HomeMy WebLinkAboutItem 7.1RptXridgeSlopeFailStdy (2) CITY CLERK File # DGJl1J[Q]-[2][flJ AGENDA STATEMENT CITY COUNCIL MEETING DATE: June 25, 1996 SUBJECT: Report on Crossridge Slope Failure Study Report Prepared by: Lee S. Thompson, Public Works Director EXIllBITS ATTACHED: I) 2) 3) Soils Study by Berlogar Hydrology Study by Santina & Thompson Page from proposed CIP for this repair. RECOMMENDATION: ("' ^' il) \L 2) Accept report Direct Staff to complete the design documents and put the project out to bid. FINANCIAL STATEMENT: The estimated cost is $405,650 for the repair of the large slide area on the Crossridge slope, together with the reconstruction of one catch basin and sections of the "Vee" ditches, plus the slope repair of four smaller slides in the Jade Circle and Topaz Circle areas. The cost to perform all of the repairs recommended in the geotechnical report is estimated at $700,000. These estimates include the initial soils and engineering investigations. DESCRIPTION: Over the last two winters, soil slides have developed along both sides of the Dougherty Hills Open Space Park above the residential neighborhoods. The City Council subsequently directed Staff to have studies done this fiscal year to determine the cause, recommend a method of repair for the slopes, and put the project out to bid. Berlogar Geotechnical Consultants was hired to perform the geotechnical study and recently completed their report. The report states that several deep soft pockets of soil were found along the face of the slopes which had been cut into during the course of grading for the tracts on each side of the hill. These soils do not have the strength to stand for long periods of time at the angle of slope that was recommended for and constructed in the original subdivisions. The repeated shrinking and swelling of the soil that takes place over time due to the alternating wet and dry seasons, reduces the strength within the soil to stand on a slope. The Study recommends removal of the lower part of the soft soil areas, installation of subdrains, and then replacement of the :;oil with ¡¡ more competent soil material to buttress the soil upslope of the repairs. The ------------------------------------------------------------------- COPIES TO: Residents/Property Owners ITEM NO. L1- g:\miscproj\xridge\agststdy imported soil is to be properly compacted on benches cut into the hill and subdrains installed to carry off water in the slope. A hydrology study and topographic survey were performed by Santina & Thompson to determine if there were problems with the concrete "Vee" ditches. It was found that the downdrains were not placed at the spacing required by the Grading Ordinance in effect at the time of the tract grading; however, the ditches could more than carry a "design storm" (10-year storm) if they had been constructed to a constant grade from the high point of the ditch to the low points. Actual field investigation indicates the "Vee" ditch presently has some flat spots and even some adverse grades. This is due to either the ditch not being graded properly during the original construction, or settlement occurring at a later time causing depressions in the ditch. While the "Vee" ditch is not contributing to instability of the slope, the ditch being at a flat slope or at an adverse slope has the potential for water to breech the ditch and go over the top of the slope into residential backyards. Santina & Thompson looked at several possible solutions to the drainage problem and reported on three alternates. These proposed alternates for the ditch problem are to: I) build a new· ditch above the cut slope to intercept the majority of the water getting to the existing "Vee" ditch. 2) reconstruct the "Vee" ditch with a 24-inch pipe under the bench terrace to shorten the distance to the pick-up points. 3) utilize the existing "Vee" ditch, but install a short overflow wall on the downhill side of the ditch to contain any ditch overflow. This alternate is the least expensive. Staffhad originally intended to incorporate Alternate #3 into the proposed project, but has since revised the recommendation to a hybrid of Alternate #2. This proposal would remove the concrete "Vee" ditch with flat or adverse grades, re-grade the bench, and install a new "Vee" ditch at the proper grade. This would cost approximately the same as Alternate #3. Staff conducted a neighborhood meeting. on June 12, 1996, to update the neighbors on the Study résults. Staff is recommending that the City repair the slopes that have actually failed at this time, together with the ditch reconstruction. This project is estimated to cost approximately $400,000. The estimated cost of a project to include the repairing of all of the deep soft soil areas that have not failed at this time is approximately $700,000. The City Council has made the decision to look to the original developers to reimburse the City for the costs involved in these repairs and for any needed repairs not to be done by the City at this time. At the neighborhood meeting, the property owners indicated their preference to request that the City undertake the total repair project at this time or design a phased project to perform all of the recommended repairs. Page 2 ( - . . ..-, . . t SANTINA&= THOMPSON.lNC. Municipal Engineering Swveying Railroad Engineering Planning May 27, 1996 Mr. Lee Thompson City of Dublin 100 Civic Plaza Dublin, CA 94568 Subject: Crossridge Road Drainage Improvements, 0327 Dear Lee: Subsequent to the City's authorization to proceed, we have reviewed the referenced site and offer your the following information. Berlogar Geotechnical Consultants prepared a geological study of the site and recommended standard repair techniques to stabilize the hillside behind the houses on Crossridge Road. Our report will address the repair of the existing vee ditch network that runs along the hillside and protects the downhill houses from the hillside storm water runoff. Our report assumes that the repair procedures proposed by Berlogar will be constructed. The vee ditch system was originally designed at a slope of 2.8 percent on the south end and at 2 percent on the north end of the site with one field inlet