Loading...
HomeMy WebLinkAbout4.02 Accept Work 91-02 CITY OF DUBLIN AGENDA STATEMENT CITY COUNCIL MEETING D~TE: August 12, 1991 SUBJECT= Acceptance of Work, Contract 91-02, Annual Street Overlay/Dougherty Road Bike Path Report by Lee Thompson, Public Works Director EXHIBITS ATTACHED: Budget Change Form (Will be delivered with Staff Report on Friday) RECOMMENDATION: ~1) Accept improvements under Contract 91-02 ) Authorize payment in the amount of $70,936.31 to Les McDonald Construction. 3) Approve.attached Budget Change Form. FINANCIAL STATEMENT: See below. DESCRIPTION: The Staff Report on this Agenda Statement will be delivered on Friday, August 9, 1991. COPIES TO: Les McDonald Construction CITY OF DUBLIN AGENDA STATEMENT CITY COUNCIL MEETING DATE: August 12, 1991 SUBJECT: Acceptance of Work, Contract No. 91-02 Annual Street Overlay/Dougherty Road Bike Path Report by: Public Works Director Lee Thompson EXHIBITS ATTACHED: RECOMMENDATION: None. 1) 2) 3) Accept improvements under Contract 91-02 Authorize payment in the amount of $70,936.31 to Les McDonald Construction. Authorize a 1990-91 fiscal year budget transfer in the amount of $93,997.10 from the Street Maintenance Operating Budget to the Overlay CIP Budget .Instruct the Finance Director to make the appropriate transfers consistent with the rules of SB140 and Measure B. FINANCIAL STATEMENT: Survey Preliminary Engr. Design Inspection Construction Est. TDA Audit Cost Operating Budget 361,700 2,746 $ 364,446 Breakdown of budqeted funds: CIP Budget TOTAL Overlay (Proj, #9658) $ 5,000 2,000 20,000 173,000 Bike Path (Proj. #9678) $ $ 5,000 5,000 5,000 5,000 7,000 2,500 22,500 59,754 594,454 2,746 $ 200,000 $ 72,254 - $ 636,700 Actual Expenditures: Operating Budget CIP Budget TOTAL Overlay Bike Path Survey Preliminary Engr. Design (including printing & legal) Inspection/Testing Construction Est. TDA Audit Cost $ 5,680.50 $ 2,209.87 20,313.73 262,761.05 265,793.00 2,746.00 265,507.05 $ 293,997.10 $ 58,493.84 $ 5,680.50 2,823.75 2,823.75 5,107.07 7,316.94 4,439.70 46,123.32 24,753.43 574,677.37 2¢746.00 $617,997.99 ITEM NO. cc: Les McDonald Construction · The-Street Repair/Overlay portion of this project is $4,942.00 under budget; however, because of the changes in funding sources, budget transfers need to be made between the Operating Budget and the CIP Budget. The Bike Path project is $13,760.16 under budget. This project is all funded under a TDA Act 3 grant. FUNDING SOURCES: General Fund TDA (Bikeway) SB 140/300 Measure B $325,505.92 61,239.84 106,252.24 125,000.00 Total $617,998.00 DESCRIPTION: In March, 1991, the City Council awarded Contract 91-02, Annual Street Overlay/Dougherty Road Bike Path, to Les McDonald Construction. The Annual Overlay Program consists of placing a 1.5" asphalt overlay on streets that are in a deteriorated condition. Before the overlay is placed, failed areas are repaired and a pavement fabric is installed on the surface. The second phase of the Dougherty Road Bike Path was also included in the project. During construction, Change Orders were authorized for repair in the Shannon Park parking lot, the raising of storm drain manholes, extra traffic signal detector loop work, the clearing of rubble from the Dougherty Road berm for the bike path, and the extension of the bike path 570 feet farther north. This extension was possible because of the contractor's comparatively low bid prices on the project. The project is funded through the General Fund, the Transportation Development Act (TDA), Senate Bill 140/300, and Measure B. The funding breakdown is included in the financial statement. In order to stay within the existing Overlay and Street Repair Budget and still receive the maximum amount of funds from the State-Local Transportation Partnership Program (SB 140), this year's funds for the slurry seal program were integrated into the overlay program. This procedure, which increased the total amount of funds available for the overlay project enabled the City to utilize the maximum State SB 140 program funding of $106,252.24. The result was a two-year overlay program this fiscal year and no slurry seal program, with the ability to capture an additional $40,372.24 in SB 140 monies over the budgeted $65,880. This change in the proposed work program will require a transfer of funds between the Street Maintenance Operating Budget and the CIP Budgets. The City Engineer has reviewed the work on the project and determined that it was complete within Fiscal Year 1990-91 and in accordance with the approved plans and specifications. Staff recommends that the City Council accept the improvements and authorize final progress payment and retention to Les McDonald Construction in the amount of $70,936.31. - a:acptover - 2 -