HomeMy WebLinkAboutItem 8.2 Traffic Engineering Contract Review (2) CITY OF DUBLIN
AGENDA STATEMENT
City Council Meeting Date: June 24, 1991
SUBJECT: \ Traffic Engineering Contract Review - TJKM
C Report by Public Works Director Lee Thompson
EXHIBITS ATTACHED: 1) Memo from Chris Kinzel, TJKM
2) Current TJKM agreement dated October 14, 1985,
with current amendment showing rates effective
for Fiscal Year 1990-91
3) Resolution and proposed TJKM agreement amendment
RECOMMENDATION: 1) Review services of TJKM
2) Adopt resolution approving amendment to agreement
with TJKM and authorize Mayor to execute
FINANCIAL STATEMENT: See below.
DESCRIPTION: Traffic Engineering services are provided to Dublin
by the firm of TJKM Transportation Consultants. Originally, TJKM functioned
as a subcontractor under the Santina and Thompson agreement. In 1985, the
City entered into a separate agreement with both Santina and Thompson and
with TJKM.
Chris Kinzel has prepared the attached self-evaluation of his firm's
performance. The staff report will highlight pertinent sections of the
information. In addition, the existing contract and an amendment covering
the new rate schedule is attached for review.
Outline of Services Provided
TJKM provides traffic engineering services generally in the areas of private
development review, Capital Improvement design and construction review. In
addition, they perform traffic engineering studies as a result of citizen or
City requests. These functions have been performed in a timely and
professional manner. '
Approximately 50 studies have been made this year as a result of Staff or
resident requests. A complete list is included with Table 1 of Mr. Kinzel's
memorandum (Exhibit 1) . Some of the more significant ones were the
Silvergate Drive Traffic Study, Nielsen School Crossing Guard Study,
Dougherty Road median closure at Pak N Save driveway, and the annual traffic
accident analysis and safety recommendations.
TJKM also performed a crossing guard study at Murray School. This study has
not been presented to the City Council. The study indicated that the traffic
volumes did not meet the warrants for a crossing guard. TJKM plans to review
this study in the fall to see if traffic volumes have increased to the point
that a crossing guard would be warranted. The residents who requested the
review have been informed of the status.
TJKM has participated in the Traffic Mitigation Fee Study; private
development review for a number of projects including the Office Club,
Chevron Station, McDonald' s, and Donlan Canyon; and the DRFA fire station
location study. TJKM also reviews and makes changes to signal timing as
needed.
A representative of TJKM attends meetings of the Traffic Safety Committee and
performs necessary studies and makes recommendations. This Committee is made
up of the Public Works Director, Senior Civil Engineer, Maintenance
Superintendent, a member of TJKM's staff, and representatives of Dublin
Police Services. The Committee reviews and responds to citizen concerns with
traffic issues. In addition, the Committee initiates a review of problems
----------- ----------------------------------------------------------------
ITEM N0. COPIES TO: Chris Kinzel, TJKM
,,,� 590 -i0
identified by Staff. The Committee has been reasonably effective in
responding to requests as well as bringing traffic problems to light and
solving them. This allows Staff to make recommendations to the City Council
based on joint review by representatives from several City departments.
Cost Effectiveness
TJKM proposes to continue to charge the City at a reduced (80%) hourly rate
for general traffic studies. This reduced rate type of work amounted to 68%
of TJKM's charges for the 89-90 fiscal year and an estimated 56% for the
1990-91 fiscal year. The remainder was expended on capital projects and on
private development review (for which the City is reimbursed by developers) .
The balance between types of projects fluctuates from year to year as noted
in the chart below.
A breakdown of TJKM's billings by fiscal year is as follows:
Rev. Budget/ Projected
Estimated Budget
1986-87 1987-88 1988-89 1989-90 1990-91 1991-92
Gen. Traffic Engr. $42,986 $46,023 $32,490 $45,761 $64,200 $ 50,000
Private Dev. 9,491 12,616 6,588 7,305 33,200 7,500
Capital Projects 43,377 39,364 12,882 14,493 16,500 17,000
Total $95,854 $98,003 $51,960 $67,559 $113,900 $ 74,500
The total engineering fees vary, based mostly on the Capital Improvement
Program devoted to the design of traffic signals and related improvements and
on the private development review workload. In the 1990-91 fiscal year, some
large individual studies directed by the City Council contributed to the
increase in the general traffic engineering fees.