at each end (see exhibits). This configuration does not meet current grading codes; however, the configuration would have had sufficient hydraulic capacity to handle a 10 year storm. Unfortunately, the vee ditch network was not built as designed. The south side was built to an AVERAGE slope of 2.9 percent and the north end was built to an AVERAGE slope of 1.5 percent. Additionally, localized areas along the vee ditch on the north side and on the south side were built flat. A 1.5 percent slope would have adequate hydraulic capacity for a 10 year storm, but a flat section does not. Presented below, we have provided three repair options. A vee ditch system conforming to current grading codes was not evaluated. Extensive amounts of re- grading would be required to meet current codes and that type of a repair would be impractical and not necessary to provide the required hydraulic capacity. ALTERNATIVE 1 - NEW BROW VEE DITCH: A new brow vee ditch could be constructed at the interface of the new cut slope with the existing un-disturbed hillside to work in conjunction with the lower vee ditch. In order to construct the new brow vee ditch, a retaining wall would have to be constructed along the brow vee ditch in order to allow for the grading of the related terrace for the brow vee ditch. The brow vee ditch could be constructed without a 1355 Willow Way, Suite 280 Concord, California 94520-5728 510-827-3200 Fax 510-687-1011 t. ~. . . ,,- . ~- . . .-. ~ . , . t- 't terrace, but some type of supplemental structure would have to be added to the brow vee ditch in order to stabilize the brow vee ditch on the steep hillside slope. The cost of the two alternates would be similar. The brow vee ditch work would cost approximately $150,000 and the lower vee ditch in the areas of the slope repairs would still have to be re-constructed. Additionally, are-constructed vee ditch with an associated 24 inch pipe under would have to be built to pick up the water from the brow vee ditch. The total cost would be approximately $240,000, not including any slope stability repair costs. ALTERNATIVE 2 - RE-CONSTRUCTED VEE DITCH WITH ASSOCIATED 24 INCH PIPE UNDER: The existing vee ditch system could be re-built with a 24 inch pipe installed underneath. This alternative has an advantage because a large portion of the existing vee ditch will have to be replaced anyway in conjunction with the slope repairs (approximately 725 feet). The new vee ditch would be re-constructed for the full length of the existing vee ditch and a 24 inch pipe would be constructed wider the re-constructed vee ditch. Field inlets would be provided at approximately 300 foot intervals along the vee ditch. This alternative would cost approximately $125,000. No work associated with the slope stability repair grading is included with this estimate; however, the minor amounts of terrace grading necessary to eliminate flat areas are included. ALTERNATIVE 3 - EXISTING VEE DITCH WITH CONSTRUCTION OF A CURBIWALL AT FLAT AREAS AND THE CONSTRUCTION OF A DEBRIS FENCE: This alternative would limit the vee ditch re-construction to the slide repair areas. The remaining vee ditch network would be unchanged and re-used. Fortunately, many of the flat areas along the vee ditch occur in the slope repair areas and would have to be re-constructed anyway. Those areas that are flat and are not destined to be re- constructed as part of the 'slope repair work can be improved with a low curb/wall along the downhill side. The low curb/wall would increase the hydraulic capacity at the marginal areas and protect the downhill houses fromvee ditch spill-over. This alternative would rely on only the two existing field inlets on either end of the V8e ditch system and the vee ditch and field inlets would be susceptible to clogging with debris. A debris fence could be constructed along the uphill side of the vee ditch in order to protect the vee ditch and field inlets from debris. This alternative would cost approximately $68,000, not including the slope stability repair work. SUM'fJIARY: The first alternative would have little if any functional advantage over the second alternative and yet would cost significantly more. The second alternative would provide a positive repair scheme and would have functional advantages over the third; however, the third alternative would be the least expensive. All alternatives would include the remodel of the two existing field inlets to better protect the field inlets from debris clogging. SANTINA&= THOMPSON.INC -\ , i . . . . t A second vee ditch exists above the discussed vee ditch at the north end of the site. This ditch appears to perform well; however, some short lengths of curb/wall could be used to improve the capacity at one or two critical areas. The cost of these walls would be minor. We have enclosed drawings, planning cost estimates, hydraulic calculation and hydrology calculations in the appendix of this report. Construction cost estimates can be provided after the formal design of the selected repair technique. Should you have any questions or comments regarding these alternatives or the area in general, please do not hesitate to contact us. Sincerely, ~ Principal Enclosures: f:\..\documenl\dub\960S07.rpl ~ :;:.: .w." SANTINA&= THOMPSON.lNC. . .- . .:. .