HomeMy WebLinkAboutItem 8.1 HeritageCtrRenovatn (2)
fl.
e
e
"
CITY OF DUBLIN
AGENDA STATEMENT
CITY COUNCIL MEETING DATE: March 13, 1995
SUBJECT
Contract Change Order #2 for the Heritage Center Renovation
(prepared by: Diane Lowart, Parks & Community Services Director)
/ 1. Proposed Change Order #2
/ 2. Project Accounting Sheet
/3. Budget Change Form
(1V'
RECOMMENDATION $1rf/" Approve Change Order and Budget Change Form
FINANCIAL STATEMENT: Project Budget Design $ 22,395
Improvements
Building
Grounds
Inspection
Miscellaneous
Subtotal
EXHffiITS ATTACHED
Change Order #2
Total
$176,925
$ 7,300
$ 7,500
$ 4,130
$218,250
$ 22,925
$241,175
DESCRIPTION : On December 27, 1994 the City Council awarded Contract 94-07, the
Heritage Center Renovation, to Skyline Construction. The renovation consists mainly of seismic repair and
exterior restoration to the old S1. Raymond's Church and the original Murray Schoolhouses, along with
modifications for handicapped access. Skyline began work on the contract on January 23, 1995.
During preliminary investigation of the work to be done in the Church, and after one of the January storms, a
significant amount of water was noticed on the floor at the base of one of the support columns. Further
investigation revealed that a severe leaking problem existed in the bell tower. At that point the City's Building
Inspector conducted a thorough investigation of the tower and the belfry. It was discovered that the reason for
the leaking was that at some time in the past, the siding on the tower was removed and replaced without
waterproof paper or metal flashing. As a consequence, the ceiling in the Church has been damaged and the
structural members of the roof and support column are subject to weakening from the water deposited by winter
rains. If this situation is allowed to continue, the Church interior and structural support will be severely
compromised.
It is the recommendation of the Architect and the Building Department that the problem be corrected by
removing the existing siding from the belfry to the ground and installing waterproof paper, metal flashing and
new siding. The cost of the new siding will be reduced by use of the extra siding that has been stored in the
Church.
The estimated cost increase as submitted by Skyline Construction is $21,833.96 and 20 additional working days
are required. Given the amount of the change order and due to the fact that there are not adequate funds
available in the Heritage Center Renovation Budget, it is necessary for the City Council to approve the change
order.
Staff has reviewed the change order submitted by Skyline Construction and concurs with the cost submitted.
Staff, however, would recommend that a 5% contingency be added to the amount to allow for additional
inspection costs associated with the increased work and the additional working days. Consequently, this will
increase the cost of the Heritage Center Renovation by $22,925 to total $241,175.
It is recommended that the City Council approve Change Order #2 in the amount of $22,925 and approve the
Budget Change Form (attached). r
---------------------------------~-----------------------------------------
ITEM NO. 8.1
COPIES TO: Dreyfuss & Todd, Architects
Skyline Construction
CITY CLERK
FILE I 16101oH:?tot
_ CITY OF DUBLIN - EXHIBIT "B" e
CONTRACT CHANGE ORDER NO.-L
PROJECT/ROAD: Heritage Center Renovation
FEDERAL NO.(S):
TO: Skyline Construction, 865 Cotting Lane, #C, Vacaville, CA 95688
PAGE 1 OF 1 PAGE
CONTRACT NO. 94-07
You are hereby directed to make the herein described changes from the plans and specifications or do the following described work
not included in the plans and specifications on this contract.
NOTE: This change order is not effective until approved by the Chief Engineer.
Description of work to be done, estimate of quantities, and prices to be paid. Segregate between additional work at contract price,
agreed price and force account. Unless otherwise stated, rates for rental of equipment cover only such time as equipment is actually
used and no allowance will be made for idle time.
Change requested by:
The last percentage shown is the net accumulated increase or decrease from the original quantity in the Engineer's Estimate.
EXTRA WORK AT AGREED PRICES
Repair beIltower, including removal of siding and comer trim from belfry to ground,
installation of metal flashing and waterproof paper, and installation of new siding.
