Loading...
HomeMy WebLinkAboutItem 4.10 Award of Bid 98-09 (2) cITY CLERK File # ~ .~[~-[]~-~ AGENDA STATEMENT CITY COUNCIL MEETING DATE: September 1, 1998 SUBJECT: Award of Bid - Contract 98-09, Shannon Center Subdrain Project Report Prepared by: Lee S. Thompson, Public Works Director EXHIBITS ATTACHED: 1) Budget Change Form 2) Resolution 3) Bid Results RECOMMENDATION:  k/fApprove Budget Change Form and adopt Resolution awarding bid to GradeTech, Inc. FINANCIAL STATEMENT: The low bid received, $16,802.00, exceeds funds budgeted for construction by $9,302. Allowing for a 5% contingency; Staff is requesting an additional appropriation in the mount of $10,150 in order to complete the project. DESCRIPTION: On August 4, 1998, the City Council authorized Staff to solicit bids for construction ofa subdraln at Shannon Park. The east end of the Shannon Center parking lot has suffered accelerated wear and tear due to water infiltration of the base material. This excess water comes from an underground spring which surfaces in the east end of the parking lot. In order to maintain a parking surface that will survive to a reasonable life expectancy, a subdrain system is necessary to intercept and remove the excess water. This project will install a subdrain along the affected areas of the lot which will intemept underground water and direct it to the nearby creek. Two bids were received (see Bid Results, Exhibit 3). The low bidder was GradeTech, Inc., with a bid of $16,802, which exceeds funds budgeted for construction. Staffhas reviewed the tow bidder's proposal and is familiar with his work. Staffrecommends that the City Council (1) approve an appropriation in the amount of $10,150 from unallocated reserves and (2) adopt the resolution awarding Contract 98-09 to GradeTeeh, Inc. COPIES TO: Bidders ITEM NO. ~ g:\miscprojkshndrain\agstawrd CITY OF DUBLIN BUDGET CHANGE FORM CHANGE FORM # New Appropriations (City Council Approval Required): Budget Transfers: X From Unappropriated Reserves From Budgeted Contingent Reserve (1080-799.000) Within Same Department Activity From New Revenues Between Departments (City Council Approval Required) Other ~Ot~i~i::!ii:~i ..................................... ~! ~?:II~!i~::~¢~ ! ~"'~"'"~"'~' .............. ~" "~:::~:~*~:!~:~i~i~!~:.i!!i ?:!i!ie?:::~Ot~ ~i!::ii ii-'i'llI ~:. .... Name: Shannon Subcirain CIP #9512 Name: Construction $ I0,150.00 Account #: Account #: 001-9512-750-050 Name: Name: Account #: Account #: Name: Name: Account #: Account #: City Manager: Signature Date: REASON FOR BUDGET CHANGE ENTRY: Low bid received for contruction exceeds funds budgeted Mayor: Date: Signature Posted By: Signature Date: RESOLUTION NO. -98 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF DUBLIN AWARDING CONTRACT'98-09 ' SHANNON PARK SUBDRAIN TO GRADETECIt, INC. WHEREAS, the City of Dublin did, on August 25, 1998, publicly open, examine, and declare all sealed bids for doing the work described in the approved Plans, Specifications, and Modifications for Contract 98-09, Shannon Park Subdrain, authorized by the City Council on August 4, 1998, which Plans, Specifications, and Modifications are hereby expressly referred to for a description of said work and for all particulars relative to the proceedings under the request for bids; and WHEREAS, said bids were submitted to the City Engineer, who has recommended that the bid hereinafter mentioned is the lowest and best bid for doing said work. NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Dublin does hereby award City of Dublin Contract 98-09 to the lowest responsible bidder therefor, to wit CrradeTech, Inc., with a bid of Sixteen Thousand Eight Hundred Two Dollars ($16,802.00), the particulars of which bid are on file in the Office of the City Engineer. PASSED, APPROVED AND ADOPTED this 1st day of September, 1998. AYE S: NOES: ABSENT: ABSTAINING: Mayor ATTEST: City Clerk g:lmiscprofishndrainlresoawrd BID RESULTS - SHANNON PARK SUBDRAIN, CONTRACT NO. 98-09 3ID OPENING DATE -AUGUST 25, 1998 GRADETECH BID UNIT TOTAL ITEM ITEM DESCRIPTION MEASURE QTY UNiT PRICE PRICE UNIT PRICE TOTAL --~-- Trenching LF 3:30 $ 11.0~ $ 3,630.00 $ 10.00 $ 3,360.~- 2 Install Subdrain & Backfill LF 330 $ 38.40 $ 12,672.00 $ 44.00 $ 14,520.00 3 Outfall LS 1 $ 500.00 $ 500.00 $ 960.00 $ 980.00 TOTAL BID: $ 16,802.00 , $ 18,800.00