- , . .: ..i . Santina & Thompson, Inc. Hillside Drainage Improvement Study Preliminary Construction Cost Estimate Cross ridge Road Dublin, California UNIT TOTAL UNITS QUANTITY PRICE PRICE Alternative 1, Construction of additional Brow Vee Ditch at Top of Slope Cut GENERAL 1 Mobilization EA 1 20,000 20,000.00 2 Associated Grading EA. 1 30,000 30,000.00 UPPER BROW VEE DITCH WORK 1 Construct new Vee ditch w/ stabelizing stru L.F. 1,220 75 91,500.00 2 Construct 2 new Field Inlets EA.. 2 2,500 5,000.00 3 24 inch RCP on slope, N. & S. end. L.F. 150 65 9,750.00 4 Connect to existing MH EA.. 1 800 800.00 LOWER VEE DITCH WORK South End 1 Demolition of existing Vee Ditch L.F. 500 5 2,500.00 2 New Vee Ditch at 2.5% L.F. 500 32 16,000.00 3 Remodel existing field inlet EA. 1 3,800 3,800.00 North End 1 Demolition of existing Vee Ditch L.F. 767 5 3,835.00 2 New Vee Ditch at 1.5% L.F. 767 32 24,544.00 3 24 Inch pipe under portion of Vee Ditch L.F. 400 65 26,000.00 4 Intermdeiate Field Inlet EA. 1 2,000 2,000.00 5 Remodel existing field inlet EA. 1 3,800 3,800.00 TOTAL 239,529.00 Alternative 2, Construction of 24 inch RCP under re-constructed Vee Ditch GENERAL 1 Mobilization EA. 1 20,000 20,000.00 2 Associated Grading EA. 1 15,000 15,000.00 South End 1 Demolition of existing Vee Ditch L.F. 500 5 2,500.00 2 New Vee Ditch at 2.5% L.F. 500 32 16,000.00 3 New 24 inch Pipe under new vee ditch L.F. 500 65 32,500.00 4 New Field Inlets along vee ditch EA. 2 2,000 4,000.00 5 Remodel existing field inlet EA. 1 3,800 3,800.00 North End 1 Demolition of existing Vee Ditch L.F. 767 5 3,835.00 2 New Vee Ditch at 2.5% L.F. 767 32 24,544.00 3 New 24 inch Pipe under new vee ditch L.F. 470 65 30,550.00 4 New Field Inlets along vee ditch EA. 2 2,000 4,000.00 5 Remodel existing field inlet EA. 1 3,800 3,800.00 TOTAL 125,529.00 5/22/96 11 :57 AM 960508.XLS 1 . . . . :": . Santina & Thompson, Inc. UNIT TOTAL UNITS QUANTITY PRICE PRICE Alternative 3, Existing Vee Ditch w/ CurblWall at Flat Areas and a Debris Fence GENERAL 1 Mobilization EA. 1 20,000 20,000.00 2 Associated Grading EA. 1 12,000 12,000.00 South End 1 Demolition of existing Vee Ditch L.F. 500 5 2,500.00 2 New Vee Ditch at 2.5% L.F. 500 32 16,000.00 3 New Debris Fence L.F. 678 15 10,170.00 4 Remodel existing field inlet EA. 1 3,800 3,800.00 North End 1 Demolition of existing Vee Ditch L.F. 372 5 1,860.00 2 New Vee Ditch at 1.5% L.F. 372 32 11,904.00 3 New Debris Fence L.F. 767 15 11,505.00 4 Wall/Curb at fiat areas L.F. 200 30 6,000.00 5 Remodel existing field inlet EA. 1 3,800 3,800.00 TOTAL 67,539.00 5/22/96 11 :57 AM 960508.XLS 2 :: !.; . 4...". ' rl'- .~ ' \.' -, HY_DR"AuLICS "'. ',.' ". . "::. ,., - '. . .-. .' ':":.:; .... . 5/21/96, 12:22 PM Santina & Thompson, Inc Hillside Drainage Improvement Study Crossridge Road Dublin, California prepared for The City of Dublin Hydrology Pg ref SOUTH END Up Slope Area Planimeter Area 6.65 Area in Square Feet 266000.00 Area in Square Acres 6.11 Area in Square Miles 0.0095 C Value (high clay content) OAO pg 6 L, length of slope 300.00 Delta, change in elevation 80.00 S, slope 0.27 V, velocity in fps 3.50 pg 28 TOC, time of concentration, including vee ditch 5.60 Use minimum TOC 10.00 Mean Annual Precipitation 18.00 Unit Rainfall Intensity, 10 yr 0.10 pg 32 i = Ix * 18; Rainfall intensity, inches per hour 1.78 C' = C + Cs 0.57 pg 36 Q = C'iA, cfs 6.20 Use Q = 10 cfs, except at South inlet NORTH END .. Up Slope Area Planimeter Area 5.95 Area in Square Feet 238000.00 Area in Square Acres 5A7 Area in Square Miles 0.0085 C Value (high clay content) OAO pg 6 L, length of slope 500.00 Delta, change in elevation 135.00 S, slope 0.27 V, velocity in fps 3.50 pg 28 TOC, time of concentration in minutes 6.00 Use minimum TOC 10.00 Mean Annual Precipitation 18.00 Unit Rainfall Intensity, 10 yr 0.10 pg 32 i=lx * 18; Rainfall intensity, inches per hour 1.78 C' = C + Cs 0.57 pg 36 Q = C'iA, cfs 5.55 UseQ=10cfs Page 1 960521.XLS '. . .":. . ~ . -. . 1.3.1 1.3.1.1 1.3.1.1.1 ~/87 HYDROLOGY Ah~ HYDRAULICS CRITERIA SUMMARY The design flow rate shall be calculated using the District Modified Rational Formula, which is: Q - i (C~ A ) Eq. 1-1 where: Q rate in cubic feet per second; in inches per hour; modified by slope and rainfall is the design runoff flow i is the rainfall intensity C~ is a runoff coefficient intensity; is the drainage area in acres. A TIME OF CONCENTP~TION. The time of concentration is the time required for the runoff from the most remote region of the watershed to reach the point of concentration at which the flow is to be calculated. It is composed of two parts, the initial time 2L concentration, sometimes referred to as the inlet time, and the conduit time. A minimum time of concentration based upon the hydraulic condi- tions which maximize flow velocities shall be used to design the flood control system. INITIAL TIME OF CONCENTRATION. The initial time of con- centration (Initial T ) is that time reouired to wet the surface, fill depressio~s and establish r~off at the first point of concentration in the watershed. Often this first point of concentration is the first inlet of the storm water system. This time will seldom be less than three minutes nor more than 20 minutes. The Initial Time of Concentration shall be dete=mined using the following criteria: UNDEVELOPED WATERSHEDS. L 60(V) Eq. 1-2 Initial T - c Where: T - Time of concentration in minutes LC _ Overland flow length in feet V - OVerland flow velocity in feet per second, from Figure 4, Page 28. ~ape 4 '- . .... . '.' '-,' .:i -.' " . 1.3.4 10 88 HYDROLOGY AND HYDRAULICS CRITERIA SUHHARY The basic runoff coefficient shall be chosen to reflect the ultimate development of the drainage area. This will be based on City/County General Plans. If General Plans are not avail- able, then a reasonable ultimate land use shall be assumed. The slope adjustment factor Cs is used to adjust for increases in runoff as the average slope of the incremental drainage area _ increases. ~: the slope to be used to find Cs is not t.he slope of the incremental waterway but that of the land draining to that waterway. The intensity factor Ci is used to reflect the decrease in soil permeability that can be expected with increased rainfall intensity. RUNOFF COEFFICIENT - CALCULATION.' The for.mula for calculating the modified runoff coefficient is: C" ....C + cs + Ci Eq. 1-3 where: -9- LAND USE DESCRIPTION PERCENT IMPERVIOUS 0.2* 0.4 0.5 Undeveloped land, Parks, Golf courses Single Family Residential Condominiums, Apartments, Institutions Mobile Home Parks, Light Industrial Medium Industrial commercial, Heavy Industrial Impervious (Streets, Parking lots, Roof tops 07 3D! 0.7 0.8 0.9 557 707 85% 100! * The basic runoff coefficient shall be increased in areas with soils having low permeability, . Note: C is computed based on weighted area times runoff using 0.2 for open'space and 0.9 for impervio~s areas. Cs ... (0.8 - C ) ( Ln (S - 1)) sO.5 Eq. 1-4 56 Ci ... {0.8 - (C + CS)}ll - 1 + 1)) I Eq. 1-5 (1/ i) + (Ln(i e and where: C" is the design runoff coefficient. C is the base weighted runoff coefficient. Cs is the slope adjustment factor. ci 'is .the rainfall intensity adjustment factor. s is the average ground slope of the incremental drainage area in percent. i is the design storm rainfall intensity (inches/hour). Fa e 6 . -:--~ 100 ~ ~ ~ ! . " . PO :'i 80 ; 70 - . 