Loading...
HomeMy WebLinkAboutItem 4.10 SchaeferRnchGPA&Contrct (2) ,. e . CITY OF DUBLIN AGENDA STATEMENT CITY COUNCIL MEETING DATE: JUNE 13,1995 SUBJECT: REPORT PREPARED BY: EXHIBITS ATTACHED: P A 94-028 Schaefer Ranch General Plan Amendment EIR First Amendment to the Contract between the City of Dublin and WPM Planning Team, Inc. Tasha Huston, Associate Planner ;J ~ Exhibit 1. / Draft Resolution approving the first amendment to the Consulting Contract between the City and WPM Exhibit 2. I Contract Amendment from WPM Planning Team, Inc. Exhibit 3. / Letter from Robert Y ohai, of Schaefer Heights Inc. BACKGROUND A TT ACHMENT: Vicinity Map RECOMMENDATIOCAu tr /~ FINANCIAL STATEMENT: DESCRIPTION: 1. Adopt Resolution approving the first amendment to the contract between the City and WPM Planning Team 2. Authorize the City Manager to Execute _ the Contract after the funding has been received from the applicant The Contract amendment will not exceed $21,045. The applicant is responsible for all processing costs associated with the contract amendment. A payment method and schedule will be developed with the Applicant and the City's Finance Department. On October 24, 1994, the City Council authorized the City Manager to sign an agreement with WPM Planning Team, Inc. (WPM) to undertake the Schaefer Ranch General Plan Amendment Study. The study involves a General Plan Amendment document and Environmental Impact Report (EIR), which will include a fiscal impact analysis and traffic impact study. The original EIR scope of work schedule anticipated an approximately 7 month time frame, with a total cost not to exceed $139,150.00. As expected under the original project description, the applicants have submitted applications for a Planned Development Prezone, Annexation, and Tentative Map. A Notice of Preparation (NOP) of the project EIR was distributed in March of 1995, and several response letters have been received. The response letter from the Dougherty Regional Fire Authority raises significant issues about fire facilities on the Schaefer Ranch site. The consultant's original work scope included only a nominal budget for analysis offire protection impacts, and did not anticipate the issues raised in response to the NOP. To address these issues properly, a subcontractor specializing in fire protection impact analysis is needed. The City's EIR consultant, WPM, has obtained a proposal from Gage-Babcock and Associates, a leading consulting firm in the field offire protection. The cost for the contract amendment, to include additional analysis of fire protection facilities and services, is as follows: Gage and Babcock: WPM: $18,300. $ 2,745. (15% of subcontractor cost, for contract administration and coordination) A letter has been received (Exhibit 3) from Robert Y ohai, the Schaefer Ranch project applicant, agreeing to deposit with the city the funds for the additional analysis. Staff recommends that the City Council adopt the attached resolution approving the first amendment to the Consulting Contract between the City and WPM Planning Team, Inc. (Exhibit 1), and authorize the City Manager to execute the contract amendment with WPM Planning Team, Inc. (Exhibit 2) after the project applicants have committed the funds needed to cover the total cost of the work scope. ---------------------------------------------------------------------- ITEM NO. 4.JlJ COPIES TO: Applicants PA File Senior planner Project Planner CITY CLERK FILE ~ ........ r' ~ tI e RESOLUTION NO. A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF DUBLIN ---------------------------------------------------------------------- APPROVING FIRST AMENDMENT TO THE CONSULTING CONTRACT WITH WPM PLANNING TEAM WHEREAS, Schaefer Heights Incorporated has applied for PA 94-028 Schaefer Ranch General Plan Amendment study, requiring preparation of an Environmental Impact Report (EIR); and WHEREAS, the city Council approved Resolution No. 111-94 awarding the EIR consulting contract to WPM Planning Team, Inc.; and WHEREAS, additional specialized information on fire and emergency response services is needed in the EIR as a result of responses to the Notice of Preparation for the EIR; and WHEREAS, the applicant agrees to fund the cost for the amendment to the EIR contract for additional analysis as proposed by Gage Babcock; and WHEREAS, the Staff Report was submitted recommending that the City Council award the proposed contract to WPM Planning Team; and WHEREAS, the City Council did consider said report and recommendations. NOW, THEREFORE, BE IT RESOLVED that the city Council does hereby approve the first amendment to the consulting contract with WPM Planning Team, Inc. PASSED, APPROVED AND ADOPTED this 13th day of June, 1995. AYES: NOES: ABSENT: ABSTAIN: Mayor ATTEST: city Clerk EXHIBIT 1 e e FIRST AMENDMENT TO AGREEMENT FOR CONSULTANT SERVICES: PREPARATION OF THE SCHAEFER RANCH ENVIRONMENTAL IMPACT REPORT \VHEREAS, the CITY OF DUBLIN ("The City") and WPM PLANNING TEAM, INe. ("The Consultant") are parties to an agreement entitled "AGREEMENT FOR CONSULTANT SERVICES FOR PREPARATION OF THE SCHAEFER RANCH ENVIRONMENTAL IMPACT REPORT, dated October 24, 1994 (the "AGREEMENT"); and \VHEREAS, additional specialized information on fIre prot<<?ction and emergency response services is needed in the Environmental Impact Report (EIR) as a result of responses to the Notice of Preparation for the EIR, and \VHEREAS, The City and The Consultant desire to amend the AGREE11ENT to provide for additional services to evaluate flre protection and emergency response services in the EIR, NOW, THEREFORE, The City and The Consultant agree to amend the Contract of October 14, 1994 as follows: A. Consultant's Services. Exhibit A is amended by adding Item 8.5.1, Speciali:ed fire protection and em ergency response analysis, with revised item and total costs. B. Additional Services. Exhibit A-2 is added to the contract, with detailed scope of services for specialized fIre protection analysis. C. Compensation. Contract paragraphs 7 and 8, referring to total compensation, are 3 EXHIBIT 2 e e amended by deleting the sum of $139.150 and adding in its place the sum of $160,195. D. Schedule. Exhibit B, Time Schedule, is replaced by Exhibit B, Revised Time Schedule. E. Progress Payment Limits. Exhibit C, "Progress Payment Limits," is amended to incorporate payment for specialized fIre protection analysis. Except as expressly set forth herein, the AGREEMENT shall remain in full force and effect. IN WITNESS WHEREOF, the parties hereto have caused this First Amendment to the AGREEMENT to be executed the day and year first written below. THE CITY OF DUBLIN (a municipal corporation) A'ITEST: City Clerk By: Richard C. Ambrose City Manager Date: WPM PLANNING TEAM. JNC#~_ By: tS{td4 !