HomeMy WebLinkAboutItem 8.1 MapeParkRenovation (2)
<1>
".
CITY CLERK
File # ~[i]Cil~-~[QJ
.
AGENDA STATEMENT
CITY COUNCIL MEETING DATE: May 28, 1996
SUBJECT:
ExmBITS ATTACHED:
RECOMMENDATION:
~. "ZtA-
.'
FINANCIAL STATEMENT:
Mape Park Renovation. Report Prepared by: Diane Lowart, Parks
& Community Services Director
A. Proposed Master Plan
B. Preliminary Cost Estimate
I. Receive presentation from Staff and Consultant
2. Receive public comment
3. Approve master plan in concept and direct Consultant to begin
work on construction documents for the base improvements and
include the sand volleyball court, restroom building and
pedestrian bridge as additive alternates to the construction
documents
4. Direct the Parks & Community Services Commission to
reevaluate the Mape Park project against the other park projects
and the available funds as part of the 1996~97 Budget process
and recommend to the City Council the park priorities for 1996-
97
$24,900 is budgeted for design development and preparation of
construction documents; no funds are budgeted for construction of
the improvements, however, $51,750 in Community Development
Block Grant funds are allocated for this project. The estimated cost
of the base park improvements is $205,023; the estimated cost of the
optional items is $122,500.
DESCRIPTION: At the March 12, 1996 meeting of the Dublin City Council, the Council
approved a consultant agreement with John Nicol & Associates, Inc. to provide landscape architectural
services for the renovation of Mape Park. Staff has been working with the consultant for the past several
months to develop a proposed master plan for the renovation of Mape Park.
Although there are no funds budgeted for the construction of the Mape Park improvements in the current
Five Year Capital Improvement Program (CIP), the estimated improvement cost that was identified in the
CIP was $194,265. This estimate was based on the following design elements: 1) removal of existing
play equipment and installation of a new accessible tot and children's play area; 2) replacement of wOrn
park furniture including benches, drinking fountains, and trash receptacles; and 3) installation of
additional park lighting.
\
-------------------------------------------------------------------
.':,
, .'
F:\mapepark\528ccdes\.doc
COPIES TO:
Parks & Community Services Commission
John Nicol & Associates
ITEM NO.
Y./
...
....
As part of the design process, two neighborhood meetings were conducted to obtain input on the preferreq., ' .'
design for the park. At the first neighborhood meeting the consultant reviewed the existing park .'
conditions and solicited input from the neighbors as to what they would like to see included in the park
design. At the second neighborhood meeting, the consultant presented two schematic designs that
incorporated the design goals and elements that were identified at the first meeting. The preferred design
elements from both schematic designs were then merged to form the proposed master plan which is
attached in Exhibit A.
The proposed master plan includes the following design elements: 1) separated younger and older
children's play areas with accessible equipment and surfacing; 2) new park furniture including benches,
trash receptacles and picnic tables; 3) two small group picnic areas; 4) concrete walkway encircling the
park; 5) upgraded park lighting; 6) sand volleyball court; 7) restroom building; 8) pedestrian bridge over
the creek; and 9) enhanced shrub and tree plantings.
Exhibit B contains a cost estimate for the improvements. The estimated cost for the base park
improvements is $205,023. The sand volleyball court, the pedestrian bridge and the restroom building are
shown as optional items as they were not included in the original scope of work for the project. The
combined total for these items is estimated to be $122,500. Thus, the total estimated cost for the Mape
Park renovation as shown on the proposed master plan is $327,523.
At the May 20, 1996 meeting of the Parks and Community Services Commission, the Commission
unanimously approved the proposed master plan, including the three optional items. Although it was :.::
recommended that the Commission prioritize the three optional items, they felt strongly that these items ,:.:.
should not be identified as options but should instead be included as part of the base park design. Their
recommendation was based, in part, on their belief that the Mape Park renovation is a project that is long
overdue, and was also influenced by the strong support shown by the neighbors for the total master plan.
As stated previously, the Five Year Capital Improvement Program does not currently appropriate funds
for construction of the Mape Park Improvements. . The City Council will be adopting a new Five Year
Capital Improvement Program for Fiscal Year 1996-2001 in June of this year, so it is conceivable that
funds could be shifted from other high priority park projects which are in the current CIP to the Mape
Park improvements as part of the new CIP. As has been the case for the past several years, there are more
park projects than available funding.
The Parks and Community Services Commission will be c.9nducting a special meeting on May 29, 1996 to
review and prioritize the park projects and to make recommendations for the funding and scheduling of
these projects. Consequently, Staff would recommend that the City Council approve the master plan in
concept and direct the Commission to reevaluate the Mape Park project against the other park projects and
the available funds. Further, as it is apparent that there is strong support to proceed with renovation of the
park in some fashion, it is recommended that the City Council direct the Consultant to begin work on the
construction documents for the base improvements as shown in the master plan and includ~ the sand
volleyball court, restroom building and pedestrian bridge as additive alternates to the construction
documents. In this way, if it is determined that there are insufficient funds to construct the entire park at .:
one time, the construction details for the alternate items will be prepared so that they can be re-bid at some . .:--'-'
later time.