During 1990, TJKM provided their services utilizing 16 different employee
classifications. Approximately 39.8% of the time expended was at a
Transportation Engineer/Planner level. The current full hourly rate for this
position is $85.00 per hour. Approximately 10% of the hours in 1990 were
performed by a Principal classification. Table 3 of TJKM' s memorandum
identifies the breakdown of total hours expended by each of the positions.
This information demonstrates that the work is being performed at the most
appropriate level, which results in a cost efficient service.
Table 2 of TJKM's memorandum utilizes the information discussed above and
shows the costs by three project types:
- General Traffic Engineering
- Private Development Review
- Capital Projects
Table 2 also identifies the average hourly rate by each of these categories.
As shown, the average hourly rate for all work in 1990 was $59.90 per hour.
Staff has also reviewed the 1989 data, and the average hourly rate was
relatively unchanged. This data demonstrates the cost-effectiveness of
services provided by TJKM.
1991-92 General Engineering
TJKM will continue to staff the City's Traffic Safety Committee and provide
traffic safety studies on an as-directed basis, as well as prepare the annual
traffic safety report. This report includes analysis of high accident
locations, the accident map, and the updating of traffic volume counts at
selected intersections.
Review of Private Development
TJKM also reviews private development projects to analyze and make
recommendations for traffic-related improvements. This year, prior to
setting a downtown traffic development fee, each project was individually
analyzed for its traffic impacts, and fees were levied accordingly.
2 -
Significant 1991-92 Capital Projects
Capital Improvement projects that TJKM will be working on in 1991-92 are:
1) San Ramon Road Phase IV - signal inspection and timing.
2) Dublin Boulevard Improvements (Donlon Way to Village Parkway) - review of
design and inspection of signals and striping.
3) Dublin Boulevard Extension - Dougherty Road to Tract 5900 - signal design
and inspection.
4) Dougherty Road Improvements South of Southern Pacific Right-of-Way -
design of striping and signal modifications.
The provision of these services is budgeted within each individual project
contained in the proposed 1991-92 Capital Improvement Budget.
Proposed Agreement
Mr. Kinzel has requested hourly rate increases which average 6.1%. Table 5
of Mr. Kinzel' s letter identifies these proposed rate changes, including the
percentage of increase per personnel classification. Table 3 of the proposal
provides a breakdown of hours expended by personnel classification during
calendar year 1990. Based on these person-hour figures, Staff calculated
that the actual average increase would be about 7.1%, since some personnel
classifications spend more time than others on Dublin projects.
TJKM's rate increases have amounted to 2.5%, 3%, and 12.5% over the last
three years, an average increase of 6% per year over the three year period.
The proposed 6.1% increase (7.1% based on a weighted staffing average) for
1991-92 is, therefore, in line with previous years' increases.
TJKM's charges for general engineering and studies, which account for the
major portion of their work, are billed at 80% of the contract rate, as shown
in the hourly rate schedule. It was noted that private development work,
which is billed at 100% of the contract rate, is not clearly defined in the
present agreement, and therefore, the proposed amendment adds private
development review to Section III (B) of the agreement.
In spite of the rate increase, TJKM's overall charges to the City of Dublin
are projected to decrease in FY 1991-92 for the following reasons:
1) The City has hired a full-time Senior Civil Engineer with a Traffic
Engineering background. It is proposed that this City employee will become
responsible for some of the general traffic engineering work that has been
performed by TJKM in the past.
2) Since the formation of the Traffic Safety Committee, the number of
requests for special traffic studies relative to stop signs, speeding, and so
forth, has declined, and those which are received are handled in a timely
manner. Staff feels that the TSC's proactive approach to potential problems
is at least partially responsible for this trend.
3) The amount of private development review is expected to decrease, as
residential projects are put on hold due to economic trends.
4) The Downtown Traffic Impact Fee will be in effect, which will preclude
the extensive individual development traffic impact fee studies.
Areas to Improve
TJKM's evaluation for FY 1990-91 indicated the need for improvement in the
areas of signal operation and timing and construction traffic control. Over
the past year, City Staff has worked with TJKM to effect several changes in
signal timing to improve traffic flow. Construction traffic control
standards have been implemented for the encroachment permit process, and
TJKM's traffic signal specialists have been spending more time reviewing
signal timing and operations. These items will continue to require
monitoring in the future as new projects and increased traffic create a need
for updates.
3 -
The City of Dublin has typically utilized the State (Caltrans) standards for
signing and pavement marking. Through the Traffic Safety Committee, City
Staff will be working with TJKM to establish formal City of Dublin standards
and practices in this area.
