Loading...
HomeMy WebLinkAboutItem 4.06 MTC FundingAlamoCanal (2) }' CITY CLERK File # D[2][3J[Q-ß][Q] AGENDA STATEMENT CITY COUNCIL MEETING DATE: May 20,1997 STJBJECT: Authorization to Apply to the Metropolitan Transportation Commission (MTC) for Transportation Development Act (TDA) Article 3 Funding for the Alamo Canal Bicycle Path Capita] Improvement Project Report Prepared by: Lee S. Thompson, Public Works Director EXHIBITS ATTACHED: 1) Resolution 2) Notice of Exemption 3) Location Map RECOMMENDATION: 'Î ~oPt Resolution directing Staff to apply for TDA funding v \ FINANCIAL STATEMENT: The City is requesting $67,843 additional TDA funding \vhich will cover the estimated costs for this project. DESCRIPTION: City Staff has submitted the Alamo Canal Bicycle Path Capital Improvement Project to the Audit Committee of the Alameda County Transportation Advisory Comm¡L~ee (ACTAC) for consideration for Transportation Development Act (TDA) Article 3 funding. Alameda County and the cities within Alameda County compete for TDA funding, which is available for certain pedestrian and bicycle projects, on an annual basis. If approved, project funding for the current application would be available in the 1997-98 fiscal year. Within Dublin, the Alamo Canal Bicycle Path rW1S north from 1-580 at the City of Pleasant on city limit, continuing north along Alameda County-Zone 7 rights-of-way, north to the San Ramon city limit. -- -- Originally, the Cities of Dublin and Pleasanton had requested ISTEA and TDA funding for this project, which includes extension of the bicycle path within the City of Pleasant on and Zone 7 right-of-way. The City of P1easanton acted as lead agency on the Alan10 Canal Bicycle Path Project, which received funding through ISTEA and TDA grants. The project was scheduled for completion in the 1996-97 fiscal year: however, due to heavy rains, canal banks eroded. Notice was received from Alameda County-Zone 7 requesting deferral of path construction until erosion repairs could be completed. The Zone 7 request did not affect construction of bridges and underpasses that was associated with the Alamo Canal Bicycle Path. ----------------------------------------------------------------- COPIES TO: ITEM NO. 4.6 g:agenmisc\apptda As a result of the Zone 7 request, the project was divided into two phases. The first phase included construction of the bridges and underpasses. The second phase will pave the path and install drainage improvements, which will complete the project. The first phase included two bridges and an underpass constructed within the City of Dublin's jurisdiction and is complete. One bridge links the Alamo Canal Bicycle Path to Dublin High School, while the second bridge provides a connection over Alamo Canal. The underpass is constructed under Dublin Boulevard. As a result of deferring construction of the path, costs anticipated by Zone 7 and the City of Pleasanton for tl1Îs j oint agency proj ect were exceeded. As a result, the City of Dublin is requesting an additional $67,843 in TDA funding to complete the second phase of the bicycle path project. Dublin Staff plans to complete the remaining design and construction of the bicycle path within Dublin, and Pleasanton will complete their portion. In addition to TDA funding, some of the ISTEA programmed funding is still available. The Cities of Dublin and Pleasanton were originally awarded $630,000 in ISTEA funds for this project. Of the total ISTEA funding, the City of Dublin has a balance of $57,300 remaining for this bicycle path project. The $57,300 in ISTEA funding, together with the $67,843 in TDA funding, will complete Dublin's portion of the project. Staff recommends that the City Council adopt the Resolution directing Staff to apply to the Metropolitan Transportation Commission for this TDA Article 3 funding for the Alamo Canal Bicycle Patl1 project. .-. Page 2 RESOLUTION NO. - 97 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF DUBLIN * * * * * * * * * APPROVING THE ALAMO CANAL BICYCLE PATH CAP IT AL IMPROVEMENT PROJECT AND DIRECTING STAFF TO APPLY TO THE METROPOLITAN TRANSPORTATION COMMISSION FOR TRANSPORTATION DEVELOPMENT ACT ARTICLE 3 FUNDING WHEREAS, the City Council of the City of Dublin advocates the safety of bicyclists and pedestrians; and WHEREAS, the City Council has reviewed the safety-related improvement as follows: Alamo Canal Bicycle Path Capital Improvement Project, along the Zone 7 right-of-way, from 1-580 at the City of Pleasant on city limit north to the San Ramon city limit NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Dublin does hereby approve the Alamo Canal Bicycle Path Capital Improvement Project and directs Staff to submit an application to the metropolitan Transportation Commission for funding of the projects under Article 3 of the Transportation Development Act. PASSED, APPROVED AND ADOPTED this 20th day of May, 1997. AYES: NOES: ABSENT: ABSTAIN: Mayor ATTEST: City Clerk g: agenm isc\resotda. doc r~·',. - - .~- ". 7'~_"': _L :._.- ; -.-.;. . L.....· _.-' ¡,; - '--~'" ~ - - ·~-~- <~ ~-l)j/;/ ~II~~~\~~ ~~-- -~r~-_~<!f -,-;: -.. ·-ër:.-:, Y.-~.~" " ~ CITY OF DUBLIN PO Box 2340, Dublin, California 94568 . City Offices, 100 CivIc Plaza, Dublin, California 945,' NOTICE OF EXEMPTION TO: County Clerk - County of Alameda FROM: City of Dublin Engineering Department 100 Civic Plaza Dublin CA 94568 PROJECT TITLE: Engineering/Public Works Department: Alamo Canal Bicycle Path, Phase 2 Transportation Development Act (TDA) project PROJECT LOCATION: North from 1-580 at the City of Pleasanton City Limit, continuing north along the Southern Pacific and Alameda County-Zone 7 rights-of-way, north to the San Ramon City Limit. Dublin, Alameda County, California 94568 PROJECT DESCRIPTION: Construction of the Alamo Canal Bicycle Path, Phase 2, as a continuation of the project commenced during Fiscal Year 1996-97. The City of Dublin, on May 20, 1997, found that the above approved project has the following exempt status: Categorical Exemption, Class 1 (c), Section 15101 Reasons why project is exempt: Minor public alterations of existing public facilities involving negligible or no expansion of use beyond that previously existing - construction of bicycle path along existing public rights-of-way. Telephone: (510) 833-6630 Signature: Mehran Sepehri, P.E., Sr. Civil Engineer Date of Signature: May 20, 1997 .- . Date of Mailing: May 20, 1997 g:\agenmiscjalaTT!oxmp. " -' AaminlstratlOn (510) 833-6650 . City Council (510) 833-660::J . Finance (510) 833-6f Code Enforcement (510) 833-6620 . Engineering (510) 833-6630 . Parks & Cr Economic Development (510) 833-6650 . Police (510) 833-6670 . Public Works (51 r~ ''''. ::- ;.': ~~. *-.. f"'"' ~--. t:__ \ ì; - /'..,:.. ..,:":-. ~ '.. -. . - ~" ~~~.~ \_~ ~~~ ~ ~ ¿. LOCA TION l\1AP - ,- J~' --= I ~=- -- -- ALAl\10 CANAL BICYCLE PATH ~~·fP!!:,'1"~~,F~ èXt~~iz ~ J.