Loading...
HomeMy WebLinkAbout4.02 Accept Work 92-03 CITY OF DUBLIN AGENDA STATEMENT City Council Meeting Date: June 22, 1992 SUBJECT: Acceptance of Work, Contract 92-03 Dublin Boulevard Bridge Deck Repair Report by: Public Works Director Lee Thompson EXHIBITS ATTACHED: None RECOMMENDATION:·~21)) Accept improvements constructed under Contract 92-03 Authorize full payment of $12,127 to American Grouting, Inc./Erbentraut & Su~uners Joint Venture. FINANCIAL STATEMENT: Budget Actual Cost Design & Testing $ 8,200 $ 4,865.58 Inspection 2,000 904.97 Improvements 30,300 12,127.00 $ 40,500 $ 17,897.55 DESCRIPTION: In April of 1992, the City Council awarded Contract 92-03, Dublin Boulevard Bridge Deck Repair, to American Grouting Inc./Erbentraut and Summers, A Joint Venture. This project is Phase I of a two-part repair commitment for the bridge deck and the channel slopes under the bridge. In this phase, the bridge deck was cleaned and sealed with a methacrylate compound which will prevent water intrusion into the structure. The City Engineer has reviewed the project improvement and found it to be in compliance with the specifications and special provisions. Staff recommends that the City Council accept the improvements and authorize payment of $12,127 to American Grouting/Erbentraut and Summers, A Joint Venture. a: ( projects ) \bridge\accptnc