00 60 .40 30 20 -. .' t: 10 m p ... t> ... 8 Uj c. 7 - 0 . I:J 0 I) ....I l:) .4 '. 3 .. :2 '- ; '.0 . ~!:~~['f: f: ~ ~ .b~.t~; =;.:;:.::..~~===-~;;;;;::; ~ ;.:-~:-_- _:- =~;:--::-:-: ..~ _~_-=:. .-- -:-;;;.;:~ --:-_ __._"";;'~:':.~.::t::.~f-::j;~ . .....-. . . . ~ ~ I..:-j:l :;';:J'~:~:-""::=:=--':O':::l:,c-::=.=--t:~j ..... . 1'" .. .._.r.~-''''%'I''''I;'....__._~ 0" _. I ____ _._t~_.I'."_"r_._""'.. ~,.. ...~.__.~__t--.ol ..4 _ Vlt:fri~ f;~ ~~~~~=::=::.:::=~ir~~i~;;::. _ -,~'.l~~l:~f}-.~~.y: :: 0.5 j ci N d ~ ci .... d 10 d co d ..... III) Do O. d d d N ~ .... 10 C> ... ... 0 l:) - 10 I:) <'l VELa Cln' IN FEET PER SECOND . ."1'10 OVERLAND FLOW VELOCITY CHART DATE: FEBRUARY 1987 " ~ . . ...L...ME:O" COLlI-TY 1-'1.000 COI-TROL W..TE:R CON~E:RY"TION ObTRICT FIGURE 4 Pc;:.. 2 g . ". .' . -. .:... - .:. .:.;\;.'. ,...;; .:.'- ~;. ',',.- .. -. . . ~ :.~::.;.~::l. ::', r::';' .....:. - ~:'" . '..- ...~ . -. '.' . '. , '.'" . " .~:. . , ~~.~ :,.- ~ ~~. .<':.- .... .,~: .. '.:: '(...... :~ ~ . - .~?};*' <,'.-.. :r .1..,.. . :".;:' f' ....... ... ._~::...~~.. '.' ...._. . . . ... -.~- " .. + ,':.: :. .-t....# . ..;. ..... r '-.' .- '. ....... .... " . ;. ..... ":, -. .. .' .~. : .. . . ... ...... -.. .'. .::: u::.:.., ......... _ ......... '" ,0 ..'" . .. ~. '. UNXT R~INF~L~~INTENSXTV.'FACTOR CMART. ...... ~.. '.~/ ,-.. ...ft I..... ..... :..,:.. .:. _'" .:_: : .,:. .. .' .~ . ..~:~. ..: :-:-: .:.; .. I x. PER t-IOUR '. ,. '. :..:- ~~~~._~. .-~~.. ...... ..~-~. ..~~~- ~~~~... ......~. ~_.... ...... -..~~- ~..~-. .~~.... ........ ~-~... .....~ ~--... ....~~ ....~.. ..' " ':,...., :~ "_UCUIlU"r.:t_II!1UV~~ , :~ 11~1lZ;r.:UIlIlZ;"r.:t_I":-UV~_1 I -:r~ 11_IlZ;01IlIlZ;MCt_I~tIlV~~ - t;~.--' llI1nll' ) TIl. 10 TIll U TIl. :s TU 100UII . 1101 nil I ) TU 10 ~ U Till ,) Till: 100n:a1 1 1001 nil I ) Till 10 n:a U TIl. ,) ns 100TDI'- .... .'.: ......... .....~ .----. ...... ...... .....~. --....~. ._--.. ...... ._---. p..-.. .-..... ........ ...... .....~ .._-.. ...... ..~-... .. ~:_:~I~. I II :";114 .,19-....n4. ..'U '.n1 I. 41" .OU '. .041 '. .0)' -' .OH .012 I I II II .on': .0)4 '~:.OH .OU .0)11 -....:., 'II.:'.IU .IU ~:::.'O' -.' .,H,:: .,,, I 1..42 ......0'0. .041,. .0n':".OH . .07' I I ., II -.0"" .0)4 .on -. .041 .OU 1 ," ... I.'.:" 1I;'.;H4 ".111".'.1,,<..'0' ::~.'))"'I.. 0.11': ;0'0'-".047 .0)1 .0~,':...'.011-"I"n II .0,.':-.OH.r'.OU" .OU .O~O I ..... r......:.. 4 11.:'.1" '.:',J~' -'.1'1'.' .1"4 :,- ."1' I H II': .0)) .041. .O~O: .031 ,'. .010 1'_ . t4 II. .0" .0)) .01'. -.0'0 :.0)0 ,'.. ._::., I:~:~) II - .11' ,.:1), .141 ~:..H~J::...,o, 1.1 nil': .0.1' ,'.OU .041 .0H':.:~.01' I:';' IS 11:.:.021 .0lJ :'.01) _.:.0'0.".0~0 I ."_ :.:.::. ~'.'_. '.,~ :....n.;:. . .. . ~:..... . ~::'.' '. .:. ;...:-.....;. .. .' ..:..~...~.... ''',~. '1:"_".:.' ..::. . <:':..- .....~.-:..:.. +" ..'. 1-.:' II; '.101. -..1" .1)'-. .IH '.190 I-I. "11.,..011...:.04' .0., c .o~) .0'1' I "II .021 .0lJ" .on .010 '.041 '.7'1';", 1 11....100......111 ,;'.12' .141 -:'.117 I 1":..41 II .011 .on .0" :.on.. .0'1' " 11 II .021 .0lJ~...on.- .040" .0., _ .' :.:.:.:',::', II.:: .071 ;.' .111 )'.III~ .1H . .1U I , 'U II :-.011 ,. ..on .OU .0~4 ';''-.011 1-"1 .. II ~ .0" .. .0)):: ,..on ',. .DU .041 .:. ."",:.1::- , 11:"':.0.. ...IO).'::':~U,::'.IH'.:.',:.U1 1'1 ., II.. .on .0" :',.00 :.on.',..OU I I, n 11',.0" .012.....on ~,.OJl :-'.0" .::"I'.IOII'".0"4~:.0"....IOI...120::'~.14l11 ~Oll .0n'.044. .00 ;.O~I...OUII"'OII':',.O" .012';.OH:".OU '.011 ..... ....: ,. -..... ...1 .... ......-... .~ ... :..' : ." ,", :":. ~:.~:"':.I '., T.': ~'! '.. 1:-"11 II. - .0"0 ,. ;01S '-:-.101 .114' .14' . I ')1 II'. .OH .on.' .0" .O~,... .OU I I. 11 11:;':.0".::'..0" :.014 .~'. .OU .011 I....;.;. I,~I' II '..021" .011'" .0".....110..-...1111 I 'S, II' .on .on :.0., .OS, ....014 I I ""-.0:'.. .on ..OH .....Oll .on I ._, I' IJ 'I .on ...011 . .OU ".lOS :.." .1)0 I ,.. ~I II .OH .042.. .on .O~I'.. .0'4 I I H II~ .0"" .01' .014 '.- .OU.. .041 I .-.- .':._:14.11;.:.011..,,014 .....0'0 .101;: .1" " H II .on .042 . .on .0)1" ,0')" H II .0" .021 ,OU .OU -;047 I I U II .~:.OU '.011,.-:. .017... .OU.... .1'1 I j' 33 II .0n:.~.042 -'.0.. '.:.O~O:: .01' I I H II .:.OH .on.". .on '_':_.0)1 .00 I '. ....J -'.;.: -. "~ - . ":.:-', -~':~I " ...... '.. -..' .... .... .-:.... .._.- , .. ,r: _ '.~'.'~ :':.\ '::.~f~f:?~; II :..OU,:...0".....0.4. .015 ~...1171 1 3111 .on. .041." .O...:..O~O.;..O" I I. "". .OH... .0)1 .on ..OU .041 I II....OH :".021 .-:.01l.....0"....114 I I, )111'::'.014";:'.041".:.0" ..0":;";0'1 I I" ""'.:.0"'.:..0)1,-.0)) :.:.017: .OU' _. '-'.: 1.;.11 1I'f.:.O" , '.074'-.: .on:; .on ..-.1111 I ), II .014 .041' .on .0., ...0'1.1 I ,. II. .0,. . .011".'.0))', .017'. .OU I, - --..:1:: 11 11':'.0'0 .....072":'-..017....0.,.:'"...,.10.1' ), II ..0)4:: .040 ..on.. .041 ~'.O'O I I "" ".0,.':..011 :::.OJ)~::.-.O],.,. .OU I <-. :'.~'" ~:~.'~."::.:m J.~...O'.O...i: .m...~>,0..4::~~::::0.~ I I,: '0 11.:.:.014 ...O~o.}:.on .S~~.U...t.:~I..0.'.J_-100 1.!;.,:;:~~'.:.-~.010 .:.O)~..~.::on . .04.! ;;.~.:~f~ . . ,- '1-1I:.;O)7'~~ .D".: .01):':.0.,.':.10: .-, U II ::.OU ..on "'-;0., .041'" _CH l'j.'IOIII.'.O:) .0'0 .on.:~'..on" .OU ,.,',:" ..:, ,;::, ".,.O~' :.:_.0'1 :'.on .,.;'010.'-.1001'1 '2 II. .012 "'.on .042. .047.: .OH I . IC, ", .OH_ .010 '.on :..OH .OU 1'-".. . I ~ 2) II :: .0)) :, .OH ":: .010 . .071 :>_.0" I I'. nil' .OU .on.. .041.:. .041:'- -.cn I I 10' II.' .OH .. .0'0 . .012 ~.;..OH" .ou '. :;;:_. ... ,'.: 24 II .0)4 .0,"' '.04. .077' .o,s. I I '4. II .032 .OJI .041 .045" .0,,"1 I 1 10"' JI .0:$ .(1)0' ..OJ~ .0)' '0 ~04S' ....~.. ,"-,) II .on .0'2 .on .on .on I I U II ..on .OU -.041" .041 .C$71 I 10~ II '.0:), .0'0 .012 .on:. .044' .. -. ....... I I 1 I ..'.' . ",:". J' . .' .. ,. I I .. I. I' .. I ~ " ,. II 'O)':J .051. ..0'5 :711 .on .0'0',.OU ,. II' .C~o .0)" -.on ",1. . on ..0)1 . 0'2 )0 II .:.04f:_...o~7 .on : '.014 ':-. .0" I I .012 .0'0 I I . 071 .0" I I . 070 .011 I I .0" ..' on I I " I I . 