Loading...
HomeMy WebLinkAboutItem 8.2 SwimCtrBathouseReno (2) e . .! j CITY OF DUBLIN AGENDA STATEMENT CITY COUNCIL MEETING DATE: June 28, 1993 EXHIBITS ATTACHED : Dublin swim Center Bathhouse Renovation Report by Diane Lowart, Recreation Director .~Existing floor plan . L Proposed floor plan . /irchitectural estimate of probable /construction costs SUBJECT : RECOMMENDATION ~ ~ : 1. Approve proposed floor plan 2. Authorize consultant to proceed with preparation of construction documents FINANCIAL STATEMENT The budget for this project Design Inspection Improvements Machinery & Equipment Miscellaneous TOTAL is as follows: $ 16,100 $ 9,210 $101,116 $ 2,945 $ 407 $129,778 DESCRIPTION Program are Bathhouse. Block Grant : Included in the 1992 - 97 Capital Improvement funds for the renovation of the Dublin swim Center This project will be funded by a Community Development ($86,350) and by the Park Dedication Fund ($43,428). The City has contracted with the architectural firm of LPT Architects to prepare the design and construction documents for the project. Att~ched is the proposed floor plan for the bathhouse renovation for rev~ew by the city Council. The proposed renovation addresses modifications to the building which are required under the Americans with Disabilities Act (ADA). This includes renovation of the restrooms, showers, changing areas and entrances/exits to the building. Additional work to be considered as part of the renovation includes floor resurfacing, construction of an additional office and interior painting. The preliminary cost estimate for those items required for compliance with the ADA is $41,910. The preliminary cost estimate for the additional work is $50,710. The total estimated cost for the project as currently designed is $92,620 which is within the amount budgeted for the improvements. The actual amount will be known once actual construction bids are received. The next phase of work by the Architect will include the completion of detailed construction drawings and an updated cost estimate. staff will obtain authorization from the City Council to solicit competitive bids once that phase is complete. The current project schedule proposes to have the renovation work underway shortly after the closing of the pool for the season in September. It is the recommendation of Staff that the City council authorize the consultant to proceed with preparation of the construction documents based on the proposed floor plan. ---------------------------------------------------------------------- ITEM. NO. f.~ COPIES TO: LPT Architects Parks & Recreation Commission CITY CLERK Fll~ ~ e e J EXISTING FLOOR PLAN ~ TO POOL 1/8.,,1''{)' ..... e . _";(""''''t.'H'''_tl.!~.. ..' eROpOScO FLOOR elAN ''..;'-, '\.' ~. _,--.~tfrltl", ~. ~ TO POOL 1/8"-1-0" , ~ JUN 11 '93 lb:~~ LH ~~KL~ HK~nll~~I~ ~~~r~~u~~' e . DUBUN SWIM CENTER 'I" I I DUBUN SWlM CENTER" ADA UPGRADES & OPl10NS 11..Jun-93 Dublin, California 1 ARCHIttCnJRAt ESTtMATE OF PROBABLE CONSTRUCTION COSTS Une Trade Item Cost 1 Concrete .. $2.300 2 demo cane. curbs 3 Instoll new cone curbs at new walls 4 Rouah Carpentry $1,900 5 frame new walls 6 Finish CarpentrY $9, '00 7 construct new toilet partttlons 8 wood trim at walls 9 construct new chonolno staU 10 replace wood door Jambs 11 replace buo screens 12 Doors. lhre.sholcb &: Hardware 82,600 13 replace e. thresholds wI bronze 14 instoll new lever loel<sets 15 Instoll nfNJ doors Into mens & womens 16 Ceramic: TIle $3.200 17 Install tUe at showers & restrooms 18 loth & Pfoster $300 19 repair work at the drlnklno fountain 20 Restroom accessories $400 21 lower mountino hts of exl$tlno aCCessories 22 Install two accessible soap dispensers 23 CabInetry S1,(ro 24 demo exlstlna cabInet 25 Install new cabinet and hInged counter 26 Rough plumbing $3,800 27 plumbIng for the new showers 28 plumbing for the new drinklno fountain 29 plumblnQ for accessible toilets 30 replcce e. QOS pipe unions 31 FinIsh Dlumblng $13.000 32 Install new accessible showers 33 Install new accessible drlnklno fountain 34 reploce e. toilets and urinals 35 Cleanup Be: Trash Removal $500 36 37 SUBTOTAL $38,100 38 39 CONTINGENCY 10% $3,810 40 j JUI"'1.l..L ::'..:'J .L01...}.L L...r1 I L....I"\'L...L... 111'......11.....1....._'_ ,..........- ,-~_. . . DUBUN SWIM CENTER .,. 41 42 43 44 45 46 47 48 OPTlONS 49 'SO Install slip resistant flOOMQ 51 o. Epoxy terrazzo 2200 sf x $14 = $30.800 52 b. ArmstronQ Crosswall< 2200 sf x $6 - $ 13,OCO 53 Point all spaces 8700 sf X $1 = S8.7oo , 54 New office 55 a. New walls 54, '00 56 b. New door & hardware $500 57 c. Electrical $2!XlO .. 58 59 OPTIONS SUBTOTAL $46.100 I 60 ; 61 OPnONSCONnNGENCY10% $4,610 62 63 TOTAl PROJECT COST $92.620 I The above Is an architectural estimate of the probable cost associated with the construction work, preoared by laPerle ArChitectS. Inc.. Pleosanton, CA. tt Is recognized that neither the Architect nor the OWner has control over the cost of labor, mater1als or equipment, over the contractor'S methods of determining bid prices, or over competitive biddIng, market or negotiating conditions. Accordingly, the Architect con not and does not warrant or represent that bids or negotIated priCes will not varv from any estimate of ConstructIon cost or evaluation prepared or agreed to by the Architect. I