HomeMy WebLinkAbout4.02 MAD 83-1 Prep Report . ., CITY CLERK
File # 3652-3101
AGENDA STATEMENT
CITY COUNCIL MEETING DATE: March 4, 1997
SUBJECT: Authorization to Prepare Engineer's Report for Street Lighting
Maintenance Assessment District 83-1
Report Prepared by: Lee S. Thompson,Public Works Director
EXHIBITS ATTACHED: Resolution directing Staff to prepare the Engineer's Annual Report
the Street Lighting Maintenance Assessment District
RECOMMENDATION: •' .Q'Y Adopt resolution
FINANCIAL STATEMENT: The cost to prepare the Engineer's Report is estimated at $2,600.
This amount is budgeted in the Engineering and Public Works
Operating Budgets and is paid by the Assessment District.
DESCRIPTION: This assessment district was established in 1983 to replace the
County Service Area which had paid maintenance and energy costs for public street lights within the City
of Dublin.
This resolution authorizes the City Engineer to begin preparation of the required Engineer's Report for the
Street Lighting Maintenance Assessment District for FY 1997-98.
The procedure for establishing annual maintenance assessments requires that the City Council first
authorize preparation of the report. A preliminary report is then brought back to the City Council for
approval later in the year, once the District budget has been formulated. Following the City Council's
approval of the preliminary report, a public hearing will be scheduled as required.
The street lighting assessment was reduced in 1996-97, as the energy and maintenance costs have been
reduced by the City's acquisition of the street lighting system from PG&E. At the February 4th meeting,
the City Council received a report regarding the requirements of Proposition 218, and it was determined
that the street lighting assessment would be frozen for the 1997-98 fiscal year.
Staff recommends that the City Council adopt the resolution.
COPIES TO: OC)(I
ITEM NO. 4.2
g:\assessdist\83-1\agstl
RESOLUTION NO. -97
A RESOLUTION OF THE CITY COUNCIL
OF'1'HL; CITY OF DUBLIN
DIRECTING PREPARATION OF ANNUAL REPORT FOR
STREET LIGHTING MAINTENANCE ASSESSMENT DISTRICT 83-1
WHEREAS, on August 2, 1983, by its Resolution No. 38-83, this City Council ordered the
formation of and levied the first assessment within the City of Dublin Street Lighting Maintenance
Assessment District ("the District") pursuant to the provisions of the Landscaping and Lighting Act of
1972 (commencing at Section 22500 of the California Streets and Highways Code) (hereinafter, "the
Act"); and
WHEREAS, Sections 22620 et seq of the Act provide for the levy of annual assessments after
formation of the District; and
WHEREAS, within said District, the existing and proposed improvements and any substantial
changes proposed to be made to the existing improvements are generally described as energy and
maintenance work for and to all street lights and acquisition of street lights within the City Limits of the
City of Dublin;
NOW, THEREFORE, BE IT RESOLVED that the Dublin City Council does hereby designate the
Dublin City Engineer as Engineer for purposes of preparing and filing with the Clerk a written report in
accordance with Section 22565 et seq of the Act; said Engineer is hereby directed to apportion said
assessments in accordance to the benefits received from said improvements by the lots, pieces and parcels
of land within the District, and said Engineer is hereby directed to accomplish such preparation and filing
forthwith.
PASSED, APPROVED AND ADOPTED this 4th day of March, 1997.
AYES:
NOES:
ABSENT:
ABSTAIN: •
Mayor
ATTEST:
City Clerk
g:lassessdist183-11resol