Loading...
HomeMy WebLinkAbout4.02 Accpt Work Sidewlk SafeCITY CLERK File # ❑F&—(j❑❑- 3❑❑5 -1�rFou�Y AGENDA STATEMENT CITY COUNCIL MEETING DATE: September 1, 2009 SUBJECT: Acceptance of Work — Contract No. 09-06, 2008-2009 Annual Sidewalk Safety Repair Program and Curb Ramp Installation (Maxicrete, Inc.) Report Prepared by: Melissa A. Morton, Public Works Director ATTACHMENTS: 1) Fiscal Year 2008 / 2009 Budget Change Form RECOMMENDATION: 1) Approve the budget change for Fiscal Year 2008-2009; and 2) Accept the improvements under Contract No. 09-06, 2008- 2009 Annual Sidewalk Safety Repair Program and Curb Ramp Installation, and authorize the release of retention after 35 days if there are no subcontractor claims. FINANCIAL STATEMENT: Project Funding Source Budget For Final Cost Budget Im rovements Change* Sidewalk Safety Repair (949100) General Fund $ 65,000 $44,252 Transfer $1,500 to 939100 ADA Transition Plan / Curb General Fund $ 30,000 $31,500 Increase Ramps (939100) Sub-Tota appropriation $1,500 from Sidewalk Project Bike Lane Amador Valley Blvd. Traffic Impact Fees Additional (96015) Electrical work of the project under separate contract. #300(after signal & Inspection) $ 4,214 $ 7,250 appropriation from Impact Fees$3,036 Measure B Bike/Ped 42,243 25,12 Sub-Tota $ 46,457 $ 32,37 GRAND TOTAL 3 PROJECTS $141,457 $108,12 * Although the total cost of the three projects was less than the total budgeted amounts for improvements, the City Council is requested to approve a Budget Change which will: 1) Transfer $1,500 of unexpended General Funds from the Sidewalk project to the ADA Transition Plan Project; and 2) Authorize $3,036 in COPY TO: Maxicrete, Inc. Page 1 of 2 G:\CIP\SIDEWALK\2008-2009\Agenda Statement acceptance.DOC ITEM NO. 4• 2 additional expenditures from available Traffic Impact Fees for the Bike Lane Project. This will fully exhaust the Amador Valley Blvd Bike Lane mitigation funds. DESCRIPTION: On May 19, 2009, the City Council awarded Contract No. 09-06, 2008-2009 Annual Sidewalk Safety Repair Program and Curb Ramp Installation, to Maxicrete, Inc. The Annual Sidewalk Safety Repair Program (Remove and Replace) repairs sidewalk offsets of 3/4-inch or more that may pose a tripping hazard. The Remove and Replace process is used in locations where the offset is more significant or where tree roots are causing the offset. This procedure requires removal of the existing sidewalk, and in the case of root problems, removal of the tree roots, and then replacement of the concrete sidewalk. While the maintenance of sidewalks and other frontage improvements is legally the responsibility of the private property owner, the City Council has adopted aCity-paid sidewalk repair program on a year-by- year basis since 1983. At the budget hearing for Fiscal Year 2008-2009, the City Council extended the funding of the repair program for an additional year. This year's Sidewalk Safety Repair Program included the construction of twenty nine (29) pedestrian curb ramps. Fourteen (14) of these ramps were funded as part of the Amador Valley Boulevard Bike Lane Capital Improvement Project (CIP No. 960015). The remaining fifteen (15) ramps were funded through the General Fund as identified in the ADA Transition Plan (CIP No. 939100). In addition, 3,518 square feet of sidewalk was repaired. Staff has reviewed the work performed under this contract and has determined that the work is satisfactory and complete. As noted in the financial section of this report, the improvements were completed under budget for the three projects combined. A Budget Change is required to recognize minor adjustments to the funding on two of the projects. The first change represents an increase in funding for the ADA Transition project of $1,500. The source of funds will be a reduction in the Sidewalk Repair Project, which has funds available. The second change is intended to address the complete expenditure of Mitigation Funds held for the Amador Valley Boulevard Bike Lane project. After the budget for the project was adopted, additional interest earnings were available in the mitigation fund. This change will allow the City to expend an additional $3,036 which will fully expend these special funds. The expenditure of the Mitigation Funds will also reduce the amount of Measure B funds required for the project. RECOMMENDATION: Staff recommends that the City Council 1) approve the Budget Change for Fiscal Year 2008-2009; and 2) accept the improvements under Contract No. 09-06, 2008- 2009 Annual Sidewalk Safety Repair Program and Curb Ramp Installation, and authorize the release of retention after 35 days if there are no subcontractor claims. Page 2 of 2 .CITY OF DUBLIN BUDGET CHANGE FORM FY 2008 / 2009 CHANGE FORM # ~~ 1 New Appropriations (City Council Approval Required): Budget Transfers: X From Unappropriated Reserves (Traffic MitigationFund)= From Budgeted Contingent Reserve (1080-799.000) Within Same Department Activity From New Revenues X_ Between Projects (City Council Approval Required) Other DECREASE BUDGET~ACCOUNT AMOUNT (DT(~REASE BIIDGFTA(>Ct}UNT ' AMOiJNT Name: EXPENSE: General Fund - 08/09- Name: EXPENSE: General Fund - OS/09- Sidewalk Repair Project -Improvements $ 1,500 Americans With Disabilities Transition Plan $ 1,500 Project -Improvements Project Account #: 94100-9400-9401-1001 Project Account #: 939100-9400-9401-1001 GL Account #: GL Account #: 3300.9301.73103 Name: EXPENSE: Traffic Mitigation Funds (Project Specific) -Amador Valley Bike $ 3,036 Lane Project -Improvements Project Account #: 960015-9400-9401-4309 GL Account #: 3600.9601.73103 Fin Mgr/ASD: ~~It~X~ • `~~~ Signature REASON FOR BUDGET CHANGE ENTRY: This budget change will: 1) Transfer $1,500 in unexpended Sidewalk Repair Project funding to the Americans With Disabilities Act Transition Plan Project. This project constructed curb ramps and adjacent sidewalks at several locations in the City. 2) Authorize an additional expenditure of Traffic Mitigation funds in lieu of Measure B Funds, on the Amador Valley Boulevard Bike Lane Project. The Budget Change was presented to the City Council 9/1/2009 as part of the acceptance of project) improvements. City Manager: Mayor: Posted By: Signature Date: Date: G:IBudgetChm+ges!/_2008_09!9_9_/_09_TripleSidewalkProj.DOC ATTACHMENT # 1 Signature Date: O 2.! ~ Q' Date: As Approved at the City Council Meeting on: Date: 9/1/2009 Signature