Loading...
HomeMy WebLinkAboutItem 7.1 Traffic Study Request (2) CITY OF DUBLIN AGENDA STATEMENT Meeting Date: January 10, 1983 SUBJECT Traffic Studies EXHIBITS ATTACHED Traffic Study Request listing RECOMMENDATION 21) Set traffic study priorities 2 ) Direct Staff to prepare engineering cost estimates FINANCIAL STATEMENT: To be determined DESCRIPTION Since incorporation, the City has received numerous requests for traffic studies. Most of these requests were tabled pending the selection of a City Engineer. Now that the City has selected a City Engineer, a list of those traffic study requests and projects which may involve traffic study have been compiled. This list is not prepared in order of priority. At the City Council ' s recent Goals and Objectives Session, the City Council indicated that it was desirous of prioritizing the list of traffic studies in order that the City Engineer and Traffic Engineer might get work underway on the higher priorities. As can be seen from the attached list, traffic study requests centered on either San Ramon Road or Dublin Boulevard. Rather than prioritizing each individual traffic study requested, it would seem more beneficial to look at either San Ramon Road or Dublin Boulevard in its entirety and at the same time, look at some of the more localized concerns that have been brought to the City Council ' s attention. It is Staff ' s recommendation that the City Council establish traffic study priorities at either San Ramon Road or Dublin Boulevard. Once that priority has been set, Staff will bring back to the Council the suggested parameters of the study area and estimated cost of conducting a study. --------------------------------------------------------------------------- ITEM NO. r( I TRAFFIC STUDY REQUEST San Ramon Road 1 . San Ramon Frontage Road 2 . CALMET Tentative Map Traffic Study 3 . Requests for access to Shell Station from San Ramon Road 4 . Silvergate Drive and San Ramon Road - Signalize (FAU Project) Dublin Boulevard 1 . Sports Grounds parking restrictions at curb (excessive red curb) 2 . Add second right turn lane on Dublin Boulevard at Dougherty Road 3 . Median break and traffic signal addition on Dublin Boulevard at Liberty House 4 . Remove median at Shell Station, 11989 Dublin Boulevard 5 . Traffic controls along Dublin Boulevard at Sports Grounds Pedestrian/Vehicle Conflicts 6 . Sierra Court and Dublin Boulevard - Signalize (FAU Project) 7 . Amador Plaza Road and Dublin Boulevard - Signalize (partially completed) 8 . Dublin Boulevard. San Ramon Road to Flood Control Channel - rehabilitate (FAU Project)