(lot . L Rudolph R. Platzek, President Date: 5/~II"'s 4 e REVISED PAGES OF ORIGINAL CONTRACT e 6. Terms. Tim.' of the essence. Consultant shall be~work immediately. The work as described in Exhibi ", Scope of Work, shall be completeacording to the schedule of Exhibit B. The days allowed in Schedule B may be extended to allow additional City review time or to receive necessary materials from the applicant. 7. Compensation. For full perfonnance of the services to be rendered pursuant to this contract for time and materials, the City shall pay the Consultant a total sum not to exceed $139,150.00 $160,195.00. The City shall pay Consultant on a time and materials basis as set forth in attached Exhibit "C". Partial payment shall be made on a monthly basis in proportion to the percentage of work completed, upon receipt of Consultant's invoice and the approval of the Planning Director, in accordance with the City's schedule for processing invoices. Invoices submitted to City for payment must contain a brief description of work performed, including the work phase and task performed, the percentage of work completed in prior periods, and the percentage of work being billed in the current period. 8. Cham!es. City may request, from time to time, changes in the scope of services to be provided by Consultant. Any changes and related fees shall be mutually agreed upon between City and Consultant and shall be the subject of a written amendment to this Agreement which may be signed on behalf of City by City Manager if the change in total compensation does not exceed 5% of $139,150 $160,195.00. 9. Consultant's Status. In the perfonnance of the obligations set forth in this Agreement, Consultant shall have the status of an independent contractor and Consultant shall not be considered to be an employee of the City for any purpose. All persons working for or under the direction of Consultant 1U'e its agents, servants, and employees and are not agents, servants, or employees of City. 10. Termination for Convenience of City. The City may tenninate this Agreement at any time by mailing a notice in writing to Consultant that the Agreement is terminated. Said Agreement shall be deemed tenninated as of the date specified in the notice and no further work shall be performed by Consultant. If the Agreement is so tenninated, the Consultant shall be paid for that percentage of the work actually completed, based on a pro rata portion of the total fixed sum compensation described in Section 7 herein at the time the notice of termination is received. 11. Non-Assi2:nabilitv. The Consultant shall not assign, sublet, or transfer this Agreement or any interest or obligation therein without the prior written consent of the City, and then only upon such tenns and conditions as City may set forth in writing. 12. Indemnifv and Hold Harmless. Consultant shall defend, indemnify, and hold harmless, the City and its officers and employees from and against all claims, losses, damage, injury, and liability for damages arising from errors, omissions, negligent or wrongful acts of the Consultant in the performance of its services under this Agreement, regardless of whether the City has reviewed and/or approved the work or services which has given rise to the claim, loss, damage, injury or liability for damages. The City's acceptance of the insurance certificates required under this Agreement does not relieve the Consultant from its obligation under this paragraph. 13. Insurance. During the term of this Agreement, Consultant shall maintain in full force and effect at its own cost and expense the following insurance coverage: 1 :\930'l'-CONTRACT.SH e REVISED APPENDIX A e \\1'M I'l;uUling Te",,,. Inc. e EXHIBIT A OcIOt><,r 14. 1994 _C"i~Cd May 18. 1995 (or Contract Amendment I PROPOSAL 3: WITH STANLEY R. HOFFMAN ASSOCIATES AND TJKM SCHAEFER HEIGHTS PROJECT EIR - CEQA FINDL~GS - GPA - UNIFIED GP I GPAs SUJ\1J\1ARY SCOPE OF SERVICES AND COST ESTIMATE Te.am Member Responsibility Te.am Member Costs WPM "TM WPM Sub- Sub-- Cost """1 Planning Team Tasks Hours Rll te S tafT Consultant WPM Consultant To t.a.l EIR PREP" R" 110:'\ 0.0 Initi:lle Project 64 5140 180 5320 0.1 Scoping Mectinss . 7/1Sf.l4 - OakJ:md - 160 miles 4 !l5 PlalZek Mileage 340 40 380 . 7(.!.9f.l4 . Dublin - 140 miles 4 !l5 Platzek Mileage 340 35 375 . !I/lO;'94 . Dublin - 140 miles 4 !IS Platzek Mileage 340 35 375 . 9M4 - Dublin - 140 miles 4 85 Platzek Mileage 340 35 375 . COlYUnunity Meeting - 140 miles !I !IS Platzek Mileage 680 35 715 0.2 Prepare Dr~tlnitiaJ Study . Review Program EIR 4 85 Platzek - - 340 - + 340 . Prepare Sec. 5162 Checklist 2 85 Platzek - - 170 . + 170 . Prepare Checklist EV:llualion 4 85 Platzek - - 340 - - 340 . Consultation - City - Proponent 2 !IS PlalZek - - 170 - - 170 . Word Processing 6 35 Fait - - 210 - - 210 0.3 Prepare Work Scopc/ProPOS:ll 18 !l5 Platzek - - 1530 - - 1530 0.4 Prcparc/Execute Contract 4 85 Platzek - - 340 - - 340 1.0 Chap. 1: Intro. and Project Description 34 1990 195 2185 1.1 Introduction 2 75 Dahlin - - 150 - - 150 1.2 Project Description . Site and Vicinity Characteristics 1 75 Dahlin - - 75 - - 75 . Proposed Development 0.5 75 Dahlin - - 37.50 + - 37.50 . Housing and Lot Characteristics 0.5 75 Dahlin - . 37.50 - - 37.50 . Project Objectives/Actions 1 75 Dahlin - - 75 . . 75 . ConstraintslOpporruni ties 1 75 Dahlin - . 75 - - 75 1.3 Graphics: Setups. 7 Figures . City Selling 2 55 Schilling Repro 110 15 125 I :\9309\9309-S84 . Octnber 14. 1994 Rc\'i.cd May 1 R. 1995 fC1r ennt met Amend",elll I e EXHIBIT A e WPM Planning Tel\m. Inc. Continued PROPOSAL 3: \Vith Stanley R. Hoffman Associates and T1KM SCHAEFER HEIGHTS PROJECT EIR - CEQA FINDINGS - GPA - UNIFIED GP I GPAs ~llJ\1J\1ARY ~COPE OF ~ERVICE~ AND CO~T E~TIMATE Team Member Responsibility Team Member Costs WPM WPM WPM Sulr Sub- Cost WPM Planning Team Tasks Hours Rate S tafT Consultant WPM Consultant Total . Site and Vicinity 2 55 Se;hilling Repro 110 15 125 . Site; Feature Names 2 55 Se;hiIling Repro 110 30 14D . Site Plan 2 55 Schilling Repro 110 15 125 . Land Use Plan 8 55 Schilling Repro 440 15 455 . Prelim. Tenl..:ltive Map 2 55 Schilling Repro 110 15 125 . Aerial Photo 2 55 Schilling Repro 110 30 140 . Slope Analysis 4 55 Schilling Repro 220 30 2..50 . Selected Site Constraints . 4 55 Se;hilling Repro 220 30 250 2.0 Chap.2; Summary 15 1125 - . 1125 2.1 Lnpacts and Mitigations MatJix 12 75 Dahlin - . 