012 '1 II .on U II . on "" .on 70 II ...0J! .OU .OU .on .on .on .040 .040 .040 .040 '..on .OU .04$ .OU . .ou .044 .0)1 1 .0)' I .0)' I .CH I .OH' I 10' I 10' I 10. I 10' I 110 II .0:3 II .. .0:) II . 0') II .1114 II .024 .0" .0" .0" .0" .0" '.0)1.. :'.OH .044' ..on .on .044 I . on .-. 0)) . 044 , .on ..:.on .on I : .on .on .on, - . - .. ...... .. .::.:..,:' JIll .:047.-_:..on .010 .0";"-.014 I I 7111 .on .OH-:'.';OU.. '.OH' ,..0)) I I lllll':.o,., '.0" .on .0]$ .on I .~ n 11....-.0.... .o~) .o~, .o,~.: ..01: I I ~, II .0)0 .on .:";OU .044... .0~4 , I ll' II '. .024 .0" .on .on" .on I , ; ;._~. I": n II ".0". .OH." .0)' ~:. .OH o::'.on I 1 .71 II'" .0'0 ..-..OJl '-".0)1 ..- '.on .0~4 I. I lU II:: .014 .0" .'-.__0'0 .OU ..041' :::"_' .,. ,., H 1I....0U:. .OS) :.'.057.:.:.0~'~,~0.0 I J", H II' .010 ..IlJl:':.OU- -'.on .0)', I 114 II :.014. .C" '.0)0' .OH ..OU I '~", .::.:,1._:.]$1..:.044...<".05>> :.on::"'ou'. .071" nil .0'0 :.035;".O)l'-_.on .C)II I 11511'<'.014: .0:1 '.0)0 .014 .01'1":'-.. '- I=-~' -,(:..0~'4: .,,~-;,~; '~..OSS:. . o~t:-'.O~~.;'~~' ,,';;" :"'.0'0 - .o;(:~:';o].i '.04'-'.m j I"m j'I':".0'4 ,.'~ ;021''':-:0)0 ~: ow." . OU I .-.:~~ :-;;.,- I nil .0U .on .on .0'2 .on I I ':7 II .0" .on '.017 .042 .o~, 1.1 11': II .014 .0'" .0]0 '_ .014 .042 I ' I ]I II :..042 .0)0:' .OH .051 .on I I n II .0" .on :":.017" .04' .... :0)" I 111 II. .0:] .0:1 '._- .0)0.' .014 ..- -.0" I ..'o" " I;'. n II.: .04':";' .oso '::.05>> ; .010 .074 I ,. ""-; .0" .OU, .on, :.04" .0): 1 ,. lit II':. .C2J .0" - .0)0 ..on ......041 I':::?~" T";,-~~~ I': 40.11-:.041 ._'.OU . o~, . on j -:. on " '0 11-. .0". . OU . on .....041 "'. OSI I I 120 II ~ .0:) .0'" . c" .'. OU ; _:~.I_I_'.: :..;~... .:;..:a.~..... .a.~_~ ...~......~.. ~~.~~~ ....a.. ........ ..a... ...... ..~~~* .__.~~ .....~. ........ ~~.... ...... ~_~~.. ...... ___ ".: :,:~.~',.:'::: .. ':. ....... -'.. '.. ...... .....7.... ..,.._~. ..... ".::-': ~~,,-:. ~.bj,.pO..)r,..:':.:_:.;'.~.':".'>.'.'~~-.f._:-'.',.::,~:,,;:-:,.:~::'::":.';:,:'''' . ..~... :.:. :;-.t'-:...~;:~> I~:.~n.~~~~~ ~0.JIO.m\:,i:..:2~~~I..j;i:1 ~', . .g.'o.~;c...1 /: i', ;:;:~.:. ~....:~~~.,:.:~. .- ~~'.;'~:n 1~ Bo>~.' <'" .~':.i..:-.~..::.J~:..:.;l:);;:~~~ . ._-...:.:.:...... _ ._ .,. .-.. _ ..' . ..' .... ft.- . . '\.. ..... .. ~ : ....... _~'".... --:::....-.... '.n. hl~:"~~ ,.10. hl1.~~" ..~15. ,.,.II.UTI -n~ ~ hll.ISOI ,.100'. ""1:."4" ,: .. _._::.._...:_.__. '. .-.:'-7 ~. -,- . .- ..:::'..::' .....re. ,..1. tll. 'U"1n:1~d /Wu ....nlld l'T.e1~uthn "" ".... \........ .. ';;~~"'~~;:"""r.i 7'1; cote. .rr- the ):-,...r. .te... It"atl.'tle.l "'.n tT~C'lp:.t.tloft '. .., ...... :'::.i.:.~....- . ..._.' .. :....;'...... .,#;..._~...... -.. ,..._. __......#,. _........... :"'... +'= :~::' :..; . . .0...... ...,;........ _.. :~:.'~~~~. ,...... _ .:' _.L.-' _... _':".:., .:..... .'; .' o.~. .t_.; ._ " n. .; - . . ..' -. . . ;;;". ~ .. o. '..'.. +:. ..... -~~'\.....:. .~.~.:~.:;~.t ~ . . ..t~. , ~ '. " ..: -, .. o. .' ...";, .1 ._ .. ...... .'l....MI:O... COUI\'TY FLOOO CO/,;'TROI. , AND DATE: FEBRUARY 1987 UNIT RAINFALL INTENSITY FIGURE 8 W... TO! CONsrR\'''' nON DISTRICT ..: ... ?v.3Z ....... .. :.:.:., .":", :...~. ':.'~ :,: ':.~~: :.:~,~ -~:\;i::.~/' , '. ~" ":. ~ ..' .. _ "::i'..~:~:~.~ - ~ I '1. '. ..<~;._~:~::;.:: ......:.~ '~" : ..'~' '. . ". ":'., ," . - -~'..: ::: .~. . . . ~ -. ~ . .' '",." .&. : .. :. .' ~ .- ~- .'.", ~ .-." *...- -... ~- . . .~..~:::'.:.~:. ~.- .'~." . . ..' ~ . . '.: .. ~" t.' . . ..,. " . ~. RUNOFF F~CTOR S~O~E ANO INTENSITV ADJUSTMENT C~ART ~c 2 OF 3 C 'In1t1~1 Runof! ractor .:.- . C"Cl< Runof! r..ctor .. Slope M::!ul<t"",nt ~.~.:.::;: C'.:' ~',~ pe"19n Runoff r"CtOr '. . ,*... ". -' .". . .. ... .' .. "}',:::"-._''1~:'de~~~~'~e:'c' t>eg1n u1th the 1n1t1al runoff f..ctor C 1n rhe upper left of rhc chart. Ora..... l1nc'" .-:i;.:;'..'ro "!:hc r19ht unt1l YOU _et .. ground "lope greater th..n the aver..ge ground slope of th~ 1ncr-elllent~1 .' ::c.;'::. dra1n"9c area. Next dr..... .. 11n.. dolJ'/\ 'unt11 you reach.. ra1nf..11 1ntens:1"!:y <;Ireater_ than YOllr Oed,.n..-:- ::Z;:7;.~'.1n!:cndty..: Next'dra... a 11nc ro rhe left to f1nd your oe"1<;1n rllnoff. factor C". _ .-.... ::~~....~:-..::t::.!:..~.:~.. '. :... ..' '. . . ,"'-.'. . . .... ." . ..............- ,"j.. ..~.a.:~':'~":. ;............ ..... .... ...." ......"'. ._"'. .... ..... ""'IIfl. .... ...... 11II11I... ......iii .... ...11II "'11II'.. iii... .... .... ..... ......... .':'::'::i'IUGIN II....:"::... ".; ',.. '.--' -.... C.. Cs ............. . -..., ...~:l:.1 ~!:LOl.' I.' .40'.n _ .42 .n .H .4S .U' .47 .n .49 .SO .Sl .S2 .H .si-"'.ss .S6 .S7 .Sf ....H' .60 ,., ....~~... .... ~... .... ~.IIII~ .... .~.. .... ~~.. .... .;"~~:~":; '..: ~o: : ;: '..:: ;;;. ; ~:' ~~ . ~:"::~ H "~;;-" -;;-: -:;~ 44 . H. ::::_ :::: ---- ::::..:::: .:;"':'~'I' .401 S 7 , 11 13 lS 17..20 "'22..2S "-.: 30..' H:"]6 . U .~. 42 -. 4S' . '". IC II .2,:' 4, 6' '~.ll' 14"'-17 .: 20".24 . 27 . , I .6011 ---- ---- ---- ____ ____ ____ ~___ ____ ____ ____ ___~ - I .7011 ----. --~_ ____ __~_ ____ ____ ____ ____ ____ ____ ____ I . lOll ~--- ____ .~. :' .... ...... ..11..'.... ........... I . -'.4011_ .00 ---- ---- : ,. ',I':' .4111 .U .00 ---- ,:,;:;..,.,- '>4211"-...H' .U' .00 '".... I'" :.43111.14 ."4 '.n",oo .ior'. 1....4111.33.1,,1". .'s'...70..00 :.,.'." t".'-' .'51.1 1.Sll.35 1.17 .'7" .71. .00 .:"?':_.IC....UII 1.70 1.S4 1.37 1.U.';"''' ..72 .00 -'.:~'i';': I..... .4711 1.81 1.73 1. S6 1.3' 1.'0 ." . 73 . 00, .:.....;.-,IC..UI 2.081.921.76 1.S' 1.411.221.01 ..H-,.OO I.. ".--' 2.21 2.12 1.'5 1.7' 1.62 1.44 1.'4 1.02 '-.7S .00 ICs .501 2.4' 2.3' '.16 1." 1.82 1.65 1.46 1.26 1.04 .76 ..00 I.. I 2.71 2.S4 2.37 2.20 2.03 1.16 1.6' 1.4' 1.21 1.0S .77 .00 I C1 .521 2.'6 2.78 2.60 2.43 2.:S 2.01 1.'0 1.71 1.Sl 1.31 1.07 ;78 ~OO I .S31 3.2' 3.04 2.85 2.67 '.4' 2.31 2.12 1.'4 1.74 1.54 1.33 1.0' .7' .00 ____ 1 .S41 3.S2 3.32 3.12 2.'3 2.74 2.S5 2.36 2.17 1.'1 1.78 1.51 1.3' 1.11 .11 '.00 I .551 3.84 3.63 3.42 3.22 3.01 2.12 2.62 2.42 2.22 2.031.12 1.61 1.31 1.13 .12 .00 I .561 4.21 3.'1 3.75 3.53 3.32 3.11 2.'0 2.6' 2.4' 2.21 2.08 1.86 1.6S 1.41 1.15 .14 .00 I .5~ 4.63 4.38 4.13 3." 3.66 3.43 3.21 2." 