Loading...
HomeMy WebLinkAboutItem 4.6 Award of Bid 92-03 (2) CITY OF DUBLIN AGENDA STATEMENT CITY COUNCIL MEETING DATE: APRIL 13, 1992 SUBJECT: Award of Bid - Contract No.92-03, Dublin Blvd. Deck Repair, Phase I (Report by Public Works Director Lee Thompson) Bridge EXHIBITS ATTACHED: 1) Resolution of Award 2) Summary of Bids RECOMMENDATION: 1) Adopt Resolution Awarding Bid to American Grouting 2) Authorize Mayor to execute agreement FINANCIAL STATEMENT: BUDGET EXPENSES: This CIP is broken into two phases: the repair of the bridge deck (1991-92); and the repair to the channel at the bridge foundations (1993-94). PHASE I Testing $ 3,200 Design 5,000 Inspection 2,000 Construction 30,300 TOTAL $40,50__0 PHASE II TOTAL $ 0 $ 3,200 12,000 17,000 3,000 5,000 179,700 210,000 $194,700 $235,200 PHASE II TOTAL $158,400 $169,004 36,300 66,196 $194,700 $235,200 BUDGET FUNDING: Gas Tax Prop 111 - Gas Tax PHASE I $10,604 29,896 TOTAL $40,50__0 LOW BID RECEIVED: ENGINEER'S ESTIMATE: CONSTRUCTION BUDGET: $12,127.00 $20,000.00 $30,300.00 ITEM NO. ~ COPIES TO: Bidders I CITY CLERK I DESCRIPTION: At its meeting of March 9, 1992, the City Council authorized Staff to advertise for bids for Contract 92-03. This project was authorized because during a periodic maintenance review, it was discovered that the concrete deck on this bridge was showing signs of wear and stress, indicated by numerous cracks developing on the deck's traffic surface and the bridge piers have been undercut from previous storm water erosion. The deck cracking has been tested by drilling circular concrete cores on the deck down to the reinforcing bars. It was found that the cracks are surface only, extending about 1 to i 1/2 inches deep. The reinforcing steel was in good condition with no corrosion. The Phase I Repair will be, then, to clean the deck surface and place a resin sealer to fill the cracks to stabilize the surface and seal the deck from moisture intrusion. The future Phase II project will backfill the channel slopes and riprap the slope surfaces to match the channel slopes upstream of this structure. The City received a total of five bids (see attached bid summary) for this project. The low bidder was American Grouting with a bid of $12,127.00. Staff has reviewed the low bidder's proposal and checked with references and the Contractor's Board for license and recommends that the city Council adopt the Resolution awarding the bid to American Grouting and authorize the Mayor to execute the Agreement. a:agstawrd RESOLUTION NO. 36-92 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF DUBLIN AWARDING CONTRACT 92-03, DUBLIN BLVD. BRIDGE DECK REPAIR, PHASE I TO AMERICAN GROUTING WHEREAS, the City of Dublin did on April 7, 1992, publicly open, examine, and declare all sealed bids for doing the work described in the approved Plans, Specifications, and Modifications for Contract 92-03 Dublin Blvd. Bridge Deck Repair, Phase I, authorized by the City Council on March 9, 1992, which Plans, Specifications, and Modifications are hereby expressly referred to for a description of said work and for all particulars relative to the proceedings under the request for bids; and WHEREAS, said bids were submitted to the City Engineer, who has reviewed the bids to determine the lowest bid which was responsive to the requirements of the bid documents; NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Dublin does hereby award Contract 92-03 to the lowest responsible bidder therefor, to wit, American Grouting, at a bid of Twelve Thousand, One Hundred Twenty-Seven Dollars and no cents ($12,127.00), the particulars of which bid are on file in the office of the City Engineer. PASSED, APPROVED AND ADOPTED this 13th day of April, 1992. AYES: NOES: Councilmembers Howard, Jeffery, Moffatt, and Mayor Snyder None ABSENT: Councilmember Burton 17/ ~ity Clerk a: \ bridge\resoawrd DUBLIN BLVD. BRIDGE DECK REPAIR - CONTRACT 92-03 BID RESULTS ENGR'S ESTIMATE AMERICAN GROUTING ITEM UNIT UNIT TOTAL UNIT TOTAL NO. DESCRIPTION MEAS QTY PRICE PRICE PRICE PRICE 1. CLEAN BRIDGE DECK SF 7,809 .15 $ 1,171.35 .20 $ 1,561.8u 2. TREAT BRIDGE DECK SF 7,809 2.05 16,008.45 1.02 7,965.18 3. TRAFFIC CONTROL LS 1 2,000.00 2,000.00 600.02 600.02 4. AIRBORNE EMISSIONS MONITOR LS 1 820.00 820.20 2,000.00 2,000.00 TOTAL: $20,000.00 $12,127.00 ASSOCIATED INDUSTRIES WEST COAST BRIDGE ITEM UNIT UNIT TOTAL UNIT TOTAL NO. DESCRIPTION MEAS QTY PRICE PRICE PRICE PRICE 1. CLEAN BRIDGE DECK SF 7,809 .25 $ 1,952.25 .20 $ 1,561.8U 2. TREAT BRIDGE DECK SF 7,809 1.05 8,199.45 1.50 11,713.50 3. TRAFFIC CONTROL LS 1 1,200.00 1,200.00 1,000.00 1,000.00 4. AIRBORNE EMISSIONS MONITOR LS 1 2,000.00 2,000.00 750.00 750.00 TOTAL: $13,351.70 $15,025.30 WESTERN WATERPROOFING ALPHA RESTORATION ITEM UNIT UNIT TOTAL UNIT TOTAL NO. DESCRIPTION MEAS QTY PRICE PRICE PRICE PRICE 1. CLEAN BRIDGE DECK SF 7,809 .45 $ 3,514.05' .40 $ 3,123.60 2. SF 7,809 1.07 8,355.63* 1.35 10,542.15 3. LS 1 1,380.00 1,380.00 5,400.00 5,400.00 4. LS 1 2,700.00 2,700.00 3,500.00 3,500.00 TREAT BRIDGE DECK TRAFFIC CONTROL AIRBORNE EMISSIONS MONITOR * Amounts adjusted after verification TOTAL: $15,949.68 $22,565.75