900 - - 900 2.2 Alternatives 2 75 Dahlin - - 150 - - 150 2.3 Controversies/lssues to Resolve 1 75 Dahlin - - 75 . - 75 3.0 Chap_ 3: Socioeconomic EffecLo;/Fiscal1 17 1275 27,3501 28,6251 3.1 Selling . Population 1 75 Dahlin Cone 75 520 595 . Employment 1 75 Dahlin Cone 75 130 205 . Retail Sales 1 75 Dahlin Cone 75 130 205 . Assessed Valuation 1 75 Dahlin Cone 75 130 205 . Housing Characteristics 1 75 Dahlin Cone 75 350 425 . lobslHousing Balance 1 75 Dahlin Cone 75 130 205 3.2 Impacts and Mitigation Measures . Corrununity Scx:iocconomic Effects I 75 Dahlin Cone 75 2080 2155 . Population Growth 1 75 Dahlin Cone 75 520 595 . Housing Stock 1 75 Dahlin Cone 75 350 425 . Affordable Housing 1 75 . Dahlin Cone 75 350 425 . Employment 1 75 Dahlin Cone 75 130 205 . lobslHousing Balance 1 75 Dahlin Cone 75 130 205 . Sales Tax Revenues 0.5 75 Dahlin Cone 37.50 130 167 50 2 I :\9309\9309-I'B4 .....1'M I'la,u\;ng Team. Inc. e EXHIBIT A Q,;lnbcr 14, 1994 eRc\';~cdM.Y 18,1995 fnrC<;>nll"3ct Amendment 1 - Continued PROPOSAL 3: \Vith Stanley R. Hoffman Associates and TJKM SCHAEFER HEIGHTS PROJECT EIR _ CEQA FINDINGS - GPA - UNIFIED GP I GPAs SlIMJ\1ARY SCOPE OF SERVICES AND COST ESTIMATE Team Member Responsibility Team Member Costs WPM WPM WPM Sub- Sub- Cost WPM Planning Team Tasks Hours Rate Staff Consultant WPM Consultant Total . Property Tv; Revenues 0.5 75 Dahlin Cone 37.50 130 167 .50 . Competitive Commerciallmpac.:LS 2 75 Dahlin Cone 150 1040 1190 3.3 Fisc.:a.\ Sludyl 2 75 Dahlin Hoffman 150 21.1001 21.2501 ~.O Chap.~: Land Use and Planning 70 5050 180 5 2..'\0 4.1 Sc.:ning . Existing Land Use 4 85 Pla12ck - - 340 - - 340 . Property O....l1erships 2 85 Platzck - - 170 - - 170 ~.2 LnpacLS and Mitigation Mcasu..:s .. . ConsiSlency .....ith Adopted Plans 8 85 Platzek - - 680 - + 680 . Sphere/Anncxation Issues 4 85 Pla12ck - + 340 - - 340 . Land Use Compatibility 2 85 PI atzck - - 170 - - 170 . Agricultural Resources 4 85 Pla12ck - - 340 - - 340 . Open Space 8 85 Platzck + - 680 - - 680 . Regional Trail Corridor 8 85 Platzck . - 680 - - 680 4.3 Graphics: Serups + 11 Figures . Existing Land Use 3 55 Schilling Repro 165 15 180 . Ownership PallemS 3 55 Schlling Repro 165 15 180 . Sub-Regional Selling 1 55 Schilling Rcpro 55 15 70 . Dublin General Plan 3 55 Schilling Repro 165 15 180 . We:>lem Extended Planning Area 3 55 Schilling Repro 165 15 180 . Spheres of lnIluenee 3 55 Sc.:hilling Repro 165 15 180 . Agriculrural Suitability 3 55 Sc.:hilling Rcpro 165 15 180 . Williamson Acl Land 3 55 Schilling Repro 165 15 180 . Urban/Ag Relationships 3 55 Schilling Rcpro 165 30 195 . Open Space Plan 4 55 Schilling Repro 220 15 235 . Region! Trail Syslem 1 55 Schilling Repro 55 15 70 3 1 :\9309\9309-I'\B4 WPM Planning Team. Inc. Oclohcr 14. 1994 Rc"i.cd May 18, 1995 for Conl...a Amendmcnl 1 e EXHIBIT A e Continued PROPOSAL 3: With Stanley R. Hoffman Associates and TJKM SCHAEFER HEIGHTS PROJECT EIR - CEQA FINDINGS - GPA - UNIFIED GP I GPAs SllMMARY SCOPE OF SERVICES AND COST ESTIMATE Te.::lm Member Responsibility Te.::lm Member Costs WPM WPM WPM Sub- Sub- Cost WPM Planning Te.::lm Tasks Hours Rale Staff Consultant WPM Consultant Total 5.0 Chap.5: Traffic and Circulation" 47 2905 17,495" 20,400" 5.1 Sclling . Project Iniliation ! 1 75 Dahlin TJKM 75 6502 7252 . Data Collection & ExisL Conditions 2 1 75 Dahlin TlKM 75 9f1:P 1035" . Travel Demand Forecast! 2 75 Dahlin TJKM 150 19202 20702 5.2 LnpaclS and Mitigation M~urcs Future LnpaclS and Mitisalions2 12 75 D:lhlin TJKM 900 , 69cxr . ffXXY , 46302 4630: . Traffie Study Report- . - - - - - TJKM - - -. . TVTM Model Runs (2 @ S 1 000/ - - - - - - TJK.M - - 30002 30ClCl'" . Reproduction" - - - - - - TJK.M - - 200" 2cxr 5.3 Graphics: Setups - 10 Figures . Road.....ay System 3 55 Schilling Repro 165 15 180 . BikefTrail System 2 55 Schilling Repro 110 15 125 . Project Trip Distrihution 4 55 Schiling Rcpro 220 15 235 . ADT - Proj~t 4 55 Schilling Repro 220 15 235 . ADT - Cumulative 4 55 Schilling Repro 220 15 235 . Peak Hour - Projcct 4 55 Schilling Repro 220 15 235 . Peak Hour - Cumulative 4 55 Schilling Repro 220 15 235 . Geometries. Project 3 55 Schilling Repro 165 15 180 . Geometries. Cumulative 3 55 Schilling Repro 165 15 180 6.0 Chap.6: Visual and Site Design 43 2905 7465 10,370 6.1 Selling . Visual Conte:l.l!Features 8 75 Dahlin miles/photos 600 50 650 . Methodology 1 75 Dahlin - - 75 - . 75 6.2 Impacts and Mitigation Mea.~ures . Significance Criteria 1 75 Dahlin . - 75 - . 75 . Alteration of Landscape Character 1 75 Dahlin . . 75 - . 75 . Grading 8 75 Dahlin - - 600 . - 600 4 1:\930'1\9309- NB4 \\1'M I'I:Uloiog Team. loc. e EXHIBIT A Oclober 14. 1994. ~e"i~ed May 1 S. 1995 for Cooll1lct Ameodmeot I Continued PROPOSAL 3: \Vith Stanley R. Hoffman Associates and TJKM SCHAEFER HEIGHTS PROJECT EIR _ CEQA FINDINGS - GPA - UNIFIED GP I GPAs SUMMARY SCOPE OF SERVICES AND COST ESTIMATE Team Member Responsibility Team Member Costs WPM WPM WPM $ulr Sub- Cost WPM Planning Team Tasks Hours Rate Staff Consulmnt WPM Consultnnt Total . Tree Removal 4 75 Dahlin . - 300 - - 300 . Fencing I 75 Dahlin - . 75 - - 75 . Light and Glare 1 75 Dahlin - - 75 - - 75 . Energy Conservation 2 75 Dahlin - - 150 - - 150 6.3 Graphics: Setups. 11 Figures . Visual Features 2 55 Schilling Rcpro 110 30 140 . Offsite Visual Sensitivity 3 55 Schilling Rcpro 165 30 195 . Vie....-points 3 55 Schilling Rcpro 165 15 ISO . Design Impact Areas 3 55 Schilling Repro 165 30 195 . Sclected Mitigation Measures 3 55 Schilling Repro 165 30 195 . View of Site: Rodeo Park 1 55 Schilling CADP 55 3640 3695 . View of Site: 1-51'0 I 55 Schilling CADP 55 3640 3695 7.0 Chap.7: Vegetlltion and Wildlife 19 1225 4605 5830 7.1 Selling . Plant/Animal Conunuruties 1 75 Dahlin McGinnis 75 440 515 . End:mgercd/TIlrcatened Species 2 75 Dahlin McGinnis 150 440 590 7.2 Impacts and Mitigation Measures . Signific;ance Criteria 0.5 75 Dahlin McGinnis 37.50 100 137.50 . Grassland 0.5 75 Dahlin McGinnis 37.50 440 477.50 . Northern Coastal Scrub 0.5 75 Dahlin McGinnis 3750 440 477 .50 . Coast Live Oak Woodland 0.5 75 Dahlin McGinnis 37.50 440 477.50 . Riparian/Stream 0.5 75 Dahlin McGinnis 37.50 440 477 .50 . Aquatic Biomes 1 75 Dahlin McGinnis 75 440 515 . Wildlife CorridorslHabitJts 1 75 Dahlin McGinnis 75 440 515 . Domestic Plants and Animals 0.5 75 Dahlin McGinnis 37.50 220 257.50 . EndaJ'lgeredfThreatened Species 1 75 Dahlin McGinnis 75 660 735 7.3 Graphics: Setups' 4 Figures . Plant/Animal Communities 3 55 Schilling Repro 165 30 195 5 I :\9309\9309-I\B4 Ocl~hcr 14. 