Loading...
HomeMy WebLinkAboutItem 4.6 AwardOfBid 85-1 (2) CITY OF DUBLIN AGENDA STATEMENT CITY COUNCIL MEETING DATE: February 11, 1985 SUBJECT : Award of Bid - Contract 85-1, Handicap Ramps, Annual Sidewalk Program and Silvergate Drive Median Modifications EXHIBITS ATTACHED : Summary of Bids RECOMMENDATION h: 1) Award bid to Hess Construction Company ~'~ 2) Authorize Mayor to execute agreement 3) Authorize City Engineer to negotiate a change order with Hess Construction for additional handicap ramps FINANCIAL STATEMENT: Low bid received $43,653. Amount budgeted for construction - $67,000 DESCRIPTION : At its meeting of January 14, 1985, the City Council authorized Staff to advertise for bids for Contract 85-1, Handicap Ramps, Annual Sidewalk Program and Silvergate Drive Median Modifications. This project combines three projects within the adopted 1984-85 Capital ~- Improvement Program which are as follows: Construction Design/Insp. Total Silvergate Drive Median Sidewalk Repair Handicap Ramps $13,000 $ 4,000 $17,000 27,000 8,000 35,000 27,000 3,000 30,000 Y ?,ooo $15,000 $82,000 Source of funds: General $52,000 HCDA Grant 30,000 T ,OOO Silvergate Drive/Silvertree Lane Median Break The Silvergate Median Modification is a 1984-85 project which would modify the existing raised mediar: on Sitvergate Drive at Silvertree Lane to permit direct access into Silvertree Lane. Sidewalk Safety Repair Program The annual sidewalk program has funds Year Capital Improvement Program. scheduled for each year of the Five- Handicap Curb Ramps -- The Handicap Curb Ramps project is a funding ap~roval under the Housing and 1984-85 project which has received Community Development Block Grant program. The City received a total of 5 bids (see attached bid summary) for this project. The low bidder was Hess Construction with a bid of $43,653. Staff has reviewed the low bidders proposal and checked work references and recommends that the City award the bid to the low bidder. That portion of the project which provides for the installation of handicap curb ramps is funded under the Housing and Community Development Block Grant program. If the City Council awards the bid to Hess Construction, the handicap curb ramps would total $11,400 of the contract amount. Since the City has been allocated $30,000 in HCDB Grant funds for Fiscal Year 1984-85, and those funds must be spent this year, it is recommended that the City Council authorize the City Engineer to negotiate a change order with Hess Construction to utilize the remaining BCDB Grant funds (approximately $18,600) for additional handicap ramps which remain to be constructed in the City. If app~/~oved, the total contract amount would be $62,253, which is still within-the 1984-85 budget. COPIES TO: ~ ~ ITEM NO. ~.~ ITEM :-~ ITEM ESTIMATED NO. ~DESCRIPTION QUANITY 1. Sidewalk - Remove & Replace 4,552.5 SF Curb & Gutter - Remove and Replace 113 LF Saw Cut Sidewalk 518.5 LF Trench Shield 390 LF Handicap Ramp 38 EA Remove Existing Median Curb & Gutter 458 LF Concrete Curb & Gutter 181 LF Street Pavement Section (3" A.C., 6" A.B., & 9" A.S.) 2250 SF 9. Street Pavement Section (Full Depth A.C. ) 104 SF 10. Adjust Manhole to Grade 1 EA 11. Striping & Pavement Marking LS 12. Remove Exist. Pavement Section & Add Topsoil 460 SF TOTAL PRICE 4. 5. 6. CONTRACT 85-1 HANDICAP RAMPS, SIDk~W~J~X & SILVERGATE MfDIAN BID SbT~4ARY Unit Total Price ENGINEERS EST. ~__~CONST. I Unit Total I Price 4.28 19,484.70 Unit Total Price 20,850.45 3.00 13,657.50 4.58 MCE 17.00 1,921.00 2.50 1,296.25 11.00 4,290.00 710.00 26,980.00 Unit Price 4.75 12.00 1,356.00 13.89 1,569.57 1.00 518.50 2.25 1,166.62 5.00 1,950.00 8.65 3,373.50 300.00 11,400.00 472.68 17,961.84 Total 21,624.38 1,921.00 1,037.00 3,900.00 22,800.00 2,061.00 2,172.00 REDICK CONST.~ERO CONST- Total Unit Total Unit Price 4.25 19,348.13 15.25 1,723.25 3.00 1,555.50 10.00 3,900.00 800.00 30,400.00 3.00 1,374.00 4.00 1,832.00 10.00 1,810.00I 14.00 2,534.00 17.00 2.00 10.00 600.00 4.32 1,978.56 4.50 7.42 1,343.02 12.00 3.50 1,603.00 18.75 3,393.75 Price 5.74 26,131.35 20.25 2,288.25 2.50 1,296.25 11.05 4,309.50 580.00 22,040.00 8.50 3,893.00 20.25 3,665.25 3.00 6,750.00 2.70 6,075.00 4.51 2.00 208.00 5.00 520.00 4.51 1,500.00 1,500.001 200.00 200.00 245.00 500.00 500.0012000.00 2,000.00 2836.00 2.00 920.00 3.50 1,610.00 2.57 67,033.95 43,653.00 10,147.50i 3.75 469.041 6.50 245.001200.00 2,836.00 250.00 1,182.20 1.50 63,123.30 8,437.50 5.15 676.00 6.50 200.00 1000.00 250.00 2,500.00 690.00 5.00 65,768.88 11,587.50 7.05 15,862.50 676.00 7.05 733.20 1,000.00 300.00 300.00 2,500.00 2105.00 2,105.00 2,300.00 79,987.13 4.25 1,955.00 84,579.30