2.77 2.S6 2.35 2.13 1.'1 1.61 1.44 1.11 . .15 ,.00 o~~ i.. .S81 S.12 4.84 4.56 4.304.04 3.7' ].553.32 ].0' 2.862.64 2.41 2.1' 1.'6 1.73 1.41 1.20 ~17 . ~ .5~ 5.6' 5.37 5.06 4.77 4.4' 4.21 3.'5 3.6' 3.44 3.20 2.'6 '2.72 2.4' 2.25 2.02 1.77 1.51 1.23 .c. i .,~ 6.37 6.01 5.66 5.32 5.00 4.70 4.40 4.12 3.14 3.51 3.32 3.06 2.82 2.57 2.32 2.08 1.82 1.55 ",.:" I .6111 7.20 6.77 6.37 ,5." 5.62 5.27 4.94 4.62 4.31 4.02 3.73 3.45 3.11 2.92 2.66 2.40 2.14 1.81 I': .62'1 8.22 7.72 7.25 6.'0 6.37 5.'7 S.S8 S.22 4.'7 4.53 4.21 3.90 3.61 3.32 3.04 2.76 2.4' 2.21 -::. I' .ntl '.518.91 8.34 7.11 7.30 6.82 6.37 5.94 5.54 S.lS 4.79 4.44 4.103.71 3.47 3.17 2.17 2.51 ..;';.. .1:.... .6411 ....... ........ '.75 '.0' 8.41 7.'07.36 6.15 6.37 5.92 5.4' 5.08 4.70 4.n 3." 3.64 3.32 3.00 .'; .1. ._.6SII ........ ~...... ....... ....... ........ '.31 8.'4 8.02 7.43 '.1' '.37 5." 5.43 5.004.'04.21 3.14 3.4' ': "~::- i' . -. .6" I ........ ........ ........ ....... ....... ........ ........ ,. SS 1.'3 8.1S 7.51 6.'2 Ii.37 5." 5.37.4.'2 4.49 4.01 ::"~' I' ~".'711 ...... ..... .... ..... .... .... ....... .... .... '.!S '.0) 1.30.'.'1 ,." ,.]' 5..12 5.30 4..11 "..' ...:.' 1-.':' ..6811 ..... .... ....... ...... ........ .... ....... ......... ...... .... ...... '.31 1.4' ,..,~ 1.02 6.37 5.'7 :.... ..... 1':'. .~, . "II. ..... '...... .... .... .... .... ...... ...... ...... ..... ..... .... ..... ..... ,. '2 1.70 ,.. 8~ 7.01 ....:..~..t J" .1011 ..... ...... ..... ..... ...... .... ...... ..... ...... .... ........ ..... ...". .... ..... .... I." I:+~ .'llt .... .... .... .... .... .... .... .... .... .... .... .... .... .... .... .... .... .1. ."11....., .... .... ...... ..." .... ......... ..... .... .... .... .... .... .... .... .... :.:.:.<.~ I. '.~ .7311 ..... ..... ..... .... ..... ...... ....... .... ..... .... .... .... .... .... .... .... ..... ...' ._..' I ..74.1 J .... .... .... .... .... .... ..... ...... .... ...... .... ..... .... .... ...... ..... ...... .... I.' ~ .7SII. .... .... ......... .... .... .... .... ..... .... .... .... ......... .... .... .... ~..':'_"': 1 . 7" t ..... ...... ..... .... .... .... ..... .... .... .... .... ..... ..... .... ...... .... .... .... ~~~:=. '-I .'.....7711. .... .... ..... .... .... .... .... ..... .... ..... ..... ..... .... .... ..... ..... ..... ...... _'''.':: I, .781 I r.::~.-:" ..,,, I ...... .... ...... ..... .... .... :::::: I': .1011 . .........."'11II'11. ...... .... .... .... ...... .... .... .... .... .... ..... ..... .... .... .... ...... ...... .... ..... .... .... .... ...... ...... ..... ..... ..... .... ...... .... ..... ...... ..... .......... ........... ....... ..... .:: ..... .... "","iii. . I ... I end end end. 31 '_ 2 ne.>:':; ne.>:!: I; I L I, 0", r I- t I I, . " .."'11I I I I. I K 1 --r Ii I; I .. --------- : ! .00 .It 1.2' 1.'0 1.94 2. " ~. " 3.15 3. " 4.36 5.2' 6.37 1.02 I 1 III I I .00 II I .n .00 R I 1." . 9) '. I 1.65 1.33 .' , 2.00 1.70 1 2.3' 2.01. I 2.12 '2.49, I 3.32 2.t'. I 3. 93 3.52 .,' I 4.70 <1..21.' I 5.72 S.l2 -. I 7.15 '.37 , ,.318.:2'. I .... . I .... ..... 1 ..." ...... - I .... ......:. J .... ...... ... I I '. .... ..... ./-. I ... I I .... .... ..... .... .... ..... .... ..... .... ..... ..... .... ..... .... DATE: FEBRUARY 1987 Al.AMEDA COUJl.TY FLOOD COJl.TROL ."1'00 WATER CONSERVATION DISTRICT RUNOFF FACTOR " ADJUSTMENT FIGURE 10 .-.-:-,,:.. . ., ... ~ ~. .... .' :........ Pa e 36, , . . - , " .- . 100 l- lL1 80 lL1 LI... 41 (.) =z Vl ~ lL1 l- Vl ::::l 0 400 60 2: :;: '. ~ ..e j:: ..J 200 40 lL1 :> ,. < c::: l- '.- - - 0 20 '. - -.' o .. FIGURE 11 TRAVEL THiE FOR OVERLAND FLm.,r ,- .5ov"T1! iY rJ D ... DIAMETER (IN) LENGTH (FT) __. FRICTION COEFF (FT'1/6) ENT+EXIT COEFF INLET CONTROL COEFF INV ELEV OUT (FT) INV ELEV IN (FT) ." TAILIJATER ELEV (FT> ELEV INCREMENT (FT) <Shift> <Prt Sc> print '? 12 '? 140 ? .014 '? 1.5 ? .61 '? 395 '? 416 '? 396 ? .5 CULVERTS <Return> repeat RESULTS HEADIJATER (FT) FLOWRATE (CFS) =============-==:===========_::: 417.00 417.50 418.00 418.50 419.00 419.50 420.00 420.50 421. 00 421.50 422.00 422.50 423.00 423.50 424.00 424.50 Ie IC Ie IC Ie Ie Ie IC Ie Ie Ie Ie IC IC IC IC 2.72 3.84 4.71 5.44 6.08 6.66 7.19 7.69 8.16 8.60 9.02 9.42 9.80 10.17 10.53 10.87 0- ;Z /} T t:.- :: q Z z.... I rJ II :;:. 4/6> I rJ \J :;. 3''> <Space Bar> bac~ to menu ..__.____...~______.____________w_...___.______.__~P_____.____________._______* :.- jJ())Z7'# ;;.tJD .DIAMETER (IN) LENGTH (FT> FRICTION COEFF (FT"1/6) _ _. ENT+EXIT COEFF INLET CONTROL ,COEFF INV ELEV OUT (FT) INV ELEV IN (FT) TAILIJATER ELEV (FT) ELEV INCREMENT (FT) <Shift> <Prt Sc> print ? 24 ? 150 ? .014 ? 1.5 ? .61 ? 407 ? 425 ? 409 ? .5 CULVERTS <Return> repeat RESULTS HEADIJATER (FT) FLOWRATE (CFS) r;:(Z,A1"c- =' q--:O U /0.,../;1- 'L;; J'!:;-O I )Z./ r1 (j-,e/9 r 13. !IJ'J ;:: ~ ~( 417- 4ZS' ~ =======::===;====:========::::_- 427.00 427.50 428.00 428.50 429.00 429.50 430.00 430.50 431.00 431.50 432.00 432.50 433.00 433.50 434.00 434.50 IC Ie IC IC IC IC Ie IC Ie Ie Ie Ie Ie IC IC Ie 15.38 18.84 21. 75 24.32 26.64 28.77 30.76 32.62 34.39 36.07 37.67 39.21 40.69 42.12 43.50 44.84 I' [J//9 ':- 27' I/Vr/ qO'j <Space Bar> bac~ to menu ----------------------_._...__.-------_._...__.~._--------.-------.-.------..-- .5.#~~/ /l ..S:!~J~ . .:". <Shift> <Prt Sc> print <Return> repeat . <Space Bar> back to menu J/\IV I IJ'1. 5' . '3 CJcJ J=r S.= I.Se:;:;, /tV V I (J 0 3~/66;r L3 s- /;./ /~/ ., MAN-MADE CHANNELS VARIABLES LIST: Y . FLO'.l DEPTH . Q - FLO'.lRATE VARIABLE TO BE SOLVED (Y,Q,B,M,S OR N) ? Y B . CHANNEL BOTTOM '.IIDTH M - CHANNEL SIDE SLOPE S - CHANNEL SLOPE N - CHANNEL ROUGHNESS Q (CFS) ? 10 RESULTS -. B (FT) ? 1 ----------------- ----------------- M (FT 1FT) ? 1 Y= 0.88 FT -. S <FT 1FT) ? .01 A= 1.66 SF - - N (FT.1/6) ? .015 P= 3.49 FT V= 6.03 FPS F= 1.37 SUPER-CRITICAL FLO'.l <Shift> <Prt Sc> print <Return> repeat <Space Bar> back to menu MAN-MADE CHANNELS VARIABLES LIST: .. Y - FLO'.l DEPTH Q - FLO'.lRATE B - CHANNEL BOTTOM '.IIDTH M - CHANNEL SIDE SLOPE S - CHANNEL SLOPE N - CHANNEL ROUGHNESS . - VARIABLE TO BE SOLVED (Y,Q,B,M,S OR N) ? Y .'-- Q (CFS) ? 10 RESULTS B (FT) ? 1 ----------------- ----------------- '.-.: M (FT 1FT) ? 