HomeMy WebLinkAboutItem 4.6 Accept Work 90-05 (2) CITY OF DUBLIN
AGENDA STATEMENT
City Council Meeting Date: January 27, 1992
SUBJECT:
Acceptance of Work - Contract 90-05 Dublin High School Stadium
Renovation
Report By Public Works Director Lee Thompson
EXHIBITS ATTACHED:
Change Order #6
RECOMMENDATION:
1)
2)
3)
Authorize approval of Change Order No. 6 for $19,454 as
the total amount of Change Orders is over the amount
which the City Manager is authorized to approve.
Accept improvements under Contract 90-05
Authorize final progress and retention payment in the
amount of $54,454 to Collishaw Construction
FINANCIAL STATEMENT:
Topo Survey
Design
OSA Design/Submittals
Inspection
Testing/OSA Inspection
Improvements
Permits
Staking
Printing/Legal
1989-90 1990-91 1991-92 TOTAL
2,366.15 0 0 2,366.15
47,066.00 0 0 47,066.00
0 30,039.65 7,210.68 37,250.33
5,150.04 30,809.65 4,051.57 40,011.26
0 11,531.72 5,661.00 17,192.72
299,246.77 450,528.34 54,454.00 804,229.11
4,980.00 250.00 1,583.00 6,813.00
1,901.70 0 0 1,901.70
2~642.60 51.50 0 2,694.10
TOTALS $363,353.26 523,210.86 72,960.25 959,524.37
BUDGET ACTUAL
Topo Survey 2,366 2,366.15
Design 47,066 47,066.00
OSA Design/Submittals 30,349 37,250.33
Inspection 39,500 40,011.26
Testing/OSA Inspection 16,900 17,192.72
Improvements 798,000 804,229.11
Permits 5,230 6,813.00
Staking 1,902 1,901.70
Printing/Legal 2~694 2,694.21
TOTAL 944,007 959,524.37
Cost Summary
City of Dublin
Dublin Unified School District
$ 667,481.06
$ 292,043.31
TOTAL $ 959,524.37
Although the total project is over budget by about $15,000, more work was done in 1990-
91 than anticipated, and the $72,960 spent in 1991-92 is $22,346 below this year's
budget of $95,306. No budget transfers are necessary.
ITEM NO. ~6 COPIES TO: Collishaw Construction
CITY CLERK
DESCRIPTION: In April of 1990, the City Council awarded Contract 90-05
Dublin High School Stadium Renovation to Collishaw Construction. The project provided
for a complete renovation of the High School football and track facility, including a
new extended football field, upgraded home and visitors' bleachers, a new lighting
system, improved field and track areas, a scorer's booth, landscaping, goal posts, and
new restroom and snack bar facilities.
In the course of construction, change orders were authorized for unforeseen
contingencies which involved changes in the existing drainage structures, additional
electrical work for the homecoming game which was held before the lighting system was
complete, a new asphalt surface around the restroom and snack bar, and repair work on
the visitors' bleachers and significant changes in the scorer's booth footing.
The project proceeded without incident until the Office of the State Architect, which
is empowered to review and approve all new school facility structures, requested that
with the exception of the pre-job approved lighting, all structural improvements be
submitted under the authority of a registered architect or structural engineer. This
requirement is in accordance with Title 24 of the California Code of Regulations.
At that point, submittals for the bleachers, the scoreboard, the goal posts, and the
scorer's booth had to be virtually re-engineered for the submittal process by a
registered architect. The OSA process of submittal, review, correction, and approval
is extremely lengthy, including changes such as the scorer's booth footing and the
existing handrails for the bleachers. The OSA also required testing at the place of
fabrication, extensive soils testing, a new site plan, and review by the State Fire
Marshall and Handicap Access Review.
Faced with these delays beyond his control, the Contractor requested and was granted a
suspension of working days on the contract. He was also paid one-half of his retention
when the project was deemed complete with the exception of the scorer's booth. Working
days were resumed when the scorer's booth fabrication was complete, and the Contractor
installed the booth and finished the punchlist corrections in November 1991.
The City's agreement with the School District is that the District provide $100,000 at
the award of contract and $97,810 plus 30% of the excess over $663,810.00. A breakdown
of these costs can be found in the Financial Statement.
Although the City's contractor has completed his work according to plan, the City has
not received a complete close-out from OSA and will still incur some charges. This has
been estimated at $4,500 and is included in the 1991-92 costs.
The City Engineer has reviewed work on the project, has found it to be complete and in
accordance with approved plans and specifications, and recommends final payment to
Collishaw Construction in the amount of $54,454.00.
