HomeMy WebLinkAboutItem 4.13 Grind-Sidewalk99-11 (2)CITY CLERK FILE # 600-35 AGE N DA STATEMENT CITY COUNCIL MEETING DATE: November 16, 1999 SUBJECT: Award of Bid - Contract 99-11, 1999 Annual Sidewalk Safety Repair Program (Two-Year Grinding Contract) Report Prepared by: Lee S. Thompson, Public Works Director EXHIBITS ATTACHED: Resolution of Award RECOMMENDATION: Adopt resolution awarding bid to Concrete Grinding Company FINANCIAL STATEMENT: Design, Inspection, & Miscellaneous Construction Remove & Replace Grinding (2-year) Handicap Ramps 1999-00 1999-00 Budgeted Estimated $ 7,850 $ 7,850 $45.,380 $ 45,380 $ 7,000 $3,783.50 $15,600 $ 15,600 2000~01 Estimated $7,000 TOTAL: $75,830 $ 72,613.50 Note that $14,904 is being paid for through a Community Block Grant. The remainder is being paid through the City's General Fund. The low bid received was $3,783.50 (see bid results in Description below). The low bid places this program approximately $3,200 below budget; however, it is anticipated that additional grinding locations will be identified for inclusion in this year's program. DESCRIPTION: On September 21, 1999, the City Council authorized Staff to solicit bids for both the Remove and Replace and Grinding portions of the Annual Sidewalk Repair. The Annual Sidewalk Safety Repair Program has been using two different processes to repair sidewalk'that is offset 3/4" or more and may pose a tripping hazard. The first process, Remove and Replace, is used in instances where the offset is more significant or where tree roots are causing the problem. The Remove and Replace project was awarded previously and is currently under construction. g:Xrntceproj\grinding\agstawrd, COPIES TO: Bidders ITEM NO. The second process is to grind less severe concrete offsets to match the adjoining grade. This process is essentially more of a maintenance-type procedure, as opposed to the construction element of the removal4 and replacement of sidewalk. For this reason, the sidewalk grinding contract is recommended as a two-year contract, similar to the Annual Striping contract. The City Council will need to approve the funding each fiscal year. The specifications for this contract include notification to the prospective contractor of the necessity for annual authorization of funding. Following is a summary of bids received for this project: CONTRACTOR UNIT PRICE TOTAL PRICE Concrete Grinding Company Central Coast Surface Grinding Company 18.80 $3,783.50 19.99 $3,924.38 Two bids were received for the project, with the low bid being submitted by Concrete Grinding Company, in the mount of $3,783.50. Staff has reviewed the bids, checked the low bidder's references, and recommends that the City Council award the contract for this project to Concrete Grinding Company. Page 2 RESOLUTION NO. - 99 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF DUBLIN AWARDING CONTRACT 99-11, 1999 ANNUAL SIDEWALK SAFETY REPAIR PROGRAM (TWO-YEAR GRINDING CONTRACT) TO CONCRETE GRINDING COMPANY WHEREAS, the City of Dublin did on November 9, 1999, publicly open, examine, and declare all sealed bids for doing the work described in the approved Plans, Specifications, and Modifications for Contract 99-11, 1999 Annual Sidewalk Safety Repair Program (Two-Year Grinding Contract), authorized by the City Council on September 21, 1999, which Plans, Specifications, and Modifications are hereby expressly referred to for a description of said work and for all particulars relative to the proceedings under the request for bids; and WHEREAS, said bids were submitted to the City Engineer, who has reviewed the bids to determine the lowest bid which was responsive to the requirements of the bid documents; NOW, THEEFOE, BE IT RESOLVED that the City Council of the City of Dublin does hereby award Contract 99-11 to the lowest responsible bidder therefor, to wit, Concrete Grinding Company, at a bid of Three Thousand Seven Hundred Eighty Three Dollars and Fifty Cents ($3,783.50), the particulars of which bid are on file in the office of the City Engineer. PASSED, APPROVED AND ADOPTED this 16th day of November, 1999. AYES: NOES: ABSENT: ABSTAIN: ATTEST: Mayor City Clerk g:~ntceproj\grindingXresoawrd