LUMP SUM:
$ 21,833.96
ESTIMATED COST INCREASE:
$ 21.833.96
BY REASON OF THIS ORDER, THE TIME OF COMPLETION WILL BE ADJUSTED AS FOLLOWS:
20 Working Days
SUBMITTED BY /DA TE
APPROVAL RECQMMENDED BY/DATE APPROVED BYIDA TE
Don Santin a, Public Works Inspector
Mehran Sepehri, Sr. Civil Engineer Lee S. Thompson, Public Works Director
We, the undersigned contractor, have given careful consideration to the change proposed and hereby agree, if this proposal is
approved, that we will provide all equipment, furnish all materials, except as may otherwise be noted above, and perform all services
necessary for the work above specified, and will accept as full payment therefor the prices shown above.
Accepted, Date -.1-.195 Contractor
By
Title
If the Contractor does not sign acceptance of this order, his attention is directed to the requirements of the specifications as to
proceeding with the ordered work and filing a written protest within the time therein specified.
e
e
EXHIBIT "A" CHANGE ORDER FORM
DATE: 317195
PROJECT NAME: Heritage Center Renovation
CIP#: 9402
CONTRACT # 94-07
PCT. COMPLETED 25%
CONTRACTOR Skyline Construction
APPROVED BUDGET AMT. $177,251.00
CONTRACT AMT. $168,500.00
CHANGE ORDER #1 $ 5,354.38
CHANGE ORDER #2 $ 21,833.96
CHANGE ORDER #3 $ -
CHANGE ORDER #4 $ -
CHANGE ORDER #5 $ -
CHANGE ORDER #6 $ -
CHANGE ORDER #7 $ -
CHANGE ORDER #8 $ -
CHANGE ORDER #9 $ -
CHANGE ORDER #10 $ -
TOTAL OF ALL CURRENT AND PRIOR CHANGE ORDERS: $ 27,188.34
ADJUSTED CONTRACT AMOUNT: $195,688.34
.
PROGRESS PAYMENTS MADE
PAYMENT #1 $ 15,277.50
PAYMENT #2 $ 10,557.00
PAYMENT #3 $ 15,609.63
PAYMENT #4 $ -
PAYMENT #5 $ -
PAYMENT #6 $ -
PAYMENT #7 $ -
PAYMENT #8 $ -
PAYMENT #9 $ -
PAYMENT #10 $ -
PAYMENT #11 $ -
PAYMENT #12 $ -
PAYMENT #13 $ -
PAYMENT #14 $ -
PAYMENT #15 $ -
TOTAL PROGRESS PAYMENTS $ 41,444.13
I
REMAINING BALANCE ON CONTRACT: $154,244.21
RECOMMENDATION: APPROVED APPROVED APPROVED
DENIED DENIED DENIED
SIGNATURE:
Supervising City Mayor
Dept Head Manager
e
e
I
,
CITY OF DUBLDl
BUDGET CHAllGE FORM
CHA1IGE FORH
...1L-
new appropriation~ budget transfer
L-.J. budget change
.L1
increase budget account
I~ r\erit~t)e.. (' enter ~"J.c;J"1'Y'
laccount II Im,raqlemetlt>
11001 - Otl-\JI -150 - 050 $~B3.6
I name rler,t~cf [qTc/ R..MOJc... t>'"n
I~nt H .(1 .5OJ..c.ne.::.- (1(15fUc.f>'m)
1200\ - q14l1/ - lot - 000 $ 1\')(10
I~
laccount II
13 $
I~
laccount II
'4 $
I~
I account II
15 $
I~
'account II
'6 $
l~
lacconnt B
17 $
I~
laccount II
18 $
TOTAL BUDGET DECREASES $
decrease budget account
~
account II
1 $
~
account It
2 $
~
account II
3 $
~
acconnt 1I
4 $
name
account II
5 $
~
acroount II
6 $
~
account II
7 $
~
account II
8 $
TOTAL BUDGET IllCREASES $ ').J., OJ J-j
REASONS, JUSTIFICATION, AND ITL~ZED COSTS:
J) III Iv kc.J>i ~ d i '" fK PoU /l>Vif 0 f f>v.... 0 I d ,S t. t.d"r"""! ~, (;hi ,vi" CJ tk<1 a ,ft cV
1M u",,/rc.U ,Jo. tfLf-{)7, tft/J(tjL U1rU~ilJwhlh, IS (liRdLd.
CITY IWIAGER
\ \
date
signature
signature
\ \
date
CITY COUllCIL