little League's ability to serve the senior
division youth whose enrollment has increased in recent years.
In scheduling the renovation of the Dublin High School athletic
fields, Staff considered the schedules of the high school baseball,
softball, soccer and football teams, as well as the physical education
classes, all of which use the area planned for renovation. From the
standpoint of the school, the best time to schedule the actual
construction of project is from mid-May through August. Dublin
Little League would like to utilize the baseball fields from March
through June. However, in order to have the turf area completed for
use by the football team for practice in August, the project cannot be
delayed until July.
In order to make up for the lack of 90-foot fields, Dublin Little
League is proposing that the city and Little League work cooperatively
to construct a field at Murray School. Staff has reviewed the site
and developed a preliminary scope of work and cost estimate. For the
purpose of this estimate, the only labor costs included are for
equipment operation (i.e. loader, trucks) based on the assumption that
Little League would provide the needed manpower for other activities.
Labor and equipment costs are taken from the City's current
maintenance contract with MCE.
Grading - Removal of Existing Material
Removal and disposal of approximately .009 to .012 cubic yards per
square foot........."1 "J ._. 'L.~7J' '<]'>~"""""""" .$2,605 - $3,308
Installation of New Baseball Field );rix
Installation of approximately 190 to 250 cubic yards at $20-$28 per
yard plus equipment..................................··$4,721 - $7,921
Installation of Cyclone Fence
Installation of approximately 160 linear feet of cyclone fence at $20
1 . f t .~. " . . ., þ,.' '.-<,-<e.. <, ,. /~.., ... "-- $ 3 2 0 0
per l ne a r 00....... .~: ?'," . .... ..,~.. ·r. . .". . . . . . . . .r. ..' ~ . " ')' . . . . . . . . . . . ,
...._: ~ I} ->I' t..
Fence Planks for Backstop (Material only).......................$ 400
Bench for Each Backstop.............................············ $ 250
Two Bleacher Units............................··..············· .$1,000
::::-::~~-----------------------::::::-::~--::::::-::::::-::::::
¿<-fu 280-30
AGENDA STATEMENT - Request From Dublin Little League
March 11, 1991
Page Two
Thus the initial cost estimate for the construction of a 90-foot
baseball field at Murray School is approximately $12,676 to $16,579.
This cost could be reduced by approximately $1,250 if the bleachers
and benches were not included. Obviously it would be nice to have
these items, however they are not essential to the overall playability
of the field. As this project was not identified for funding in the
Fiscal Year 1990-91 Budget, funds are not available.
Funding for a complete renovation of the Murray School athletic fields
is currently included in the Five Year Capital Improvement Program and
is scheduled for Fiscal Year 1992-1993. The scope of the project
includes grading and reseeding of the entire site along with
installation of an irrigation system, paved walk and renovation of the
backstops. The improvements associated with the construction of the
proposed 90-foot diamond could, in all likelihood, be integrated into
the future renovation project. .
Another issue to be considered by the City Council is the effect that
the drought may have on any proposed improvements to school property.
Currently the City and the District are facing water cutbacks of up to
50 percent. Additionally the rates for water usage have increased
substantially. The anticipated cutbacks combined with the rate
increases may delay the scheduled renovation of the Dublin High School
athletic fields. If this occurs, the construction of an additional
field at Murray School may be unnecessary.
Although the City has a master Joint Use/Development Agreement with
the Dublin Unified School District, the City does not have the right
to authorize construction projects on school property. Therefore it
will be necessary for Dublin Little League to obtain permission of the
District prior to proceeding with the proposed project. In
preliminary discussions between Staff and the District, they indicate
that there are plans to place portable buildings at Murray School and,
consequently, could not comment on the proposal without further
information.
As the Dublin Unified School District has not yet committed
project and given the uncertainty as to the availability of
Staff recommends that the City Council defer consideration
request until such time that these issues are resolved.
to the
water,
of the
DUBLIN LITIl¿ LEAGUE
P.O. BOX 2037, DUBLIN. CA 94568
PHONE:
March 4, 1991
City of Dublin City Council
100 Civic Plaza
Dublin, CA 94568
ATTN: Mr. Peter W. Snyder
Dear Mr. Snyder:
The Dublin Little League is seeking the aid and co-
operation of the Dublin City Council to provide a 90' base-
ball diamond at Murry School.
We have experienced a tremendous growth this year and
find the baseball fields at the Sports Grounds and at the
High School no longer adequate for the expansion of youths
in our league. This season alone could be devastating to
these youngsters because we will lose the useage of 2 of 3
fields due to the renovation of Dublin High School.
The Dublin Little League is prepared to provide all
"professional" labor to have a 90' diamond constructed. We
have committed parent volunteers that have pledged their
time in order to obtain a new field. Please keep in mind
that these volunteers are licensed contractors and equipment
operators willing to donate their labor to the city and to
the League for this project.
The Dublin Little League request that the City supply
the materials and the location for a new field. Hopefully,
the City would designate the Murry School property because
the cost would be minimal, the location is preferable and
most of all, Murry School is scheduled for immediate renova-
tions.
I certainly do appreciate your consideration in this matter
and if I can be of any further assistance, please do not hes-
itate to contact me at 828-3957 or call Dale Skinner at 828-7821.
Sincerely,
~u. ~LIN LI~TLE. LEAGU~_, /
~~~~,~f
David Distad
President
"A NON-PROFIT YOUTH SPORTS ORGANIZA TlON"