Recommendation
Staff recommends that the City Council review the written and oral reports,
provide input, and adopt the resolution approving the amendment to the
agreement.
- 4 -
C � �
MAR
1991
MEMORANDUM �IJ&I
March 7, 1991
TO: Lee Thompson, City Engineer
FROM: Chris D. Kinzel
SUBJECT: City of Dublin Contract Review and FY 1991-92 Proposal
This memorandum provides information about the traffic engineering services
TJKM provides to the City of Dublin. The first section of this memorandum deals
with a self-assessment of TJKM performance over the past year.
Performance Assessment
1. Contract Compliance
The administrative duties, development review duties and capital
projects that TJKM has participated in include the review of routine
citizen requests, requests from the City Council for traffic control
changes, new traffic signal designs, traffic impact analyses for proposed
development, review of site plans for proposed development, signal
timing studies, planning of road network improvements, speed surveys,
and investigation of school related traffic safety issues. See Table 1 for a
list of specific projects.
We believe these services have been provided in a "prompt, professional
and workmanlike manner in accordance with the standards of the
engineering profession".
During the past year, TJKM has continued to participate in the City
Traffic Committee which meets twice a month. The meeting is attended
by representatives of the City Engineer's Office, Maintenance, TJKM,
and the Police Department. The committee allows for a high level of
coordination of traffic engineering and traffic safety issues among the
affected departments. The committee also facilitates the prompt and
coordinated response to City Council agenda items. Many routine items
are resolved at the meeting and other more complex issues are
designated for further study with the knowledge of all parties.
4637 Chabot Drive,Suite 214, Pleasanton,Califorr _ a Fill° <
PLEASANTON•SACRAMENTO•FRESNC
Lee Thompson -2- March 7, 1991
TJKM staffing for City of Dublin traffic engineering services has been
fairly consistent. Transportation Engineer David Othling has attended
the City Traffic Committee meetings since June and has performed most
of the traffic investigations assigned by the committee, City Engineer, or
he City Manager. David and Transportation Planner Gerri Langtry have
conducted most of the traffic impact evaluations for proposed
development in the City of Dublin. They have been supervised by
Principal Associate Ty Tekawa and Principal Chris Kinzel, both of whom
are registered Professional Engineers. Ty Tekawa provided general
review and coordination of all traffic engineering design functions
including traffic signals and signing and striping design or review.
Associate John Gildea coordinates signal timing and operations. Chris
Kinzel makes most of the presentations at City Council meetings, and
provides overall direction to other TJKM staff members.
Other TJKM staff are assigned as needed to assist the four primary
Dublin team members, particularly in the area of design and field data
collection. Much of the design work is accomplished at the Assistant
Traffic Engineer or Traffic Engineer level. The TJKM goal continues to
be to provide quality traffic engineering services to the City of Dublin at
the lowest possible job.classification level, while providing appropriate
review and supervision.
2. Availability
Traffic engineering services are provided to the City of Dublin from
TJKM's corporate headquarters in northern Pleasanton, a couple of miles
from the Dublin City Hall. We feel we have been available as needed
and requested by the City staff.
3. Responsiveness
Generally, other than safety related items, traffic engineering matters do
not require immediate response. We feel our overall responsiveness has
improved in the past year.
4. Cost Effectiveness
During the twelve calendar months of 1990, TJKM invested a total of
1,600 hours on Dublin projects and invoiced a total of$95,838. Dividing
the total billings by the total hours, indicates that the average hourly
rate was $59.90, about the same as last years rate. Of the total billings,
$75,525 (79 percent) was for regular day to day traffic services, $16,620
(17 percent) was for private developer funded studies, and $3,693 (4
percent) was for design of capital projects. Table 3 shows the 1990
billings by TJKM job classification.
Table 4 summarizes the TJKM billings for the past four fiscal years by
work category and estimates the current year final billings. The 1991-92
budget is also indicated from work load discussions with the City
Engineer.
Lee Thompson -3- March 7, 1991
A 40 percent increase in TJKM general traffic engineering billings is
expected for fiscal year 1990-91. This is due in part to TJKM's
contributions on several sensitive safety-oriented projects which involved
a significant amount of coordination with the City staff and private
citizens. These included the Nielsen School Crossing Guard and Traffic
Circulation Study, the Murray School Crossing Guard Study, and the
Silvergate Speed Control Study. Mehran Sepehri has recently joined the
City of Dublin as the Senior Civil Engineer. Mehran's experience and
traffic engineering background will allow the City of Dublin to perform
more traffic related studies in-house which could result in reduced TJKM
billings in the next fiscal year.
