Loading...
HomeMy WebLinkAboutItem 4.08 Sidewalk-Vanguard (2) CITY CLERK FILE # 600-35 AGENDA STATEMENT CITY COUNCIL MEETING,DATE: October19, 1999 SUBJECT: Award of Bid - Contract 99-10, 1999-2000 Sidewalk Safety Repair (Remove and Replace) Program and Handicap Ramp Construction Report Prepared by: Lee S. Thompson, Public Works Director EXHIBITS ATTACHED: 1) 2) 3) Budget Change Form Resolution of Award Bid Results / RECOMMENDATION: hf/. l ) Direct Staff to reduce the number of handicap ramps to be constructed from 15 to 13 Adopt resolution awarding bid to Vanguard Construction and approve a Budget Change of $10,926 from General Fund FINANCIAL STATEMENT: Design. tn.qpection &Misc: Construction: Remove & Replace Grillfling Handicap Ramps (CDBG Funding) SUBTOTAL: TOTAL PROJECT: Total Project Construction Budgeted Low Bid $ 7,850 $35,150 $42,477.50 $ 7.000 $50,000 14.904 $18.000.00 $64,904 TOTAL CONSTRUCTION (Remove & Replace and Ramps): $50.054 $60.477.50 The low bid received was $60,477.50, which exceeds funds budgeted for this project. Higher- than-expected bids received reflect the busy construction season. S!aff recommends deferring the consU-uction of 2 handicap ramps to reduce the original bid amount by $2,400 to a total of .$15,600 for I3 ramps, of which $14,904 will be funded by a Community Development Block Grant (CDBG). With this reduction and allowing a 5% contingency, an additional appropriation of $10,926 in General Fund monies (001 ) is needed Io complete ,the project. The sidewalk safety repair work has been budgeted, together with the sidewalk grinding proj eel, in the General Fund; however, the grin' ding portion will be performed at a later date. g:~nmeprojNsidewall,?_~"~.gsmwrd COPIES TO: Bidders ITEM NO. 4.tt DESCRIPTION: On September 21, 1999, the City Council authorized Staff to solicit bids for Contract 99-10, Annual Sidewalk Safety Repair Program- Sidewalk Remove and Replace (with handicap ramp construction). The Annual Sidewalk Safety Repair Program repairs sidewalk locations that are offset 3/4" or more and may pose a tripping hazard. This contract specifies removal of existing sidewalk, curb and gutter, and in the case of root problems, removal of tree roots, installation of a root barrier to mitigate future problems, and then replacement of the concrete sidewalk. This year, the consreaction of 15 handicap ramps was also included in the project funded by CDBG. However, due to the bid. amount exceeding the available CDBG funds, Staff is requesting direction to reduce to 13 the number of handicap ramps being constructed for a savings of $2,400. A total of 6 bids were received for the project (Attachment 3). Low bidder was Vanguard Construction, with a bid of $60,477.50. Staff recommends that the City Council direct Staff to reduce the number of handicap ramps to 13, and having reviewed the bid results and checked with references, Staff further recommends that the City Council adopt the resolution awarding Contract 99-10 to Vanguard Construction and approve a Budget Change of $10,926 from General Fund. Page 2 CITY OF DUBLIN BUDGET CHANGE FORM CHANGE FORM # New Appropriations (City Council Approval Required): Budget Transfers: __X__ From Unappropriated Reserves From Budgeted Contingent Reserve (1080-799.000) Within Same Department Activity From New Revenues Between Departments (City Council Approval Required) Other Name: Name: Sidewalk Safety Repair Program $10,926 Account #: Account #: 001-94250-750-050 Name: Name: Account #: Account #: Name: Name: Account #: Account #: Name: Account #: Account #: Name: Name: Account #: Account #: City Manager: Date: REASON FOR BUDGET CHANGE ENTRY: Signature Low bid for the Sidewalk Safety Repair Pro~am - Remove/Replace, exceeded estimated costs for the project. Mayor: Date: Signature Posted By: g:mntcprojksidewa~budgchng99~l O Signature Date: RESOLUTION NO. - 99 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF DUBLIN AWARDING CONTRACT 99-10, 1999-2000 ANNUAL SIDEWALK SAFETY REPAIR PROGRAM AND HANDICAP RAMP CONSTRUCTION TO VANGUARD CONSTRUCTION WHEREAS, the City of Dublin did on October 12, 1999, publicly open, examine, and declare all sealed bids for doing the work described in the approved Specifications for Contract 99-I 0, 1999-2000 Annual Sidewalk Safety Repair Program and Handicap Ramp Construction, authorized by the City Council on September 21, 1999, which Specifications are hereby expressly referred to for a description of said work and for all particulars relative to the proceedings under the request for bids; and WHEREAS, said bids were submitted to the City Engineer, who has reviewed the bids to determine the lowest bid which was responsive to the requirements. oft he bid documents; NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Dublin does hereby award Contract 99-10 to the lowest responsible bidder therefor, to wit, Vanguard Construction, at a bid of Sixty Thousand Four Hundred Seventy Seven Dollars and Fifty Cents ($60,477.50), the particulars of which bid are on file in the office of the City Engineer. PASSED, APPROVED AND ADOPTED this 19th day of October, 1999. AYES: NOES: ABSENT: ABSTAIN: Mayor ATTEST: City Clerk g:xanteeprojksidewalkXresoawrd99-O0 6 Handicap Ramps TOTAL BASE BID: BID ITEM E JJR CONSTRUCTION RICE UNIT PRICE; TOTAL PRICE 0.00 $ 10.00 $ 22,010.00 O.00 $ 4.00 $ 5,280.00 i0.00 $ 15.00 $ 1,425.00 ~0.00 $ 25.00 $ 14,625.00 0.00 $ 7.00 $ 4,095.00 ~0.00 $ 1,200.00 $ 18,000.00 ~0.00 $ 65,435.00 RICE ~7.40 · ~4.90 · ~o.0o ,.9.5'~· ;2.55 · !4.15 · :ation 6 Handicap Ramps TOTAL BASE BID: EA 15 $1,490.00 $ 22,350.00 $ 1,800.00 $ 27,OO0.OO $ 2,150.17 $ 32,252.55 $ 71,791.00 $ 75,703.75 $ 117 * Amounts corrected after veri~