1994 R~,'i>cd May 18.1995 (NConlrad Amcndlll~nll WI'M Planning T~am. Inc. e EXHIB IT A e Continued PROPOSAL 3: \Vith Stanley R. Hoffman Associates and TJKM SCHAEFER HEIGHTS PROJECT EIR ~ CEQA FINDINGS - GPA ~ UNIFIED GP / GPAs SlIMMARY SCOPE OF SERVICES AND COST ESTIMATE T~m Member Responsibilit). Te:lm Member Costs WPM WPM WPM Sub- Sub~ . Cost WPM Planning Team Tasks Hours Rate S tnff Consultant WPM Consultant Total . Str= Channel Alterations 3 55 Schilling Repro 165 30 195 . Areas of Vegetation Removal 3 55 Schilling Repro 165 30 195 . Typical Reconstructed Pond 1 55 Schilling Repro 55 15 70 8.0 Chap.8: Public Facilities and Ser\'ices 41 5700 *" 24,3306W(l 30,030 &9&5 8.\ Domestic Water Supply . Selling 1 75 Dahlin Greiner 75 1000 1075 . Impacts and Mitigation Measures 1 75 Dahlin Greiner 75 2000 2075 8.2 Wa.$tewater .. . Selling I 75 Dahlin Greiner 75 1000 1075 . Impacts and Mitigation Measures 1 75 Dahlin Greiner 75 2000 2075 8.3 Solid Wa.ste . Selling 1 75 Dahlin - - 75 - - 75 . Impacts and Mitigation Measures 2 75 Dahlin - - 150 - - 150 8,4 Police Protection . Selling 2 75 Dahlin . - 150 . - 150 . Impacts and Mitigation Measures :2 75 Dahlin - - 150 - - 150 8.5 Fire Protection . Seuing 2 75 Dahlin - - 150 - - 150 . Impacts and Mitigation Mea.surcs 2 75 Dahlin - - 150 . - 150 8S.1 Speciali;edflre protection and emcr- LS LS Dahlin Gage - 2745 18300 21.045 se1'lC)' response analysis Babcock 8.6 Parks and Recreation . Selling 2 75 Dahlin - - 150 - - 150 . Impacts and Mitigation Measures 2 75 Dahlin - . 150 - - 150 8.7 Open Space . Selling 2 75 Dahlin . - 150 - . 150 . Impacts and Mitigation Measures 2 75 Dahlin - - 150 . . 150 8.8 Regional Trail . Seuing 1 75 Dahlin . - 75 . . 75 6 I :\930C1\9309-NB4 .....1"M I'lanning Tcam. Inc. _ EXHIBIT A Oclober 14. 1994 _RcViSCd May 18. 1995 ror Conlr1lCI Amendmcnt 1 Continued PROPOSAL 3: \Vith Stanley R. Hoffman Associates and TJKM SCHAEFER HEIGHTS PROJECT EIR _ CEQA FINDINGS - GPA - UNIFIED GP I GPAs SllMMARY SCOPE OF SERVICES AND COST ESTIMATE Team Member Responsibility Team Member Costs WPM WPM. WPM Sub- Sub- Cost 'WPM Planning Team Tasks Hours Rate Staff Consultant WPM Consultant Total . Impacts and Mitigation Mea.sures 2 75 Dahlin - - 150 - - 150 8.9 Schools . Setting 3 75 Dahlin - - 225 - - 225 . Impacts and Mitigation Measures 3 75 Dahlin . - 225 - - 225 8.10 Other Services . Setting I 75 Dahlin - . 75 - - 75 . Impacts and Mitigation Measures 2 75 Dahlin - - 150 - . 150 8.11 Graphics: Setups - 2 Figures .. . Water Supply Plan 3 55 Schilling Repro 165 15 180 . Wastewater Plan 3 55 Schilling Repro 165 15 180 9.0 Chap.9: H)'drolog)'1Water Qualit}. 10 630 3030 3660 9.1 Drainage . Selling I 75 Dahlin Greiner 75 500 575 . Impacts and Mitigation Measures 1 75 Dahlin Greiner 75 1000 1075 9.2 Water QualilY . Setting I 75 Dahlin Greiner 75 500 575 . Impacts and Mitigation Measures 1 75 Dahlin Greiner 75 1000 1075 9.3 Graphics: Setups - 2 Figures . Watershcd/Drainage Patterns 3 55 Schilling Repro 165 15 180 . Stonn Drainage Plan 3 55 Schilling Repro 165 15 180 10.0 Chnp. 10: Geology, Soils and Grading 21 1315 3665 4980 10.1 Setting . Sile Conditions I 75 Dahlin HOC 75 350 425 . Proposed Grading 2 75 Dahlin HOC 150 350 500 10.2 Impacts and Mitigation Measures . Significance Criteria 0.5 75 Dahlin BOC 3750 350 38750 . Mass Grading 1 75 Dahlin BOC 75 350 425 . Slope Stability 1 75 Dahlin HOC 75 350 425 7 1 :\9309\9309-I'B4 Ocloocr 14.1994 R~vj.cd lvby 18. 1995 for COlllraCl. ^m~llwn~1l1 t e EXHIBIT A e WPM Planning T~am. In~. Continued PROPOSAL 3: \Vith Stanley R. Hoffman Associates and TJKM SCHAEFER HEIGHTS PROJECT EIR - CEQA FINDINGS - GPA - UNIFIED GP I GPAs SUMMARY SCOPE OF SERVICES AND COST ESTIMATE Team Member Responsibility Team Member Costs WPM WPM WPM Sub- Sub- Cost WPM Planning Team Tasks Hours Rale Staff Consultant "l'M Consultant Total . Erosion 0.5 75 Dahlin BGC 3750 350 38750 . Fill Seulement 0.5 75 Dahlin BGC 3750 350 38750 . Expansive/Corrosive Soil 0.5 75 Dahlin BGC 3750 350 387.50 . Seismic H=d 0.5 75 Dahlin BGC 37.50 350 387.50 . Excavation 0.5 75 Dahlin BGC 37.50 350 38750 10.3 Graphics: Setups - 7 Figures . Area Geologic Map 2 55 Schilling Repro 110 30 140 . R~gional Faull/Seismicity Map - I 55 Schilling Repro 55 15 70 . Prelim. Geologic Map 2 55 Schillng R~pro 110 30 140 . Landslide Hazards 2 55 Schilling Repro 110 30 140 . Other Geologic Constraints 2 55 Schilling Repro 110 30 J4(1 . Grading Plan 3 55 Schilling Repro 165 15 180 . Landslide Mitigation Measures I 55 Schilling Repro 55 15 70 11.0 Soi.~e3 11 685 60 745 11.1 Setting . Noise Context3 0.5 75 Dahlin - - 37.503 - - 37.sri . Noise Levels3 0.5 75 Dahlin - - 37.503 - - 37.sri 11.2 Impacts and Mitigation Measures . Significance Criteria3 0.5 75 Dahlin - . 37.503 . - 375ri . Construction Noise3 0.5 75 Dahlin - - 37.503 - - 37.5a' . Highway and Street Noise3 2 75 Dahlin - - 1503 - - 15cr 11.3 Graphics: Setups. 2 Figures . Existing Noise Conditions 4 55 Schilling Repro 220 30 250 . Year 201 0 Noise 3 55 Schilling Repro 165 30 195 12.0 Air Quality 6 450 2100 2550 12.1 Selling . Regulations 1 75 Dahlin Pollack 75 100 175 . Existing Conditions 1 75 Dahlin Pollack 75 300 375 8 1:\930'1\9309-1\84 e EXHIBIT A OClober 14. 1994 _CVi'Cd May Ill. 1995 forConl",cl Amendment I \\1'M Planning Team. Inc. Continued PROPOSAL 3: \Vith Stanley R. Hoffman Associates and TJKM SCHAEFER HEIG HTS PROJECT EIR - CEQA FINDINGS - GPA . UNIFIED GP / GPAs SUMMARY SCOPE OF SERVICES AND COST ESTIMATE Team Member Responsibilit). Team Member Costs WPM WPM WPl\1 Sub- Sub- Cost WPM Planning Team Tasks Hours Rate Staff Consultant WPM Consultant Total 12.2 Impacts and Mitigation Measures . Significance Crileria 0.5 75 Dahlin Pollack 37.50 100 137.50 . Particulates 0.5 75 Dahlin - . 37.50 . - 37.50 . Construction Emissions 0.5 75 Dahlin - - 37.50 - . 37.50 . Regional Owne Emissions 0.5 75 Dahlin Pollac:k 37.50 1200 1237.50 . CO Emissions 0.5 75 Dahlin Pollac:k 37.50 400 437.50 . Wood Buming Emissions 0.5 I 75 Dahlin - - 37.50 - - 37.50 . Global Warming I 75 Dahlin - - 75 - . 75 13.0 Enef1:), Resources 5 375 . . 375 13.1 SC:lling3 1 75 Dahlin - - 753 - - 753 13.2 Impacls and Mitigation Mea..<ures3 4 75 Dahlin - - 3003 - - 3003 14.0 Cultural Resources3 5 3353 30 3653 14.1 Selling 3 1 75 Dahlin 753 753 - - - - 14.2 Impacts and Mitigation Mea.<un:s3 2 75 Dahlin - - 1503 - - 1503 14.3 Graphics: Setups - 1 Figure . Cultural Resource Locations3 2 55 Sc:hilling Repro 1103 30 14& 15.0 Other Environmenbl Issues 5 375 - - 375 15.1 Hazardous Materials3 . Selling3 1 75 Dahlin - - 753 - - 753 . Impacls and Mitigation Measures3 2 75 Dahlin . - 1503 . - 15o-l 15.2 Other Potential Issues . Selling 1 75 Dahlin - - 75 - - 75 . Impacls and Mitigation Measures 1 75 Dahlin - - 75 - - 75 16.0 Other Legal Requirements 6 450 - . 