5. Program Development and Implementation
This item deals with timeliness and accuracy and would best be
addressed by the City Engineer and the City staff.
Proposal
TJKM proposes to continue offering transportation engineering services to the City
of Dublin during the City's 1991-92 Fiscal Year (FY) of July 1, 1991 to June 30,
1992. The proposed hourly rates for FY 1991-92 are indicated in Table 5. The table
also provides a comparison of the current and proposed City of Dublin contract
rates. The proposed full rates would apply to any capital improvement project or
projects funded by private developers. The proposed reduced rates would apply to
all other traffic engineering services provided by TJKM. The reduced rates are
80 percent of the full rates. The proposed rates average a 6.8 percent increase over
the current rates.
TJKM requires no insurance subsidy from the City of Dublin. Our errors and
omission insurance limits are $500,000.
As to ways that traffic engineering services can be improved in the City of Dublin,
we feel there has been measurable improvement in some areas. The Traffic Safety
Committee has been taking more of a proactive role than in previous years. Traffic
signal timing, operation, and special maintenance and traffic operations during
street and utility construction and maintenance has improved, but is in need of
continuing attention. Also, the establishment of formal standards and procedures
for the implementation of traffic signing, striping and pavement markings would be
beneficial.
We have appreciated the opportunity to conduct traffic reviews of proposed
development in the City of Dublin. We feel we have been able to contribute positive
comments resulting in improved access to public streets, circulation, and parking
within each development. We hope to continue in this role.
We continue to be sensitive to the issue of conflict of interest or a perception of
conflict. TJKM has extensive involvement with many public and private entities in
the Tri-Valley, hopefully to the advantage of the City of Dublin. We appreciate the
City's flexibility in this area.
Lee Thompson -4- March 7, 1991
TJKM is very pleased to be providing traffic engineering service to the City of
Dublin and hopes to continue providing such services as long as the City desires.
The advantages of utilizing TJKM's consulting services include the availability of a
variety of experienced senior transportation professionals to handle peak loads.
Please contact me if there are questions on any of these matters.
ca
Attachments
157-001.CON
L
Table 1
TJKM 1990 PROJECTS
Annual Safety Report
Annual Downtown Traffic Monitoring Report
Dublin Boulevard Extension
San Ramon Road Phase 4 Construction Assistance
Dublin Boulevard Signals and Timing
Emergency Vehicle Signal Pre-emption (Opticom) Analysis
Downtown Traffic Impact Mitigation Fee Study
Traffic Safety Committee Meetings
General Signal Timing
Dublin BART EIR Review
Dougherty Road Improvement Project Review
Donlon Commons Review
Amador Valley Blvd.Nork Drive Striping
Dublin Boulevard/Silvergate Drive Preliminary Intersection Design
Silvergate Speed Control Study
East Dublin General Plan Amendment
Village Parkway Signal Warrants Study
Regional St./Dublin Blvd. Re-striping
Attendance at City Council Meetings
Attendance at Planning Commission Meetings
Office Club Traffic Impact Fee and Plan Review
Chevron Traffic Impact Fee and Plan Review
Shamrock Ford Traffic Impact Fee and Plan Review
8119 Locust Place No Parking Zone
San Ramon Rd./Alcosta Blvd. As-built Plans
Fire Station Location Study
BP Oil Plan Review
McDonalds Traffic Impact Fee and Plan Review
Arroyo Vista Signing and Striping
Dougherty Rd./Fall Creek Sight Distance
Topaz Circle Sight Distance
Murray School Crossing Guard Study
Town and Country Traffic Impact Fee and Plan Review
Stagecoach Road Signing and Striping
Transportations Systems Management Program
Dublin Meadows Sight Distance Review
Amador Valley Blvd./Emerald Stop Sign Review
Donlon Canyon Plan Review
Nielsen School Crossing Guard and Access Study
Dougherty Rd. Speed Survey
Bandon Signing and Striping
Del Paso Plan Review
Village Pkwy. Stop Sign Study
Dublin Speed Survey
Silvergate Dr. Stop Signs
San Ramon Rd. Bike Path at The Springs
Donlon Way/Springs Apartments Access Study
