HomeMy WebLinkAbout4.04 Accept Work 93-11 CITY OF DUBLIN
AGE~A STATEMENT
City Council Meeting Date: December 13, 1993
SUBJECT:
Acceptance of Work - Contract 93-11 NPDES Pilot Project
Report by: Public Works Director Lee Thompson
EXHIBITS ATTACHED:
1)
2)
Location Sketch
Agreement Modification
RECOMMENDATION: 1)
Accept work constructed under Contract 93-11 and
authorize payment of retention in the amount of $2,858
to Harris & Harris.
Authorize an additional appropriation of $9,265.50
from new revenues.
FINANCIAL STATEMENT:
Design/Inspection/Testing
Improvements
Total:
Budqeted by Year
92-93 93-94 94-95 Total
$ 1,000.00 $ 4,100.00 $ 3,600.00 $ 8,700.00
24,900.00 24,900.00
$ 1,000.00 $29,000.00 $ 3,600.00 $33,600.00
Expected Expenditures By Year
Design/Inspection/Testing
Improvements
Total:
92-93
634.50
$ 634.50
~3-94 94-95 Total
$ 9,681.91 (max.) 0.00 $10,316.41
28,583.59 0.00 28,583.59
$ 38,265.50 0.00 $38,900.00
The amount of the NPDES grant is $38,900.00
The approved CIP budget anticipated spending $1,000 in Fiscal Year 1992-93, $29,000
in 1993-94, and $3,600 for testing in 1994-95. In 1992-93, $645.50 was actually
spent, and it appears that all the testing can be done this fiscal year. Dublin has
also been allotted an additional $5,300 for a professional outside consulting firm
to perform the tests on the ability of the project to remove the parking lot
pollutants from the storm water runoff.
It is therefore necessary to appropriate an additional $9,265.50 to the 1993-94
Capital Improvement budget to complete the project. All costs will be offset by
NPDES grant money.
DESCRIPTION: The Alameda County Urban Runoff Clean Water Program
(ACURCWP) set aside $300,000 to encourage agencies to propose pilot projects to
improve the storm water quality in a cost effective way. The pervious concrete/sand
filter project for the Shannon Community Center parking lot (as shown in Exhibit 1)
was one of the pilot projects chosen to be fully funded by the ACURCWP.
Through a contract with Harris ahd Harris, which was awarded by the City Council on
Septen%ber 13, 1993, the City of Dublin Public Works Department constructed two (2)
concrete filter structures 1 1/2 feet wide by 2 feet deep. These concrete channels
were filled with filter sand and covered with 5-foot long pervious concrete covers.
The channels will act as a filter to remove some of the hazardous material from
storm water which now flows down the creek to San Francisco Bay.
ITEM NO. ~ COPIES TO: Harris & Harris
I
CITY CLERK
..... FILE
Pervious concrete is a mixture of gravel and cement with air voids that allows storm
water to pass through and still allows light vehicle traffic to pass over the top.
The sand is a mixture of sand particles that are blended to filter out the heavy
metal particles found in our storm water. The sand that becomes saturated with
pollutants can later be disposed of by mixing it in with base rock for roadway
construction.
Work on Contract 93-11 has been completed according to approved plans and
specifications and to the satisfaction of the City Engineer. Staff recommends that
the City Council (1) accept work constructed under Contract 93-11 and authorize
payment of retention in the amount of $2,858 to Harris & Harris; and (2) Authorize
transfer of $9,265.50 from unallocated reserves to this project. The additional
funds will be offset by grant fund revenues.
a:(contracts)~pervious~agstacpt
Page 2
Shannon
Cenf er
Pervious Conc
Sand R'lf er
20Hang
PVC
Parking Lof
p¢~vieus Cone
Sand
,', 35'long
' Sf
'Drain
Shannon Ave.
CITY OF DUBLIN
~PROVED
DATE ';; ' '
bP, AW~ ':~ "
PUBLIC WORKS
DEPARTMENT
p ERVIOUS CONCRETE
SAND FILTER
LOOATION
EXHIBIT ~Z
COUNTY OF ALAMEDA
PUBLIC WORKS AGENCY
399 Elmhu~st Stxeet · Hayward, CA 94544-1395
(510) 670-5480
October 28, 1993
Mehran Sepehri
Senior Civil Enginee~
City of Dublin
PO Box 2340
Dublin, Ca. 94568
Dear Mr. Sepehri:
Subj: Agreement Modification for Pervious Concrete Pilot Study
Proposed for the City of Dublin's consideration is this agreement
modification for the City Manager's execution in order for the City to
continue the subject project.