450 16.1 Unavoidable Significant Effects 1 75 Dahlin - - 75 - - 75 16.2 Short-Tenn Use,lLong-Tenn Productivity 1 75 Dahlin - - 75 - - 75 16.3 Significant Irreversible 'Effects 1 75 Dahlin - - 75 - - 75 16.4 Growth-Inducement 9 1:\9309\9309-1\64 Odohcr 14.1994 Re,';<cJ May IR. 1995 for Contract Amen..!lllcnl 1 e WPM Pl:Illning TC:llll. Inc. EXHIBIT A e Continued PROPOSAL 3; \Vith Stanley R. Hoffman Associates and TJKM SCHAEFER HEIGHTS PROJECT EIR - CEQA FINDINGS - GPA - UNIFIED GP I GPAs SIIMMARY SCOPE OF SERVICES AND COST ESTIMATE Team Member Responsibility Team Member Costs WPM WPM WPM Sub- Sub- Cost WPM Planning Team Tasks Hours Rate S t.aJT Consultant 'WPM Consultant Total . Indirect 1 75 Dahlin . . 75 . . 75 . Expansion of Facilities 0.5 75 Dahlin . . 37.50 . - 37.50 . Improved Access 0.5 75 Dahlin . . 37.50 . . 37.50 . Other Potential Effects 1 75 Dahlin . . 75 - . 75 17.0 Alternath'es 53 4195 1590 5785 17.1 No-Projcct Ahemative I 75 Dahlin . - 75 - . 75 17.2 Rural Residential Alternativc 4 75 Dahlin - - 300 - - 300 17.3 Mitigated Plan Alternative .. . Prepare Concept Plan 24 75 Dahlin Team 1800 1500 3300 . Forward to City/Proponcnt 1 75 Dahlin CopicslUPS 75 30 105 . Allend Staff/Proponent Mceting 8 75 Dahlin . . 600 . . 60Cl . Prepare Rcvised Concept Plan 8 75 Dahlin . . 600 . - 60Cl 17.4 Off-Site Alternative 3 75 Dahlin - - 225 - . 225 17.5 Evaluation of Alternatives 2 75 Dahlin - . 150 . . 150 17.6 Envirorunentally Superior Allernatives 1 75 Dahlin - . 75 - - 75 17.7 Alternatives Not Considered 1 75 Dahlin . . 75 . . 75 17.8 Graphics: Setups. 2 Figures . Rural Residential Alternative 2 55 Schilling Repro 110 30 140 . Mitigated Plan Alternative 2 55 Schilling Repro 110 30 140 18.0 Cumulative Impacts 23 1645 30 1675 18.1 Cwnulative Projects 2 75 Dahlin . . 150 . . 150 18.2 Impacts and Mitigation Measures . Cumulative Traffic 1 75 Dahlin . . 75 . . 75 . Cwnulative Water Supply 6 75 Dahlin . . 450 . . 450 . Cumulative Wastewater 4 75 Dahlin . . 300 - . 300 . Cwnulative Public Service 2 75 Dahlin . - 150 - . 150 . Cwnulative Air Quality 2 75 Dahlin - - 150 - - 150 . Cwnulative: Other Issues 2 75 Dahlin - . 150 . . 150 10 I :\9309\9309-NB4 e EXHIBIT A October 14. 1994 _e\'i~ed May 18. 1995 for Contract Amcndment I WPM !'lanning TC3lll. Inc. Continued PROPOSAL 3: \Vith Stanley R. Hoffman Associates and TJKl\1 SCHAEFER HEIGHTS PROJECT EIR - CEQA FINDINGS - GPA - UNIFIED GP I GPAs SllMMARY SCOPE OF SERVICES AND COST ESTIMATE Te:1m Member Responsibility Te:1m Member Costs WPM WPM WPM Sub-- Sub. Cost WPM Planning Te:1m Tasks Hours Rate S tafT Consultant 'WPM Consultant Total 18.3 Graphics: $ctups - 2 Figures . Cumulative Sites 3 55 Schilling Repro 165 15 180 . Tri. Valley Traffic Zones I 55 Schilling Repro 55 15 70 19.0 :'.liti:;ation :'.lonitoring 33 2155 . - 2155 19.1 MiL Monitoring Rccommendations 24 75 Dahlin . . 1800 . . lSOO 19.2 Master Mitigation Measures Lisl I 75 Dahlin . . 75 . . 75 19.3 Word Processing 8 35 Fait . . 280 - . 280 20.0 ADEIR - DEIR Prep:lr.llion 84 3900 . . 3900 .- 20.1 Synthesis and Editing: ADEIR 24 75 Dahlin . . 1800 - - 1800 20.2 Word Processing . ADEIR Document 48 35 Foit . - 1680 - . 1680 . ADEIR Revisions \2 35 Foit . . 420 - . 420 21.0 ADEIR - OEIR Printing 28 1080 2665 3745 2 J.J ADEIR Printing . City:15 copies @ $2S each 2 35 Foit Printer 70 375 445 . Proponent.: 4 copies @ $25 each I 35 Foit Printer 35 100 135 . Binding and Delivery 3 35 Foit UPS 105 15 \20 21.2 DEIR Printing . Offset Printing - 7 Figures 5 55 Schilling Prin tet 275 390 665 . City: 60 copies @ $25 each 4 35 Fait Printet 140 1500 1640 . Proponent.: 10 copies @ $25 each I 35 Foit Prill ter 35 250 285 . Binding and Delivery 12 35 Foit UPS 420 35 455 22.0 AOEIR - OEIR Meetings 40 3000 245 3245 22.1 2 Staff Meetings (280 miles) 8 75 Dahlin Mileage 600 70 670 22.2 3 Public Meetings (420 miles) 24 75 Dahlin Mileage 1800 105 1905 22.3 2 Other Meetings (280 miles) 8 75 Dahlin Mileage 600 70 670 23.0 Response to Comments: OEIR4 Nolincludel Dahlin Team SOl in~ludcd 4 Not includcl Not includcl 11 1 :\9309\9309.:>:84 O~lobcr 14. 1994 Rc\'j",J May 18. 1995 for COllin'" AlllcnJmcll1 1 WPM PI:IIlninj: Tcalll. Inc. e EXHIBIT A e Continued PROPOSAL 3: \Vith Stanley R, Hoffman Associates and TJKM SCHAEFER HEIGHTS PROJECT EIR - CEQA FINDINGS - GPA - UNIFIED GP I GPAs SllMMARY SCOPE OF SERVICES AND COST ESTIMATE Team Member Responsibility Team Member Costs WPM WPM WPM Sub- Sub. Cost "l'M Planning Team Tasks Hours Rate Staff Consultant WPM Consultant Total 2..1.0 FEIR Preporotion 4S USO - - USO 24.1 Revisions to DElR 20 75 Dahlin - - 1500 - - 1500 24.2 Word Processing . Response to Comments 24 35 Foit . - 840 - . 840 . Revisions to DElR 4 35 Foit - - 140 - - 140 25.0 FEIR Printing 22 870 2075 29..15 25.1 FEIR . Offsel Printing - 7 Figures .. 5 S5 Schillin Printer 275 390 665 . City: 60 copies @ $25 c.:lch 4 35 Foit Prin ter 140 1500 1640 . Proponent: 6 copies @ $15 each I 35 Fait Prinler 35 150 185 . Binding and Delivery 11 35 Foit UPS 420 35 455 St.:llTOTAL: EIR 750 5/ .155 97.190 148,545 4S;&Hl .:t&;99Q 127,:99 rFCH mOI'\GS PRFPAR.\TIO\; 26.0 CEQA Findings Document 60 3780 25 3805 26.1 Findings of Fact - Impacts 16 75 Dahlin - - 1200 - . 1100 16.2 Findings of Fact. Alternatives 4 75 Dahlin . . 300 - - 300 26.3 Findings of Fact -Growth Inducement 4 75 Dahlin - - 300 - - 300 26.4 Statement of Overriding Considerations 4 75 Dahlin - - 300 - - 300 26.5 Word Processing 8 35 Fait - - 180 - . 180 26.6 Print Draft Findings Docwnent . City: 6 copies @ $8 each 1 35 Fait Printer 35 . - 35 . Proponent: 6 copies @ 58 each I 35 Fait Prin ter 35 - - 35 . Binding and Dc:livery 1 35 Fait UPS 70 10 80 26.7 Phone Review w/ City Allorney 8 75 Dahlin - - 600 - . 600 16.8 Revise Draft Findings Document 6 75 Dahlin - - 450 - . 450 16.9 Print Final Findings Document . City: 20 copies @ 58 each 1 2 35 Fait Prin ter 70 . - 70 12 I :\9309\9309-NB4 e EXHIBIT A Octoher 14. 1994 _~"i'~d May I R. 1995 for CO"I...~1 ^1lI~f1Jm~"1 I V,1'1'1 I'lalu.ing T~am. Inc. Continued PROPOSAL 3: \Vith Stanley R. Hoffman Associates and TJK.M SCHAEFER HEIGHTS PROJECT EIR - CEQA FINDINGS - GPA - UNIFIED GP I GPAs SlIMMARY SCOPE OF SERVICES AND COST ESTIMATE Team Member Responsibility Team Member Costs WPM WPM WPM Sub- Sub- Cost WPM Planning Team Tasks Hours R:lle Sl:lff Consultant WPM Consultant To t.aJ . Proponent.: 4 copies @ $8 each 1 35 Foit Printer 35 - - 35 . Binding andDdivery 3 35 Foit UPS 105 15 120 GE"FR .\1. PI..\ "-: .\ \fE'iD\fF\T PR FP.\R.