· I~t
p~~
I
~
- '~
n
l,f.
<<--
] ~
u ~i
~ 3.-,,:
f-
e"
~ ~
I- ". ~e_
o I!'-
V)~~ E
e,H .:S!!
~H 0..
~ ~'~ J!
Q.).5 f ~
~ J.61- ~
b
C
o
."
e
C<l
-E
."
u
"'0
u
c...
~
::l
'5
gLL.
"'O~
. i: .,0
.J:J .-
(5 ~
~ ~\
.r" I ,..... --1........-.... b:::-'".....( j
~ ~-Jt" --I.... ~ ~_ 1,.. ~
_ t- . ~ A" -all ,-,r: J" >>"'"" ~ ~- /I ';;;:: 1.3""
~ '717~" r~/ ,
- 5lJ- + ~ ~ ~~ + ~ .~~;;;..~t~,:.:..:. ,:.:,'~~':,"~.~:':::..1
-.-e - ...-IE- .....,..-..(:.,~-5-t ~. 5:V:., ~" ,.' '.~: ;
').~ ( ""\:' :....,':......-: 0.' '. .. ;":., fi : as. .-.....:..: .... ':..:'L /.:J' .::; '.~,
c..:! + ..".' ". '.' . :..::~ ~ 1~''\". .:; . :r-7I\:, ..::: "~\'
~ ~~ ......: -t . <.... ~:.-~ // ~...:.. . :"..V .~. ..-f ,;o?:~\
~8 3 ..' .>..~:-"~.~.:. fi -:j;;JJ~~'" f---:r,--i ::. "~".!!:\
0.. <C ~ 1'. I I VI E "- ~ I I ' ", ; . .,' '. ·
. . ell . ~ 0" O::l <.- .'
~ IJ. '. W G 0";( ~ :: .'
~ "5 .:..... '0 W ~Y.'. Vl1 I I I, '.'
..,$' . '. c:;..:'::~ ~ ...J I\. :"'1 ~ ~ I I I I::.' '.
~'- " c.: I..___J ~ '0 ,...... Vi :::;- < ! I ~ ..I'",'
::l ~. 9 ~ - ---- --- .:
~ '" ... . "'~ .......~ 1/\ J-... ''-'.:',..<( r
~ ::. 'r ) ~ " .."..'.,..:" '\,
l<M;t.: 11.;~ ""': ])1,.' ' " ~~~.' . ", A; -: )-r> "':;'i;(
, ..~ I ~~~~ "''=~..a]' \ ~!'." "','.-"~
, I I I , , IT' "..pj:'Y {' _., ~~ \~"'~ J rn',
:/ !t ~\A~l~~~~" t;j,".'" , '.
~l '\~. . .il.( _~ ":~'\\\\" '~':,~.~~"; ",.', ". ',: ,: .:~~
pno'M::lPJ::lA::llluJ ~~ ';.....1'.:.;',. .:. " '\ ',' ,": "':'" "'..:,' "A
~!] I-:~,;...:.~'.' ~,:":'. ,",,;-:,)""'Y:7-
~ r-=z . '.. ' . '. ...., ~ .
'E b ('7\~ ': ~ r. . ;':, :'-',yo: ,X<'
~ J N/'" 7' t. . : , ", . '.. '/
1--.__ --~ t ~ fi'~ 4' ~~::." ~,
<( 0 ,..~ w/Z'; ,
'= '" .'.'. . .'" ~ '.. ,--4
..; ~ l! ~ ,:'..: r."7:"'--:-": .;: c:: - - - - ~ ,'/:,
:C'p ~ '-;. . . ";g"5 ~ !V ....:
I ~ ~~ ~ - '. :. I ' :g .s S 3 III "
I "l! is 1-;,.... .t.,.. ' lXle If P. O2 ~ 1
u. f- '" . .1', ~ H 'Vi ~ '.:
I- " "1" g .E ~ OJ 0 \ f--
~.: . . == ~ ~ :'1::' 'i::
I- : . I ~'i: E ~ .!:! I '-
i-.,'.. ~Cl<- ~t:l..
. ::1' ,-
i '. '. : ~ I: /f'!
" I .. I \- t=!
= I'll.. .. I '- ~ eo 0
_ ,,", \ u: 0 I e - ~
;a.~ .b=C
~:.,.JI" i L, ~~~. ~u ~/wi~~
"',::. ;:::: ..oIL... ~ t
~., >:'1. :,"5' ~.- =; "5;~"
~ t -'," ,I .. ~ "'1""" r.€' ~;J.._
fIr:: I, Ull. ~ r '\' ~
~HJ -,<:. ~.iH\t~5 !n ~
. . I' 0. . < ' '0 . '10: .. en ~ \
.E E ' .. U I- !. "I)
.D ~" \ ';'" : ~ 'C .::1 ',~ III
;::l " '" --\ , ~ ~ ]" " 1 ' ~,..,
.E ~ ~ j l- I .t:: r-' l:l. VI ...,. ·
v. -::n " I ~ ~ '; '~i :; .'0''=...~
3m jj.t' l~HL; I~~ \
.rY. :',.,-:: '/ ~~'.'" .',' ,'.:". ,:-' /11...-';=0
.... ' ',' , - r,,'., : :', ,..- ,- I
- ., ", ,.' ;;.- ~ '. ' ~ ,"'. .'" -...
ty ;\,' JI , ' " ,I, F-'", ': .: : ". - = ,
~/:; ~r'--~~~+~~~-~:, } " · . : ~ W~ 'fa
'. .', ,''; , I'~.J:J, I '.-' '. C<l , . 1\ \,
I .s .:. :. '. I' ,"" " I :a"~ ,I' ..' .... ....l .
