Loading...
HomeMy WebLinkAboutItem 4.04 Accept Work 98-14 (2)CITY CLERK AGENDA STATEMENT CITY COUNCIL MEETING DATE: May 18, 1999 SUBJECT: Acceptance of Work, Contract 98-14, Heritage Center I-IVAC System Report Prepared by: Lee S. Thompson, Public Works Director ATTACHMENTS: None RECOMMENDATION: Accept improvements under Contract 98-14 and authorize payment ~3/ to Breeze Air Systems in the amount of$17,988.00. FINANCIAL STATEMENT: The original amount budgeted for the project was $13,000. At the time the bid was awarded, a budget appropriation was approved in the amount of $ I 1,994, bringing the total to $24,994. Engineering/Design/Inspection Legal Notices Construction (Breeze Air) Construction (MCE) PG&E Connection Fee Estimated Proiect Budget Actual Cost $ 2,907 $ 4,372.80 138.72 19,787 17,988.00 213.98 2,300 1.422.50 TOTAL: $24,994 $24,136.00 DESCRIPTION: On February 2, 1999, the City Council awarded Contract 98-14, Heritage Center HVAC System, to Breeze Air Systems. At that time, a budget appropriation was approved for the completion of the work as the bid was substantially over the funds budgeted. This increase was warranted for the expanded scope of work for the project. The original scope of work provided for the replacement of two out-of-date heating and cooling units at the Dublin Heritage Center with one larger unit, as well as the installation of new ducting, thermostat, wiring and electrical connections. However, the scope of work was expanded to include the installation of one 3-ton capacity unit and one 5-ton capacity unit, as well as gas lines for the operation of these units. The addition of the gas lines necessitated contracting with PG&E for the gas service. At this time, Staffrecommends that Council accept the contract with Breeze Air Systems as complete and authorize final payment in the amount of $17,988.00. COPIES TO: Breeze Air Systems ITEM NO. g:Lmis cpr oj~hvac~agstacpt RESOLUTION NO. 11 - 99 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF DUBLIN AWARDING CONTRACT 98-14 HERITAGE CENTER HVAC SYSTEM TO BREEZE AIR SYSTEMS WHEREAS, the City of Dublin did, on January 26, 1999, publicly open, examine, and declare one sealed bid for doing the work described in the approved Plans, Specifications, and Modifications for Contract 98-14, Heritage Center HVAC System, authorized by the City Council on October 20, 1998, which Plans, Specifications, and Modifications are hereby expressly referred to for a description of said work and for all particulars relative to the proceedings under the request for bids; and WHEREAS, said bid was submitted to the City Engineer, who has recommended that the bid hereinafter mentioned is the lowest and best bid for doing said work. NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Dublin does hereby award City of Dublin Contract 98-14 to the lowest responsible bidder therefor, to wit Breeze Air Systems with a bid of Seventeen Thousand Nine Hundred Eighty-Eight Dollars and No Cents ($17,988.00), the particulars of which bid are on file in the Office of the City Engineer. PASSED, APPROVED AND ADOPTED this 2nd day of February, 1999. AYES: Councilmembers Howard, McCormick, Zika and Mayor Houston NOES: None ABSENT: Councilmember Lockhart ABSTAIN: None ATTE ST.~'7/; .~J"7/ K2/G/2-2-99/resohchvac g:lmi$cprojIhvaclresoawrd