\ 110'11 27.0 Sch:lefer Heights GPA Document 77 4,355 no 5,075 27.1 GP/GPA Polic)' Issues 8 75 Dahlin - - 600 - - fOO 27.2 GP/GPA Text Changes 8 75 Dahin ~ . 600 . . fOO 27.3 GPA Graphics: Setups. 3 Figures . W. Plan Arl'3 L.U./Circ. Map 8 55 Schilling Rcpro 440 30 470 ." . GP btended Plan Area ~bp I 55 Schilling Repro 55 15 70 . Development Potential I 55 Schilling Repro 55 15 70 . Constraints Map I 55 Schilling Repro 55 15 70 27.4 Consultations w/ City Attorney 8 75 Dahlin . . 600 - - fOO 27.5 Revise GPA - ifnccdcd 8 75 Dahlin . . 600 - - fOO 27.6 Word Processing . Admin. Draft GPA 11 35 Foit + . 410 . - 420 . Revise Admin. Draft GPA 4 35 Foit - - 140 - - 140 . Revise Draft 2 35 Foil - - 70 - - 70 17.7 GPA Printing . Admin. Draft GPA: 4 copies $5 each 2 55 Schilling Printer 110 101 130 . Draft GPA: 60 copies $5 each 3 55 Schilling Printer 165 300 465 . Final GPA: 60 copies $5 each 3 55 Schilling Printer 165 300 465 . Binding and Delivery 8 35 Foit UPS 280 25 305 l,,'IFIFD GP I SCHAFF'FR RA'iCH GPA \fo\l' I'RFPAR 0\ 110:-'; 28.0 Unify GP/SH M:lp Grnphic 28.1 Digitize SH GPA onto GP MapS l1S 55 Schilling - - 66fi . - 6W 28.2 High Resolution Negative 4 55 Schilling Repro. 220 30 250 28.3 Crononex Mylai 26 55 Schilling Repro. 1106 806 1906 28.4 Layout and Coordination 2 75 Dahlin . . 150 - . 150 13 I :\9309\9309-1'\B4 October 14, 1994 Revised May 18, 1995 for Contract Amendment I e EXHIBIT A e WPM Planning Team. Inc. Continued PROPOSAL 3: With Stanley R. Hoffman Associates and TJKM SCHAEFER HEIGHTS PROJECT EIR - CEQA FINDINGS. GPA . UNIFIED GP I GPAs SUMMARY SCOPE OF SERVICES AND COST ESTIMATE . ... . Team Member Responsibility Team Member Costs WPM WPM.. WPM . ....... Sub....... .. .. Sub~ Cost WPM Planning Team Tasks Hours I.... ... Rate> Staff . Consultant ....WPM... Consultant Total 18.5 Consultations wI City Staff 2 75 Dahlin - - 150 - - 150 29.0 Print Unified GP Maps 19.1 Graphic Setup for Color Printing 3 55 Schilling - - 165 - - 165 19.2 24 x 36 GP Map - Color Printing Option 1: Color Plotting 7 27 55 Schilling CAD Sol. 1107 10007 11107 Optiah:. Colo. Off Jet P.d,tiht; 6 55 Sd.illin~ Printer 33e t65e +98e 19.3 Delivery of Color Gp Maps 2 35 Fait UPS 70 25 95 311.9 Optionlll: Motlnted Cohn GP l\111p .. 30.1 Calor Crliflhie Setl:lp +81t ~ Sehillin~ ReI'f&. !)9G1t 33elt ~lt :;0.2 Color Plolld~g 4lt ~ Senillmg ReI'f&. ~lt (;Glt ~lt 30.3 M(ll:ll1td',g. rellm CI\:3l\ B6M'a +11 ~ Schilling ReI'f&. ~lt ;.511 Wit 20.1 Delivel') e.f MSl:lnted CP Mop ;11 ;.5 fttif ~ -Hl51t a5lt -t4Q1t SU1TOTAL: V~aFIED CP I 811 MAP ,19lt - - - i;Q51t i;B5lt ~'4 , TOTAL COST: EIR _ CEQA FINDINGS - GPA -UNIFIED GP I SCHAEFER RANCH GPA MAP Subtotal: EIR - - - - - - - - 51J.55 97,290 H~~~i 48;5Hl -1S;999 Subtotal: CEQA Findings ~ - - - - - ~ - 3,780 25 3,805 Subtotal: GpA ~ - - - + - ~ + 4,355 720 5,075 Subtotal: Unified GP I Schaefer Ranch GPA ~ ~ - - ~ - - + 1,6358 1.1358 2,7708 Map TOTAL - - - - - - - - 61 ,OO~ ::'8~~q 160,19i ~ ~ 14 I :\9309\9309-NB4 "-l'M l'l:\IUling Team. Inc. e EXHIBIT A _ Octoocr 14, 1994 _Revised May 18, 1995 for Contract Amendment I F00tn0tCS: I. See Exhibit A-I: Stanley R. Hoffman Associates proposal for detail of Stanley R. Hoffman Associates Scope of Services which is the binding Scope of Services. 2. See Exhibit A-2: TJKM proposal for detail of TJKM Scope of Services which is the binding Scope of Services. 3. TIle source of infonnation for these environmental topics shall be the Western Dublin Specific Plan/General Plan Amendment Final EIR. No original field work or quantitative analysis will be perfOffiled. 4. Since the numlx:r of commcnts and the level of response ean vary widely. it is difficult to prediet and provide a fixed fee for Task 23.0. Prior to undertaking Task 23.0 Response to Comments: DEIR the consultant will estimate the time and matcrials cost for preparation of response to comments and will report that estimate to the City. Task 23.0 work will not be initiated by the consultlli1t and his subconsultants until the City notifies the consultant to proceed and complete Task 23.0. Actual costs of this task will be carefully recorded. At the conclusion of this task, an amendmcnt to the contract will be made, based on this actual COSL 5. Assumcs Unified GP/East Dublin GP A Map disc will read into WPM's CAD and will require only minimal cleanup. Also assumcs applicant or City will provide full size to scale Schacfcr Ranch GPA Map. 6. WPM to provide one full size (scale to be detcmlined) unified General Plan Map mylar to City (no copies). - 7. Cost for color printing assumcs Option I: Color Plotting. S. Cost for optional Task 30.0 Mountcd Color GP Map not included in total cost. 15 , .\n"2t'\l>.01:no_l('nA e e EXHffiIT A-2 (a part of Exhibit A) SCOPE OF WORK AND COSTS FOR ADDITIONAL PLANNING AND ENVIRONMENTAL SERVICES SPECIALIZED FIRE PROTECTION AND EMERGENCY SERVICES ANALYSIS e ~ c:B\. e GAGE.BABCOCK & ASSOCIATES, INC. SAN FRANCISCO OFFICE. 1890 NORTH CALIFORNIA BLVD., SUITf 200 . WALI~UT CR'=.'=.K, CA !J45S6.3i'1 1 1 HOl,A,o\S W. JAE"fR, P.E.. F",~'rl.;"' JOliN C. WOYCHCE$C. r.E.. "fV,,'lp~' TEL (510) ?30.aooo fAY. (~'O) P30-o-133 PROPOSAL TO: WPM PlannIng Team Inc. 1200 "G. St.. Suite 1 B Modesto, CA 94607 TO PROVIDE: Fire Protection Consulting Services for analyzing requIrements for fire department and medical response to proposed new development. PURPOSE: To provide en objective, professional and technical response to fire and emergency medical service (EMS) requirements for the proposed Schaefer Heights development. SCOPE OF WORK: 1. Cond uet dete-[JetlltlriIJQ Inttllvltlw:. wltll II Hi FI1 ~ CllltJf. Pel illntrdlC !.8lVlctr pi ovld81 S, tilt! dtrVtlh)lJtrl'~ representatives. 2. Study and analysis will include, but not necessarily be limited to the following aspects: a. 1.5.0. Rating Impacts - Review and summarize standards of significance for fire and emergency response times. Identity response time requirements In codes and policies applicable to Dublin. Determine If there Is a regionally predomInant response time standard for hillside communities comparable to the proposed project. Giva examples of how comparable fringe residential projects hava met local fire protection requirements, whether by performance standards (sprinkler requirements, etc.) or standard application of "flatland" urban response times. b. The development's built-in fire prevention and protection features. c. Brief site visit; assesS wlldland exposures. d. Evaluation of existing fire and EMS resources, and ability to provIde an adequate level of servIce. e. Develop related fire and EMS experience statistics. f. E6timate fire potential. g. Estimate EMS & Paramedic service demands. Determine the following: average medical and fire response time; worst-case response time for the most remote parcel. h. Evaluation of project and altarnatives considering existing fire and emergency response stratoglc plans. CNCltltUISM~~1 C.,:'N~.L'~lA'II:i IN 11111 l'II(}lll.lI0N. :;AI L '" ANI! :;!.