Alcosta Blvd./San Ramon Rd. Signal Operations
Pak 'N Save Access Study
Various Traffic and Intersection Studies
Various Capital Improvement Projects
Various Signing and Striping Projects
Various Field Investigations
TABLE 2
1990 TJKM BILLINGS BY PROJECT TYPE
Average
Protect Type Amount Hours Rate $/HR
General Traffic 75,525 1,103 . 68.47
Engineering
Private Development 16,620 448 37.10
Review
Capital Projects 3,693 49 75.37
Total 95,838 1,600 59.90
TABLE 3
1990 TJKM BILLINGS BY JOB CLASSIFICATION
Hours Percentage
Principal 168 10.4
Principal Associate 263 16.3
Senior Associate 0 0.0
Associate 57 3.6
Senior Traffic Engineer 16 1.0
Senior Transportation 0 0.0
Engineer/Planner
Traffic Engineer 1 0.1
Transportation Engineer/ 638 39.8
Planner
Assistant Traffic Engineer 36 2.3
Traffic Engineering Assistant 0 0.0
Technician IV 73 4.6
Technician III 12 0.8
Technician II 100 6.3
Technician 1 92 5.8
Graphics Designer 24 1.5
Designer 0 0.0
Drafter 23 1.4
Project Coordinator 2 0.1
Word Processing Supervisor 28 1.8
Secretarial/Word Processing 65 4.1
Computer 2 0_1
Total 1,600 100.0
TABLE 4
TJKM BILLINGS BY FISCAL YEAR
Estimated Budget
Project Type 1986-87 1987-88 1988-89 1989-90 1990-91 1991-92
General Traffic Engineering $42,986 $46,023 $32,490 $45,761 $64,200 $50,000
Private Development Review 9,491 12,616 6,588 7,305 33,200 7,500
Capital Projects 43,377 39,364 12,882 14,493 16,500 17,000
Total $95,854 $98,003 $51,960 $67,559 $113,900 $74,500
5/29/91
TABLES
TJKM HOURLY RATE SCHEDULE
Current- Reduced Proposedb Reduced° Percentage
90-91 90-91 91-92 91-92 Increase
Principal $130 $96 $140 $103 7.3
Principal Associate 110 88 120 94 6.8
Senior Associate 100 80 110 86 7.5
Associate 95 76 105 82 8.3
Senior Traffic Engineer 90 72 100 77 6.9
Senior Transportation Engineer/Planner 90 72 100 77 6.9
Traffic Engineer 85 68 90 72 5.9
Transportation Engineer/Planner 85 68 90 72 5.9
Assistant Traffic Engineer 75 58 80 64 6.7
Traffic Engineering Assistant 60 48 65 52 8.3
Technician IV 50 40 52 42 4.0
Technician 111 43 34 45 36 4.7
Technician 11 35 28 37 30 5.7
Technician 1 20 16 22 18 10.0
Graphics Designer 60 48 65 52 8.3
Designer 50 40 55 44 10.0
Drafter 45 36 48 39 6.7
Project Coordinator 50 40 50 40 0.0
Word Processing Supervisor 46 37 48 39 4.3
Secretarial/Word Processing 44 35 46 37 4.5
Computer 30 30 30 30 0.0
Average Percentage Increase 6.1
Expert witness charges available on request.
Current TJKM rates in the City of Dublin, effective until July 1, 1991.
b These rates shall apply for capital improvement design work and private development review
as indicated in the master agreement.
These rates are a maximum of 80 percent of TJKM standard rates, and shall apply to general
traffic engineering services, excluding capital improvement design and private development
review.
A G R E E M E N T
1985 ,
This Agreement is made and entered into thisferredito as 'City" ) , and
by and between the City of Dublin hereinafter referred to as "Consultant" ) .
TJKM Transportation Consultants ,
WHEREAS, City is desirous of the services of a City Traffic Engineer and
related engineering; and
WHEREAS, Consultant is qualified to render said necessary services and
desires to serve as City Traffic Engineer to City.
NOW, THEREFORE, the parties hereto agree as follows :
I , DUTIES OF CONSULTANT
Consultant agrees to provide those engineering services that may
be required by the City of Dublin during the term of this agreement in a
prompt, professional and workmanlike manner in accordance with the
standards of the engineering profession. All work shall be completed to
the satisfaction
City may, at
followingtdu discretion,
duties :
request per
A. Administrative Duties
1. Perform the statutory responsibilities of City Traffic
Engineer.
2. Analyze the City' s traffic engineering needs and
recommend programs to the City Manager consistent with the economic
capabilities of the City.
3 . Attend meetings with City Staff, public officials ,
community leaders , developers , contractors , and the general public, as
required by the City.
4. At the discretion of the City, review and comment on
planning programs and land development projects which are not only located
within the City, but also located outside the City and which may have a
traffic impact on the City.
