Loading...
HomeMy WebLinkAbout4.03 Award of Bid 98-11A ` CITY CLERK File # 6 0 r)-, n , AGENDA STATEMENT CITY COUNCIL MEETING DATE: February 16, 1999 SUBJECT: • Award of Bid -Heritage Center Improvements, Phase I Contract 98-11A Report Prepared by: Lee S. Thompson, Public Works Director ATTACHMENTS: 1) Resolution of Award 2) Bid Results OdRECOMMENDATION: Adopt resolution awarding bid to Grade Tech, Inc. FINANCIAL STATEMENT: General Fund monies are budgeted for constructing both phases of the project in the amount of$69,070. The architect's estimate for Phase I improvements was $57,354 and the low bid submitted was $45,800. The low bid plus a 10% construction contingency is $50,380. NOTE: The Architect's estimate for Phase II improvements (landscaping and irrigation) is $71,778. Although the bid plus 10% contingency is below the architect's estimate for Phase I, it is still anticipated that a Budget Change will be necessary for Phase II. DESCRIPTION: At the meeting of January 5, 1999, the City Council authorized Staff to solicit bids for Contract 98-11A, Heritage Center Improvements, Phase I. This project was part of the scope of work originally put out to bid last Fall. Only one bid was received,which was significantly higher than the funds budgeted. The bid was rejected and the decision was made to re-bid the project,breaking it into two projects with separate scopes of work. This project includes clearing and demolition of the site, grading, asphalt paving, construction of pedestrian paths,miscellaneous steel work to install gates and bollards, and the installation of timber headers for landscaping included in Phase II improvements. Phase II will include landscaping, irrigation and wedding chapel structures. A total of 8 bids were received with the low bid of$45,800 being submitted by Grade Tech, Inc. Staff has reviewed the bid results, checked with references, and recommends that the City Council adopt the resolution awarding the bid to Grade Tech, Inc. V COPIES TO: Grade Tech, Inc. ITEM NO. 4.7 g:miscproj\heritagel\agstawrd.doc RESOLUTION NO. -99 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF DUBLIN AWARDING CONTRACT 98-11A HERITAGE CENTER IMPROVEMENTS, PHASE I TO GRADE TECH, INC. WHEREAS, the City of Dublin did, on February 4, 1999, publicly open, examine, and declare all sealed bids for doing the work described in the approved Plans, Specifications, and Modifications for Contract 98-1 lA, Heritage Center Improvements, Phase I, authorized by the City Council on Janumy 5, 1999, which Plans, Specifications, and Modifications are hereby expressly referred to for a description of said work and for all particulars relative to the proceedings under the request for bids; and WHEREAS, said bids were submitted to the City Engineer, who has recommended that the bid hereinafter mentioned is the lowest and best bid for doing said work. NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Dublin does hereby award City of Dublin Contract 98-1 lA to the lowest responsible bidder therefor, to wit Grade Tech, Inc., with a bid of Forty-Five Thousand Eight Hundred Dollars ($45,800.00), the particulars of which bid are on file in the Office of the City Engineer. PASSED, APPROVED AND ADOPTED this 16th day of December, 1999. AYES: NOES: ABSENT: ABSTAINING: Mayor ATTEST: City Clerk g: ~niscproj~Heritagelqresoawrd BID RESULTS - HERITAGE CENTER IMPROVEMENTS, CONTRACT NO. 98-11A ENGINEER'S ESTIMATE GRADE TECH GOLDEN PACIFIC WSP TRUCKING BID UNIT TOTAL TOTAL TOTAL TOTAL ITEM ITEM DESCRIPTION MEASURE QTY UNIT PRICE PRICE UNIT PRICE PRICE UNIT PRICE PRICE UNIT PRICE PRICE --~--~,iear~g-a~d~JJti-on ---Ls --~ '~-~{~'3~5.{~6 ~-~:';~5.00 ~-~{)~001{~5 ~,~[~0" ~'~-~0.00 $ 7,01~:~-$ 7,0~5.00 --~h~FinesSudace ~F _~7~ $ 2.00 $ 5,460.00 $ 2.50 $ 6,825.00 S 3.35 $ 9,145.50 $ 2.49 $ 6,797.70 _~_qe~e[~o~r~{~x~) ....... LF" 852 $ ~4.20 $_~,5~a.~0 ~.~ ~ 7 Slruc[ure&Misc. SleelWork LS 1 $ 0,300.00 $ 6,300.00 $ 3,000.00 $ 3,000.00 $ 7,500,00 $ 7,500.00 $ 8,224.00 $ 8,224.00 TOTAL BID: $ 57,354.40 $ 45,800.00 $47,670.50 $ 52,246.62 RMT ~N DSCAPE DK ENVIRO NMENTAL BILAND CONS~R, s.R~: CO. BLOSSOM VALLEY BID UNIT TOTAL TOTAL TOTAL TOTAL TOTAL ITEM ITEM DESCRIPTION MEASURE Q~ UNIT PRICE PRICE UNIT PRICE PRICE UNIT PRICE PRICE UNIT PRICE PRICE UNIT PRICE PRICE 1 Clearing andDemoIRiofl LS 1 S 10,572.00 $ 10,572.00 $14,000.00 $ 14,000.00 S12,1g0.00 $12,190.00 --~Sda~Fi~esSudace ~~ ~---~.6~ ~;_~-{~i~ ~'~.~6-{--~~ ~6- $ 4,641.00 $ 0.50 $ 1,365.00 ~--~l('~ng SF 2,440 $ 3.75 $ 9,150.00 $ 4.77 $ 11,638.80 7 StrucLure & Misc. Steel WorkLS I ~b:06 ~:~:6~ ~6:6~ ~:~66:b6 ~ TOTAL BID: .~,937.00 $~.3~. $64,709.5~_ ~5,160.00 $ 65,970.00