(;lJlII I'Y CHI(;A(:O . !;N~ III",jCI:;CO . I O~'; t,'J(\ELES . NEW YO,.;K . WASHltK,TON . ATLl\r~lA . VAN('.OUVEFI ~ e e I. Provide wrttten respollse lo EIR commenl::; 011 fill: UIIU t:lll Itllgency responsEI iSSUClS (assume two hours). 3. Report: Prepare a comprehensive summary report of findings, professional opinions, conclusions and any recommendations. Prepare responses to comments on the report. 4. Meetings: Attend one meeting with the developer to review and receive comments on the draft report, prior to finalization. Attend and particlpate 8S necessary In up to two public meetings involving aspacts of this study. COt~TRACTUAL DATA: The Agreement made this 15th Day of May, 1995, by and between WPM Planning Team Inc.. hereinafter callod WPM and Gage-Babcock & Assoc1ates, Inc., hereinafter called the Engineer. Now therefore. WPM and the Engineer agree as follows: The Engineer agrees to provide qualified fire protection consulting talent and Incidental servIces for the above named work as set forth In PURPOSE and SCOPE OF WORK. WPM agrees to pay the Engineer for such services on a time and expense fee basIs, wilh an estimated maximum of Eighteen Thousand Three Hundred Dollars, ($18,300). This includes estimates for data search, and travel costs. Each Invoice will summarize progress and tasks completed. Personnel rates would be charged for at the following established rates: PrincIpal S140.00 per hour Sr. Consultant S175.00 per hour Supervisory Engineer $110.00 per hour Senior Engineer S 95.00 per hour Staff EngIneer $ 85.00 per hour Cad Operator S 55.00 per hottr Drafter $ 45.00 per hour No work beyond the scope of work would be conducted wIthout previous approval of the WPM. Only time actually spent on this project. would bo charged. In addition, direct Job expenses would be charged at cost plus 10% and automobile use at 37 cents per mile. Billing would be made monthly for actual time exponded and costs Incurred. Payments not made within 30 days of InvoIce are subject to a service charge of 1-112% per month. 1. Engineering Services. Shall consist of providing the necessary engineering talent and attendant services to perform the fire protection consulting service described under PURPOSE and SCOPE OF WORK. 2. Extra Servlces and Special Cases. In the event the Engineer Is caused extra work, or other expense due to changes or alternate designs ordered by WPM, he shall be equItably paid for such extra expense and the service Involved. If any work speclfied by the EngIneer Is left unfinished or suspended, Gage-Babcock & AssocIates, Inc. 2 WPM Planning Team Inc. Proposal May 15,1995 e e In whole or In part, the EngIneer Is to be paid for the !'.ervlces rendered on account of It. This shell Include at\ernatlves Involving extra drawings and scope, whIch were not accepted In the original contract, and meetings, site visits find submittals beyond those listed In SCOPE OF WORK. Work specifically excluded from this agreement which constltutes e>.'tra work are provision of technical specifications. design drawings, cost estimates, drafting or AuloCAO work, bidding Information, bid forms and general conditions of contract, extra meetings or options based on research into support documentation to support non-code supported approaches.) Payrnent to tile En91neer for extra services authorlzod In writing shall be at the Engintler's establlshod hourly rates specified In SCOPE OF WORK. 3. Successol1> and Assigns. This Agreement shall be binding on WPM and Engineer and their partners, successors, executors, administrators and legal representatives. Neither WPM nor Engineer shall asslgn. sublet or transfer any rights under or Interest in this Agreement without the written consent of the other. Nothing under this Agreement shall be construed to give any rights or benefits in this Agreement to anyone other than WPM or Engineer, and all duties and responslbllltles undertaken pursuant to this Agreement ....111 be for the sole and exclusIve benefit of WPM and Engineer and not for the benefit of any other perty. 4. Quality of Services. Gage-Babcock 8. Associates acknowledges that Its services under this Proposal v.-111 be of reasonable and acceptable professlonel quality In consonance with the Code of Ethics of the National Society or Professlonal Engineers, and to be carried out by or under the direct supervision of 8 regIstered professional engIneer. 5. Services FurnIshed by WPM. The compensation agreed to herein anticipates tllat WPM will furnlst) the Engineer with such fire protection Information and data as may be available. with architectural, mechanical and electrical dra~ngs, and the schematic basis for desIgn of the building. with necessary access to premIses. and with consultation from time to time. 6. Scheduling. The Engineer agrees to commence work on this project within 10 days after execution of this Contract, end continuously pursued thereafter. It is recognized that completion will depend upon the timely avallal.llllty of essenUal data and personnel for Interviews. The Engineer will be available for consultation and meeting attendance after reasonable advance notice. The EngIneer will make every effort, consistent with prior agreements with other clients, to complete this study within the time table agreed to at our May 9th meeting. 7. Termination. ThIs Agreement may be terminated by either party upon seven days' written notice in the event of substantial failure by the other party to perform In accordance with the terms hereof through no faull of the terminating party. In the event of termInation due to fault of other than Engineer, Engineer will be paid for all services rendered and all reimbursable expenses to the date of termination. 8. Controlling Law. ThIs Agreement Is to bo governfild by the laws of the State of California. 