Loading...
HomeMy WebLinkAboutItem 4.05 AdvertiseForBids 97-10 (2)CITY CLERK AGENDA STATEMENT CITY COUNCIL MEETING DATE: August 5, 1997 SUBJECT: Authorization To Solicit Bids for Contract 97-10. Heritage Center Parking Lot Report Prepared by: Lee S. Thompson, Public Works Director EXHIBITS ATTACHED: RECOMIVIENDATION: ~ FINANCIAL STATEMENT: Engineering/Inspection/Misc Improvements TOTAL 1) 2) Map of Project Location Plans and Specifications will be available at the City Council meeting Authorize Staff to advertise for bids Tiffs project is being funded from Parkland Dedication In Lieu fees of $47,750 and is included in the 199%98 Capital Projects Budget. 1997-98 $ 1,000 46.750 $ 47,750 DESCRIPTION: The Heritage Center was acquired in 1993 and building renovations were completed in 1995. The current par'king area is dirt with compacted gravel and is rutted and uneven. The schematic design for the par'king lot was included as part o£the Heritage Center Master Plan This project will include construction of a paved parking lot with asphalt concrete, striping for parking spaces, irrigation and electrical conduit for future landscaping and lighting, concrete driveway, and removal of existing asphalt sidewalk on Donlan Way and replacement with a City standard concrete sidewalk. Staffrecommends that City Council authorize Staffto advertise for bids. g:miscproj\hparklot\agst auth COPIES TO: ITEM NO. HERiTAG'¢ G':'NTER PARKING 10T HERITAGE cENT:ER PARKING~LLOT -- - LO O A"i'I ON--'~ AP~ CITY BF ApPRDVAL APPRDVAL -- __ HERITAGE CENTER PARKING LOT APPRi3vE'D PUBLIC WDRK$ DIRECTDR