Acceptance of Work - Civic Center Cabling Project
(Prepared by: Bo Barker, Management Assistant)
EXHIBITS A'ITACHED: 1.
2.
Change Order #1
Change Order #2
RECOMMENDATIO~: ^ ~ccept the Civic Center Cabling Project and authorize final payment
/~r in the amount of $18,433 to Johnson Controls.
FINANCIAL STATEMENT:
Funding Source Total Internal Criminal General
Service Activity Fund
Fund Fund
Bud~eted Funds $18,000 $6,875 $4,250 $6,875
Original Contract $14,637 $5,562 $3,513 $5,562
Change Order #1 $ 3,308 $1,257 $ 794 $1,257
Total Contract Amount $17,945 $6,819 $4~ $6,819
Additional Work was done by Johnson Controls installing cables for telephones in
Police Services investigations bay. This additional work is represented in Change
Order #2, Exhibit 2 and cost $488. Adequate funds are available in the adopted
Police Services budget for fiscal year 1994-95. .
The total amount paid to Johnson Controls will be $18,433.
DESCRIPTION: On October 10, 1995, the City Council awarded the Civic Center Cabling
Project to Johnson Controls. The project consisted of installing cabling for the new computer
network throughout the Civic Center. The company submitted a base bid which included a fixed
number of computer locations and an estimated amount of cable required to wire those locations.
Prior to the commencement of the project, the City added 12 locations to the original
specifications. This included locations in Police Services as well as the administration wings of
the Civic Center. This change was made to cover possible future computer locations. The other
factor which impacted the total project cost was the total amount of cable required. The original
bid used an estimation of 6500 feet of regular cable and 450 feet of fiber optic cable. With the
addition of the 12 locations as well as unforeseen circumstances in the building such as fire walls
and other routing difficulties, an additional 12,000 feet of cable was pulled. Also, an additional
100 feet of fiber optic cable was necessary. Change order #1 (Exhibit 1) covers the materials and
labor associated with these changes. The additional cost for this change order was $3.308
Additionally, 5location~ in the investigation room of the police wing were wired with voice
quality wiring in anticipation of new work areas. These changes are described in the change order
#2 (Exhibit 2). These were added at a low incremental cost since Johnson Controls personnel
were also pulling data cables in the same locations. The total cost of change order #2 was ~.
The cabling project has been completed and the cabling system is working properly. Staff
recommends that the City Council accept the improvements and authorize Staff to authorize
payment to Johnson Controls in the amount of $18,433.
Copies to:. Dave Wall, Johnson Controls
CITY CLERK
FILE ~
ItemNo. #.,
,.
.
JOh~"'ontrols. Inc.
NQI~cifrn[egralton Services
1048 Serpentine Lane
Suite 302
Plp.::l~::lnton CA 9.4566
Tel. 510/4841422
FAX; 510/4841434
00 J~HNSON
NTR~LS
CHANGE ORDER
TO: Bo Harker
City Of Dublin
CHANGE ORDER '# om.
DATE: 1120/95
Job NsmelLocation:City Of Dublin
Job Number:5220007
AuLhorization Number:
Duteuf EAilitiul,,; ClJUln1t.:t.1 0/20/94
We hereby agree to make the change(s) specified below:
To provide and install the additional l2K of CAT5 4-pair cable.
To provide and install the additional 100' of Fibe.r Glihk
Labor
$316.00
Materials
$2992.00
NOTE: This Change Order becomes parL of and in conformance with the existing conu'act.
WE AGREE hereby to make the changc(s) specified above at this price $ 3,308.00
Date 01120/95 I 'j' f\.'
Authorized JeI Signature
A\:\:l:plell - The above prices find spccific.\tion:s of this Change Order ure lI!ltillfnclory and :lTe hereby
accepted. All work to he performed under I;amc terms and conditions ilS specified in original contract unless.
otherwise stipulated.
Signature:.__.___ .__ _..
Authorized CUSTOMER Signature
Dale of Acceptance:
;:fj~:iH B ~. )]
1
-
....
,
.
Johnson Controls. Inc.
Network Integration Services
1048 serp.e Lane
Suite 302
Pleasanton. 94566
Tel. 510/4841422
FAX: 510/4841434
J~HNSON
CONTR~LS
CHANGE ORDER
TO: Bo Barker
City Of Dublin
CHANGE ORDER # 002
DATE: 12106/94
Job NamelLocation:City Of Dublin
Job Number:5220007
Authorization Number:
Date of Existing Contract: 10120/94
We hereby agree to make the change(s) specified below:
To Add five data staions to the Police side.
NOTE: This Change Order becomes part of and in conformance with the existing contract.
WE AGREE hereby to make the change(s) specified above at this price $488.00
Date
Authorized JCI Signature
Accepted - The above prices and specifications of this Change Order are satisfactory and are hereby
accepted. All work to be performed under same terms and conditions as specified in original contract unless
otherwise stipulated.
Signature:
0A-tv---
i\ut or' ed CUSTOMER Signature
Date of Acceptance: