Loading...
HomeMy WebLinkAboutItem 4.03 Street Overlay Accpt Wrk G~~~ OF DU~~2 19' ~1~~ `82 STAFF REPORT CITY CLERK `~~1~ ~l DUBLIN CITY COUNCIL File # p[][~-®© DATE: September 21, 2010 TO: ~ Honorable Mayor and City Councilmembers FROM: Joni Pattillo, City Manager SUBJE Acceptance of Work -Contract No. 10-04, G. Bortolotto & Co., Inc. 2009-2010 Annual Street Overlay Program (CIP No. 969101) and Eastern Dublin Arterial Improvements (CIP No. 960004) Prepared By: Steven Yee, Public Works Manager EXECUTIVE SUMMARY: A contract was awarded by the City Council on May 4, 2010 to G. Bortolotto & Co., Inc. for the Annual Street Overlay Program (CIP No. 969101). On June 1, 2010 the City Council approved an additional appropriation and change in the scope of work to address a storm drain pipe repair on Wineberry Way and to complete paving on Central Parkway between Lockhart Street and Fallon Road. The Public Works Department has determined that the work under this contract is now complete. FINANCIAL IMPACT: The total amount authorized by the City Council for the contract including contingencies and Contract Change Order No. 1 was $597,856.91. As summarized below, the improvements were completed for less than that amount as the full contingency was not required. - _ ~ Contract Award Final Cost Of Project /Funding Source Contingency 8~ Improvements Change Order #1 Under the Contract _ roiect 969100- Overlay Traffic Congestion Relief Funds TCRF#2209 $ 406,987.00 $ 406,987.00 Measure B Local Streets & Roads #2204 $ 128,194.91 $ 64,640.00 State Gas Tax #2201 $ 9.174.00 $ 8.340.00 Sub-Total Overlay $ 544,355.91 $ 479,967.00 Project 960004- East Dublin Arterial Improvements $ 53,471.00 $ 43,955.00 Eastern Dublin TIF Category 1 TOTAL: $ 597,826.91 $ 523,922.00 RECOMMENDATION: Staff recommends that the City Council accept the improvements under Contract No. 10-04, with G. Bortolotto & Co., Inc, and authorize the release of retention after 35 days if there are no subcontractor claims. Page 1 of 2 ITEM NO. 3 - ~ Submitted By Reviewed By Revie By Public Works Director Administrative Services Director Assistant City Manager DESCRIPTION: The 2009-2010 Annual Street Overlay Program consisted of removing and replacing failed asphalt concrete (AC) pavement to a minimum depth of 4 inches on residential streets and 6 inches on collector/arterial streets, resurfacing the street with a minimum 1 %2-inch overlay of AC, and re-striping pavement markings. This Program resurfaced the following streets: STREETS INCLUDED IN THE 2009-2010 ANNUAL STREET OVERLAY PROGRAM Mulber Place Lewis Avenue Soleado Court S uirrel Creek Circle Mulber Court Beckett Wa Santo Court Quail Creek Circle Wineber Wa Au usta Court Kolb Place Willow Creek Circle Locust Court Via Za ata Bluebell Wa New ort Court Locust Place Za ata Court Lancaster Road C ress Court Re io Court Juarez Lane Also included in this year's Program was the repair of approximately 60 lineal feet of 12-inch reinforced concrete storm drain pipe on Wineberry Way, which was necessary before the street could be overlaid. In addition, the paving of Central Parkway between Lockhart Street and Fallon Road was also included in the Program In order to allow traffic flow along Central Parkway. This additional work was covered by a budget change and Contract Change Order No. 1 as approved by the City Council on June 1, 2010. Staff has inspected the work completed under this Contract and recommends that the City Council accept the improvements. NOTICING REQUIREMENTS/PUBLIC OUTREACH: Public Noticing is not required. A copy of the Staff Report was provided to the contractor. ATTACHMENTS: 1. Map G:\CIP\Overlay\2009-2010\Staff Report Acceptance - 09-10 Overlay (2).doc Page 2 of 2 2009-2010 Annual Street Overlay Program W ~J OF ppe~ti ~ ~ O ~ LOCUST PLACE NORTH ~ SQUIRREL CREEK CIRCLE I~~~V~~ WINEBERRY WAY p QUAIL CREEK CIRCLE Ll 9~~FOR~~P O K~ MULBERRY PLACE m CYPRESS COUR a MULBERRY COUR Op WILLOW CREEK DRIVE O BLUEBELL WAY RO P D T O LOCUST PLACE SOUTH ~ 2 LOCUST COURT ~ AUGUSTA COUR y DRIVE ~ WAY D i ~1 ~ `G K P 9 +3 AR~1 S'~VE4 ~ BECKETTWAY O VS~P~NTON~O'~FO?IVE GT O O ~~~,R ~~G ORIVE F mRIVE NEWPORT COURT e~op~ ~ ~ G J ZAPATACOURT ~ y ~ 0 ~ 3 7Z -9~ m A VIA ZAPAT D F, q CK 90.pF A O?IVE GE 3 SOLEADO COURT ~'Ay JUAREZ LANE O~ `~02 ~ PtL~QR~~ a 2 O ~ i -1 V~ G A 00 ~ ~P OJ m SANTO COURT H/~ QA o ~J ~ K\NG SAY a N ~ m LANCASTER ROA 7'E REGIOCOURT D Q JP~ z v`E O GOO & O ORIVE 9.p tiE P~ f~ LEWISAVENUE 4 r ~ ?IJ 3 < F ~'RATDNC/gym y~<LS DRILE J OQ9 9~¢~ '9p<f OR VE(q~E ~ 9 N S ~ BPy ~ ~ ST?FET X90 OVg~ N BOU<EI/q?O h /E??q VPa~ DUBLIN BOULE VA 9li{i~ KOLB PLACE DRIVE HANS~N rq BET WAY 4\~-rr~ F ~ ~w N ~ ~ / MONO ORIV~ EW/` U ~p~RP~ ~LEV ARO ~ ~ ~i' 1" 6 ~ ~ o ~.~5 0.5 ,.,;lei ~ Overlay Streets Streets ®City of Dublin ®Parks RFTA e