1 Y= 0.79 FT S (FT 1FT) ? .015 A= 1.43 SF . . N (FT-1/6) ? .015 P= 3.25 FT - . v= 7.01 FPS F= 1.66 SUPER-CRITICAL FLO'.l <Shift> <Prt Sc> print . <Return> repeat <Space Bar> back to menu . ""0" 5#ff#T C F/ZI/?f.:, .' . VARIABLES LIST: Y - FLOU DEPTH C - FLOURATE MAN-MADE CHANNELS B - CHANNEL BOTTOM UIDTH M CHANNEL SIDE SLOPE S - CHANNEL SLOPE N CHANNEL ROUGHNESS VARIABLE TO BE SOLVED (Y,C,B,M,S OR N) ? Y Q (CFS) ? 10 B eFT) ? 1 M (FT/FT) ? 1 S (FT/FT) ? .024 N (FT.'/6) ? .015 '. .. '. ,. , <Shift> <Prt Sc> print RESULTS ----------------- ----------------- y= 0.70 FT A= 1.20 SF P= 2.99 FT V= 8.34 FPS F= 2.08 SUPER-CRITICAL FLOU <Return> repeat <Space Bar> back to menu A.__._._~~.~_..._.____.__.._._._______.~._______~..____._.~_______.__...___.___ . . Sv/$6rD 5' /2.)/9. ,... w > -z ~<( z..J eta.. w~ ~ <t ( QI$ TP.5~l ~ TP.S. . .\ - - . TP.S3 __r__ ,- J I' : I I / " / I I I ,/ att / \ / . , / / , / , , , , / .. / ,/ ' , , / / / ... .. q.. .. / , " " ='0.-.:; '" \. , , \ \ \ ~: ,::" ." \.. :~ :' \ . .+\~ --C (V /od /'Y \ .:J: -:1/19 U l !: c ,\ \ .1 I I .1 ! I' I I' , / .I I .' ,. TP.38 i_ .' ... / ;' .' ...... -'0. .......-. .~ ...... ......... / ,I' aTt .' , , I ;. ..... t ...::. j ,. c , .. . ----1 -.- \ - J.31N', B13,:!I I . . _.', qTt ~,J~,'_.---". ....L .;--"' - --:=:: . "....,;~--:-;:--~--- - ~----...-., .'-.1 ~';'.;" .-.... , "i -..-J ----' ... ..... ~: --........7. ---.-J". ~ .............-l ~ ~ .:......J -------' ' ":: . ." ',', ::- ,'...... ",. '>:>'..', ;>:... ( .. . , .. . ..... ~.-:.~:~...:./..: - :l /<;i':\::":~>:;:-:: I: :':::_:.:c::.:.:.::':::.:::;':',::, ".::~ .:~-.: .;-~: ....... -'-\:::>'" -" ". ..... ..-/....::.:.~~ .: ...... ......:. ".;,'-"-:_", I. . _ . ~ _ , .".:': ,: ~~ ;.;. ',:'.:. :.:: "-. ',".. . -- j . . . 't: '::.:::'.:.: .::.;:-;-:.:::: ..,.., ......., ,":',;'::;/:'.'>,:::'~::::: . . .'......, " . .".-. ". ..,....-.::. ~ .:.:-;\.... .". .- :r: I-- . 0:::: D Z I - I ! I I . . ~ I P-" LJ I Z! .. 1----4 I l-I {/}-e t---if--:. XH Wp i ! ~ ,,; ~ i I ~t..- , ~._. I \ T U I- 1----4 c::::l ~01 ~~ i j~ 1 ]V ~i ~I I i Lj Z ......-i H (/j H Xl-- 'W ~--.J 1Z ---J1----4 W c::::lc::::l D--.J 2:W W~ o.::t_4....- i \' ! -"j :3 w Z WCZ 1----4<[ 0... <J:: w , Oo...Ck: : :. --.JW<[ i i i ...._-V~_.a::...-.- .___.L_~._____ --- ---f---' i . . . - . . :31 :L 01 . 0 Ck:: !-~"'~l'-" , LL~: :3--.JiI oTlu ~o...:t: LL~I~ T. ; "",' . . . . . . . . . . . . . . . .. ._-+--.---f-- ! ~-...--.-..-----.---.-.-J----.--- l______.! .' ". . . . . . . . . :" ""I -- , ~ ! l:J Z I:--'""l f.- V:l i-l xl- WW '--.J I UZ wl----4 Rp! a o j :2:-d j -----. ~ W f-I i r LL i ! ---~ I I i I ~ ! ~"i .----r- -1-- \:'~ i I.... i ~ ,:,.1. i ~ i I, '" ~ U i I ! lit:! I ~ ~! i i iw I I I ~ ~ i i I iW i ! 1 Iii ---+)>---+-----+-- i ~ ~ i:3 1 ! Iw! I ! Z ~ I I ~ , ! I I ; I 13dldl xa lGlNI i f\3N! ! ; ; ; ; ; ~J1I(]j f\Octls: WITJClJ ff\Ol.:l1 \D v ('IJ a OJ \D (Y) (Y) (Y) (Y) ('IJ (\j -.:t' v v v v v v (\j v ('IJ ('\J ..q- I I- ~ o (/) \D v v -.:t' -.:t' -.:t' I < ! ! NOll '\j ^3l3 ; !~ . -:..-J -------.-J ----'- ' ~ .. -=----..; ~ ~ ---.J ---.J -.:.J ~ ----.-J .---l ~ o o \D ......-t o o ~ ~ <=> <=> C\J .....--t --' W. ,;;-:-. ., ~.:.~..... . .~..::,. c~~.."'.~- - 6-:. .~ ::--"::1. .... --~ - . -. J--i' -::'=.J~"-- :.. ---- -~. -", - b;~~ ~;.~lL. Z~D . . ~r. -~1~ W '~D-- t- ~ <[ 0 <=> <=> .....--t Z D I--i }- a <[ <=> ?- m C/) . i I I I I <=> <=> \D o o ..q- a ('IJ v .. , __...:..........J ~ N W > - ~~ Z-J ceo.. LU ~- ~( ~ QI . TP.5.\' \~~ . - TP-53 r \, \ \. \. .. '--.. .,./ " '. .. " ./ "- ..., ? " " ... , " ./ \. , "- , , \ .. , \ "- '.' \ \ \ \ \ \ I i I I : / , J , , / , / ,.,' / I 'j' / I I j QTt I ,. .' . TP-:l8 I... , ./ .' .. I , /f; { / . , I ? "0 .I i ............ --...... --. , ' ...... , '............. / ;' .r-' " QTt ..... /,- .' I \l i c .. . !. ......: '\. ~ ::;,. \. \ \ aTt , , . ~ . I"; ~ ~ ~"~ ~ "'. . .',",' . ...... . ..,."- :::." . . . ." ,.". ,",' , . ' . '. I' ...>" ',....,' , ..,..... ... ". -," .. :'." . ' . .- ., . ..... :r: I- Ck:: o Z ....................",......; .----..........1............."'." . . . ' . . . . . . . . . . . . . . . . . ' . . . ' ... n. .........~.. .............". ....,..". .~..., " i tjJ ~. .......... ...~..... 1.... ...... .. ...... "r ~~~; I/)U ; \' f-if- . , X 1----4 : WR : , ' . ' ...n...................'t.' ,.......................t...-..---...................-!..'.-.. i .. un........ ,." .... ~,.n. ....... ........., ....t...'........' , . . . . , . , . , . . . . . , . . . , . , . , . . ' , . . . m.......T........m'.................--. ...n.__....~ . . . ' . ' .n...n.nn...u........t...................'..'.....? o a n....-t.._......................_n~__........................-.~-----._..................--- ..q- ~ , ' , ' , ' , ' , ' , ' , ' , ' , ' ! ! _._+.....................,--_.--~..............".-.,... --~.....................-. LJj z! f-i! 1-: ,I/)! l--lll- Xiw w:~ g -r-T-~r~-T--T.- ~ ::E!w Wil-l Ck::iLL __...n.................;.... ..n____..........,..,..~..,....., W~ 0...~i5 DD-Ck:: --.JW<r m.........(/)mo:::....... .... .00............'1 Ck:: 1--1 <[ D- ,W mm...................l.....Ck:.... W D- O ~ I/) I I- ::J o I/) \0 -.:t' v L- --.....t....."............---- <[ W Ck: <[ ~ ...q- ..q- . . . . . . . . .......m.--~................5----t.. wi zi 1 __._................._._~n._......................n-l" , ' o m--c............--.m-. 0 o ~ ..............-....--!-.. ................1..............,' ..............,..~...._ ._n_................~....n. n.....n.........+..........., ..'1"........... "" __.__m'.,..~....__..__m__"mm................._;, "",: :"" 1-1 w: ~i zj 1----4 ; , ' . ' . ' . ' , . , . , ' , . . ' , . . ' , . , ' , . , . . . . . -.n.n.......n.t..................-...,.....~ .00.....................,-.; -n..t................, .00..00-.+..........., :3; wi Z mm__lmm.... ..............". , . , . , . , . , . , . . . . . . ' . . . ' . ' . ' . ' . ' . . . . . . . . ~.........'....n.__.__.......,....," 1-: __.....,.......W.l..__..,_................. ~! 21 1----4 ; ....00.. .......... .... .~,." -71 LJ Z 1----4 l- I/) 1--11- Xw w--.J i --.J 2S a mm--.--.........tm,W.....m..'.... 0 ~~ (\j O~ ::Ew WI----4 Ck:LL ~ . . . . . . .n......t.........n' n 00-..0000.-.;............................-.;.. I U I- 1----4 P ; m--.-bJ.....+.........,.. Wi > :3 W z ('IJ v ~ o V V m (Y) -.:t' v (Y) v (\j (Y) v o (Y) ~ co ('IJ -.:t' \D ('IJ ~ v ('\J v ('IJ ('IJ ...q- \D (Y) -.:t' NOll'\j ^3l3 a a \D ~ Z D ~ I- 0<[ o}- mC/') o o \D o a ..q- o ('IJ v C\J w >W r--t.