HomeMy WebLinkAbout4.02 Accept Work 98-12CITY CLERK AGENDA STATEMENT CITY COUNCIL MEETING DATE: December 1,1998 SUBJECT: Acceptance of Work- Contract 98-12, San Ramon Road Slope Repair Report Prepared by: Lee S. Thompson, Public Works Director EXHIBITS ATTACHED: None RECOMMENDATION: Accept improvements under Contract 98-12; authorize payment to Golden Pacific Construction, Inc. for release of retention in the amount of $8,346.65 after 35 days if there are no subcontractor claims. FINANCIAL STATEMENT: Design/Inspection/Survey/ Project Management/Testing Printing/Legal Construction 1998-99 1998-99 Budget Expenditures $ 31,500 $ 47,000.00 (est.) 600 708.07 184,500 166,933.00 Total: $216,600 $214,641.07 Note that $4,030.30 was spent in Fiscal Year 1997-98 for Preliminary Engineering work. DESCRIPTION: On September 15, 1998, the City Council awarded the San Ramon Slope Repair Project to Golden Pacific Construction, Inc. This project corrected a soil slip-out on the westem hillside of San Ramon Road north of Vomac Road which was caused by heavy rains last winter. The repair area, approximately 60 feet down-slope from residents of Rhoda Avenue, ~as stabilized by excavating the slide area, installing a subdrain system and constructing engineered fill. COPIES TO: Golden Pacific Construction ITEM NO. ~ g:~niscproj\srslope\agstacpt Staff had applied to the Federal Emergency Management Agency (FEMA) and Federal Highway Administration (FHWA) for emergency funding; however, the funding was denied as it was not deemed an immediate danger to homes or roadways. At this time, Staff recommends that Council accept the contract with Golden Pacific Construction, Inc., as complete and authorize payment of the final retention in the amount of $8,346.65 after 35 days subject to subcontractor claims. 2