5 . Advise the City Manager as to engineering and
construction financing available from other governmental agencies and when
so directed, prepare -and initiate application for such fundings.
6. Recommend ordinances and regulations pertaining to
traffic engineering matters .
7. Establish working relationships and coordination with
other public agencies and private utilities involving traffic engineering
matters affecting the City.
8. Provide special engineering reports as to such related
traffic studies .
9 . Give direction to and assist City Staff -in performing
traffic studies as necessary and/or required.
+' 10. At the request of the City, recommend solutions to
street design problems .
11. Provide general engineering consultation in connection
with traffic circulation, street signs , noise impact, etc.
Page 1
M S. ,U .k Kt�z•--1� ti
h w ��
C. Development Review Duties
1 . Review proposed developments and make recommendations
pertaining to traffic engineering considerations .
2 . Review traffic engineering aspects of planning
applications .
D. Capital Projects
1 . Assist City Manager in development of a capital
improvement program that relates to traffic matters.
2 . Upon specific and separate authorization by the City,
prepare plans and specifications for traffic related capital improvement
projects. It is understood that Consultant will provide design services
for most traffic related capital improvement projects . However, the City
reserves the right to bid any project or bring in -specialists when deemed
necessary by the City or the Consultant.
A capital improvement is defined as any project in
which the construction is performed by someone other than the City forces
or the City' s designated street maintenance contractor.
II . DESIGNATION AS CITY TRAFFIC ENGINEER
For the term of this agreement, the following employee of
consultant is to be designated as City Traffic Engineer:
Chris Kinzel Registered Traffic Engineer
III. COMPENSATION
Consultant shall be compensated for work as follows :
A. The following work shall be charged at 80 percent of the
rates shown in Exhibit A:
1. General Traffic Engineering services and studies
excluding capital improvement project design.
B. The following work shall be charged at the rates shown in
Exhibit A:
1 . Capital improvement design work, which is billed on a
time and material basis . Prior to proceeding with the work, a maximum
estimated budget shall be established by City and shall not be exceeded
without approval of the City Manager.
C. The City shall not pay for the cost of commuting from the
Consultant ' s office to Dublin City Office.
Page 2
IV. COLLECTION OF FEES
All fees to be collected from any private developer, engineer, or
architect in connection with the carrying out of the functions set forth
above, if collected by engineer shall be collected in the name of the Clfv-
Engineer shall employ record keeping measures acceptable to the City.
fees are collected by the City, engineer shall review the appropriate
ordinances and fee schedules in effect by City and shall provide to the
persons designated by the City for collection of fees , the amount of such
fees to be collected.
V. INDEPENDENT CONTRACTOR STATUS
In the performance of the work undertaken pursuant to this
agreement , consultant is deemed to be an independent contractor.
Consultant ' s employees are not to be considered employees of the City of
Dublin for any purpose.
VI . ASSIGNABILITY
This agreement shall not be assignable or transferable by the
Consultant without the expressed written consent of the City Manager.
VII , OWNERSHIP OF WORK
All documents , data studies , surveys , drawings , maps and reports
furnished to the Consultant by the City, as well as reports and supportive
is contract shall be considered the
data prepared by the Consultant under th
property of the City of Dublin and upon request at the completion of the
services to be performed, they will be turned over to the City of Dublin.
VIII, PERFORMANCE OF WORK
Consultant agrees to perform work as stated in this agreement to
the satisfaction of the City.
Ix. LIABILITY COVERAGE
A. City shall not be called upon to assume any liability for
the direct payment of any salary, wage or other compensation to any person
employed by the Consultant performing services for the City.
B. Consultant firm shall hold harmless the City from damages ,
costs or expenses that may arise because of damage to property or injury to
persons received or suffered by reason of the operation of engineering firm
which may be occasioned by any negligent act or omission to act which
amounts to negligence on the part of the Consultant or any of its agents ,
officers and employees and subcontractors .
C. Consultant agrees to provide at its own expense general
liability insurance in an amount not less than $1, 000 , 000 and further name
the City as an additional insured.
Page 3
D. Consultant shall provide the City with evidence that it has
covering 500
ria000its employees and professiona
Worker's Compensation Insurance l
liability insurance in the amount o
E. Consultant shall assume liability for the wrongful or
negligent acts , errors and omissions of its officers , agents and employees
and subcontractors in regard to any functions or activity carried out by
them on behalf of the City.
X. TERM OF AGREEMENT
The term of this agreement shall be from the date first written
above until terminated.
vidin city
the firmterminate
writtenrnoticeof In the
the
engineering firm mi pro g engineering firm shall be compensated for
event of such termination, the eng_ 9
such services up to the point of termination. Such compensation for work
to the percentage of progress completed at
in progress would be prorated as
the date of termination.