-J ~t--I <[U.- ZD ~O!: W(L ~ .-J <[ , _------! _,.-J .---l ~ ~ ~ ~ M W > - ~Z Z~ ffi c.. /- ~ .1 ~( QI ~5~ . - TP-53 -- " : ./ \ // \, \ '- .. -., ,/ '. ./ . '. " , ," , ". /' , " ". \ " \ \ . .' "- \. \ \ \ , j . i I i i I " ,/ /" 'j' " J I ! aTt ,/ - TP..31 I.... I ./ /." .. I /: '. -- '~ , / / I , , / '-- ........... "-- ~, '. " , ..... ..... ............ I .-I gTt /,- \ \ TP.21 . - \. (22:" ',.TP TP.2;". TP.25 . -. -,. (--;1' . ,...... , . T.P_21,i-'alsl .... I QC? ~ ~lIl c .. .., .~ , ~ '\.~'.-- .. , ----' \ .. ~t -----.: --- '. --;-~.- ---.J ----'. -..-J .. .. '," ". .-:....'-..,' ....... ", .......... .... ;.... . .' .;.' ,.." \.0 ~ C\J a\. C\J C\J C\J C\J ~ V V v HJ1IIT f~~ 2 ~ ~ ~ ~ -.J --~ ~ :r: l- n:::: o z ,-.J .~ Wi<r: WI- (/)W mmm'''''''''''''1~..m....... I . . , . . . , ' . . , ' . . , . ; : : l . . . . . . . . , . . . .........................+...............__...........+...............,.,....___.n~.__.........,.....,....,.___~ : j ! '\. . Ii: · . a \. i j i . · a -.'I".\"'.."."'........1"'.....".."..""'.......r...'........-..........'...1....-.'-..............."'1..."'.'....m...."....'.'[.'.......-.."'-'"""\.0 . . .......-l \ . ................':...n._'n~ ...........................'1 --...._.............,',..~,.... ..-----..............;.,....... }- -.J 1.L -.J:W <r:i-.J :3'n:::: ,,-,W . IJ:l i",> i n:::: i...;> _.m[...............:::J...lo ! Uj-.J . . . . j !~i I ! j i ! j j a , ; ; , ; a T-ri--T-----r--"--- ~ ; 11- j l V? 1 i X 1-: r'- j W; j 1W ,i i . 1 ~1 . . n'.............................L...................._...,.__....._._.............L.d....~....~.......__................f.._.................nn..........................m... g : l~D~j' ~ i i -.J · ; : :E i :W~: 1 ~ w.... i I 1 ! i , ,:r:, ' , --T-r--~-T---T-:; . ~ 1 1"\ , !:3. : .........................:... ....... .........~......... w.........~................ .. ' .....................~".... :e.........,..., , Z ' ! U I- ~ ~ .. . a . : : . ' ; ~ n_n_n.._.........'l'........,.........---......."':-.........................---"!---.......................---"I"................,.....-_.._.~..................-_._.._....~........,....----........... , . . . , ' a .......-l W W > W%<r: 0.-' o<IW o.....Ck: -.JW<r: . ...'......"'(/).nCk:.n.nmn.. .,....,,'.'.......n. . . , . . . . . . ). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ................"., ,.....-...--& . . . . . . . . . . . . . . . , . . y - mm'.................;--....mb;. ~ X W . . . . . . . . . . . . _.~.--_........................~... ...__n..............;.....".. i --_...............; ...------..............,..~ --r . . . . . . . . . . . . . . . . . . . . . . . . . . . . --..................--.--1............'...--..---.....t............ .n._.......................~_.__.____._ . . . . . . . . . . . . . , . . "..' I i' i . .,. ..,. .n...'" 0)0 ............";......-..,, m_m ,..; .......m..n.... _nm' ,-...... ..,~. i.... i".. , ".. ._................~ . . . . . . . . . . . . . . . . . . . . . . . . . ' . . ' . . . _n..___.."'l-.........................__.-l'_..........................,~..._,., . . . :r: I- :::J o (/) \.0 -.;;j v _nm.............<t-- W Ck: <r: Ck: ~ <r: ,0.- :w .mn'.........,...l.....()(.. W 0.... o -.J V? .----n-.i..................,..-" _?n._ n_...................;...... _..nn...n_......,........."....._._. _n._.....+........... L.:J i a m__............... _.........,..... _........::z.lmm..m............ a ~. v 1-; (/): ~:I- X;w Wj-.J -.JiZ _~---j_--~l~- i~ ~lt: ....,....'...'1"""""",....... 1- :r: U I- ,~ . m".....~................. W W > :3 W z ; ; .--.n-.f...................'.'. --t... ........-..-..........1"...'..... .-.1..'.......'. m \.0 (Y) (Y) v v v C\J (Y) (Y) v v a (Y) v m C\J ~ v v ..;f C\J V V NOll '\j ^3l3 I I I! ~--, .- ..... -~ ----...... (Y) w >W 1---1-' rl---l <[LL ZD lY~ wo.... r -' <[ Z D l--l r- a<::[ af- m(/) a a \.0 a a C\J -.J -.J <r: '::3 Q::: W ~ 0.... , .1< > 1. > , :;. ~I < . . l , " !: ~/~ PHOTOGRAP'HS . " ~. , . .." ~ . . . t':; .' . . SOUTH END -- ... . . NORTH END . ., ., ~. ;:, , (:. i" "':v ~ >) '. r;."', "' 7; ~(/:: :.. \11""1 ...... .... "-'\. ...-:-.... '., . ~ tI ,r "-A '''~ .'J'1' ""',. ..',' ,~\.... / I ~~;'\\"?~~ ....~.,~.,.. '; "i-~.... . ~:~t:,.\::..,. .',:,-tSO:~ ..It." ~Ib,\ \ \'-, .. ~f,;..>: ~:w..~~~,;~", ~" "..-::!=: '~'I\ \~\\,.,., "".'':Y;,'" "'~.7~-!...~\o-~ .. ,.' ...... ~ ",Ie. -:~~'ll~'T'!:r~~ .~~t 'J.::J"';t,~....~,,,: ---.~'~\h . ~'i'M~\~':l' '. · "1..,.." . . <j:Q'.' ;;,i ..\,:'...... -,",\ L..~\'ril.~ ~.: 1J. ,# ~ .-.,~~:. . ~.. ..... \j.~ -; ~: .~..J~.~ c: .' A II "., .... ~ ~ ~ I " , -t~ ~ t.,. :: ; .... l . .-:; L :.It. . l JII 1996-2001 CAPITAL IMPROVEMENT PROGRAM PROJECT NO. 9405 PROJECT DESCRIPTION Dougherty Hills Park Slope Repair ACTIVITY PARKS DESCRIPTION - LOCATION This project provides for slope repair, concrete vee ditch repair and installation of sub-drains on the east side of Dougherty Hills Park above Crossridge Road, and on the west side above Jade Circle and Topaz Circle. COMMENTS Heavy rains in January of 1995 and 1996 caused several localized land slides in the Dougherty Hills Park area, After examination of the area by a geotechnical consultant, it was recommended that the existing slide areas be re-graded with more stable material, existing vee ditches be repaired to improve drainage and a short wall be installed to help prevent overflows, The existing drainage inlet will be remodeled to help prevent debris from blocking the surface grate. ESTIMATED COSTS Fund Prior Years 1: , I i I ~... ..' ,';;:r,...."ll,"::;<';';.";'-'''''.:,'''.:.:.:.:.;.;.;.;.;';.;.;.:';';';';:""""s':"''''-''';': :':'~~j"""S:';';':':':':':"':':""';';"""''''6GOO':':':' ,:,'. :~.:l.~":';::::::::::::::::::::::::::~:::::::;:::::;:;:;:;:;::::;;:;:~ ,~~.~.:. ;:::::J:u.::J-.~~ .::::~;~~:~:~~~:::::~:~::::::::::~ .::~:::: ~ I Prelim. Engr. Designllnsp Improvements Miscellaneous S 40,000 65,100 001 300,000 550 S66.000 FINANCINGfYEARS SCHEDULE 1996-97 1997-98 1998-99 1999-2000 2000-01 Totals S339,650 $405,650 :\:S:13~;65D:tttN:::::tt:Mti::::@f::::::~tiit::Wtr;t:::~::::::KWWtMtit:i::i:ttt?Mt::IIII:{::::S405~550{ - 28 - EXH!~IT 3 .-n;,fI" li~ .