Loading...
HomeMy WebLinkAboutItem 4.06 Accept Work 96-02 (2) CITY CLERK File # ~-~~--~-~-~---~ AGENDA STATEMENT CITY COUNCIL MEETING DATE: July 23, 1996 SUBJECT: Acceptance of Work- Contract 96-02 Annual Overlay Project Report Prepared by: Lee S. Thompson, Public Works Director EXItlBITS ATTACHED: List of locations repaired. RECOMMENDATION: / 1) Accept improvements under Contract 96-02. Authorize payment o1'$57,499.45 to O'Grady Paving for their final invoice and release retention in the amount of $40,517.46 after 35 days if there are no subcontractor clai/ns. FINANCIAL STATEMENT: Engineering/Design/Inspection Construction Miscellaneous General Fund (001) SB 3O0 (220) Measure B (217) Gas Tax (206) Bu__~d et Actual $ 10,000.00 $ 11,164.54 $ 431,439.00 $ 405,174.56 $ 600.00 $ 677.21 TOTAL $ 442,039.00 $417,016.31 BUDGETED BY FUND Overlay CIP ~ Total $ 90,789.00 $145,250.00 $ 236,039.00 $ 40,000.00 $ 0.00 $ 40,000.00 $136,000.00 $ 0.00 $136,000.00 $ 0.00 $ 30.000.00 $ 30,000.00 TOTAL $ 266,789.00 $175,250.00 $ 442,039.00 COPIES TO: O'Grady Paving Michael Lim, Caln'ans ITEM NO. g:~u-nmcproj~sJd ewalk~agstacpt I ACTUAL COST BY FUND Overlay CIP Operating Budget Total General Fund (001) $ 97, 760.06 $135,148.98 $ 232,909.04 SB 300 (220) $ 25,518.47 $ 0.00 $ 25,518.47 Measure B (217) $136,000.00 $ 0.00 $136,000.00 Gas Tax (206) $ 0.00 22~$..~Z,.5_I~L_~. $ 22.588.80 TOTAL $ 259,278.53 $157,737.78 $ 417,016.31 DESCRIPTION: In May of 1996, the City Council awarded the annual overlay contract to O'Grady Paving. This project provided for street repair at various locations for both the overlay and slurry seal projects and the asphalt overlay of streets at various locations in the City. In addition to paving, the median islands along Village Parkway were raised to accommodate this and future overlays. The City Council approved a $70,000 change order to overlay Dougherty Road from north of Houston Place to south of Amador Valley Boulevard and Dublin Boulevard from Hansen Drive to Donlon Way. This project was funded by Gas Taxes, State SB 300 Funding, Measure B (1/2 cent sales tax) and the General Fund. The project is made up of moneys budgeted in the Overlay CIP project as well as the operating budget for Street Maintenance. The CiD' Engineer has reviewed the work on the project and has determined that the work is complete and in accordance with the approved specifications. Staffrecommends that the City Council accept the improvements and authorize final payment in the amount of $57,499.45 as well as the retention amount of $40,517.46 to O'Grady Paving. g.' loverl~,loverlaykagstacp l ANNUAL OVERLAY PROGRAM 1995-96 LOCATION LIST Village Parkway Dublin Boulevard Dougherty Road Cedar Lane Eden Street Spruce Lane King Way Hemlock Street Prince Drive Poplar Way Post Road Hyde Court Hickory Lane