Loading...
HomeMy WebLinkAbout4.04 Award of Bid 98-08CITY CLERK AGENDA STATEMENT CITY COUNCIL MEETING DATE: September 1,1998 SUBJECT: Award of Bid - Contract 98-08 Shannon Park Pedestrian Path Report Prepared by: Lee S. "(hompson, Public Works Director EXHIBITS ATTACHED: 1) Budget Change Form 2) Resolution 3) Bid Results RECOMMENDATION: 1) 2) Approve additional appropriation in the amount of $1.686 Adopt resolution awarding bid to W. T. Cook Construction FINANCIAL STATEMENT: Desigrdlnspection/Field Staking Construction Improvements Miscellaneous (LegaI, Pemfits) TOTAL BUDGET Shannon Center Pedestrian Path $1.050 6.500 250 $ 7.800 The low bid received, $7,795.42, exceeds funds budgeted for constrgction. Allowing for a 5% contingency, an additional appropriation in the anmunt of $1,686 is needed for this proj eot. DESCRIPTION: On August 4, 1998, the City Council authorized Staff to solicit bids for construction of a pedestrian path at Shannon Park. This project was originally budgeted in Fiscal Year 1997-98 but was not completed. The City Council has approved a budget change to re-appropriate funds for construction in the current fiscal year. In the recent past, residents have been traversing the slope between the existing bike path along the west side of San Ramon Road and the service parking area at the rear of Shannon Center. A temporary path has resulted from this trailblazing and may present a hazard to the users. This project will construct a paved path on the previously graded slope. g:\miscproj~shn n pathLagstawrd COPIES TO: Bidders ITEM NO. Tile project has been identified in the City Council's adopted Goals and Objectives. A total of five bids were received. The low bidder was \V. T. Cook Construction with a bid of $7.795.42. which exceeds funds budgeted for construction. An additional appropriation is necessary to complete the project. Staffhas reviewed the low bidder's proposal and checked with references and recommends that the City Council (1) approve an additional appropriation in the amount of $1,686 and (2) adopt the resolurion awar'ding Contract 89-08 to W. T. Cook Consffuction. Page 2 CITY OF DUBEIN BUDGET CHANGE FORM CHANGE FORM # New Appropriations (C ty Council Approval Required): X From Unappropriated Reserves Budget Transfers: From Budgeted Contingent Reserve (1080-799.000) Wifltin Same Department ActiviB' From New Revenues Between Departments (City Council Approval Required) Otiler :::::¥:: ', ' ....... Name' Shannon Pedestrian Path'~.% CI? Name: #9541 Construction $1.686,00 Account #: Account #: 001-95-~1-750-050 Name: Name: Account #: Account #: Name: Name: Account #: Account #: City Manager: Date: Signature ~EASON FOR BUDGET CHANGE ENTRY: Bids received exceed budgeted funds Date: Mayor: Signature Posted By: Signature Date: RESOLUTION NO. -98 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF DUBLIN AWARDING CONTRACT 98-08 SHANNON PEDESTRIAN PATH TO W. T. COOK CONSTRUCTION. WHEREAS, the City of Dublin did, on August 25, 1998, publicly open. examine, and declare all sealed bids for doing the work described in the approved Plans, Specifications, and Modifications for Contract 98-08, Shannon Pedestrian Path, authorized by the City Council on August 4, 1998, which Plans, Specifications, and Modifications are hereby expressly referred to for a description of said work and for all particulars relative to the proceedings under the request for bids: and WHEREAS, said bids were submitted to the City Engineer, who has recommended that the bid hereinafter mentioned is the lowest and best bid for doing said work. NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Dublin does hereby award City of Dublin Contract 98-08 to the lowest responsible bidder therefor, to wit W. T. Cook Construction, with a bid of Seven Thousand Seven Hundred Ninety Five Dollars and Forty Two Cents ($7,795.42), the particulars of which bid are on file in the Office of the City Engineer. PASSED, APPROVED AND ADOPTED this I st da3' of September. 1998. AYES: NOES: ABSENT: ABSTAINING: Mayor ATTEST: City Clerk g.. imiscproj2hnnpathlresoawrd - SHANNON PARK PED. PATH, CONTRACT NO. 98-08 oPENING DA'[E -AUGUST 25, i998- UNIT ITEM DESCRIPTION MEASURE Clearing, Grubbing & Grading LS Headeib0ard LF A.C. PaUl LF TOTAL BID: UNIT ITEM DESCRIPTION I & Grading LS Heade~b0~rd ' LF A.C. Path LF TOTAl. BID: w.T.CooK VARGAS & ESQUIVEL TOTAL UNIT PRICE PRICE $ 3183.7.~i $ 3,~37.81 $ ..... 5.96 $-2,384.00 $ $ 1,5'73.61$ 1,573.61 $ I $ 7,795.42 J.A.GONSALVES I TOTAL UNIT PRICEI PRICE $ 2,500.00 $ 2,500.00 $ 6.00 $ 21400.00 $ 51o0o.o0 $ 5,ooo.oo $ 9,9oo.00 UNIT PRICE TOTAL $ 2,000.00 $ 2,000.00 $ $ 6,849.00 $ 8,849.00 8.R.P UNIT PRICE TOTAL $ 2,800.00 $ 2,800.00 $ 5.50 $ 2,200.00 $ 6,500.00 $ 6,500.00 $ 11,500.00 GRADETECH JNIT PRICE TOTAL PRICE[ $ 2,000.00 $ 2,000.00 I $ 0.01 15 4.00! $ 7,866.00/ $ 7,866.00I 9,870.00