~ . .' {", I ' , ' ", ": I C/} :;:: I ' ,: ." C ' 1l:U ....-
I ~', :.: :::. I ',"' ,'. I ':g.", I ,:: ,:,:::~' '.' ,. '..4 \ .,:.'.
:i. 1Wj.:.",,,-~ :,:;.'.,~~~.:-b ':"'~.-~.;J ,,<, ',;.: o. . " :. ,:.~~(A I
~ ~ ~k/' ........, ."....,.','.', ,-,>." <..~,. l.P lJ~
-), 4 't- 'l + I";:" ,,",' "".; '.:'" ' , ,'..,:' ~
1. A. " /'":'';''''~~''''' ,',:'
'I ~: ' . . ./~
'1 ',"",.,.. ' , .' _
~'"
T
",'
f!
<:
.g
u
E:
.
.
I
.,.
t
-
e
6'l
e
..
~
~
CI:l
~
Q:;
I
I
I
-
,
I
~
pno'M nUl~qns uus
1-J I I I
\ \
r
.
.
\
\\\
,
"I'
. III
,
,
- -
, ?'" ""IIIIl
,ol
."
.~
~~
/
~
~
t:Q
~
Q
~
o
~
~
~
U
~
~
~~
~~
~~
11~~
~
..t
.
1.0
Cj'I
--
LI":l
~'
,~
s;::
:3
@~ ~
~f-< ~
<ej- ii1
5~ S~
uf ~6
;z< <~5'l
ii 15 :>
o I-' '
~z ~iin
9,:s ~:s ~
~
o
co
o
\0
o
-.:t
o
C"\l
o
-
o
.
N
JOHN NICOL & ASSOCIATES, INC. . LANDSCAPE ARCHITECTS
3581 Mt. Diablo Blvd., Suire 245, Lafayette, CA 94549
Phone (510) 284-3050 FAX (510) 284-3052
.
Cost Opinion Project Nome: MAPE PARK RENOVATION
MASTER PLAN Location: Dublin, California
Name of Client: City of Dublin
Dote of Estimate: May 17,1996
Item Quantity Unit Item Description Unit Price Extensions
1 1 LS Demolition and removals $7,500.00 $ 7 ,500
2 40,000 SF Grading; rough and finish $0.25 $10,000
3 7,400 SF Concrete paving; broom w/ trowel joints $3.50 $25,900
4 430 LF Concrete curbing and playlot $10.00 $4,300
5 160 LF Concrete seatwalls/planters $30.00 $4,800
6 1 LS Playlot equipment $30,000.00 $30,000
7 8,000 SF Playlot surfacing system $3.00 $24,000
8 1,050 SF Decomposed granite picnic area $1.25 $1,31 3
9 1 LS Drainage system; incl. inlets, piping & outfall detail $13,500.00 $13,500
10 30,000 SF Irrigation modifications and extensions $0.75 $22,500
11 1 LS Electrical undergrounding and panel $7,000.00 $ 7 ,000
12 4 EA Replace security lights $2,000.00 $8,000
13 1 EA Drinking Fountain; incl. services $3,500.00 $3,500
14 500 SF Wood shade structure $15.00 $ 7 ,500
15 7 EA Picnic tables $1,200.00 $8,400
16 8 EA Benches $400.00 $3,200
17 3 EA T rash receptacles $400.00 $1,200
18 1 EA Bicycle rock $400.00 $400
19 30,000 SF Soil preparation $0.20 $6,000
20 15,000 SF Hydrosod lawn $0.20 $3,000
21 13 EA 24" box trees $250.00 $3,250
22 38 EA 15 gallon trees $80.00 $3,040
23 7,200 SF Shrubs and groundcover plantings $0.60 $4,320
24 80,000 SF 90 days maintenance period $0.03 $2,400
PARK RENOVATION SUBTOTAL: $205,023
. .
1 1 LS Restroom building, incl.utililties design & processing $75,000.00 $75,000
2 1 LS Volleyball court, incl. curb, sand & lands/irrigation $12,500.00 $12,500
modifications and drainage
3 1 LS Pedestrian bridge w/abutments, incl. design & processing $35,000.00 $35,000
OPTIONAL PARK ITEMS SUBTOTAL: $122,500
Subtotal: $327,523
10% Contingency: $32,752
Total Including Contingency: $360,275
.