This modification, per your request, consists of an additional $5300.00 to
allow continuation of water quality monitoring of the subject project. The
new "not to exceed cap"will now be $38,900.00. As provided in the
agreement, the Management Committee of the Alameda County Urban Runoff Clean
Water Program, recommeCded approval of this additional funding. This action
was taken at their October 26, 1993 meeting. No other changes in the
agreement, dated July 20, 1993, are made.
The Agreement modification as stipulated in paragraph 2, page 2 of the
original agreement (Contract # C-93-748) is contained herein for the City's
consideration.
If the enclosed modification meets with your approval, please return four
executed originals to this office so that we may proceed with processing
invoices. If you have any questions, please contact Gary Shawley at 510-670-
5582.
Sincerely,
Donald J. LaBelle
Director of Public Works
Dated
City Manager
--4J ....
Dated
GWS:A89919
Enc.
page one of two
AGREEMENT
THIS AGREEMENT, made and entered into this ~day of ~, 19_~ by and
between the ALAMEDA COUNTY FLOOD CONTROL AND WATER CONSERVATION DISTRICT, State
of California, hereinafter called DISTRICT, and
CITY OF DUBLIN
hereinafter called DUBLIN.
WITNESSETH: That DUBLIN for and in consideration of the covenants, conditions,
agreements, and stipulations of DISTRICT hereinafter expressed, does hereby
agree to furnish services and materials to DISTRICT, as follows, and/or as
described on exhibits attached to and incorporated herein.
EXHIBITS ATTACHED: DUBLIN shall furnish services as described in Exhibit A of
this Agreement. Terms and conditions for payment are attached in Exhibit B.
DUBLIN as a City is self-insured as to any requirements under this Agreement.
No policies or bonds are required of either.party as to any provisions of this
Agreement.
CONTRACT PERIOD will be from through June 30. 1994
COMPENSATION: DISTRICT agrees to pay DUBLIN for services performed hereunder
as described in Exhibit B - Payment Schedule.
The total amount paid by DISTRICT to DUBLIN under this agreement shall not
exceed the sum of $33,600.00.
ADDITIONAL PROVISIONS set forth in suceeding pages hereof constitute a part of
this agreement.
IN WITNESS WHEREOF, the parties hereto have executed this agreement as of the
day and year first above written.
~/~') DISTRIQT / ,~_~DUBLIN
-A~A ' BOARD OF SUPERVISORS MAYOR
COUNTY FLOOD CONTROL
AND WATER CONSERVATION DISTRICT
Approved as to Form
KELVIN H. BOOT.~ JR., County Counsel
by ~'~
CITY OF DUBLIN
Approved as to FOrm
ELIZABETH SILVER, City Attorney
l~/' ' ~
'·2,
page two of two
FEDERAL AND STATE AUDITS. Until the expiration of five years after the
furnishing of any services pursuant to this Agreement, DUBLIN shall.make
available, upon written request, to the federal/State government.o~ any of
their duly authorized representatives, this Agreement, and such books,
documents, and records of DUBLIN that are necessary to certify the nature
and extent of the reasonable cost of services to DISTRICT. If DUBLIN
enters into any Agreement with any related organization to provide services
pursuant to this Aoreement with a value or cost of $10,000 or more over a
twelve-month period, such Agreement shall contain a clause to the effect
that until the expiration of five years after the furnishing of sergices
pursuant to such subcontract, the related oroanization shall make
available, upon written request, to the federal/State government or any of
their duly authorized representatives, the subcontract, and books,
documents a~d records of such o~anization that are necessary to verify
nature and extent of such costs.-' This paragraph shall b'e of no force and
effect when and if it is not required by law.
MODIFICATION. No alteration or variation of the terms of this Agreement
· shall be valid unless made' in writing and signed by Dublin's City
Manaaer and {he District's Public Works Director.'Any modification to
increase the total amount to be paid by DISTRICT to DUBLIN shall require
the recommendation of the Management Committee of the Alameda County Urban
Runoff Clean'Water Program. Modification to increase the total amount
paid to DUBLIN by DISTRICT by no more than twentyfive percent (254) shall
be valid when made in writing and signed by DUBLIN's City Man'ager and the
DISTRICT's Public Works Director.