If the engineering firm terminates its services to the City, it
must provide the City with written notice at least 90 dayssin adovance of
such termination. All notices to the City
City Manager
City of Dublin
6500 Dublin Boulevard, Suite 101
Dublin, CA 94568
All notices to Consultant shall be addressed to:
TJKM
4637 Chabot Drive, Suite 214
Pleasanton, CA 94568
Notices , as referred to above , shall be sent via ' stered Mail.
CITY OF D LIW/
By
Mayor
AT F
City Cle TJKM
By
Chris Kinzel
APPROVED AS/;TO FORM:
City Attorney
Page 4
EXHIBIT A
TJKM
PROPOSED HOURLY CHARGE RATES
*
1984 Rates Proposed Rates Difference
Principal $ 90 $ 98 + $ 8
Principal Associate
78 82 + $ 4
Senior Associate 74 76 + $ 2
Associate 69 72 + $ 3
Senior Traffic Engineer 65 68 + $ 3
Senior Transportation Engr 65 68 + $ 3
Traffic Engineer 55 60 + $ 5
Transportation Engineer NP 60 NC
Assistant Traffic Engineer 44 49 + $ 5
Traffic Engineering Assistant39 42 + $ 3
Technician II 34 34 0
Technician I 22 22 0
Graphics Supervisor NP 42 NC
Draftsman 29 34 + $ 5
Secretarial 32 35 + $ 3
Computer 30 30 0
Above rates include standard overhead items . Travel costs are
billed at 30 cents/mile. Outside services are billed at cost
plus 10 percent for handling.
Invoices are due and payable within 30 days. Invoices paid after
30 days will be subject to separate billings of 1 1/2 percent per
month of unpaid balance. Late charges are not included in any
agreement for maximum charges.
Expert witness charges available on request.
* Fees are reduced by 20% for General Traffic Engineering
services and studies excluding capital improvement project
design.
Effective March 1 , 1985
EXHIBIT "A"
AMENDMENT TO AGREEMENT
BETWEEN CITY OF DUBLIN AND TJKM
FOR TRAFFIC ENGINEERING SERVICES
WHEREAS, the City of Dublin (hereinafter referred to as "CITY")
and TJKM Transportation Consultants (hereinafter referred to as "CONSULTANT")
first entered into an agreement on October 14, 1985, to provide traffic
engineering services to the City of Dublin; and
WHEREAS, the fees established in Exhibit "A" of the most recent
amendment to the agreement were effective from July 1, 1989 to June 30, 1990;
and
WHEREAS , CITY wishes to continue contracting for services from
CONSULTANT; and
WHEREAS, an adjustment of fees for services rendered is desirable
by both CITY and CONSULTANT;
NOW, THEREFORE, the parties hereto agree as follows:
Section 1: Adjustment of Rates
The TJKM hourly rate schedule (Exhibit "A") shall replace the rate schedule
which was adopted by the City Council on June 27 , 1989.
The change in rates shall be effective from July 1, 1990 and shall continue
in effect until June 30, 1991, or until rescinded or amended by the City
Council according to the provisions of the agreement.
CITY OF DUBLIN
Mayor
ATTEST:
`-`City leek
TJKM TRANSPORTATION CONSULTANTS
Chris Kinzel
Date of Adoption
EXHIBIT "A" OF AMENDM'
TJKM HOURLY RATE SCHEDULE
Current- Reduced Proposedb Reduced°
89-90 89-90 90-91 90-91
Principal $120 $90 $130 $96
Principal Associate 90 72 110 88
Senior Associate 84 67 100 80
Associate 82 66 95 76
Senior Traffic Engineer 79 63 90 72
Senior Transportation Engineer/Planner 79 63 90 72
Traffic Engineer 75 60 85 68
Transportation Engineer/Planner 75 60 85 68
Assistant Traffic Engineer 65 52 73 58
Traffic Engineering Assistant 52 42 60 48
Technician IV 45 36 50 40
Technician 111 41 33 43 34
Technician 11 33 27 35 28
Technician 1 20 16 20 16
Graphics Designer 52 42 60 48
Designer 44 35 50 40
Drafter 40 32 ' 45 36
Project Coordinator 46 37 50 40
Word Processing Supervisor 43 35 46 37
Secretarial/Word Processing 41 33 44 35
Computer 30 30 30 30
Expert witness charges available on request.
