Loading...
HomeMy WebLinkAboutItem 4.05 Accept Work 93-06 (2) CITY OF DUBLIN AGENDA STATEMENT City Council Meeting Date= June 28, 1993 SUBJECT: Acceptance of Work - Contract 93-06, Street slurry Seal Report by: Public Works Director Lee Thompson EXHIBITS ATTACHED: None RECOMMENDATION: 1) 2) Accept improvements constructed under Contract 93-06 Authorize payment to American Asphalt in the amount of $3,608.14 (payment of retention) FINANCIAL STATEMENT: BUDGET ACTUAL COST Slurry Repair Bid (budgeted in Operating Budget) $ 45,000.00 31,889.10 $ 38,978.93 33,184.00 TOTAL (all gas tax) $ 76,889.10 $ 72,162.93 NOTE: Design and inspection are accounted for in the Engineering Operating Budget DESCRIPTION: In May 1993, the City Council awarded Contract 93-06, the Annual Slurry Seal Program, to American Asphalt. Slurry seal is a preventive maintenance technique used to prolong the life of a street. It consists of a sand/oil mixture which seals cracks and provides a ne~ uniform wearing surface. The City streets are presently on a seven-year cycle. Before streets are seal coated, oil spots are removed and asphalt failures are repaired. Streets which were slurry sealed during 1992-93 are as follows: Donlon Way Rhoda Court Rhoda Avenue West Vomac Road Peppertree Court Vomac Court Plata Way San Sabana Road Alegre Drive Mancini Court Amarillo Court Zandol Court Los Ranchitos Court Murietta Court Regio Drive Alto Way Obispo Court Barnhollow Court Wildcat Court Creekside Drive Serra Court Solana Drive Estrella Court Peppertree Road (Silvergate to Ladera) Ladera Drive (Peppertree to Amarillo) Shannon Court Castilian Court San Sabana Court Marwick Drive Marwick Court Ladera Court Luna Court Corto Court Casa Linda Court Calle Verde Road Bloomington Way (Marwick to Fenwick) Soleado Court Regio Court Santo Court Iglesia Drive The City Engineer has reviewed the work on the project and determined that it is complete and in accordance with the approved specifications. Staff reco~nends that the City Council accept the improvements and authorize payment to American Asphalt in the amount of $3,608.14, upon receipt of proper invoice. a:slurry~agstacpt ITEM NO.__~__~ COPIES TO: American Asphalt