Loading...
HomeMy WebLinkAboutItem 4.02 Advertise Bids 97-01 (2)CITY CLERK File AGENDA STATEMENT CITY COUNCIL MEETING DATE: February 5, 1997 SUBJECT: Authorization to Go To Bid -- Contract No. 97-01 Serra Court Drainage Improvements Report Prepared by: Lee S. Thompson, Public Works Director EXHIBITS ATTACHED: 1) Location Map 2) Specifications will be available at the Council Meeting RECOMMENDATION: ~ FINANCIAL STATEMENT: Authorize Staff to go to bid on the Serra Court Drainage Improvements Project It is estimated that this project will cost approximately $12,000. Additional asphalt repair and overlay is not included in the estimate, but will later be included in the City's Overlay Program. Construction of these drainage improvements will extend the life of the pavement and reduce the total maintenance costs for this street. DESCRIPTION: The ~4nter rains have exacerbated an under~ound spring which surfaces in the rear yards of two residences at the west end of Serra Court. This spring has now extended under Serra Court, surfacing in Peppertree Road, and has caused severe damage to the pavement on both Serra Court and Peppertree Road. Water under the street softens the road subgrade and allows it to flex m.d break up the asphalt pavement. If preventative measures are not taken at this time, the City will ne yd to do a full street reconstruction in the near future at a much higher cost. The purpose oft}tis project is to install a perforated subdrain along and across Serra Court, where it will tie into a storm drain crossing Dublin Green Drive. The subdrain is designed to pick up and drain off undergound water before the water flows under the street. Repair and overlay of the street will be included in a future Overlay Program, for which there will be a separate contract. As the necessity for this work was not anticipated during the Council's approval of the Capital Improvement Pro,am for 1996-97, a budget change will need to be made before awarding the bid for this project. Staffreconunends that the City Council authorize Staffto go to bid on this project and bring back a budget revision authorization at the time of award of bid. COPIES TO: ITEM NO. ~__~ g:raiscproj~erract\agstauth 38 .' Z~~~- .' -' ,~N~ _ · - '~' - ' INSTALl. SUBDRAJN ....: 50 FT~ ' '-" ~ ~4 .. - STDRM~RAIN PRO.CT LOCA~ON AND C~S~UC~ O~EW - &ZTY DF DU~L[N PU3LZC ~D~K~ ~EPA~THENT -.-:.- CONTRACT NO. APPRDVAL :':'~"' SE~RA COU~T APPRDV~L 97--01 PUBLIC WDRKS DIR~CTDR ~. KAS Ic~zc~z~ c~* ~A*zOl/27/971sc~uz NONE I~R~w]N~ NO, ll ~r 1