9. Insuranco. Engineer shall procure and maintain in effect insurance policies for protection against t.:li:llrlls u"r.J~, wUlke,'s compensation acts; claims for damages because of bodily InJury Including personal InJury, sickness or disease or death of any and all employees or of any person other than such employees; from claims or damages because of Injury to or destruction of property Including loss of use resulting therefrom, as such coverage Is normally provided In generatllabllltv, contractual liability, Automobile liability and professIonal liability policies; and eny other Insurances prescribed by law. Gage-Babcock & Associates, Inc. 3 WPM Planning Team Inc. Proposal May 15,1095 e e Limits of policies currently In force are as follows: Business Auto Liability _ $1 Million, Workers Compensation. Statutol)'/$SOO,OOO Employer Liability, Comprehensive General liability - $1 Million, ProfessIonal Uablllty - $2 Million and Umbrella liability . $1 Million excess of $500,000. Certificates of Insurance will be furnished If requested. WPM and EnginEler hereby agree to tho full performance of the covenants contained herein. IN WITNESS WHEREOF they have executed thIs Agreement, the day and year first above written. GAGE-BABCOCK & ASSOCIATES. INC. By G)~ ~~~ '1f /t.:;~ i1f/J :t.Q::~ / ( . cl< Woychees~ .E. / (.-' Principal ACCEPTED: l \?eYld;"'o c..\'tj CCl.>V\c.',\ O'f'r'....."4 \ ) By Title Date Gage-Babcock & AssocIates, Inc. 5 WPM Planning Team Inc. Propo&al May 15,1995 --=- Date * June 9, 1995 June 13, 1995 June 19. 1995 June 30.1995 Jllly 7. 1995 Jul..... 7. 1995 July 17.1995 July 31. 1995 August 1, 1995 S eptem ber 1. 1995 September 15.1995 S eptem ber 1995 (to be determined) 1 :\9309\CONTRACT.SH e e EXHID IT B REVISED TIME SCHEDULE (MAY 1995) for preparation and processing of SCHAEFER RANCH EIR/ CEQA FINDINGS/ GPA Davs Allowed Action Submission of 19 copies of Administrative Draft EIR for City staff and applicant review (excluding fire protection section) (15 copies City I 4 copies applicant) Estimated date for notice to proceed on Colltract Amendment 1 (Fire protection) Submission of 4 copies of Administrative Draft General Plan Amendment to City 21 Staff retillns ADEIR comments to WPM 18 Staff retillns ADGP A comments to WPM 25 S ubm ission of AD EIR fire protection section to City 10 Staff returns ADEIR fire protection commellts to HI PM 14 Submission of 70 copies of Draft ErR 60 copies for City 10 copies for applicant 1 Begin Draft EIR review period; delivery to State Clearinghouse Submission of 60 copies of Draft GP A · 56 copies to City . 4 copies for applicant Submission of Draft CEQA Findings to City (6 copies City I 6 copies applicant) Public hearing on Draft ErR e e EXHIBIT B, Continued ~ Dm's A /lowed A crion September 15.1995 45 End of Draft EIR public review period (assumes a 45-day public review period starting August 1, 1995 ) S eptem bel' 25. 1995 10 Evaluate comments on Draft EIR and request contract amendment for preparation of Resp. to Comments October 3. 1995 8 Estimated date of notice to proceed on contract amendment for resp. to comments October 10.1995 42 Staff rctUr1lS com m ems 011 Findings TO WPM October 24.1995 21 Submission of 66 copies of Draft Final EIR to City (60 copies City / 6 copies applicant) October 31. 1995 Submission of 60 copies of Draft Final GP A to City (56 copies City / 4 copies applicant) OCTober 31. 1995 7 Submission of 24 copies of Draft Final CEQA Findings to City (20 copies City / 4 copies applicant) to be deteml ined Planning Com mission and CiT)' Council hearings E1R Cenification . GPA Adoption 'Ie Schedule to be revised based upon completion of fiscal and transportation sections 1:\9309\CONTRACT.SH e e REVISED EXHIBIT C PROGRESS PAYMENT LIMITS for work on SCHAEFER RANCH EIR/CEQA FINDINGS/GPA/UNIFIED GP/GPA MAP Maximum Amount of Pro cress Pavments Actions Not to exceed $97,405.00 Administrative Draft EIR / GPA (within 30 days of acceptance submittal: excluding fire section) Not to e.rceed $18,940.00 Administrative Draft EIR - fire section and CPA (within 30 days of submittal) Not to exceed $13,915.00 Draft EIR / GPA (within 30 days of acceptance)* Not to exceed $13,915.00 Final EIR / GPA CEQA Findings (within 30 days of acceptance) Not to exceed $11,132.00 $13,237.00 Approval of Final EIR / CEQA Findings / GPA (within 30 days of certification)** Not to exceed $2,783.00 Unified GP / Schaefer Ranch GPA Map NOTE: This payment schedule assumes prompt and timely adherence to Exhibit B: Time Schedule of this contract. If work is delayed for reasons beyond the control of the Consultant, the Consultant shall submit an invoice for work completed to that point together with evidence of work completed on the contract. Upon verification of work completed by the Consultant, the City shall pay the Consultant according to the invoice. The Consultant shall submit statements on a monthly basis, with prompt payment by the City in keeping with this schedule. * The City shall retain 10% of the amount requested at each invoice. After receipt and acceptance by the City of the Draft EIR, the total retention amount accrued at that point will be released, upon City acceptance. ** The City shall retain 10% of the amount requested at each invoice. After certification of the Final EIR and adoption of the General Plan Amendment, the remainder of the retention will be release, upon City acceptance. 1 :\9309\CONlRACT.SH ,~y~~~~~~~,,~ e SCHAEFER HEIGHTS May 18, 1995 Mr. Laurence L. Tong, Planning Director City of Dublin 100 Civic Plaza P.O. Box 2340 Dublin, CA 94568-2340 Re: "SCHAEFER RANCH" - EIR Contract Amendment Dublin, CaliCornia Dear Mr. Tong, Please accept this letter as our support for the proposed EIR contract amendment proposed by WPM Planning Team, Inc. to include experts in the area of analyzing fire safety and medical emergency requirements. We believe that creating a safe project is essential and must be studied thoroughly to explore the alternatives and consider the actual benefits and the associated costs the taxpayers.' We encourage you to expedite WPM Planning Team's request for the contract amendment to the City Council so it can be considered at their June 13, 1995 regular meeting as a consent item on the agenda. We understand and agree that Schaefer Heights, Inc. will be responsible to pay for the addition- al cost of the contract amendment. We look forward to your support in this matter and, as always, would be happy to answer any questions you may have. Very' truly yours, 4<~~ Robert Yohai )resident ..' -:-.... pc: R. Ambrose, Dublin R. Platzek, wpM. S. Zagari, SRI D. Fitzpatrick, SRI J. Parsons, PjADR ,/ I' Schaefer Heights, Inc. 155 Filbert St.. Suite 200 Oakland, CA 94607 415.893.8186 Fax 415.893.0205 R.ECEIV~[) tjAY 2 3 J99L-.- EXHIBIT 3 .! c co - a. e (1) c Q) " c .- - .c ~ .0: e . I g IUil uftl I / c I 10 / <(a.... I ./ W- I ~o iU1ti ill~~ <(0; c oU>m wZ(.!) dlln 1mb OZc ~~~ wo..O Z ~ Al i! ~€i :::J Ii fl CDO~ ~z ::>w 00(1) Jf1 i zzz I.~! Ii" hili ~ 11111 i' ~Q dlh~ z ~ :::Jo~ ~w4;; OO~ .zzz, ~~2 ~ ~ ~ I ".. ATTACHMENT