Current TJKM rates in the City of Dublin, effective July 1, 1990.
b 'These rates shall apply for capital improvement design work as indicated in the
master agreement.
These rates are 80 percent of TJKM standard rates, and shall apply to General
Traffic Engineering Services and Studies, excluding capital improvement design.
RESOLUTION NO. -91
A RESOLUTION OF THE CITY COUNCIL
OF THE CITY OF DUBLIN
-----------------------
APPROVING AMENDMENT TO AGREEMENT FOR TRAFFIC ENGINEERING SERVICES
WITH TJKM TRANSPORTATION CONSULTANTS
WHEREAS, the City Council of the City of Dublin approved an
agreement for engineering services with TJKM Transportation Consultants, on
October 14, 1985; and
WHEREAS, the City of Dublin and TJKM Transportation Consultants
have agreed to amend the agreement as regards hourly rates; and
WHEREAS, a clarification of rates is needed for review of private
development applications and plans and for traffic studies relating to private
developments;
NOW, THEREFORE, BE IT RESOLVED that the City Council of the City
of Dublin does hereby approve the amendment to the agreement which is attached
hereto as Exhibit "A" .
BE IT FURTHER RESOLVED that the Mayor is authorized to execute the
amendment to the agreement.
PASSED, APPROVED, AND ADOPTED this _th day of 1991.
AYES:
NOES:
ABSENT:
Mayor
ATTEST:
City Clerk
AMENDMENT TO AGREEMENT
BETWEEN CITY OF DUBLIN AND Tj.__
FOR TRAFFIC ENGINEERING SERVICES
WHEREAS, the City of Dublin (hereinafter referred to as "CITY")
and TJKM Transportation Consultants (hereinafter referred to as "CONSULTANT")
first entered into an agreement on October 14, 1985, to provide traffic
engineering services to the City of Dublin; and
WHEREAS, the fees established in Exhibit "A" of the most recent
amendment to the agreement were effective from July 1, 1990 to June 30, 1991;
and
WHEREAS, CITY wishes to continue contracting for services from
CONSULTANT; and
WHEREAS, an adjustment of fees for services rendered is desirable
by both CITY and CONSULTANT;
NOW, THEREFORE, the parties hereto agree as follows:
Section 1: Adjustment of Rates
The TJKM hourly rate schedule (Exhibit "A") shall replace the rate schedule
which was adopted by the City Council on June 26, 1990.
The change in rates shall be effective from July 1, 1991 and shall continue
in effect until June 30, 1992, or until rescinded or amended by the City
Council according to the provisions of the agreement.
Section 2: Compensation
Section III (B) of the Agreement shall be amended to include the following:
2. Review of proposed developments and traffic studies for proposed
developments.
CITY OF DUBLIN
Mayor
ATTEST:
City Clerk
TJKM TRANSPORTATION CONSULTANTS
Chris Kinzel
Date of Adoption
" EXHIBIT "A" OF AMENDMENT
TABLE 5
TJKM HOURLY RATE SCHEDULE
Current-, Reduced Proposedb Reduced° Percentage
90-91 90-91 91-92 91-92 Increase
Principal $130 $96 $140 $103 7.3
Principal Associate 110 88 120 94 6.8
Senior Associate 100 80 110 86 7.5
Associate 95 76 105 82 8.3
Senior Traffic Engineer 90 72 100 77 6.9
Senior Transportation Engineer/Planner 90 72 100 77 6.9
Traffic Engineer 85 68 90 72 5.9
Transportation Engineer/Planner 85 68 90 72 5.9
Assistant Traffic Engineer 75 58 80 64 6.7
Traffic Engineering Assistant . 60 48 65 52 8.3
Technician N 50 40 52 42 4.0
Technician III 43 34 45 36 4.7
Technician II 35 28 37 30 5.7
Technician I 20 16 22 18 10.0
Graphics Designer 60 48 65 52 8.3
Designer 50 40 55 44 10.0
Drafter 45 36 48 39 6.7
Project Coordinator 50 40 50 40 0.0
Word Processing Supervisor 46 37 48 39 4.3
Secretarial/Word Processing 44 35 46 37 4.5
Computer 30 30 30 30 0.0
Average Percentage Increase 6.1
Expert witness charges available on request.
Current TJKM rates in the City of Dublin, effective until July 1, 1991.
b These rates shall apply for capital improvement design work and private development review
as indicated in the master agreement.
These rates are a maximum of 80 percent of TJKM standard rates, and shall apply to general
traffic engineering services, excluding capital improvement design and private development
review.