- 2 -
EXHIBIT "A"
CHANGE ORDER FORM
DATE: January 8, 1992
PROJECT NAME:
PROJECT CIP #:
PROJECT FINANCE CONTROL #:
ENGINEERING CONTRACT #:
PERCENT COMPLETED:
COUNCIL-APPROVED CONTRACTOR:
APPROVED BUDGET AMOUNT :
COUNCIL-APPROVED CONTRACT AMOUNT:
Dublin Hiqh School Renovation
9582
9582
91-05
100%
Collishaw Construction
$832~711.00
$357,010.00
CHANGE AMOUNT (+/-)
CHANGE ORDER NO. 1 $ 2,050.00
CHANGE ORDER NO. 2 $ 6,120.00
CHANGE ORDER NO. 3 $ 3,085.74
CHANGE ORDER NO. 4 $ 14,273.00
CHANGE ORDER NO. 5 $ 2,635.96
CHANGE ORDER NO. 6 $ 19,454.00
CHANGE ORDER NO. 7 $ (399.59)
CHANGE ORDER NO. 8 $
CHANGE ORDER NO. 9 $
CHANGE ORDER NO. 10 $
TOTAL OF ALL CURRENT AND PRIOR CHANGE ORDERS:
$ 47,219.11
ADJUSTED CONTRACT AMOUNT:
$804,229.11
PROGRESS PAYMENTS MADE:
PAYMENT NO. 1 $150,778.80
PAYMENT NO. 2 $148~467.96
PAYMENT NO. 3 $ 91,575.00
PAYMENT NO. 4 $ 32,175.00
PAYMENT NO. 5 $ 53~046.00
PAYMENT NO. 6 $149,426.77
PAYMENT NO. 7 $ 10,980.00
PAYMENT NO. 8 $ 35~358.31
PAYMENT NO. 9 $ 37,252.35
PAYMENT NO. 10 $ 3,226.16
PAYMENT NO. 11 $ 37,488.76
PAYMENT NO. 12 $ 54,454.00
PAYMENT NO. 13
PAYMENT NO. 14 $
PAYMENT NO. 15
TOTAL PROGRESS PAYMENTS:
$804,229.11
REMAINING BALANCE ON CONTRACT:
$ 0
RECOMMENDATION:
a: act sheet
APPROVED
DENIED
~S~uper~vZis ing
Dept. Head
APPROVED
DENIED
City Manager
APPROVED
DENIED
Mayor
CITY OF DUBLIN - EXHIBIT I"
CONTRACT CHANGE ORDER NO. 6
PROJECT/ROAD: Dublin High School Renovation PAGE 1 OF 1 PAGE
FEDERAL NO.(S) N/A CONTRACT NO. 91-05
TO: Collishaw Construction, 1125 Mabury Road, San Jose
NOTE: Th~s chan~e older ;s nat effe~Jve until approved by The Chief Engineer.
EXTRA WORK AT AGREED PRICES
Increase size of footing for scorer's b0oth
as required by OSA review
Lump Sum (Including Audit)
Remove existing scorer's booth
Lump Sum
Fabricate and install handrailing to
scorer's booth as required by Code
Lump Sum
$12, 519.00
5,980.00
955.00
ESTIMATED COST:
$19,454.00
BY REASON OF THIS ORDER, THE TIME OF COMPLETION WILL BE ADJUSTED AS
FOLLOWS: N/A
SUBMITTED BY: Don Santina, PW Inspector DATE:
APPROVAL RECOMMENDED: Lee Thompson, PW Director. , ~ DATE:
APPROVED, CHIEF ENGINEER, BY: LET, PW Director,y~,~ DATE:
01/08/92
01/08/92
01/08/92
CITY OF DUBLIN - EXHIBIT "
CONTRACT CHANGE ORDER NO. 7
PROJECT/ROAD: Dublin High School Renovation PAGE 1 OF 1 PAGE
FEDERAL NO. CS) N/A CONTRACT NO. 91-05
TO: Collishaw Construction, 1125 Mabury Road, San Jose
BALANCE OF BID ITEMS
The following items were either under or over the bid quantity:
Bid Actual
#8 $15,000.00 $14,580.00
#10 1,380.00 1,400.41
BY REASON OF THIS
$420.00)
20.41
ESTIMATED COST: ($399.59)
ORDER, THE TIME OF COMPLETION WILL BE ADJUSTED AS
Ii: lhe Contractor ({ocs nol $~gn acceptance of th;s order, b~s Qt~entlon is cl~rected ~o lhe requ~remen~ .f the spe*:~f{catlons as to plo<,eding
FOLLOWS: N/A
SUBMITTED BY: Don Santina, PW Inspector DATE: 01/08/92
APPROVAL RECOMMENDED: Lee Thompson, PW Direct~rf/~ DATE: 01/08/92
APPROVED, CHIEF ENGINEER, BY: LST, PW Director~_~3 DATE: 01/08/92