Loading...
HomeMy WebLinkAbout3.3 AccptImp83-2DB AmdrPlzAGENDA STATEMENT CITY COUNCIL MEETING DATE: August 13, 1984 SUBJECT: Contract 83-2, Traffic Signal - Dublin Boulevard and Amador Plaza Road EXHIBITS ATTACHED: None RECOMMENDATION: Accept improvements under Contract 83-2 Authorize final payment to Rosendin Electric Inc. in the amount of $7,454.51. FINANCIAL STATEMENT: Total project budget (including Engineering and Inspection) $100,000.00 Total project cost (including Engineering and Inspection) $89,545.00 DESCRIPTION: In January 1984, the City Council awarded Contract 83-2 to Rosendin Electric, Inc. to install a traffic signal and highway lighting system at the intersection of Dublin Boulevard and Amador Plaza Road. The original contract amount was $72,837.00 After commencement of work, an additional $1,708 was authorized to install an interconnect cable for future synchronization of Dublin Boulevard signals. A breakdown of cost versus budget is shown below: BUDGET ACTUAL Construction Engineering/Inspection Subtotal Revenue - Developer Contribution Total Net Cost $ 85,000.00 15,000.00 $100,000.00 $74,545.00 15,000.00 $89,545.00 7,760.00 7,760.00 $ 92,240.00 $81,785.00 This project was approved as part of the 1983-84 Capital Improvement Budget. The County had required the developers of Enea Plaza to contribute $25,000 in in-kind improvements and/or cash toward the construction of the traffic signal. The Enea developers installed $17,240 in improvements and deposited $7,760.00 in cash with the City. The Contractor has completed the improvements in accordance with the approved plans, specifications and modifications.