HOLD HARMLESS/INDEMNIFICATION. DUBLIN shal~l"indemnify DISTRICT, its
offic6rs and employees against liability for injury or damage caused by a
negligent act or omission of DUBLIN in the performance of this Agreement
and shall hold DISTRICT harmless ~rom any loss occasioned as a result of
the performance of this Agreement by DUBLIN. DISTRICT shall indemnify
DUBLIN, its officers and employees'against liability for injury or damage
caused by a negligent ~ct or omission of DISTRICT in the performance of
this Agreement and shall.hold DUBLIN harmless from any loss occasioned as a
result o~ the performance of this Agreement by DISTRICT.
PAYMENT.. Payment to DUBLIN'W~ll be ~ade only upon presentation of proper
claim by DUBLIN subject to the approval of DISTRICT for which the services
have been completed.
A79376
sCOFF OF 'vVORK
PERVIOUS CONCRETE & SAND FILTER PtLOT STUDY
TASKS
The work will be conducted according to the City 6f Dublin's conceptual
proposal to develop and demonstrate the performance of a pervious concrete
· and sand filter system. The proposal Pervious Concrete & Sand Filter Pilot '
Study Prooosal dated August 1992 is incorporated into this agreement by
reference. The work described in this proposal will be completed and twenty
(20) copies of the final report submitted within the term of this agreement.
'F'~NAL REPORT FORMAT
The following report format is recommended to describe the study and its
results. The seven main sec.¢ions of the report are indicated by the headings
numbered I thru VII. Additional subsections may be added to the reoort
provided they fit within one of the main headings.
Recommended Report Format :
ExecuTive SummaW
Introduction
'.~ackground
Methodology
'V.
P, esuIis
Discusslon ·
A. EvMu~don of the effectiveness of polluzan-Z removal ~chieved by the p.o~ project
zechnology(ies)-; ' " , '
Ev~lu~tion of the spplicsbi~ity of~he techno,Ogy[~es] use~ to other conditions
~ollowing type of crkeria ..
' "'' · CounW
situ~¢ons ~ound wt=n n 'A]amed~ Cobmy - D~scribe the
~or use of the technologY ss may pem~in~zo use in o~hsr Ai~mea~
situations: sp~ce requirements; flow qd~mt]ti~s ~nd qu$1iW requ[rem~m~s;
· [equiremems; ~mounts end ty2eS
relt~bll ~, operation end m~n~en~nce
wastes generated; =~ ~?'~,- of th- technoloay(ies) used comp~reo
Evs~uat]on of the cos~-e~iecdbeness =
C, , : ~ch~ev[ng po[luZ~q( ~aductlons
other me~hods o}
Vii. SummeEy' and ConclUsion . .
The Three items listed under the Disc. Oss~on hea~tng
-select the project forimp~ement~d°n~ ~hesac~heda shs~i be ~u~her evslusted~ndd8scr~bed in
the repo~. Aqy deficiencies ininformatl°n needed
included in the rapo~ so that the limlzations c.f the study results are clearly descrlbed. .:...
EXHIBIT B
Payment Schedule
DISTRICT will pay DUBLIN for conduct of the pervious concrete pilot study
upon submission of a completed statement at the conclusion of each.phase of
the pilot study. Each statement shall include the agreement number, details
of tasks performed for the corresponding phase, personnel (staff or
contractor) performing the task, and total amount of dollars to be p~id by
DISTRICT for each task.
DISTRICT wilt pay DUBLIN within thirty (30) working days of receipt by'
DISTRICT of an invoice from DUBLIN. It is agreed and understood that the
line item costs for each project phase are estimates.
PROJECT PHASES AND COSTS
1. DESIGN ..................... ' ............... $ 1,000.00
2. CONSTRUCTION .................. ~ ........... 27,000.00
3. SAMPLE COLLECTiON/ANALYSIS .... ~ ............ 4,600.00
4. FINAL REPORT ..................... ' .......... 1.000.00
' $33.600.00,
TOTAL NOT TO EXCEED ......... ... ......
A79360